This document contains attachments with as-built drawings and details related to the utility systems at the Caneel Bay Resort in the U.S. Virgin Islands. The attachments show the layout and configuration of the water supply, sewage, and irrigation systems at the resort.

The related federal contract opportunity is a Request for Proposals (RFP) issued by the Department of the Interior National Park Service to conduct a Non-Time Critical Removal Action (NTCRA) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) at the Caneel Bay Resort within the Virgin Islands National Park. The work includes removing approximately 13,000 bank cubic yards of contaminated soil and landfill refuse and 40 cubic yards of contaminated sediment, transporting the material to appropriate disposal facilities, and performing limited site restoration. The estimated contract value is between $5,000,000 and $10,000,000. This is a best value, negotiated procurement set-aside for small businesses. Proposals are due approximately 30 days after the RFP is posted on SAM.gov.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CBIA_NPS008575

yore itary TE exist Bek CAP.

SP POTASLE. WATER UNE,

Pa LaF DIST FLO, NO 1S (ABANDANED)

(SEPTIC TAMILSCSTANDE

Auay Ce

MRCAMCCAL SOUNT La eiskreo.

PRESSURE. Ut STAN

Horan. bub,ISTBOGraneey) pol USTELD NOG feranoev)

ALS.P) GRATITY: FLOW

EFLUENT LINE.

bist. pio no-4

(STANDEY

YO" prep

CETANOEE

MAINSSEWAGE

ELECTION STATIONS

BIT BO few

{RBENDSNED)

fo naisAg

EWAGE PLANT

(EPELUET S1SCHAR

seas ERvIGdT Coven, WRECK INV: OF co

Lelie cay.

eat. yLeki ele. REIN ENE PPE. WiTM CASKET,iM \ a hee AARERSINTAKE & Bae RA ay | af fat

Lee POE MOUNTED ON CORIOSION

CUMPS IW PARALLEL (NEW PDIAP TO JAATCH

NG)

ues re Lo

VEVEL SWITCHES 42/8 LEVEL TO OPERATE PUAAP

Existia Pume piel. - LEVEL TO OPERATE. pUAES oy

SMTA ES SELECT. STARTERS TO BE ENCLOS

ASWING [AGHT ON PUMP Ne pos fo. SWHEM [NSOpearionMprercnape nae mo

[ESRI ATION LER

MAN

HASH PIP

DIRECTION OF FLOW

2o'a's G-o" Miah

EXMET- GRAVITY TANK

GAL. Capacity”

AMICAG JOINT!

the, EINE

REVISION

CANE EL BAY. AREAS:

SEWAGE DISPOSAL 'ENRRIGATION:

SYSTEMS: Seana

UTILETY. SYSTEMS-AS BUILT

ICANEEL, BAY. PLANTATION

SoVLRGIN' \GEANDS

Attachment 4, As-Built Drawings and monitoring well details at Caneel Bay Resort

CBIA_NPS008575, utility system as-builts

VALVE BOX

WH 3 VALVES

New Ware PRMART Te ESTING Bes ear BOSTING WATER SUPPLY LINECANEELigTERNS CONNECTED. UNDER

UNITS GAL”

OS TIES NEW. WATER PRIMARY”EapsTond: PE

WATER TREATMENT

PLANT AND PUMP

poy:

[168° rae

CTRICALge PoemE STRICALMAN HOLE Mea

NE Ce ROE eggs ME Ce oy

N SEWER er Se

INTO EXISTING 6° PVC

& REPLACE VALVE

“este yore Ve

FIRST FLOOR SLAB

SALT JEDP

INTAKE op pe

Sees en CSE : CAR cunei wien SEE,STORM. BISPLA‘isting Conditions

"DE HAAS "ASSOC! og|"ARCHITECTS PLANNERS”

6100 REDHOOK QUARTERS

ST. THOMAS, U.S.V.I., 00802

~GANEEL BAY RESORT

WATERTRENCHPLAN

STe JOHN, USVI.

"SHEET.NUMBER:

CBIA_NPS008576

CBIA_NPS008576, water trench plan

{ revige 35 woogen pale with serossearm &@LISKY as ulata:

Exist Sti Mew pole with @SKVA Fransformer PLAGE ING Note, 7AOOK > 2O8S//EOV, type W “Splase, Provide PO Maura koon .

G-wire, pole moun fed. Baen emen mng grounding

Drep pass). faceiy at OFpane oh fee wats,- to an

= dea under ditch

Reeduaing e/Dow-with TOR fewpe

ERY)LakV he inet ag 3"above wer : primary Feaderos een aver. “present QuyING. BF fe new im

Lgguing as required.prove valve incl. valve box Gate forT-wrench and fe@ens Fae

PRON

a operation(emergency only).

“eng:

pO po

ERIS TIDEpore, le existing puinp ia cr vuoder excep?

Bry Terrace. Fernstal!foal; aeCESS-dischargeOres, }replace check valve with 3° Cleytean valve #404 Sa D fi ible.

(constant flow ).SeF pilat that ey,wi the.

intermediate suctio.

overflow whenstage:

Valve 8e cistern wilh ror fais pump ana cisferh pump running.instali‘Staff’ are altitude gauge On DUIPe Or 35 Fi. Mark suction, ELECTE leve/ range:

cistern. See oi dragr SA | ain, FALEbelow plan Provide &" conc. base under New 8pump potable and conc. apron in alt water — directrans from purnp. storage| Existingbumped4"pal able water p e e r s

Ling feoreservair. |r Run pipe Lo thru scheduie | 40 block steel sleeves onder rocdsond§5:

beypond paverneart a e s (typical

SECTION

Connect pump discharg fo 8 line ge thrugate valve

“Or Sewree?pire feesey Pee, Poof SenoPhee

Sure Uaths fon, wWeerlan pum. ies vo / ra LOM, (ate MOP ES.

en traf.

Ble Foten tric

[vay Lac.

fon Gh ic stat, foecear ee te fi HOE Prévide Clearance

70. renave CACCK eedpPOCKAGES SUAROFA-Guides An Gr

(nofane Ors) Ose

See NOL 08 ALAR werter-to rer CANEEL..TROT BAY, Hasse cy ry ST. JOHN, IES OPS pRovect 19E

Adapter to barge!AOS

BainsmaaannatsetindecereeraterannovavaennetAINSI CBIA_NPS008580

CBIA_NPS008580, potable water storage eB GIA B eq io en ce fophensraxe pumeLe e so u

T ao

C O

N S tY ep ea ar aBNORMAL BERD,crstean NES

E H

N E

S S rscoinneemyy ODT es wot pen

Ingor waren covektionPag Z o

S q re ea ce n ea n p an eo te

Me a

\Mugs roe > SaGocpSALee >

L E

G E

N O poop W A

T E

R coLLEcTIgNROOF W A

T E

R C

O L

L E

G

IO

N Lines M

A N

H O

L E

S coheed WA N, A N o

R cu as eD WATER INT A oS

|U T

IL

IT

Y

S Y

S T

E M

S *A

S BUILT

C A

N E

E

L BAY

P L

A N

T A

T

IO

N

ST. JOHN, U

.S

'V

IB

R G

IN

IS

L

A N

G

C B

IA

_N

P S

008594

CBIA_NPS008594, utility system as-builts, 7AB

Vanasse Hangen Brustlin, Inc.

100 State St. Suite 600 Montpelier, VT 05602

(802) 229-4600

Easting (ft): 842844.551 Horizontal Datum: NAD83 Northing (ft): 1226027.693 Vertical Datum: NAVD88

Project: Caneel Bay Resort Site Location: St. John, U.S. Virgin Islands Project Number: 58345.21

Soil Logger: TRO Start Date: 2/23/2021 End Date: 2/23/2021

Ground Elevation (ft): 27.8506 Well Logger: TRO Reference Pt. Elevation (ft): 27.8506 Date Installed: 2/23/2021

Elev. Depth

(ft) (ft) Lithologic Description Notes

See boring log for SC-3-09.

Se e

SC

-3

-0

L og

Well located next to SC-3-09 Boring Location

Steel Guard Pipe

Grout

Bentonite Seal

Filter Sand

Drilling Company: OnSite Environmental Borehole Depth (ft bgs): 16 Filter Pack Interval (ft bgs): 7.5-16 Drawn by: TEH Drilling Method: Hollow Stem Augers Borehole Diameter (in.): 8 Well Screen Interval (ft bgs): 9-14

Drilling Rig: Geoprobe 6620DT Well Diameter (in.): 1.5 Depth to Groundwater (ft bgs): dry Revision: 0 Drilling Fluid: None Sampling Method: None Page 1 of 1

AR-001771

Vanasse Hangen Brustlin, Inc.

100 State St. Suite 600 Montpelier, VT 05602

(802) 229-4600

Easting (ft): 842844.293 Horizontal Datum: NAD83 Northing (ft): 1226027.501 Vertical Datum: NAVD88

Ground Elevation (ft): 25.0775 Reference Pt. Elevation (ft): --

Project: Caneel Bay Resort Site Location: St. John, U.S. Virgin Islands Project Number: 58345.21

Soil Logger: TRO Start Date: 2/21/2021 End Date: 2/21/2021

Well Logger: N/A Date Installed: N/A

Elev. Depth

(ft) (ft) Lithologic Description Sample ID Notes

0 Dark Gray (7.5YR4/1), dry, sandy SILT (ML); little gravel and wood/roots/grass

Dark Gray (7.5YR4/1), dry, sandy SILT (ML); little gravel and wood/carpet backing material No Recovery

Gray (7.5YR5/1), dry, sandy SILT (ML) with wood fragments

Dark Gray (7.5YR3/1), dry/moist, sandy SILT; some coarse gravel Pale Yellow (5Y7/4), moist, gravelly SAND (SW) with woody material Light Gray (10YR7/2), fine SAND (SW) No Recovery

Grayish Brown (2.5Y5/2), dry, sandy SILT (ML); little gravel with plastic, shells, carpet fibers

Black (2.5Y2.5/1), moist, sandy SILT (ML); trace gravel with woody material

Gray (2.5Y5/1), moist, silty SAND (SW); little gravel

No Recovery

Gray (2.5Y5/1), moist, silty SAND (SW); little gravel

Dark Grayish Brown (2.5Y4/2), moist, stiff, gravelly SILT (ML); some sand

Light Gray (2.5Y7/2), dry, very stiff, sandy GRAVEL (GM)

No Recovery

Very Dark Gray (2.5Y3/1), moist, gravelly SILT (ML); little sand

Brownish Gray (2.5Y6/2), moist, silty SAND (SW); some gravel

Light Brown (7.5YR6/4), dry, stiff, gravelly SAND (SW)

Gray, dry, Rock fragments

1.6

0.3

1.6 1.0

SANDY SILT

SANDY SILT

NR

SANDY SILT

SANDY SILT

GRAVELLY

SAND

SAND

NR

SANDY SILT

SANDY SILT

SILTY SAND

NR

SILTY SAND

GRAVELLY SILT

SANDY GRAVEL

NR

GRAVELLY SILT

SILTY SAND

GRAVELLY

SAND

Rock

NR

No Waste Characterization Sample Collected

SC-3-09(0-3)

SC-3-09(3-6)

Drilling Company: OnSite Environmental Borehole Depth (ft bgs): 19 Filter Pack Interval (ft bgs): N/A Drawn by: TEH Drilling Method: Direct Push Technology (DPT) Borehole Diameter (in.): 3 Well Screen Interval (ft bgs): N/A

Drilling Rig: Geoprobe 6620DT Well Diameter (in.): N/A Depth to Groundwater (ft bgs): -- Revision: 0 Drilling Fluid: -- Sampling Method: Macrocore Dual Tube Page 1 of 1

AR-001785

CBIA_NPS008575, utility system as-builts
CBIA_NPS008576, water trench plan
CBIA_NPS008580, potable water storage
CBIA_NPS008594, utility system as-builts 7AB

File details come from the government source that posted it. Updated .