This document is a technical specification (Section 33 56 10) for the factory fabricated fuel storage tanks and accessories required for a federal contract opportunity. The key details are:
The contract will construct a fuel farm and dispensing system, including the installation of four 5,000 gallon above ground gasoline storage tanks, one 5,000 gallon above ground diesel tank, a fuel dispensing and tracking system, concrete pad and shelter, underground utilities, and other supporting infrastructure. The technical specification covers the requirements for the fuel storage tanks, piping, dispensing equipment, leak detection monitoring system, fuel tracking system, and other accessories. It includes information on standards, submittals, quality assurance, and testing and inspection requirements. The work is part of a larger solicitation (Solicitation Number: 140P2024R0069) being issued by the Department of the Interior National Park Service National Office.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KALA – 248432 33 56 10 -1
FACTORY FABRICATED FUEL
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
SECTION 33 56 10 – FACTORY FABRICATED FUEL STORAGE TANKS AND ACCESSORIES
PART 1 GENERAL
1 .1 DESCRIPTION
A. Section includes the furnishing, fabrication, delivery and installation of aboveground fuel storage system complete, including but not limited to the following:
1. Aboveground fuel storage tanks and accessories for gasoline and diesel, including supports.
2. Fuel and vent piping system.
3. Fuel Dispensing pump assembly.
4. Fuel Tracking System, including tracking system software package.
5. Automatic Tank Gauging and Leak detection monitoring system.
6. Pipe, valves, fittings, hangers and supports.
7. Electrical conduits, wiring, and components pertaining to the monitoring and control system.
8. Portable fire extinguisher and cabinet
9. Operation and maintenance instructions and manuals.
10. Manufacturer's literature, shop drawings and record drawings.
11. Inspection, test, and guarantee.
1 .2 CODES, STANDARDS, REGULATIONS
A. Installation of all work in this section shall be made in accordance with State Department of Health Regulations, National Fire Protection Association, and the Building Code of the County of Maui.
B. All applicable codes, regulations and ordinances of public bodies having jurisdiction are considered a part of these specifications; all work installed and materials provided must comply with the current edition of such codes, regulations and ordinances.
C. Present to the Contracting Officer certificates of inspection and approval from proper authorities.
KALA – 248432 33 56 10 -2
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
1.3 REFERENCES
A. American National Standards Institute (ANSI):
1. ANSI B16.3 – Malleable Iron Threaded Fittings.
2. ANSI B16.39 – Malleable Iron Threaded Pipe Unions.
3. ANSI B16.9 – Factory-Made Wrought Buttwelding Fittings.
4. ANSI Z535 – Safety Alerting Standards.
5. ANSI/MSS SP-58 – Manufacturers Standardization Society: Pipe Hangers and Supports
– Selection and Application
B. ASTM International Publications:
1. ASTMA27/A27M – Carbon Steel Casings for General Application.
2. ASTM A36/A36M – Standard Specification for Carbon Structural Steel
3. ASTM.A53 - Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless.
4. ASTM A312 – Standard Specification for Seamless and Welded Austenitic Stainless Steel Pipes
5. ASTM A351 – Standard Specification for Castings, Austenitic, for Pressure Containing Parts
C. National Fire Protection Associations (NFPA)
1. NFPA 10, 2018-- Standard for Portable Fire Extinguishers
2. NFPA 30, 2018– Flammable and Combustible Liquids Code.
3. NFPA 30A, 2018– Code for Motor Fuel Dispensing Facilities and Repair Garages.
4. NFPA 70 – National Electric Code.
5. NFPA 704 – Standard System for the Identification of the Hazards of Materials for Emergency Response.
D. Occupational Safety And Health Administration (OSHA)
1. 29 CFR 1910.1200 – Hazard Communication.
E. Underwriters Laboratories, Inc. (UL)
1. UL 142 – Steel Aboveground Tanks for Flammable and Combustible Liquids.
2. UL 299 – Dry Chemical Fire Extinguishers
KALA – 248432 33 56 10 -3
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
3. UL 2085 – Protected Aboveground Tanks for Flammable and Combustible Liquids.
4. UL 698 – Safety Industrial Control Equipment for Use in Hazardous (Classified) Locations.
5. UL 886 – Safety Outlet Boxes and Fittings for use in Hazardous (Classified) Locations.
1.4 CONTRACT DRAWINGS
A. Contract drawings are essentially diagrammatic, indicating general layout and approximate locations toward establishing the scope for uniform estimating basis. Equipment specified in this section, such as the fuel tanks and fuel dispensers, may differ in dimension and configuration by manufacturer. Equipment and piping arrangements shall fit into space allotted and shall allow adequate clearances for servicing and maintenance. Reasonable modifications to indicated locations and arrangement to suit job conditions shall not constitute basis for requesting additional funds from the NPS.
B. Capacities of all equipment and materials shall be not less than those indicated.
C. Nameplate: Each major component of equipment shall have the manufacturer's name, address, and catalog number on a plate securely attached to the item of equipment.
D. Verification of Dimensions: The Contractor shall be responsible for the proper relation of his work to the building structure and to the work of all trades. The Contractor shall visit the premises and thoroughly familiarize himself with all details of the work and working conditions, to verify all dimensions in the field, and to advise the NPS of any discrepancy before performing any work.
1.5 ACTION SUBMITTALS
A. Submit the following in accordance with Section 01 33 23 – Submittal Procedures:
B. Product Data: Submit product data for the following:
1. Aboveground fuel storage tanks and accessories, including supports.
2. Fuel Dispensing Pump Assembly
3. Fuel Tracking System, including tracking system software package.
4. Automatic Tank Gauging and Leak detection monitoring system.
5. Pipe, valves, fittings, hangers and supports.
6. Portable fire extinguisher and Cabinet
C. Shop Drawings: Submit shop drawings of plans, performance data and details showing locations and installation including but not limited to the following.
1. Aboveground fuel storage tanks and accessories. Shop drawings shall identify tank dimensions and locations of all tank mounted accessories, including but not limited to, KALA – 248432 33 56 10 -4
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024) fill ports, tanks gauge ports, manways, vents, primary and secondary emergency vents, overfill prevention valves, leak detection probes, and inventory probes.
2. Fuel dispensing pump assembly. Shop drawings shall identify dispenser dimensions, and locations of accessories including, but not limited to, fuel piping connections, fuel pumps, fueling nozzles, and electrical and communication connections.
3. Fuel tracking system. Shop drawings shall identify dimensions, and locations of accessories including, but not limited to electrical and communication connections.
4. Fuel and vent piping system.
D. Operation and Maintenance Manuals: Submit in accordance with 01 78 23 Operation and Maintenance Data:
1. Aboveground fuel storage tanks.
2. Fuel dispensing pump assembly
3. Fuel tracking system.
4. Fuel tracking system software training manual.
5. Automatic Tank Gauging and Leak detection monitoring system.
6. Tank level probes.
7. Remote alarms.
8. Tank interstitial sensors.
9. Containment sump sensor.
1.6 INFORMATIONAL SUBMITTALS
A. Quality Standard Compliance Certificates:
1. Aboveground fuel storage tanks.
2. Automatic Tank Gauging and Leak detection monitoring system.
3. Fuel dispensing pumps
4. Pipe, valves, and fittings.
B. Guarantee and Certificate: Submit one year guarantee and certificate.
KALA – 248432 33 56 10 -5
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
1.7 OMISSIONS
A. It is the intent of the plans and specifications to provide a complete installation. Should there be omissions, the Contractor shall call the attention of the NPS to such omissions fifteen (15) days advance of the date of the proposal so that the necessary corrections can be made.
1.8 QUALITY ASSURANCE
A. Standard Products: Materials shall be resistant to the fuel and other petroleum-based products conforming to requirements of FS VV-F-800, "Fuel Oil, Diesel". Completed installation shall conform to applicable requirements of NFPA 30, "Flammable and Combustible Liquids Code".
B. Permitting: Contractor shall obtain necessary permits in conjunction with installation of underground petroleum piping as may be required by federal, state, or local authority. Submit copy of permits to the Contracting Officer.
C. Licensed Personnel: Personnel required to install underground petroleum piping shall be licensed/certified by the State of Hawaii. Submit copy of license/certification to the Contracting Officer.
D. Safety: Ensure employees are trained in the requirements of 29 CFR 1910.1200, "Hazard Communication", and understand information contained in material safety data sheets for their protection against toxic and hazardous chemical effects.
E. Warranty: Provide a minimum 20 year warranty for each aboveground storage tank. The warranty shall cover (1) against release of stored fuel from the secondary containment tank; (2) against failure of the primary tank caused by non-corrosion related cracking, breaking or collapse; and (3) perforation of the primary tank caused by internal corrosion as long as the product stored within the tank is compatible with steel.
PART 2 - PRODUCTS
2.1 MATERIAL AND EQUIPMENT
A. All materials shall be new, of equal or better quality of materials specified, and approved by the Contracting Officer. For ease of maintenance and parts replacement, select equipment from a single manufacturer as much as possible.
B. All materials shall be suitable for the service intended. Service will be No. 2 fuel oil (diesel) or gasoline, as indicated.
2.2 ABOVEGROUND FUEL STORAGE TANKS
A. General: Tanks provided shall be of the type described in paragraph 2.2.B. Each provided AST shall be UL listed for compliance with UL 2085, as an insulated, secondary containment aboveground storage tank, protected type. Each tank shall bear the UL label in compliance with UL 2085.
KALA – 248432 33 56 10 -6
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
B. Secondarily Contained (Steel Vaulted) Tank: Tank system shall include a primary storage tank and an integral fully enclosed secondary containment reservoir. Tank system shall be in accordance with NFPA 30 and NFPA 30A. Tank system shall be designed and manufactured for horizontal installation. Primary storage tank shall be constructed of single wall steel in accordance with UL
142. Containment reservoir shall be single-wall steel conforming to UL 142. The interstitial space between the storage tank and the containment reservoir shall be filled with a 2-hour fire rated insulating concrete inhibitor in accordance with UL 2085. Tank system shall bear the UL 2085 label. The volume of the containment reservoir shall be greater than or equal to 110 percent of the primary tank volume. The primary storage tank shall be supported within the containment reservoir with steel tank saddles, or other similar supports, fabricated and attached by the tank manufacturer.
Tank system shall be mounted on steel saddle support bases and provided with lifting lugs which allow tank system relocation.
C. Tank Exterior Protective Coating: Tank exterior protective coating shall be a high-performance coating suitable for corrosive or marine environments. The coating shall be capable of withstanding 500 hours exposure to the salt spray test specified in ASTM B117. Color shall be white or as indicted on the architectural drawings.
D. Tank Interior Protective Coating: Tank shall be provided with an interior protective coating in accordance with manufacturer's recommendations. Coating shall be compatible with fuel being stored.
E. Tank Manway: Tank manway shall be provided with a manway cover. Tank manway shall have an internal diameter of 18 inch as indicated. Tank manway shall be provided with a matching flanged watertight manway cover. Manway covers shall be constructed of cast steel in accordance with ASTM A 27/ A 27M, grade 60-30 as a minimum. Manhole covers shall be for nontraffic.
F. Tank Piping Penetrations: The number and size of tank piping penetrations shall be provided as indicated. All threaded connections shall be 316 stainless steel. Dielectric bushings shall be provided on all pipe connections to a tank when connecting dissimilar metals. Pipe connections to a tank shall be through welded-in-place double tapered NPT couplings. The termination of fill lines within a tank shall be provided with an anti-splash deflector. Tank suction line shall be provided with a foot valve to prevent line drainage.
G. Tank Signage
1. The tank shall be provided with signs affixed to the tank exterior in a visible location.
The signs shall be red letters on white background with minimum size 3" high, 1/2" stroke. The signs shall indicate the following:
a. "NO SMOKING OR OPEN FLAMES WITHIN 25 FEET" on all approachable sides and dispensing area within 25 feet.
b. For gasoline tanks: "DANGER-FLAMMABLE LIQUID" on all approachable sides, 3" high, 1/2" stroke, red letters on white background.
c. For diesel tank: "DANGER-COMBUSTIBLE LIQUID" on all approachable sides, 3" high, 1/2" stroke, red letters on white background.
d. Warning labels conforming to NFPA 704 Hazard Labeling System on all approachable sides (12" square, NFPA standard style and colors).
KALA – 248432 33 56 10 -7
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
e. The tank shall be provided with a label indicating its empty lifting weight (1" high, 3/16" stroke).
2. The diesel and gasoline tanks shall be provided with labels affixed to the tank exterior indicating the following information:
a. "CAUTION: This tank to contain only petroleum products" at the fill port (3/4" high, 1/8" stroke).
b. "xxxx GALLONS" is the actual compartment capacity near the fill port. Contractor shall insert actual tank capacity for tank furnished.
c. "FILL" at the fill port.
d. "VENT" at the vent riser.
e. "EMERGENCY VENT" at the emergency vent fitting.
f. "MONITOR TUBE" or "TEST WELL" at the monitor tube.
g. “Owner/Operator: National Park Service”: 1” H x 1/8” stroke letters, red on white, on or under the dispenser on tank.
h. NFPA 704 identification of the fire hazards of material placards. On all approachable side of tank.
KALA – 248432 33 56 10 -8
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
i. “IN CASE OF FIRE OR SPILL
1) Use emergency pump shutoff
2) Report the accident:
3) Fire Department No. _________________
4) Facility Address:___________________”
5) 1” high x 3/16” stroke, red on white, on or under the dispenser on tank.
j. “PRODUCT I.D.” tag on fill pipe: 3/4” high letters, red on white.
H. Tank Fittings and Attachments: Provide each tank with the following fittings and attachments as indicated or required:
1. Tank mounted fuel port with spill containment and male camlock fill connection.
2. Supply drop tube with foot valve.
3. Tank level gauge fitting.
4. Free flow vent type for diesel and gasoline riser. Overall riser height as indicated.
5. Emergency primary and secondary vents. Sizes as indicated.
6. 1.5-inch anti-siphon valve with expansion relief to prevent draining tank in the event of a piping failure.
7. Interstitial leak detection connection with lockable cap, clearly marked.
2.3 STORAGE TANK ACCESSORIES
A. Storage Tank Fill Automatic Shutoff Valve: Shall restrict flow to 2 gallons per minute when tank reaches approximately 90% of capacity. Aluminum body, 2” threaded connection. Acceptable manufacturers and models, contingent upon compliance with contract documents: Morrison Bros model 9095C, OPW model 61fstop, or equal.
B. Storage Tank Emergency Vent: UL listed. Provide primary and secondary tank emergency pressure relief vents for all storage tanks, with aluminum body and lid, carbon graphite shear pin designed to break at 2.5 psi, spring loaded lid, stainless steel link designed to break at 3.5 psi and cast iron bar designed to break at 6.5 psi, and 8" connection. Acceptable manufacturers and models, contingent upon compliance with contract documents: OPW 202-F, Morrison Bros
KALA – 248432 33 56 10 -9
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
2440M, or equal. Provide aluminum emergency vent adapter for emergency vent tank connections less than 8".
C. Storage Tank Vent: Provide primary tank vents for all storage tanks, with aluminum body and 2" connection. Acceptable manufacturers and models, contingent upon compliance with contract documents: OPW 23, Morrison Bros 354, or equal. Provide vent riser with height as indicated.
D. Gallon Gauge: Clock style, readable from up to 20 feet, with reading in gallons with scale to suit tank size. High level indicated with red zone indicator. Provide with stainless steel float and cable.
Acceptable manufacturers and models, contingent upon compliance with contract documents:
Morrison 818C clock gauge, or equal.
E. Provide factory seismic restraint system.
F. Provide factory installed, OSHA compliant access ladder suitable for tank size.
2.4 FILL PORT WITH SPILL CONTAINMENT
A. Provide each tank with a fill port with spill containment. The filling connection includes a 3-inch quick coupler, swing check valve, and ball valve. The spill containment shall consist of a weather-tight box constructed of minimum 24 gauge steel, with a lockable weatherproof access door or lid.
The containment box shall hold a minimum of 15 gallons. Provide the containment box with a vent, a manual 1-inch drain valve, and a hand pump.
2.5 AUTOMATIC TANK GAUGING AND LEAK DETECTION MONITORING SYSTEM
A. The system shall be UL listed, intrinsically safe for use in hazardous locations. The system shall include the monitoring panel, remote displays, probes, sensors, alarm annunciators, sensor and control wiring, transformers, and connectors, supplied by a single manufacturer. Electrical connections below grade shall be buried service wire splice encapsulation kits. Provide PVC conduit with sweep elbows for all buried cable incidental to the monitoring and leak detection system. Acceptable manufactures, contingent upon compliance with contract documents: Veeder- Root or equal.
B. Monitor Panel: Provide a microprocessor-based wall-mounted monitoring panel capable of interfacing with the sensors, probes, and alarms specified hereinafter. The monitor shall be housed in a NEMA 4X stainless steel enclosure with visual indicators for power, alarm, and warning conditions. An 8-inch color touch screen display and an integral printer capable of providing a hard copy record of the amount of fuel dispensed in understandable English shall be provided. The monitoring system shall be suitable for continuous operation, reporting both normal operating conditions and system malfunctions or failures. The monitor panel shall include a printer and adequate number of relays with alarm capabilities for the following conditions: tank high water level, tank low liquid level, overfill, tank leak, piping leak and containment sump leak. The monitor shall be capable of monitoring up to 32 tanks and shall be capable of handling multiple sensors. User access and control at front panel touch screen shall be through user specific log-in.
User-defined roles shall be used to restrict access, and/or functionality. Provide cables, sensor/input/output/communications modules, connectors, battery backup and mounting and installation hardware. Acceptable manufacturers and models, contingent upon compliance with contract documents: Veeder Root TLS-450 Plus, or equal.
KALA – 248432 33 56 10 -10
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
C. Monitoring Panel Remote Connectivity: Provide the monitoring panel with web-enabled interface that will allow for remote monitoring of status and alarm conditions via a web browser on a computer or mobile device. Contractor shall coordinate with the Internet Service Provider to ensure compatibility with the cable modem being provided for the site.
D. Tank Interstitial Sensor: Provide a sensor for each tank which shall function in the leak detector tube of the interstitial space for the storage tank as indicated. The sensor shall meet NFPA 30, "National Electrical Code", Class I, Division 1, Group D for hazardous location. The sensor shall have the ability to detect the presence of liquid in the interstitial space and provide an alarm condition. The monitoring system shall have the ability to continuously monitor the integrity of the sensor for an open condition, alarm condition, or normal operating condition. Sensors shall be compatible with the fluid which it is monitoring.
E. Tank Level Probe: Provide an electronic, magnetostrictive wire probe for each tank with the ability to collect in-tank fluid height and temperature data. The probe shall interface with the monitoring panel which in turn shall be capable of providing on-demand inventory reports, which shall include fluid volume, fluid height, fluid temperature, date, and time. After a delivery of fuel to the tank has been completed, the system shall be capable of providing an inventory report on the monitor panel, which shall include the starting volume in the tank, ending volume in the tank, net increase in volume, date, and time. Probe shall be compatible with the fluid which it is monitoring.
F. Containment Sump Sensor: Provide a non-discriminating sump sensor for the containment sump under the dispenser. Sensor shall be compatible with gasoline and diesel. Sensor shall activate an alarm condition if liquid (fuel or water) level in the sump exceeds 1.84 inches. Provide with adequate length of cable to connect to the monitoring panel.
G. Remote Alarm Panel: Provide an alarm capable of providing both audible and visual warnings of a potential overfill to the operator making a fluid delivery to the tank. The alarm panel shall be equipped with a push button to provide the operator with the ability to acknowledge the alarm and silence the audible indicator. The alarm and acknowledgment switch shall be designed to operate in an outdoor environment. The audible alarm noise level shall be adjustable between 78 to 103 dB at 10 feet. Alarm enclosure shall be NEMA 4X rated. The signal for the overfill alarm shall be from the tank inventory level probe.
H. High Level Alarm Sensor: Provide a sensor which will function in the tank space of each storage tank as indicated. The sensor shall meet NFPA 30, “National Electrical Code”, Class I, Division I, Group D for hazardous location. The sensor shall have the ability to detect the presence of liquid at the high/overfill limit of the tank and provide an alarm condition. Sensor shall be compatible with the fluid it is monitoring. The tank inventory level sensor connected to the leak detection/automatic tank gauging system may provide this function.
2.6 FUEL PIPING SYSTEM
A. Piping:
1. Aboveground: Type 304 stainless steel, seamless, ASTM A312, Schedule 40. Piping system shall be threaded and/or welded.
2. Underground: Product pipe shall be Type 304 stainless steel pipe as specified for aboveground piping or shall be Fiberglass Reinforced Plastic (FRP) pipe shall be listed
KALA – 248432 33 56 10 -11
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024) in UL Flammable and Combustible Liquids and Gases Equipment Directory, and shall be chemically compatible with the fuel to be handled. Fittings, end connections and adhesives shall also be listed in UL Flammable and Combustible Liquids and Gases Equipment Directory and be chemically compatible with the fuel to be handled. Use only adhesives that have not exceeded the manufacturer's recommendations for shelf life and pot life. Secondary containment piping system shall be as specified in this section.
Provide monitoring port at low point for underground fuel piping system for buried pipe for each fuel type for visible inspection for leaks.
3. Grooved piping connections and crimped together connections are not allowed.
B. Fittings: Provide threaded or welded Type 304 stainless steel fittings, Class 150, conforming to ASTM A351 and ASME B1.20.1. Fittings shall be suitable for the working pressure and temperature of the service fluid and waste product. Threaded fittings shall be permitted for use as adapters to equipment, pumps, valves, etc.
C. Ball Valves: Provide ball valves where indicated, rated 150-pound class or class suitable for the temperature and pressure of the system, Type 304 stainless steel body and ball, teflon seats.
Valve materials shall be suitable for the service fluid and shall provide leak tightness.
D. Check Valves: Single poppet or ball check type, 150-pound class or class suitable for the temperature and pressure of the system. Type 304 stainless steel, valves, 2-inch and smaller, shall have screwed ends. Valves larger than 2-inch shall have flanged ends. Valve materials shall be suitable for the service fluid and shall provide leak tightness.
E. Basket Strainer: Provide simplex basket strainer with cast steel body, 316 stainless steel strainer baskets with no larger than 1/8-inch perforations, yoked cover and flanged end connections.
Strainer shall have a minimum pressure rating of 150 psi with a maximum clean pressure drop of
2.5 psi at indicated fuel flow rate. Strainer shall be suitable for use with fuel being handled.
F. Dry Disconnect Coupling: Provide dry disconnect coupling with aluminum body, Buna- N seal and flanged end connection. Truck end connection shall be in accordance with API standards.
Coordinate actual coupling to be provided with the NPS's fuel supplier.
G. Dielectric Unions: Provide when connecting pipe of dissimilar metals. ASME/ANSI B16.39, "Malleable Iron Threaded Pipe Unions Classes 150, 250 and 300 (ASME)", Class 250 pound.
Dielectric unions conforming to dimensional, strength and pressure requirements of FS WW-U- 531, Class 1. Union shall have water-impervious insulation barrier capable of limiting galvanic current to one (1) percent of the short-circuit current in a corresponding bimetallic joint. When dry, it shall be able to withstand a 600-volt breakdown test.
H. Gaskets: Provide woven non-asbestos fibers with fluorocarbon plastic binder or compressed with nitrile or neoprene binder compatible with fluid being handled.
I. Flexible piping connectors: Provide flexible piping connectors where indicated. Flexible connectors shall be all stainless steel construction, and shall be rated for a working pressure of 150 psig, as well as for vacuum service. Connectors shall be compatible with gasoline and diesel.
KALA – 248432 33 56 10 -12
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
J. Secondary Containment Piping System:
1. The secondary containment piping shall be fiberglass reinforced plastic (FRP) that is chemically compatible with the type of fuel to be handled, be non-corrosive, dielectric, non-biodegradable, and resistant to attack from microbial growth. Containment piping shall be capable of withstanding a minimum of 5 psi air pressure.
2. Provide internal supports as recommended by the containment pipe manufacturer at not more than 10 foot intervals. The internal supports shall be designed to prevent point loading on fiberglass piping and designed to allow for continuous drainage of the secondary pipe in place.
3. End seals and other subassemblies shall be designed to prevent ingress of moisture into the system. All subassemblies shall be designed to allow for complete draining of the secondary containment.
4. Field closures shall be made with split fiberglass closure sleeves of the same diameter and thickness of the containment pipe. The sleeve shall be sealed and bonded to the containment pipe with double hand lay-ups over all seams.
2.7 ANTI-SIPHON VALVE
A. Anti-siphon valve shall be aluminum or ductile iron construction, UL listed, stainless steel spring, factory adjusted head pressure setting, adjustable pressure setting, internal pressure relief valve. All materials shall be compatible with the fuel being handled. Acceptable manufacturers and models, contingent upon compliance with contract documents: OPW 199ASV, EBW 636 or equal.
2.8 FUEL DISPENSING PUMP ASSEMBLY
A. Dispensing system shall be a 2 product, 2 hose, 1 sided system equipped with hoses, nozzles, containment sump, complete and operable. The dispenser shall be equipped with two suction pumps, one for each product, for standard flow rates. Suction pumps shall be suitable for Class 1, Division 1, Group D locations.
B. Dispenser features: Provided dispenser with the following minimum features and accessories:
1. Dispenser frame shall be of a bolted interlocking frame design with powder-coated corrosion-resistant steel top cover, side panels and hinged cabinet doors. Lower and upper doors shall be lockable. Dispenser shall be two product, single sided and high hose configured type.
2. Two fuel hoses, one for each product type. Minimum 15 feet long. Provide with automatic fill nozzles with swivels and breakaways.
3. Two self-contained suction style v-belt driven positive displacement pumps, each with a 2 HP continuous duty motors. Pumping system shall include integrated strainer filtration, bypass valve, outlet control valve, atmospheric chamber, vortex style air eliminator, and self-lubricating bearings. Provide drain plug in filter cover. Minimum dry suction capacity shall be 12 inches Hg. Minimum wet suction capacity shall be 21 inches Hg.
KALA – 248432 33 56 10 -13
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
4. Two volumetric positive displacement meters with accuracy of +/- 0.3% for flowrates from 1.5 gpm to 26 gpm.
5. Shear-impact valves, located in the dispenser base.
6. FRP base sump containment.
7. Fuel type, gallons dispensed and price per gallon displays.
8. Integrated connectivity to fuel tracking system.
9. Dispensing signage at or near dispenser shall be in accordance with NFPA 30A.
2.9 FUEL TRACKING SYSTEM
A. Pedestal mounted fuel tracking system controller and software with interface panel located as indicated on the plans. The interface panel shall have keypad access, proximity card and/or magnetic card swipe to authorize and control the dispensing of fuel products to vehicles. System shall be administered by local NPS through system software. NPS shall determine authorization criteria. System software shall enable NPS to identify and assign access to account users by numerical keypad access and or proximity card. Fuel Force Exacta-C-P or equal.
The system shall allow for the following criteria.
1. Log each fuel dispensing transaction, including date, time, fuel type, gallons dispensed, cost per gallon and total cost.
2. Be capable of providing printed record of dispensing transaction.
3. System administrator shall be able to limit fuel dispensed on a daily, weekly or monthly for any user.
4. View standard and customizable reports for fuel usage.
5. Controller unit shall be factory ready to connect to an on-site cable modem to allow for remote monitoring of status and alarm conditions via a web browser on a computer or mobile device. Contractor shall coordinate with the Internet Service Provider to ensure compatibility with the cable modem being provided for the site.
6. Underwriters Laboratories approved,
7. Factory-integrated surge protection.
8. Solid state data storage.
9. Numeric 16-button flat faced keypad
10. Four line, 80 character LCD backlit screen
11. Functional at -20°F to 140°F and 95% humidity
12. Manufacturer’s software to allow NPS administrator to access fuel management tasks from single dashboard at a personal desktop computer and allow for query using common reporting tools. Software to be installed on an existing NPS desktop PC.
Contractor shall coordinate software requirements with NPS at the start of the project or no later than 60-days prior to scheduled software training.
13. Acceptable manufacturers and models, contingent upon compliance with contract documents for the tracking software: Fuel Force Fuel Management Software or equal.
KALA – 248432 33 56 10 -14
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
2.10 PIPE SUPPORTS
A. Supports must be the adjustable type conforming to MSS SP-58, except as modified herein.
Provide hot-dipped galvanized finish on rods, nuts bolts, washer, hangers and supports. Provide miscellaneous metal that conforms to ASTM A36/A36M, standard mill finished structural steel shapes, stainless steel.
2.11 PORTABLE FIRE EXTINGUISHER AND CABINET
A. Portable Fire Extinguisher:
1. Purple K dry chemical type, UL rated 80B:C, 10-lb nominal capacity with potassium bicarbonate dry chemical, with hose and nozzle.
2. Cylinder: Steel with high gloss polyester powder paint. Color shall be red.
3. Valves: Chrome-plated brass
4. Handles and Levers: Stainless steel
5. Instruction Label: Include pictorial marking system complying with NFPA 10, Appendix B.
6. Warranty: Six (6) years, minimum.
B. Fire Extinguisher Cabinet: Fiberglass extinguisher cabinet, sized to accommodate the fire extinguisher. Cabinet shall be UV-resistant, constructed to protect fire extinguisher from rain, salt air, chemicals, moisture, dust, and insects. Provide with stainless steel full-length hinge, rivets, and latches. Door shall latch securely and shall have a view window. Color shall be high visibility red.
C. Provide type 316 stainless steel fasteners to secure the canopy support structure.
D. Signage: Provide signage to be mounted above the fire extinguisher cabinet to indicate the location of the fire extinguisher. Sign shall be rigid polyethylene, L-style 90, high visibility sign that projects from the support structure. Minimum size shall be 12” high by 9” wide. Sign shall meet
ANSI Z53.1.
2.12 SPECIAL WIRING
A. All factory-assembled, package type equipment shall be provided with integral control panel to which all motors in each unit shall be factory wired. Control panel shall contain all relays, starters, and other control devices, all arranged so as to be accessible for maintenance, testing, and inspection. Control panel on each unit shall contain control transformer installed so that all control circuits extending to remote control devices, thermostats, etc., will be 120 volts maximum.
B. Any wiring not shown and required to properly connect equipment, including connections to special safety control or apparatus not shown, shall be included under this Section.
C. All electrical conduit and wiring between the control panel, tank, emergency alarm panel and packaged pump set shall be provided by the contractor in accordance with all manufacturer’s recommendations and the National Electric Code. Wiring, equipment, and fittings shall be
KALA – 248432 33 56 10 -15
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024) explosion-proof in conformance with applicable requirements of UL 698 and UL 886 for Class I, Division 1, Group C and D hazardous locations.
2.13 MISCELLANEOUS SIGNS
A. Provide a “NO SMOKING” sign within 15 feet of point of transfer while filling operations are in progress at container or vehicles (i.e. at aboveground fuel tank, fuel dispenser). Sign shall be made from aluminum with plastic laminate to protect the printed message from the weather, minimum size 10 inches high by 7 inches wide. Acceptable manufacturers and models, contingent upon compliance with contract documents: Lab Safety Supply 1A-744s or equal.
B. All signs shall conform to the requirements of ANSI Z535. Provide fasteners for wall mounting or galvanized steel U-channel or square tubing sign posts with concrete footing for free standing locations.
2.14 INITIAL INVENTORY OF FUEL
A. Gasoline: Provide 7,500 gallons of unleaded gasoline. Gasoline shall be unleaded, ethanol-free with minimum octane rating of 87. The initial inventory of gasoline may be used for testing the aboveground gasoline storage tanks.
B. Diesel fuel: Provide 5,000 gallons of ultra-low sulfur diesel fuel. The initial inventory of diesel fuel may be used for testing the aboveground diesel storage tank.
PART 3 - EXECUTION
3.1 PREPARATION
A. Visit the worksite and become fully aware of all existing conditions. Investigate the Contract Documents and make proper provisions to avoid interferences and construction delays. Determine the exact route of each pipe. Make offsets and changes in direction required to maintain proper headroom and pitch or to accommodate the structure and the work of other trades. Furnish other trades with information to properly locate and size openings in the structure required for this work.
Furnish anchor bolts, sleeves, inserts and supports required for this work.
3.2 INSTALLATION AND REQUIREMENTS
A. Perform work using personnel skilled in the trade involved. Provide competent supervision.
Furnish new equipment, materials and accessories bearing the manufacturer's identification and conforming to recognized commercial standards. All required demolition, including saw cutting and chipping of concrete and masonry to remove or install fixtures and piping shall be provided as well as patching, repair and painting at no additional cost to the NPS. Provide all extra materials and labor for a complete operable system at no additional cost to the NPS.
KALA – 248432 33 56 10 -16
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
3.3 ACCESS TO EQUIPMENT
A. Install all control devices, specialties, valves and related items to provide easy access for operation, inspection, repair and maintenance. If these items are concealed behind walls or ceilings of non-removable type construction, provide access panels of proper size for easy access at no additional cost to the NPS.
3.4 EQUIPMENT INSTALLATION
A. Install equipment in the space allotted with sufficient clearance for proper operation and maintenance. Where equipment differs in arrangement or connections from those shown, provide all required changes in piping, supports and appurtenances and cost of work of any other trades affected. Provide equipment accessories necessary for proper operation and support.
3.5 FUEL STORAGE TANKS
A. When moving, handling or working around the storage tank ensure no damage occurs to the tank, its fittings and attachments, concrete pad, piping, or the leak detection monitoring system components. Cap all unused fittings to prevent the introduction of foreign matter into the tank.
1. Installation: Install storage tanks as indicated and in accordance with manufacturer's instructions. Tank shall be anchored to the concrete pad. Provide grout between the concrete pad and tank supports as necessary. Coordinate work among trades to prevent conflicts or delays. Verify proper locations for piping and conduit penetrations through the concrete pad and anchor bolt locations prior to pouring concrete. Install all fittings after tank is anchored. Fittings shall be properly protected from damage during installation. Steel vaulted tanks shall be installed a minimum 18 inches above finished floor to provide clearance for tank inspection and maintenance.
3.6 PIPING
A. Above ground piping systems shall be of Type 304 stainless steel. Piping connections to equipment shall be as required by equipment manufacturer. Clean pipe interior of foreign matter.
When work is not in progress, close open ends of pipe and fittings so that water, earth, or other substances cannot enter. Replace pipe, fittings, or appurtenances found defective after installation.
Make threaded joints with tapered threads and make tight with joint compound; compatible with intended petroleum products, applied to male threads only. Install in accordance with the pipe manufacturer’s recommendations.
1. Installation: Handle tubing, pipe and accessories to ensure sound, undamaged condition.
Provide stauff-style clamps for attachment and anchoring of tubing and pipes to building structure. Sleeves through concrete may be 20-gage metal, fiber, or other approved material. Sleeves shall be located on center with piping and fastened in place. Space between sleeves and pipe shall be caulked and filled with bituminous plastic cement or mechanical caulking units designed for such use.
B. Underground piping with secondary containment shall be installed in accordance with the manufacturer’s published instructions.
KALA – 248432 33 56 10 -17
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
1. A 4-inch layer of sand or fine gravel shall be placed and tamped in the trench to provide uniform bedding for the containment pipe. The entire trench shall be evenly backfilled with a similar material as the bedding for the containment pipe. The entire trench shall be evenly backfilled with a similar material as the bedding in 6-inch compacted layers to a minimum height of 6 inches above the top of the piping system. The remaining trench shall be evenly and continuously backfilled in uniform layers with suitable excavated soil. Bedding and backfill materials shall be as recommended by the manufacturer.
3.7 PIPE SUPPORTS
A. Install supports with a maximum spacing as indicated on drawings. In addition to meeting the requirements noted on drawings, provide additional supports where concentrated piping loads exist (e.g. valves, penetration through walls and at change in direction).
B. Provide attachments to building structure. Refer to architectural drawings for building structure materials. Provide structural steel brackets required to support piping, headers and system components, but not shown on drawings.
3.8 AUTOMATIC TANK GAUGING AND LEAK DETECTION MONITORING SYSTEM
A. General: Provide all wiring, conduit, junction boxes, and other devices required for the leak detection monitoring system. Wiring, equipment, and fittings shall be explosion-proof in conformance with applicable requirements of UL 698 and UL 886 for Class I, Division 1, Group C and D hazardous locations. Submit proof of such conformance for approval. Installation shall conform to requirements of NFPA 70. Store and handle all leak detection monitoring system components to ensure sound, undamaged condition. Do not drop, strike, or otherwise mishandle the components, which could result in loss of calibration or damage. All damaged equipment shall be replaced with new equipment at no additional cost to the NPS.
B. Monitor Panel: Mount the monitor panel as indicated and in accordance with the manufacturer's instructions. Provide necessary mounting hardware. Provide power to the monitor panel.
C. Probes and Sensors: Install probes and sensors as indicated and in accordance with the manufacturer's instructions. Pre-test probes and sensors prior to installation. Do not allow foreign matter to enter the storage tank or interstitial space during installation. Probes and sensors shall not be damaged during installation.
D. Remote Alarm Panels: Mount the remote alarm and acknowledgment button as indicated and in accordance with the manufacturer's instructions. Provide necessary mounting hardware.
3.9 ELECTRICAL WORK
A. Provide wiring, conduits, switches and devices required for controlling electrical equipment.
Wiring, equipment, and fittings shall be explosion-proof in conformance with applicable requirements of UL 698 and UL 886 for Class I, Division 1, Group C and D hazardous locations.
Submit proof of such conformance. Electrical installations shall conform to requirements of
NFPA 70.
KALA – 248432 33 56 10 -18
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
3.10 PORTABLE FIRE EXTINGUISHER AND CABINET
A. Install the portable fire extinguisher and cabinet in the location indicated on the plans. Secure the fire extinguisher cabinet to the steel support structure using appropriately sized 316 stainless steel fasteners. Top of the fire extinguisher cabinet shall be no higher than 48 inches above finished floor.
3.11 TESTS
A. Piping Pneumatic Test: Test product carrier piping under pneumatic pressure of at least 1-1/4 times designed working pressure of the particular piping system, but not less than 50 psig. Test secondary piping under pneumatic pressure of 10 psig. Provide filtered, oil-free air for tests. Joints in secondary piping shall not be made until product carrier pipe is successfully pressure tested. Take care not to exceed pressure rating of various fittings. Maintain pressure in product carrier piping for at least 2 hours during which there shall be no drop in pressure in each line greater than that allowed for thermal expansion and contraction. Maintain a pressure in secondary piping for at least one hour. To facilitate this test, various sections of each piping system may be isolated to test each separately. Furnish tapped test adapter fittings that can be attached to each end of the section of line being tested that will permit direct connection to the piping from air compressor. No taps in line will be permitted. Furnish necessary equipment for testing. Gauges shall be subject to testing and approval. In the event leaks are detected, repair and repeat tests. Upon satisfactory completion of tests, relieve pressure and seal line. Make provisions to prevent displacement of piping during testing. Keep personnel clear of piping during pneumatic testing. Isolate equipment such as pumps, tanks, and meters from piping system during tests.
B. Aboveground Piping Pneumatic and Hydrostatic Tests: Testing shall comply with the applicable requirements of ASME B31.3, NFPA 30, and the requirements specified herein. Care shall be taken not to exceed pressure rating of various fittings. Hydrostatic testing shall be performed using fuel as the liquid. Water shall not be introduced into the system for testing. To facilitate the pneumatic and hydrostatic tests, various sections of the piping system may be isolated and tested separately. Where such sections terminate at flanged valve points, the line shall be closed by means of blind flanges in lieu of relying on the valve. Tapped flanges shall be provided to allow a direct connection between the piping and the air compressor and/or pressurizing pump. Tapped flanges shall also be used for gauge connections. Taps in the permanent line will not be permitted. Gauges shall be subject to testing and approval. In the event leaks are detected, the pipe shall be repaired and the test repeated. Following satisfactory completion of each pneumatic and hydrostatic test, the pressure shall be relieved and the pipe immediately sealed. Provision shall be made to prevent displacement of the piping during testing. Personnel shall be kept clear of the piping during pneumatic testing.
C. Aboveground Storage Tank Tightness Tests: A tightness test shall be performed on each aboveground storage tank. The tests shall be performed prior to making piping connections. Tests shall be capable of detecting a 0.1 gph leak rate from any portion of the tank while accounting for effects of thermal expansion or contraction. Gauges used in the tightness tests shall have a scale with a maximum limit of 10 psig. Each storage tank shall be pressurized with air to 5 psig and monitored for a drop in pressure over a 2-hour period during which there shall be no drop in pressure in the tank greater than that allowed for pressure variations due to thermal effects.
D. Manufacturer's Tank Tests: Following the tank tightness test, each storage tank shall be leak tested in accordance with the manufacturer's written test procedure if the manufacturer's test procedure is
KALA – 248432 33 56 10 -19
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024) different from the tightness tests already performed. Any test failure shall require corrective action and retest.
E. Fuel System Flushing and Operational Test: Install temporary piping or hose equipped with a strainer having not less than 40-mesh screen between supply pipe and tank fill connection on tank from which fuel is being pumped. Furnish temporary pump for flushing. Clean means absence of sediment or emulsion; bright refers to fluorescent appearance of fuel that has no cloud or haze. Test system to demonstrate performance requirements for which it was designed. Test shall include unloading fuel trucks to demonstrate effectiveness of overfill and overspill protection system.
When a portion of each system or a piece of equipment fails to pass tests, make repairs or adjustments and repeat test until satisfactory performance is achieved. Tests shall be witnessed by the Contracting Officer, and the Contractor shall notify the Contracting Officer a minimum of 14 days before testing. Furnish calibrated instruments and equipment, as well as the fuel, required to clean and flush each system and to conduct tests. Upon completion of tests replace filters.
F. Leak Detection Monitoring System Test: Activate leak detection monitoring system and test in accordance with manufacturer's instructions and witnessed by the Contracting Officer. All deficiencies shall be corrected and the system re-tested.
G. High Liquid Level Alarm Test: Each storage tank shall be initially overfilled with the appropriate product in order to verify the high liquid level alarms in the remote alarm panel function as designed. The initial overfill shall also verify that the storage tank overfill protection device functions as designed. Tank overfilling shall stop immediately once the overfill device operates.
The Contractor shall not overfill any storage more than 98 percent level even if the leak detection and liquid level electronic panel and the overfill device do not function as designed. Any problems with the electronic panel or the overfill prevention device shall be corrected and retested. The system shall be drained below the high liquid levels following all tests.
3.12 EQUIPMENT TEST, INSPECTION AND OPERATION
A. Test and Inspection: Perform all field tests and trial operations and conduct all field inspections.
Provide all labor, equipment, and incidentals required for the tests. Contracting Officer shall witness all field tests and trial operations and shall conduct final field inspections. Give the Contracting Officer ample notice of the dates and times scheduled for tests, trial operations, and inspections which require the presence of the Contracting Officer. All deficiencies found shall be rectified and work affected by such deficiencies shall be completely retested at the Contractor's expense.
B. Operation: Place into operation all equipment provided and installed, except as specifically noted otherwise. Make all necessary adjustments to equipment to assure proper operation as instructed by the manufacturers of the equipment. Lubricate equipment prior to operation in accordance with the manufacturer's instructions. Dry out all motors before operation as required to develop and maintain proper and constant insulation resistance.
3.13 PAINTING AND IDENTIFYING
A. The items furnished under this section are to be painted and identified under Section 09 90 00 – PAINTING. Do not paint over name plates or other identifying labels.
KALA – 248432 33 56 10 -20
STORAGE TANKS AND ACCESSORIES
(rev 8/23/2024)
3.14 PIPING IDENTIFICATION
A.