This document is an amendment to solicitation 140P2024R0009 for the rehabilitation of the historic Laurel Dorm in Yellowstone National Park. The key details are:

  1. The amendment provides answers to questions submitted by offerors, including clarification that the NAICS code size standard is $45 million, not $14.5 million as originally stated. It also extends the proposal due date and schedules a pre-bid meeting on May 16, 2024 in the Old Faithful area of Yellowstone.

  2. The amendment attaches a "Project Experience" form for offerors to submit details on up to 5 relevant projects completed in the last 5 years. It also provides guidance on the page limits for resumes, past performance narratives, and clarifies the key personnel positions required.

  3. The amendment addresses availability of summer and winter accommodations for contractor personnel within Yellowstone National Park, including details on RV sites and dormitory-style lodging options.

View the file

Other files

File Type Posted
Sol_140P2024R0009_Amd_0006.pdf PDF
B09_AMD_06_Questions_and_Answer_6_13_2024_0006.pdf PDF
323113-20142_10_Chain-Link_Fences_and_Gates_0005.pdf PDF
Q_A_6_4_24_0005.pdf PDF
Sol_140P2024R0009_Amd_0005.pdf PDF
B08_Section_J_Wage_Determination_5_24_24_0005.pdf PDF
140P2024R0009_04_combined_0004.pdf PDF
Sol_140P2024R0009_Amd_0004.pdf PDF
Sol_140P2024R0009_Amd_0003.pdf PDF
Amendment_3_Q_and_A_Pre_Proposal_Agenda_5_10_2024_0003.pdf PDF
Sol_140P2024R0009_Amd_0002.pdf PDF
B09_P2024R0009_Amendment_01_4_16_24_0001.pdf PDF
Sol_140P2024R0009_Amd_0001.pdf PDF
Att_12_Laurel_Dorm_Project_Manual_Final_Stamped_Drawings_Part_2.pdf PDF
Att_01_Vol_I_PastPerf_Part_I.docx DOCX document
Att_14_O_M_Checklist.pdf PDF
Att_04_Soil_Temperatures___Gas_Mntrg_Rpt.pdf PDF
Att_02_Vol_II_GenRefs_Part_II.doc DOC document
Att_17_Construction_Contract_Administration.docx DOCX document
Att_16_Wage_Determination.pdf PDF
Att_02_Vol_II_PriceSched_Part_III.xlsx XLSX spreadsheet
Att_08_Enclosure_Assessment_Report_10-15-2019.pdf PDF
B08_Solit_Clauses_Construction_4_12_24.pdf PDF
Att_02_Vol_II_BidBond_Part_I.pdf PDF
Att_10_Mitigation_List.pdf PDF
Att_09_Product_File_FINAL_CD_10-06-2023.pdf PDF
Att_13_Project_Manual_Final_Stamped_Vol_1_of_2__1_23_24pdf.pdf PDF
Att_02_Vol_II_SubKPlanForm_Part_IV.doc DOC document
Sol_140P2024R0009.pdf PDF
Att_11_StatementOfStructuralTestsSpecialInspections.pdf PDF
Att_07_Assessment_Report_10-04-2019.pdf PDF
Att_06_Final_HSR_08-13-2019.pdf PDF
Att_03_Geotechnical_Evaluation_Report.pdf PDF
Att_05_Hazardous_Materials_Report.pdf PDF
ATT_15_Submittal_List.pdf PDF
Att_01_Vol_I_Exp_Part_II.docx DOCX document
Att_12_Laurel_Dorm_Project_Manual_Final_Stamped_Drawings_Part_1.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2024R0009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

05/02/20240002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/11/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is as follows:

1. Provide answers for the Questions submitted.

2. To extend the proposal due date.

3. Schedule a pre-bid meeting that will be held on May 16, 2024, in the Old Faithful area of Yellowstone National Park. Details of exactly when and where the pre-bid meeting will take place will be shared via future Amendment.

4. Clarify NAICS 236220 Size Standard is $45,000,000.00

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jason Longshore

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2024R0009/0002

5. Provide Project Experience Form

All other terms and conditions of the solicitation package remain unchanged and in full force and effect.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

YELL 312116

Rehabilitate Historic Laurel Dorm, Yellowstone National Park Solicitation 140P2024R0009 – Questions and Answers

Amendment 02, issued: 5/2/2024

1. Page 14 - Section H (a), Key personnel: Project Manager, Superintendent, QCM, Safety Manager. Can any of these be performed by the same person?

Answer: The Project Manager and Superintendent cannot perform other duties. The QCM and Safety Manager may perform other duties.

The purpose of this amendment is to delete line 1.7(B)(2) from Specification Section 01 40 00. See below.

2. Page 44 – Middle of page, NAICS 236220 size standard is not $14.5M. Will this be re-issued, or can we make the correction with pen?

Answer: The NAICS codes size standard is $45M, that was an error. The correct size standard $45M.

3. Page 54 - Factor 6 - Can a CPARS be submitted in lieu of the PPQ?

Answer: Yes

4. 1.0 Page 53 – FACTOR 2 – PROJECT EXPERIENCE

Submit the attached “Project Experience” form addressing specific experience aspects below for up to five (5) relevant projects completed in the last five (5) years.

Submit separate forms for each project.

I do not see a “Project Experience Form”. Please advise.

Answer: Please see attached Project Experience form in Amendment 02

5. The site visit details are “TBD”. Will NPS be holding a formal site visit for this project?

Answer: A pre-bid meeting will be held on May 16, 2024, in the Old Faithful area of Yellowstone National Park. Specific details of time and location of where the pre-bid meeting will take place will be shared via future Amendment. The Pre-bid will likely take place earlier on 5/16, last for approximately 2 hours (Slide show presentation) , a break, then proceed to Laurel Dorms for site visit. Site visit is optional, presentation will be issued via amendment.

6. Page 14 - Section H (a), Key personnel: Project Manager, Superintendent, QCM, Safety Manager. Can any of these be performed by the same person?

Answer: See answer to Question 1.

7. For Volume 1 Technical Proposal, please confirm that Factor 4 is to be Factor 4 Schedule, not Factor 4 Safety.

Answer: Correct. Factor 4 is “Schedule.”

8. Please confirm the page count for the Resumes in Factor 5- Key Personnel

Answer: Limit the total length of all four resumes to no more than 10 pages.

9. In Section H the roles are listed as Project Manager, Job-Site Superintendent, Quality Control Manager, Safety Manager. In Factor 5 the key personnel are listed as Project Manager, Superintendent, On- Site Quality Control Specialist, and On- Site Safety Specialist. Please confirm the correct roles so we can have them listed appropriately on their resumes.

Answer: Though the titles are somewhat different the positions are the same.

PM = PM

Job Site Superintendent = Superintendent QCM = ON Site QCM Safety Manage = On Site Safety Manager

10. In Factor 6- Past Performance the RFP States: Submit a narrative disclosing any instances of past performance that may be considered less than fully satisfactory.

Please confirm the page limitation for this narrative.

Answer: Limit narrative descriptions of less-than-fully-satisfactory performance to no more than one page per project.

11. Are there any summer accommodations available in the park for construction contractors?

Answer: Yes. During the months of the year that Grant Village is accessible by road, RV sites have been reserved for Laurel Dorm contractors at the New Grant Contractor Court, should the contractors choose to take advantage. In calendar years 2024 and 2025, the contractor will have access to 15 sites. The sites will be available from approximately June 1 through October 15 of each year, depending on snow conditions and when park utility crews can turn on the water. (Weather permitting: if the Park district facility mangers complete plowing of park roads and are able to plow/open the campgrounds earlier, then the contractor may be permitted to drive on park roads under administrative travel restrictions (staff and partner travel only) even though the roads may not be open to the public. These dates are dynamic and dependent upon weather and park operations progress.

Grant Village is 23 miles away from Old Faithful, and Google Maps estimates the drive time as 38 minutes.

If the Contractor elects to use these sites, they shall notify the Contracting Officer in writing on or before April 1 of each year of the exact number of sites they and/or their subcontractors will occupy for the season. For 2024, requests must be made within 10 days of award. The Contractor shall enter into a rental agreement with Yellowstone National Park for each RV site needed. Contact Nav Singh at (307) 296-6323 for a copy of the rental agreement.

There is no partial and/or weekly rate. The billing season will begin on May 1 and end on September 30. Bills will be issued for the season on May 1, with payment due within 30 days. For 2024, bills will be issued shortly after notice is made to the Contracting Officer. Site usage for October and November (weather permitting) will be billed separately on December 1, with payment due within 30 days.

Flat monthly rates for RV sites with full hook-ups is $430.34 per site. Site rates will increase annually. The increase from 2023 to 2024 was $30 per month. These rates include water, sewer, electricity and trash service. To connect to the sewer hookups at the sites, Contractor employees are required to have an appropriate adapter, which shall securely connect using a snug, threated fitting. Submit adapter for approval prior to connection to the sewer system.

The Contractor must comply with the following requirements:

1. Designate an on-site camp boss to ensure the Contractor Camp operation remains in compliance with Park regulations. Submit the name and phone number of the camp boss to the CO. The responsibilities of the camp boss include, but are not limited to, food handling and storage, solid waste storage and disposal, management of camp facilities, and acting as the contact for NPS personnel involved in bear management, parking and camping.

2. To prevent unnatural attractants to bears, no foods, pet foods, garbage, drinks, trash or food and drink containers are allowed outside vehicles or trailers except during actual use. Specific guidelines will be further outlined during orientation sessions provided by the NPS. Notify the CO of any grizzly bear or gray wolf encounters in the camp area.

3. Notify CO two weeks before occupying camp so orientation sessions can be coordinated. All Contractor and subcontractor employees and their immediate families who will reside with them in the park are required to attend orientation sessions specific to the trailer camp.

4. Any mishandling of garbage, trash, food and other potential bear attractants described above will result in Yellowstone National Park issuing the appropriate level of law enforcement to the responsible person, or Contractor. Repetition of mishandling or any case of deliberate feeding of wildlife will result in loss of in-park residence privileges. If mishandling occurs and a specific individual is not determined, the Contractor will be held responsible.

5. All Contractor-designated RV sites are for Contractor employees and their immediate families only.

Use of the New Grant Contractor Court is entirely up to the Contractor. Campground and accommodations are also available outside the park.

12. Are there any winter accommodations available in the park for construction contractors?

Answer: Yes. The park develops agreements with concessionaires to operate lodging, restaurant and other facilities located in the park. Xanterra is the concessionaire that operates the lodging facilities in the Old Faithful area, and can accommodate up to 48 construction Contractor personnel from approximately October 25, 2024, to April 2, 2025. The Bitterroot Dorm, located at Old Faithful, will be set aside for this use. The cost is $30 per room per night, with a minimum use of 6 rooms per night (or at least paid for). Rooms are single-occupancy. 24 units have their own bathroom. Accommodating more than 24 workers would require the shared use of bathrooms with one other person. The cost includes all utilities and WiFi. Rooms do not include cooking facilities or refrigerators. Refrigerators can be brought to the site, but must be approved in advance to ensure the electrical capacity is sufficient. A laundry room is available, and there is no charge for use of the facilities.

Meals are served in Xanterra’s employee dining room, and are available to Contractors for the following rates: $10 for breakfast, $12.50 for lunch, $15 for supper (rates subject to slight increases over time).

If the Contractor chooses to take advantage of this opportunity, the arrangement will be between them and Xanterra. The Park will play no role in collecting fees or enforcing the rules. Lodging is available outside the park, but the roads to Old Faithful are typically closed to vehicle traffic between early November and late April. Snowmobile travel is permitted, subject to park regulations stated in the specifications.

Project Experience Questionnaire Solicitation: 140P2023R0041

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror Company Name

REFERENCED PROJECT INFORMATION

Project Title Title

Project Location City, State

Brief Project Description

Description

Project Owner Company Name POC: First & Last Name Phone: (XXX) XXX-XXXX

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name

Role on Referenced

Project (Prime or Sub)

Trade

Price (list for each contractor’s specific work)

Performance Period

(calendar days) (list for each contractor’s specific work)

Original Final Original Final

Sparky’s Electrical Company Prime Prime $XXX,XXX $X,XXX,XXX XX XX

ABC Plumbing & Heating, Co Subcontractor Plumbing & Mechanical

$X,XXX,XXX $X,XXX,XXX XXX XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

7. Provide any other additional project information you believe should be presented.