This document is an amendment to a solicitation for repair and restoration work at Cape Hatteras Lighthouse. The National Park Service is seeking a contractor to perform repair work on Cape Hatteras Lighthouse, restore or reconstruct the historic first order Fresnel lens, and improve or restore the historic landscape. The period of performance is 550 days. A bid bond is required and bids are due by 5:00 PM EST on July 18, 2023. The amendment provides sign-in sheets from a site visit, corrects the date for drawings, and includes questions and answers from potential offerors. Submitted bids must acknowledge receipt of the amendment.
The document provides additional details on the scope of work, including requirements for scaffolding, hoisting, enclosure and shoring systems. It also addresses staging, material movement and questions on simultaneous work at the oil house. The National Park Service is not procuring temporary equipment directly and means and methods are the contractor's responsibility.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2023R0132 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
07/18/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/03/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CAHA 213068 / Repair Cape Hatteras Lighthouse, CAHA 319350 Restore or Reconstruct Historic
First Order Fresnel Lens, and CAHA 319351 Improve or Restore Historic Landscape
The purpose of this amendment 0001 is to incorporate the following:
1. Sign in sheets from the 12 July 2023 site visit.
2. Correct date for Drawings in Section J to June 27, 2023.
3. Post Questions and Answers.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Bai Perney
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
No. TITLE DATE
NO.
OF
PAGES
Attachment 1 Specifications June 27, 2023 600
Attachment 2 Drawings June 27, 2023 130
Attachment 3 Construction Wage Decision NC20230065 04/21/2023 7
Attachment 4 Cape Hatteras Lead Based Paint Report Apr 14, 2022 41
Attachment 5 Cape Hatteras Cultural Landscape Report JUN 15, 2004 70
Attachment 6 Cape Hatteras Historic Structure Report No Date 322
Attachment 7 Project Experience Questionnaire No Date 1
Attachment 8 Past Performance Questionnaire No Date 1
Attachment 9 General References No Date 2
Attachment 10 Small Business Subcontracting Plan Form No Date 12
CAHA 213068 / Repair Cape Hatteras Lighthouse, CAHA 319350 Restore or Reconstruct Historic First Order Fresnel
Lens, and CAHA 319351 Improve or Restore Historic Landscape
Questions and Answers
July 18, 2023
Question Number
Question Answer/Response
Considering the scope and scale of this project, is it NPS’s intent to procure the scaffold, hoisting, enclosure and shoring systems directly from a scaffold and shoring provider? Or do you intend to run the scaffold, hoisting, enclosure, and shoring scope items through the GC?
NPS does not intend to procure these systems, the means and methods of accomplishing the work are the contractor's responsibility.
What’s the anticipated scaffold rental duration? Or should I just go by the overall period of performance?
Duration of equipment use and rentals are part of the means and methods of accomplishing the work and are the contractor's responsibility.
Based on the specifications listed in the drawings, the system provided by the scaffold contractor will be multi-faceted. As illuded to in question 1, this project will require interior and exterior access scaffolding, interior shoring, and an exterior scaffold enclosure system. Because of the overall height, access to the exterior scaffold system deck levels will be by use of full height scaffold stair towers.
However, due to the height, personnel access to all levels of the lighthouse may still be challenging. In addition, vertical material conveyance will also be an issue. Has NPS considered requiring a personnel and material hoist for this project? The hoist would be integrated with the exterior access scaffold system.
The means and methods of accomplishing the work are the contractor's responsibility and will be evaluated in submittal review.
Suggested systems should be incorporated with shoring and scaffolding submittals for review.
Does NPS intend for the scaffold system to integrate a hoisting and trolley mechanism at the top for Fresnel lens portion of the restoration project? This temporary hoisting and trolley system may also be useful during the installation and removal of the Replica Beacon.
The means and methods of accomplishing the work are the contractor's responsibility and will be evaluated in submittal review.
Suggested systems should be incorporated with shoring and scaffolding submittals for review.
The construction material staging, and construction material movement options are shown in the site orientation plan. Considering the scaffold operation would be one of the first activities, Should we anticipate the staging and material movement pathways will have already been installed prior to our mobilization? I see construction mats are called out. Will these mats accommodate forklifts?
The Contractor will be responsible for installing staging and material movement pathways protections and determining the load rating.
Does NPS intend for the oil house restoration to take place simultaneous to the lighthouse restoration? Has it been determined whether the oil house will be scaffolded and enclosed for this restoration work?
Oil house restoration schedule are part of the means and methods of accomplishing the work and are the contractor's responsibility.
I see NPS is considering raising the Principal and Double Keepers Quarters. Are these structures also being restored?
Raising the Principal Keepers Quarters and the Double Keepers Quarters are not part of this scope of work and are noted for informational purposes only.
9 Is the period of performance 550 days or 720 days? The period of performance is 550 days
10 Is a bid bond required? Yes. A bid bond is required
11 Is the time due 5 PM EST? yes
| PART I – THE SCHEDULE |
| SECTION A – SOLICITATION / Contract Form |
| SECTION B – Bid Schedule |
| SECTION C – Specifications / Drawings |
| SECTION D – packing and marking |
| SECTION E – Inspection and Acceptance |
| SECTION F – Deliveries or Performance |
| 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) |
| 52.211-12 Liquidated Damages—Construction (SEPT 2000) |
| 52.211-13 Time Extensions (SEPT 2000) |
| 52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984) |
| 52.242-14 SUSPENSION OF WORK (APR 1984) |
| SECTION G – Contract Administration Data |
| 1452.201-70 Authorities and delegations (SEPT 2011) |
| 1452.204-70 Release of Claims—Department of the Interior (JUL 1996) |
| NOTICE TO CONTRACTORS - CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM (DEC 2015) |
| ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS – INTERNET PAYMENT PLATFORM (APR 2013) |
| SECTION H – Special Contract Requirements |
| SPECIAL REQUIREMENT 1: OPTION FOR ADDITIONAL SERVICES—SEPARATELY PRICED LINE ITEMS |
| Special requirement 2: key personnel |
| Special requirement 3: key trades |
| SPECIAL requirement 4: SMALL BUSINESS PARTICIPATION |
| 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996) |
| PART II – Contract Clauses |
| SECTION I – Contract Clauses |
| CLAUSES INCORPORATED BY REFERENCE |
| 1452.203-70 Restrictions on Endorsements (jul 1996) |
| 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020) |
| 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (nov 2021) |
| 52.204-25 Prohibition on Contracting for Certain Telecommunications and video Surveillance Services and Equipment (NOV 2021) |
| 1452.215-70 Examination of Records by the Department of the Interior (apr 1984) |
| 52.219-4 Notice of Price Evaluation Preference for HUBZone Small Business Concerns (oct 2022) |
| 52.225-11 BUY AMERICAN – CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (DEC 2022) |
| 1452.228-70 Liability Insurance. (JUL 1996) |
| 52.236-1 Performance of Work by the Contractor (apr 1984) |
| 52.236-2 Differing Site Conditions (apr 1984) |
| 52.236-3 Site Investigation and Conditions Affecting the Work (apr 1984) |
| 52.236-4 Physical Data (apr 1984) |
| 52.236-5 Material and Workmanship (apr 1984) |
| 52.236-6 Superintendence by the Contractor (apr 1984) |
| 52.236-7 Permits and Responsibilities (nov 1991) |
| 52.236-8 Other Contracts (apr 1984) |
| 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (apr 1984) |
| 52.236-10 Operations and Storage Areas (apr 1984) |
| 52.236-11 Use and Possession Prior to Completion (apr 1984) |
| 52.236-12 Cleaning Up (apr 1984) |
| 52.236-13 Accident Prevention (nov 1991) |
| 52.236-14 Availability and Use of Utility Services (apr 1984) |
| 52.236-15 Schedules for Construction Contracts (apr 1984) |
| 52.236-17 Layout of Work. (Apr 1984) |
| 52.236-21 Specifications and Drawings for Construction (feb 1997) |
| 52.236-26 Preconstruction Conference (feb 1995) |
| 1452.236-70 Prohibition Against Use of Lead-based Paint (jul 1996) |
| 52.252-2 Clauses Incorporated by Reference (FEB 1998) |
| 52.252-6 Authorized Deviations in Clauses. (Nov 2020) |
| PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS |
| SECTION J – List of Attachments |
| PART IV – REPRESENTATIONS AND INSTRUCTIONS |
| SECTION K – Representations, Certifications and Other Statements of Offerors |
| PROVISIONS INCORPORATED BY REFERENCE |
| 52.204-8 annual representations and certifications (Mar 2023) |
| 52.204-24 Representations Regarding Certain Telecommunications and Video Surveillance Services and Equipment (nov 2021) |
| 52.204-26 Covered Telecommunications Equipment or Services-Representation (OCT 2020) |
| 52.209-7 Information Regarding Responsibility Matters (OCT 2018) |
| 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (NOV 2021) |
| SECTION L – Instructions, Conditions and Notices to OFFERORS |
| PROVISIONS INCORPORATED BY REFERENCE |
| 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions. (June 1988) |
| 1452.215-71 Use and Disclosure of Proposal Information—Department of the Interior (apr 1984) |
| 52.216-1 Type of Contract (apr 1984) |
| 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (feb 1999) |
| 52.225-12 Notice of buy american requirement – construction materials under trade agreements (may 2014) |
| 52.228-1 BID Guarantee (sep 1996) |
| 52.233-2 Service of Protest Department of the Interior (sept 2006) (Deviation) (JUL 1996) |
| 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) |
| 52.236-27 Site Visit (Construction) – alternate I (feb 1995) |
| 52.252-5 Authorized Deviations in Provisions (Nov 2020) |
| Instructions for the Submission of Offers and Other Information – Competitive Source Selection |
| SECTION M – Evaluation Factors for Award |
| Special provision 1: Evaluation of Options |