This document defines ten contract line items (CLINs) for a federal contract to repair the Fort Jefferson Counterscarp and perform dredging at Fort Jefferson and Garden Key in the Florida Keys. The contract involves two project management information system (PMIS) numbers to be combined under one contract. CLINs 1 through 4 cover base work, with CLIN 1 involving mobilization and facilities for counterscarp repairs, CLIN 2 comprising repairs to the counterscarp itself, CLIN 3 related to mobilization and facilities for dredging, and CLIN 4 encompassing the dredging work. CLINs 5 through 10 are options to address additional damage from Hurricane Ian, covering concrete walkway replacement, brick replacement, void filling, scour hole remediation, core repair, and additional dredging. Payment methods include lump sums, unit prices, and percentage completion. The National Park Service is the contracting agency.

View the file

Other files

File Type Posted
B09_Attachment_EVER_DRTO_2023_Hurricane_Plan_FINAL_Amendment06_0006.pdf PDF
B09_-_Amendment_0006_-_140P2023R0033_0006.pdf PDF
B09_Attachment_Price_Schedule_REV001_Amendment06_0006.xlsx XLSX spreadsheet
Sol_140P2023R0033_Amd_0006.pdf PDF
B09_Attachment_Fuel_Line_Relocation_Plan_Amendment06_0006.pdf PDF
Sol_140P2023R0033_Amd_0005.pdf PDF
B09_DRTO_244370-72_Contractor_RFI_Responses_Amend05_0005.pdf PDF
B09_-_Amendment_0005_-_140P2023R0033_0005.pdf PDF
Sol_140P2023R0033_Amd_0004.pdf PDF
B08_RFP_140P2023R0033_Amendment_0004_8_22_23_0004.pdf PDF
Sol_140P2023R0033_Amd_0003.pdf PDF
B09_Amendment_3_Sign_in_Sheet_Pg1_0003.PDF PDF
B09_Amendment_3_Sign_in_Sheet_Pg2_0003.PDF PDF
B08_RFP_140P2023R0033_Amendment_0002_Attachment_3_Presentation_0002.pptx PPTX presentation
Sol_140P2023R0033_Amd_0002.pdf PDF
B08_RFP_140P2023R0033_Amendment_0002_8_2_23_0002.pdf PDF
B08_RFP_140P2023R0033_Amendment_0002_Attachment_1_SF1442_Conformed_Copy_0002.pdf PDF
B08_RFP_140P2023R0033_Amendment_0002_Attachment_2_Attendance_List_and_Meeting_Minutes_0002.pdf PDF
Sol_140P2023R0033_Amd_0001.pdf PDF
B08_RFP_140P2023R0033_Amendment_0001_6_30_23_0001.pdf PDF
B08_Section_J_Attachment_9_Underwater_Inspection.pdf PDF
B08_Section_J_Attachment_14_General_Decision_Number_FL20230002.pdf PDF
B08_Section_J_Attachment_8_Waterfront_Inspection.pdf PDF
B08_Section_J_Attachment_13_Price_Schedule.xlsx XLSX spreadsheet
B08_Section_J_Attachment_16_Proposal_Submission_Package_Portfolio.pdf PDF
B08_Section_J_Attachment_6_Benthic_Survey.pdf PDF
B08_Section_J_Attachment_7_Sediment_Sampling.pdf PDF
B08_Section_J_Attachment_3_Geotechnical_Exploration.pdf PDF
B08_Section_J_Attachment_5_Petrographic_Investigation.pdf PDF
B08_Section_J_Attachment_10_Marine_Survey.pdf PDF
B08_Section_J_Attachment_4_Ft_Jeff_Counterscarp_Materials_Test.pdf PDF
B08_Section_J_Attachment_12_Topographic_Survey.pdf PDF
Sol_140P2023R0033.pdf PDF
B08_Section_J_Attachment_11_Coral_and_Seagrass_Survey.pdf PDF
B08_Section_J_Attachment_2_Drawings.pdf PDF
B08_Section_J_Attachment_15_General_Decision_Number_FL20230096.pdf PDF
B08_Section_J_Attachment_1_Specifications_6_26_23.pdf PDF
B08_Solicitation_140P2023R0033_SF_1442_DRTO_244370_244372_6_26_23.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRTO 244370 & 244372 01 27 00 - 1

012721 DEFINITION OF CONTRACT LINE ITEMS

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of work, include costs in a related item.

C. The contract line items listed below relate to two PMIS, to be lumped under one contract:

1. DRTO 244370 – Repairs to the Fort Jefferson Counterscarp

2. DRTO 244372 – Perform Dredging of Fort Jefferson Moat and Finger-Slips and Piers at

Garden Key Waterfront

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEM NUMBER (CLIN)

A. Contract Line Item Number 1, BASE – Mobilization, Demobilization & Temporary Facilities for work related to repairs of the Fort Jefferson Counterscarp

1. This item consists of mobilization and demobilization of all required personnel, equipment, and materials to and from Garden Key and housing of personnel at Fort Jefferson for the completion of the work under DRTO 244370 – Repairs to Fort Jefferson Counterscarp.

2. Measurement for payment: No measurement required.

3. Payment will be made based on review of updated schedule of values submitted with progress payments, totaling the contract lump sum price.

B. Contract Line Item Number 2, BASE – Repairs to Fort Jefferson Counterscarp

1. This CLIN includes, but is not limited to, costs for project management, home office support, quality control related tasks throughout the duration of the Project, costs for compliance with environmental permit requirements and environmental monitoring and protection measurements, all labor, materials, and equipment to complete the repairs to the Fort Jefferson Counterscarp.

The work covered under this CLIN includes repairs to the concrete walkway, masonry brick repair, underwater concrete void repair, sluice gate pedestrian walkway, foundation and void repair under the counterscarp, and discrete counterscarp reconstruction. Base quantities and work items are outlined in the table of “Summary of Irma Repairs” on Sheet S6.1 of the Contract Drawings.

DRTO 244370 & 244372 01 27 00 - 2

2. Measurement for payment: Contractor will submit a cost loaded schedule in accordance with Section 01 32 16 outlining percent complete during the billing period.

3. Payment will be made based on monthly invoices.

C. Contract Line Item Number 3, BASE – Mobilization, Demobilization & Temporary Facilities for Dredging of Fort Jefferson Moat and Finger Slips and Piers at Garden Key Waterfront

1. This CLIN item consists of mobilization and demobilization of all required personnel, equipment, and materials to and from Garden Key and housing of personnel at Fort Jefferson for the completion of the work under DRTO 244372 – Dredging of Fort Jefferson Moat and Finger Slips and Piers at Garden Key Waterfront.

2. Measurement for payment: No measurement required.

3. Payment will be made based on review of updated schedule of values submitted with progress payments, totaling the contract lump sum price.

D. Contract Line Item Number 4, BASE - Dredging of Fort Jefferson Moat and Finger Slips and Piers at Garden Key Waterfront

1. This CLIN includes, but is not limited to, costs for project management, home office support, quality control related tasks throughout the duration of the Project, costs for compliance with environmental permit requirements and environmental monitoring and protection measurements, all labor, materials, and equipment to complete the dredging work.

The work covered under this CLIN includes dredging the two sediment deposits in the moat and one in the finger pier slips. Dredge profiles will be to the design elevations as shown in the Contract Documents. Work shall include all required surveying, quality control, excavation, hauling, dewatering, placement, and sifting of material as required by the Contract Documents.

2. Measurement for payment: Contractor will submit a cost loaded schedule in accordance with Section 01 32 16 (or otherwise directed by Contracting Officer) outlining percent complete during the billing period.

3. Payment will be made based on monthly invoices.

E. Contract Line Item Number 5, OPTION A, Type 1 Repair (Hurricane Ian Related Damage)

1. This CLIN item consists of an allowance for furnishing materials and replacing sections of missing cement walkway along the counterscarp. Work shall include surface cleaning/preparation to facilitate bonding of the new overlay.

2. Measurement for payment will be based on the stated contract quantities.

3. Payment will be made at the contract price per square foot.

F. Contract Line Item Number 6, OPTION B, Type 2 Repair (Hurricane Ian Related Damage)

1. This CLIN item consists of an allowance for furnishing materials and replacing missing sections of brick, above water, along the counterscarp. Work shall include surface cleaning/preparation to facilitate adequate bonding of the new brick.

2. Measurement for payment will be based on the stated contract quantities.

3. Payment will be made at the contract price per linear foot.

G. Contract Line Item Number 7, OPTION C, Type 3 Repair (Hurricane Ian Related Damage)

DRTO 244370 & 244372 01 27 00 - 3

1. This CLIN item consists of an allowance for furnishing materials and filling below-water voids in the counterscarp, encountered in sections of brick and/or the concrete base/core.

2. Measurement for payment will be based on the stated contract quantities.

3. Payment will be made at the contract price per cubic foot.

H. Contract Line Item Number 8, OPTION D, Type 4 Repair (Hurricane Ian Related Damage)

1. This CLIN item consists of an allowance for filling observed scour holes below the counterscarp to restore stability to the structure. Where feasible and indicated, use of woven geotextile dredging bags will be pumped of repurposed dredge sand from Garden Key to provide stability below the Counterscarp. Rubble rip rap will be placed at the oceanside toe of the counterscarp along the width of the filled scour hole.

2. Measurement for payment will be based on the stated contract quantities.

3. Payment will be made at the contract price per linear foot of wall requiring repair.

I. Contract Line Item Number 9, OPTION E, Type 5 Repair (Hurricane Ian Related Damage)

1. This CLIN item consists of an allowance for repairing counterscarp core cracking/voids by the cross-tie repair shown in the Contract Drawings.

2. Measurement for payment will be based on the stated contract quantities.

3. Payment will be made at the contract price per linear foot of wall requiring repair.

J. Contract Line Item Number 10, OPTION F, Dredging of Fort Jefferson Moat (Hurricane Ian Related Damage)

1. This CLIN includes dredging the two sediment deposits in the moat. Dredge profiles will be to the design elevations as shown in the Contract Documents. Work shall include all required surveying, quality control, excavation, hauling, dewatering, placement, and sifting of material as required by the Contract Documents.

2. Measurement for payment will be based on the stated contract quantities.

3. Payment will be made at the contract price per cubic yard of material removed.

END OF SECTION 01 27 00

PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
C. The contract line items listed below relate to two PMIS, to be lumped under one contract:
1. DRTO 244370 – Repairs to the Fort Jefferson Counterscarp
2. DRTO 244372 – Perform Dredging of Fort Jefferson Moat and Finger-Slips and Piers at Garden Key Waterfront
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEM NUMBER (CLIN)
A. Contract Line Item Number 1, BASE – Mobilization, Demobilization & Temporary Facilities for work related to repairs of the Fort Jefferson Counterscarp
1. This item consists of mobilization and demobilization of all required personnel, equipment, and materials to and from Garden Key and housing of personnel at Fort Jefferson for the completion of the work under DRTO 244370 – Repairs to Fort Jefferson...
2. Measurement for payment: No measurement required.
3. Payment will be made based on review of updated schedule of values submitted with progress payments, totaling the contract lump sum price.
B. Contract Line Item Number 2, BASE – Repairs to Fort Jefferson Counterscarp
1. This CLIN includes, but is not limited to, costs for project management, home office support, quality control related tasks throughout the duration of the Project, costs for compliance with environmental permit requirements and environmental monito...
The work covered under this CLIN includes repairs to the concrete walkway, masonry brick repair, underwater concrete void repair, sluice gate pedestrian walkway, foundation and void repair under the counterscarp, and discrete counterscarp reconstructi...
2. Measurement for payment: Contractor will submit a cost loaded schedule in accordance with Section 01 32 16 outlining percent complete during the billing period.
3. Payment will be made based on monthly invoices.
C. Contract Line Item Number 3, BASE – Mobilization, Demobilization & Temporary Facilities for Dredging of Fort Jefferson Moat and Finger Slips and Piers at Garden Key Waterfront
1. This CLIN item consists of mobilization and demobilization of all required personnel, equipment, and materials to and from Garden Key and housing of personnel at Fort Jefferson for the completion of the work under DRTO 244372 – Dredging of Fort Jef...
2. Measurement for payment: No measurement required.
3. Payment will be made based on review of updated schedule of values submitted with progress payments, totaling the contract lump sum price.
D. Contract Line Item Number 4, BASE - Dredging of Fort Jefferson Moat and Finger Slips and Piers at Garden Key Waterfront
1. This CLIN includes, but is not limited to, costs for project management, home office support, quality control related tasks throughout the duration of the Project, costs for compliance with environmental permit requirements and environmental monito...
The work covered under this CLIN includes dredging the two sediment deposits in the moat and one in the finger pier slips. Dredge profiles will be to the design elevations as shown in the Contract Documents. Work shall include all required surveying, ...
2. Measurement for payment: Contractor will submit a cost loaded schedule in accordance with Section 01 32 16 (or otherwise directed by Contracting Officer) outlining percent complete during the billing period.
3. Payment will be made based on monthly invoices.
E. Contract Line Item Number 5, OPTION A, Type 1 Repair (Hurricane Ian Related Damage)
1. This CLIN item consists of an allowance for furnishing materials and replacing sections of missing cement walkway along the counterscarp. Work shall include surface cleaning/preparation to facilitate bonding of the new overlay.
2. Measurement for payment will be based on the stated contract quantities.
3. Payment will be made at the contract price per square foot.
F. Contract Line Item Number 6, OPTION B, Type 2 Repair (Hurricane Ian Related Damage)
1. This CLIN item consists of an allowance for furnishing materials and replacing missing sections of brick, above water, along the counterscarp. Work shall include surface cleaning/preparation to facilitate adequate bonding of the new brick.
2. Measurement for payment will be based on the stated contract quantities.
3. Payment will be made at the contract price per linear foot.
G. Contract Line Item Number 7, OPTION C, Type 3 Repair (Hurricane Ian Related Damage)
1. This CLIN item consists of an allowance for furnishing materials and filling below-water voids in the counterscarp, encountered in sections of brick and/or the concrete base/core.
2. Measurement for payment will be based on the stated contract quantities.
3. Payment will be made at the contract price per cubic foot.
H. Contract Line Item Number 8, OPTION D, Type 4 Repair (Hurricane Ian Related Damage)
1. This CLIN item consists of an allowance for filling observed scour holes below the counterscarp to restore stability to the structure. Where feasible and indicated, use of woven geotextile dredging bags will be pumped of repurposed dredge sand from...
2. Measurement for payment will be based on the stated contract quantities.
3. Payment will be made at the contract price per linear foot of wall requiring repair.
I. Contract Line Item Number 9, OPTION E, Type 5 Repair (Hurricane Ian Related Damage)
1. This CLIN item consists of an allowance for repairing counterscarp core cracking/voids by the cross-tie repair shown in the Contract Drawings.
2. Measurement for payment will be based on the stated contract quantities.
3. Payment will be made at the contract price per linear foot of wall requiring repair.
J. Contract Line Item Number 10, OPTION F, Dredging of Fort Jefferson Moat (Hurricane Ian Related Damage)
1. This CLIN includes dredging the two sediment deposits in the moat. Dredge profiles will be to the design elevations as shown in the Contract Documents. Work shall include all required surveying, quality control, excavation, hauling, dewatering, pla...
2. Measurement for payment will be based on the stated contract quantities.
3. Payment will be made at the contract price per cubic yard of material removed.