B08_RFP_140P2023R0033_Amendment_0002_Attachment_3_Presentation_0002.pptx
PPTX presentation 12 MB Posted
- Solicitation number
- 140P2023R0033
About this file
This PowerPoint presentation is an attachment to an amendment to a request for proposals (RFP) from the National Park Service National Office regarding dredging and repair work at Fort Jefferson in the Dry Tortugas National Park. The RFP seeks proposals for dredging approximately 244,370 cubic yards of material from the entrance channel and harbor at Fort Jefferson, and dredging approximately 244,372 cubic yards from an area immediately west of the fort. Offerors must submit proposals by February 23, 2023. The award is expected to be made on or around April 30, 2023 to the offeror whose proposal is determined to be the most advantageous to the government considering technical merit and price factors. The contract will have a period of performance from June 1, 2023 through November 30, 2023.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Virtual Industry Day Repairs to the Fort Jefferson Counterscarp and to Perform Dredging of Fort Jefferson Moat and Fingerslips at Garden Key Dry Tortugas National Park, Key West, Florida
Solicitation #: 140P2023R0033
NPS PMIS #: DRTO 244370/244372
THIS MEETING WILL BE RECORDED
July 25, 2023 E X P E R I E N C E Y O U R A M E R I C A
AGENDA
INTRODUCTIONS
PROJECT/SOLICITATION MILESTONES
SOLICITATION REQUIREMENTS
SITE LAYOUT/ORIENTATION
PROJECT BACKGROUND
SCOPE OF WORK
MAJOR AREAS OF WORK/KEY ITEMS
UPCOMING FORMAL SITE VISIT/PLANNING
INDUSTRY DAY CONFERENCE QUESTIONS
CONCLUSION
Introduction to the Project Team Contracting Officer: John Babcock Contract Specialist: Michael Smith Project Manager/COR: Christine Roe Project Specialist/COR: Matthew Shafer Designer of Record: HDR Engineering, Inc.
Onsite Construction Management Representative: Third Party Company to be selected off GSA
SOLICITATION INFORMATION & CRITERIA
SOLICITATION NO.140P2023R0033 Planned Acquisition Milestones - Note that these dates are intended acquisition milestone estimates and not official dates. Refer to the solicitation for official dates upon issuance.
SOLICITATION ISSUED – June 26, 2023 INDUSTRY DAY VIRTUAL MEETING – July 25, 2023 PRE-BID SITE WALK – August 9, 2023, at 11 am Eastern PRE-BID REQUEST FOR INFORMATION DUE DATE – August 14, 2023 PLANNED NPS RESPONSE TO PRE-BID RFIS – August 18, 2023 PROPOSAL DUE DATE – August 25, 2023 ESTIMATED AWARD DATE – September 15, 2023 365 calendar day period of performance from (estimated) notice to proceed date of November 6, 2023 Award Type of Contract to be issued – Firm Fixed Price Full and Open Competition. Subcontracting Plan required for Large Business Offerors.
NAICS Code: 237990 - Small Business Size Standard: $45.0M PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS included
SOLICITATION REQUIREMENTS
Offerors shall ensure they acknowledge all Amendments and complete blocks 14 through 20c of the SF1442 Offerors shall complete SPECIAL REQUIREMENT 2: KEY PERSONNEL and SPECIAL REQUIREMENT 3: KEY TRADES of the SF1442 Submit a completed copy of provision 52.204-8 shown in section “K” of this solicitation. Complete all required representations and certifications if they are not available at www.SAM.gov. Your firm must maintain current, active registration at www.SAM.gov to be eligible for award and you are encouraged to complete SAM registration before submitting your offer.
Submit separate electronic PDF copies for the Technical Proposal and Price Proposal
Solicitation Requirements: Technical Proposal ORGANIZATION: Organize your Technical Proposal with the following table of contents:
FACTOR 1 – PROJECT EXPERIENCE
FACTOR 2 – KEY TRADES
FACTOR 3 – TECHNICAL APPROACH
FACTOR 4 – SCHEDULE
FACTOR 5 – MANAGEMENT APPROACH
PAST PERFORMANCE
SMALL BUSINESS PARTICIPATION
Solicitation Requirements: FACTOR 1: Project Experience Submit the attached "Project Experience" form addressing specific experience aspects below for 1 to 5 relevant projects completed in the last 7 years. More Projects submitted that meet the requirements below will be rated more favorably. Submit separate forms for each project. NOTE: Submit the same projects for the Past Performance as submitted under this factor.
Natural, Cultural, or Historic Resources: Renovation; Restoration; Rehabilitation of historic structures similar in scope, magnitude and complexity to this solicitation. Include experience and processes employed to meet all cultural resource and compliance requirements in Specification Section 01 11 00 - Summary of Work and Section 01 31 00 - Project Management and Coordination.
Remote Construction Experience: Construction at remote sites with difficult access, in extreme environmental conditions under limited construction seasons, working in close proximity and protecting natural resources such as but not limited to loggerhead sea turtles, sea grasses, corals, and other sensitive cultural resources similar to the scope, magnitude, and complexity of this solicitation.
Teaming Experience: Describe your experience as a prime contractor working with the proposed team (key personnel and key subcontractors). Prime contractor experience is experience as a general contractor managing multiple subcontractors on projects you self-performed at least 30% of the cost of the contract, excluding materials.
EVALUATION: Project experience demonstrating (1) capability to successfully complete relevant projects of similar scope and magnitude to this solicitation; (2) technical knowledge and skill required for this solicitation; and (3) effective management, problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Those not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Solicitation Requirements: FACTOR 2: Key Trades Describe experience and capability for the each of the following Key Trades identified in Section H of this solicitation and listed below. Indicate whether or not you have previously worked with these firms on previous projects. All firms proposed as Key Trades are subject to substitution requirements contained in this solicitation.
Key Trades/Key Subcontractor Project Experience: Submit the attached "Project Experience" form for each identified Key Trade Subcontractor addressing specific experience aspects below for 1 to 5 relevant projects completed in the last 7 years. More Projects submitted that meet the requirements below will be rated more favorably. Submit separate forms for each project. Key Trades, are subject to substitution requirements in Section H of this solicitation and resulting contract. NOTE: Submit the same projects for Past Performance as submitted under this factor.
Marine Construction Experience: Describe experience in Marine Construction projects you completed on-time and within budget that are similar in scope, magnitude, and complexity to this solicitation. Specifically describe experience with barging equipment and supplies and working in open waters adjacent to vertical structures as required in this solicitation at Specification Sections 011100 – Summary, 013100 – Project Management and Coordination, 015710 – Moat Protection, 442250 – Turbidity and Sediment Monitoring of Work and/or Drawing sub-sheet(s) # G3 – G3.4, W2.1-W2.2.
Dredging Construction Experience: Describe experience in Dredging Construction projects you completed on-time and within budget that are similar in scope, magnitude, and complexity to this solicitation. Specifically describe experience with dredging material adjacent to vertical structures as required in this solicitation at Specification Section 352400 – Dredging and/or Drawing sub-sheet(s) # C1 – C3.4.
Historic Brick Masonry Construction Experience: Describe experience in historic brick masonry performed by your firm or your proposed subcontractor similar in scope, magnitude, and complexity to this solicitation. Specifically describe experience with performing repairs in and out of the water as required in this solicitation at Specification Sections 030100.71 – Rehabilitation of Concrete, 033130 – Marine Concrete, 040516 – Brick Unit Masonry Grouting and Re-pointing, and 042113 – Replacement Brick Masonry and/or Drawing sub-sheet(s) # S3.3 and S3.5.
EVALUATION: Key Trades experience demonstrating (1) capability in same or similar Key Trade successful relevant projects of similar scope and magnitude to this solicitation; (2) technical knowledge and skill required for this solicitation; and (3) effective problem solving, communication, coordination, and organization present lower levels of risk and will be more favorably rated. Subcontractors not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Solicitation Requirements: FACTOR 3: Technical Approach Describe experience and capability for the each of the following Key Trades identified in Section H of this solicitation and listed below. Indicate whether or not you have previously worked with these firms on previous projects. All firms proposed as Key Trades are subject to substitution requirements contained in this solicitation.
Approach to Critical Contract Requirements: Describe Submit a written detailed technical approach for performing this construction project. Describe logistics for material delivery, staging, installation and disposal, including long lead items. Address the successful execution of the project while protecting the parks resources, maintaining park operations, and minimizing impacts to Park visitors. Consider any unique considerations relating to project scope, and creative and innovative ideas to execute the project in an expeditious manner. Demonstrate a clear understanding of the project scope and offer realistic strategies and methods for addressing the overall project scope.
Means/Methods: Provide a written technical approach for performing this construction project which demonstrates a clear understanding of the project, how the work will be accomplished, and how the work could be impacted by weather and seasonal compliance requirements. No specific form or format is prescribed for this technical approach document. Describe your phasing and sequencing of work showing interrelationships of the major elements below:
Masonry Repair on counterscarp wall (Defect Type 1, 2, 3) Reconstruction of collapsed wall section Repair of scour/undermined areas under the counterscarp (Defect Type 4) Repair of the counterscarp core damage (Defect Type 5) Dredging of material within the Moat Dredging of material at fingerslips and piers Sifting and placement of dredge material on the beach and in the parade grounds
Solicitation Requirements: FACTOR 3: Technical Approach cont’d Natural, Cultural, or Historic Resources: Describe your approach to protection and preservation of natural/cultural/historic resources as required in the solicitation, including but not limited to requirements in Specification Section 01 11 00 - Summary of Work and Section 01 31 00 - Project Management and Coordination
EVALUATION: Technical approaches that comply with applicable contract requirements; are realistic, appropriate, and efficient; and demonstrate logic and scope understanding present lower levels of risk and will be more favorably rated. Approaches not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Solicitation Requirements: FACTOR 4: Schedule Submit your proposed construction schedule for THIS SPECIFIC PROJECT showing completion within the required period of performance contained in this solicitation with accompanying schedule narrative. Submit your schedule in MS Project Gantt Chart format; for evaluation purposes only assume a Notice to Proceed date of November 6, 2023; and include specific activities required for this project and a clear critical path with major milestones and applicable predecessor activities. There is no preprinted form for this submittal. In your accompanying narrative explain your schedule logic, critical path activities, and key considerations such as:
Construction schedules and narrative descriptions documenting (1) clear and efficient critical path and logical sequencing; (2) account for procurement lead-time, subcontractor/trade coordination, on-site storage and staging, resource and time constraints; and (3) demonstrate risk mitigation and successful completion within the required period of performance present lower levels of risk and will be more favorably rated. Schedules which do not demonstrate these attributes present higher levels or risk and will be less favorably rated.
Approach to Critical Contract Requirements: The Narrative should describe your approach to successfully accomplish identifying the critical path for material submittal, review, approval and acquisition, dredging and beach placement outside of restricted work periods, and anticipated rough seas and weather delays in accordance with requirements contained at Specification Section 011100 – Summary of Work, 013216 – Construction Schedule and Drawing Sheet #s W2.1 – W2.2 within proposed Schedule submitted with Subfactor G. of this Factor. Identify potential related risks or reasons for project time or cost impacts and your solutions to mitigate and resolve them.
Risk Analysis: Submit a risk analysis identifying critical issues, potential problems, and/or areas of concern with recommended solutions. Include strategies to manage project risks such as weather and working around unforeseen site conditions, material lead times, and work force availability.
EVALUATION: Construction schedules and narrative descriptions documenting (1) a critical path and logical sequencing; (2) account for procurement lead-time, subcontractor/trade coordination, on-site storage and staging, resource and time constraints; and (3) demonstrate risk mitigation and successful completion within the required period of performance present lower levels of risk and will be more favorably rated. Schedules which do not demonstrate these attributes present higher levels or risk and will be less favorably rated.
Solicitation Requirements: FACTOR 5: Management Approach Management Approach is organizational structure and business processes to manage, control, and oversee your firm's operations. Submit a written narrative limited to 7 pages describing your management approach to the specific aspects below. Additional pages will not be evaluated. Pictures can be included and will count towards the page limitation. There is no preprinted form for this submittal.
Logistics, Coordination, Process: Submit a general management approach narrative for maintaining and managing project safety, quality control and coordination, cost management, and schedule management. Address how these general management procedures will be applied specifically to the constrained and remote location of the Dry Tortugas National Park; where basic services ranging from power to potable water do not exist or are very limited, and Key West, FL; where supplemental services are limited due to the remote location from a major metropolitan area. Include approach for staffing the project and approach for accommodating personnel operating in an isolated and remote location, living in close quarters for long periods of time. Include details about supplying and maintaining all project supplies, materials, and personnel to complete the project Roles and Responsibilities: Submit an organizational chart identifying the project team with major subcontractors and key personnel, identifying specific roles, responsibilities, and lines of authority. Describe how the subcontractors will be managed and coordinated. Describe the approach to manage and maintain the contract’s schedule, cost and scope. Describe how safety requirements will be incorporated into all activities. Describe how the quality control requirements will be performed to ensure the Government receives a quality project.
Owner & Regulatory Entity Coordination: Describe proposed coordination with the project owner (National Park Service), Army Corps of Engineers, Florida Department of Environmental Protections, and other (Federal, State, City, Local) regulatory entities to complete work within all parameters of the solicitation.
EVALUATION: Management approaches demonstrating (1) sound management practices and business processes; (2) effective cost and quality control; and (3) clear corporate and project team commitment, hierarchy and lines of communication, roles, responsibilities, and relationships present lower levels of risk and will be more favorably rated. Plans not demonstrating these attributes present higher levels of risk and will be less favorably rated.
Solicitation Requirements: Past Performance Submit Past Performance information for the same projects submitted under Project Experience (Factors 1 and 2) using the attached Past Performance Questionnaire. Information may be regarding the offeror's firm and/or its proposed subcontractors performing key trades and other construction activities. Subcontractor past performance will only be considered if it correlates to the work the subcontractor will be performing on this requirement. If available, offerors may submit a Past Performance Information Retrieval System (PPIRS) evaluation report in lieu of the Past Performance Questionnaire. Submittal process for the Past Performance Questionnaire is as follows:
1)Complete Sections I and II only of the attached Past Performance Questionnaire and forward to your client reference. The reference shall be someone who was substantially involved with the project and can provide a complete, objective assessment of your performance. Direct them to complete and submit the survey to the address and point of contact in paragraph B above by the due date and time for proposal receipt.
2)Submit copies of the questionnaire that you forwarded to your references with their point of contact information in this proposal Volume I.
3)Submit a narrative disclosing any instances of past performance that may be considered less than fully satisfactory. Describe pertinent facts, circumstances and any remedial action taken or to be taken to correct the deficiency. Failure to disclose such instances could result in an unfavorable assessment of the offeror's past performance record.
EVALUATION: Past performance demonstrating higher levels of success and quality on more relevant projects similar in scope and magnitude to this solicitation present lower levels of risk and will be more favorably rated. Projects that are more relevant to the requirements of this solicitation will be given more weight in the overall past performance rating. Project Experience ratings (Factors 1 and 2) will be considered in determining relevancy for projects submitted under this factor. If an offeror has no past performance on similar work relevant to this solicitation, they will be evaluated neither favorably nor unfavorably. Past performance on contracts with the Federal Government, other public agencies, or private organizations will be considered. All submitted references may not be contacted. Sources other than submitted references may be contacted. During proposal evaluations, exchanges between the Government and offerors may occur to clarify the relevance of past performance information and/or address adverse past performance information which an offeror has not yet had an opportunity to respond to.
Solicitation Requirements: Small Business Participation All offerors (both other than small businesses and small businesses) shall submit Small Business Participation documentation that address the evaluation criteria defined in the Small Business Participation factor contained in section M of this solicitation.
EVALUATION: All offerors (both other than small businesses and small businesses) will be evaluated on the extent of proposed participation/commitment to use U.S. small businesses in the performance of this acquisition (as small business prime offerors or small business subcontractors) relative to the objectives and requirements established herein. Small business offerors will receive the maximum credit for this evaluation factor and do not need to submit any documentation supporting this evaluation factor. The Government will evaluate the following to determine if the offeror met or exceeded the requirements:
The extent to which firms as defined in FAR Part 19, are specifically identified in proposals The extent to which offerors demonstrate substantive commitment to small business firms, such as, letters of commitment, Joint Ventures, mentor/protégé agreements, or other demonstrations of commitment (i.e., binding commitments will become enforceable/contractual requirements) Identification of the type and variety of the work small firms are to perform (i.e., binding commitments will become enforceable/contractual requirements) The extent of participation of small business prime offerors and small business subcontractors in terms of the value of the total acquisition (total contract value) (i.e., binding commitments will become enforceable/contractual requirements) The extent to which the offeror provides detailed explanations/documentation supporting the proposed quantitative participation Extent to which the offeror complied with requirements of FAR 52.219-8, Utilization of Small Business Concerns (i.e., binding commitments will become enforceable/contractual requirements) Extent to which the offeror complied with requirements of FAR 52.219-9 Small Business Subcontracting Plan (when applicable) (i.e., binding commitments will become enforceable/contractual requirements) The Government will evaluate the proposal to determine which offeror proposes the best value in terms of Small Business Participation. Offers submitted by a small business prime offeror will also be evaluated and will receive the maximum score for this evaluation criteria.
Solicitation Requirements: Price Proposal SECTION B CONTRACT PRICE SCHEDULE: Enter the proposed dollar amount for each line item in the Price Schedule, including any optional items, if applicable. Also provide a separate Schedule of Values (SOV) for each line item in the Section B Contract Price Schedule. Each SOV shall show the line item price broken down by major work components. Proposed pricing is an evaluation factor. Proposed pricing will be evaluated for fair and reasonableness. Reasonableness will be determined in accordance with the proposal analysis technics identified in the FAR, DIAR and all other applicable statutes, regulations and policies. If multiple contract line items are included in the price schedule, prices will be evaluated to determine whether any line items are unbalanced in accordance with FAR 15.404-1(g). Offerors are cautioned to distribute costs appropriately.
SF 24 BID BOND: Submit Standard Form 24, Bid Bond duly executed between the offeror and the bonding company. Refer to clause 52.228-1. The SF24 Bid Bond will be reviewed for completeness and acceptability.
GENERAL REFERENCES: Complete and submit the attached "General References," form. Information will be used in determining Responsibility pursuant to FAR 9.103. Points of contact will be queried to determine Responsibility pursuant to FAR 9.103.
SMALL BUSINESS SUBCONTRACTING PLAN: Large businesses will only be considered for award if they submit an acceptable Small Business Subcontracting Plan. Plans that meet or exceed the NPS small business subcontracting goals and are otherwise compliant with FAR Part 19.705 shall be considered acceptable Plans that indicate goals less than the NPS small business subcontracting goals but are otherwise compliant with FAR Part 19.705 shall be considered acceptable if the Contracting Officer determines the offeror’s submitted rationale for not meeting the NPS goals are reasonable.
Solicitation Requirements: Subcontracting Plan SMALL BUSINESS SUBCONTRACTING PLAN: Small business offerors are not required to submit a subcontracting plan; however, large business offerors shall complete and submit the attached Subcontracting Plan Form in response to the requirements of clause 52.219-9.
The NPS subcontracting goals for Fiscal Year 2023 are: Small Businesses (44.8%), Small Disadvantaged Businesses (5%), Women-Owned Businesses (5%), HUBZone (3%), and Service Disabled Veteran-Owned Businesses (3%), Indian Small Business Economic Enterprises (ISBEE) (3%) Subcontracting plans that contain goals less than the NPS goals shall include rationale as to why the above goals cannot be met.
Solicitation Requirements: Basis for Award The Government will conduct a source selection using the Best Value Continuum Tradeoff Process defined at FAR Part 15.1. The Contracting Officer (CO) will obligate and award a contract to the offeror who submits a proposal the Source Selection Authority (SSA) determines conforms to solicitation requirements; is fair and reasonable; and provides the best value to the government considering all evaluation factors combined as detailed below. For this acquisition, the CO is the SSA.
The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.
Additionally, pursuant to FAR 52.215-1(f), Contract Award, contained herein:
The Government may reject any or all proposals if such action is in the Government’s interest.
The Government may waive informalities and minor irregularities in proposals received.
The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them to be necessary.
Solicitation Requirements: Evaluation Process All proposal evaluations will be conducted in strict confidence. The number and identifies of offerors and proposal contents will be revealed only to individuals involved in the evaluation process. No information will be revealed to other offerors. The evaluation process is as follows:
Initial Review: Proposals will be reviewed for compliance with the solicitation to verify that all submission requirements are met; all certifications are complete, and the offeror is responsive and otherwise eligible to receive award of a Federal contract. If the proposal does not comply or lacks sufficient information to be meaningfully evaluated, it may be eliminated from further consideration for award.
Non-Price Evaluation: A Technical Evaluation Panel (TEP) comprised of Government personnel will conduct a non-price evaluation of proposals. The TEP will review, evaluate, assess risk, and rate all acceptable proposals against the technical factors contained in this solicitation. The TEP will not have knowledge of any pricing until the technical evaluation is complete.
Past Performance Evaluation: The TEP and CO/SSA will also evaluate offerors’ past performance. The evaluation will assess the government’s confidence level for offers to successfully perform contract requirements based on survey responses, PPIRS data, and other pertinent, relevant information.
Price Evaluation: Upon completion of the technical evaluation, the TEP and CO/SSA will review pricing as evaluated in Volume 2 below. The TEP will make an award recommendation to the CO/SSA.
Tradeoff Analysis: The CO/SSA will review the TEP’s award recommendation and independently perform a tradeoff analysis between each proposal’s (1) demonstrated technical advantages, disadvantages, strengths, weaknesses; (2) past performance confidence assessment; and (3) proposed pricing.
Selection: The CO/SSA will select the proposal that provides the overall best value, considering all evaluation factors, to the Government for award. The Government may elect to accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.
Solicitation Requirements: General Information Technical Proposal: Factors 1 – 5 are listed in descending order of importance.
Past Performance: Past Performance is less important than all Technical Factors combined.
Proposed pricing is an evaluation factor. All evaluation factors other than price, when combined are significantly more important than price.
Optional Line Items 4 through 9 are included in the Price Schedule and the Contracting Officer may unilaterally exercise the option by written notice to the Contractor within 90 days after contract award.
Offerors providing less than 45 calendar days for Government Acceptance after the date offers are due will not be considered and will be rejected.
Submit, at a minimum, an offer that conforms to the solicitation documents. By submission of an offer, the offeror unconditionally assents to the terms and conditions in this solicitation and in any solicitation attachments. Proposals offering alternative stipulations to the requirements of this solicitation will NOT be considered or accepted. If you would like to propose an alternative, please do so in the form of a Pre-Bid Request for Information prior to formal submission in the Proposal.
In accordance with FAR 36.209, all firms, prime contractors or subconsultants, involved in developing the design or specifications for this construction solicitation are not eligible and prohibited from receiving any part of this construction award. Proposals from or containing firms under these circumstances will not be considered for award.
Project Overview
SITE LOCATION REFERENCE
Project Location: Fort Jefferson is located on Garden Key, Dry Tortugas National Park, 70 miles west of Key West, Florida
SITE SCOPE REVIEW
The work of this contract is for the Repairs to the Fort Jefferson Counterscarp and to Perform Dredging of Fort Jefferson Moat and Fingerslips at Garden Key that were damaged by hurricanes over the last 5 years.
This property is listed on the National Register of Historic Places (NR) and managed as a cultural resource asset. Historical significance extends to the entire site including all associated buildings, landscapes, engineering features and marine construction.
Project Background
The exterior of Fort Jefferson includes two major features, the Scarp and the Counterscarp. The Counterscarp is the seawall around Fort Jefferson which protects it from the ocean’s energy and forms the outer wall of the moat. The majority of the work is on the counterscarp and dredging in select areas.
Garden Key is the location of the park’s only public use dock. The main dock supports both park operations providing moorage for the Park supply ship and the Park’s concessionaire ferry.
Project Background
PROJECT OVERVIEW
SITE LAYOUT AND ORIENTATION
Main Dock Used by Public and NPS Proposed Barge Landing/Access North Coaling Dock Staging Area Wall Breach Locations for Dredging Counterscarp Repairs Fort Jefferson Parade Grounds
DRTO 244370 - Repairs to Fort Jefferson Counterscarp Repair damaged areas of the counterscarp with new materials and methods to achieve a more durable structure. This repair option will address the collapsed section of the wall and wall repairs while matching the historic fabric. Materials and methods are based on durability and compatibility with the fort's historic features. Underwater voids under the counterscarp wall will be repaired. Rip rap will be placed in select location at the base of the walls to aid in hardening and prolonging the counterscarp's life from future wave energy and scour. Coral relocation to be performed by the Park prior to construction beginning.
DRTO 244372 - Dredging of Fort Jefferson Moat and Fingerslips at Garden Key Waterfront The scope of this project involves the removal of hurricane accumulated sand deposits at Fort Jefferson. Dredging volume is approximately 3,000 CY and is located within the moat of the Fort and at the access finger slips. Dredged material will be stored/spread within the project boundaries.
Scope of Work
Major Areas of Work Counterscarp
Major Areas of Work Dredge
North Moat South Moat Fingerslips
SITE SCOPE REVIEW – KEY ITEMS
Schedule Sooty Tern Nesting Season; February 01 to September 30 – no work may take place on the isthmus connecting Garden and Bush Keys Loggerhead Turtle Nesting Season: May 01 to September 30 – no work may take place on or near the indicated beaches. This includes excavation, material handling, storage, vessel landing, or any activity that may disturb the beach in any way.
Atlantic Hurricane Season: June 01 to November 30 – Contractor shall be prepared to comply with Park emergency storm preparedness procedures which will include securing all equipment, materials, and work and evacuating the site if required/directed by the Contracting Officer .Coordination Limited housing, see specification for details Limited use of main dock. Would need to coordinate with Park on availability and times of use.
Limited areas for mooring and anchoring of vessels, coordinate with Park and reference benthic survey.
No groundbreaking activities will take place until all Government provided permitting documentation is in hand. Currently documents are expected late September to early October.
Preconstruction assessment and survey per specifications required.
Contractor shall conduct operations to ensure the least inconvenience to public.
KEY ITEMS
FORMAL SITE VISIT INFORMATION/PLANNING
The Formal Site Visit that will be held for solicitation # 140P2023R0033. Due to the logistical difficulties of getting to Garden Key the Denver Service Center wants to give all interested parties sufficient time to arrange transportation to and from Garden Key for the Site Visit. The Site Visit will be held on August 9, 2023. Interested parties who are going to attend shall register by no later than August 4, 2023, to register please submit an email to the Contract Specialist at michael_smith@contractor.nps.gov before the specified date and time. Interested parties are limited to two participants for the visit, including subcontractors. We highly encourage all interest parties to attend the Site Visit. The Site Visit Provision in the solicitation states as follows:
52.236-27 SITE VISIT (CONSTRUCTION) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for August 9, 2023, at approximately 11:00 am Eastern Time.
(c) Participants will meet at On Site at Fort Jefferson, Garden Key Main Dock no earlier than 10:45 am Eastern.
(End of provision)
PRE-PROPOSAL CONFERENCE QUESTIONS
Site Visit Information/Liability Form Understand that transportation to and from the site location must be self-provided. We were sharing information from the Yankee Freedom Ferry but it is our understanding that the Ferry for August 9th is now full. We are also sharing information for the seaplane that makes regular visits to the island(www.keywestseaplanecharters.com). Individuals may also utilize private charters at their choice. Thank you for your interest in the opportunity and look forward to seeing your team at the site visit!
For Liability Purposes Please Complete the Park Form Here: https://forms.office.com/pages/responsepage.aspx?id=urWTBhhLe02TQfMvQApUlCbl_504ZhVHudPhhF3mNXpUM05QRkxURExERUtHQUwySUs0Q1VRVFlGRy4u
Site Visit Information/Ferry Ride Information(Yankee Freedom III) Website: https://www.drytortugas.com/day-trip-ferry-tickets/
FERRY DEPARTURE
CHECK IN: 7AM
BOARDING: 7:30AM
DEPARTURE: 8AM
ARRIVE AT FORT JEFFERSON: 10:30AM
DRY TORTUGAS & FERRY RETURN
FORT JEFFERSON TOUR: 11AM
LUNCH: 11AM – 1PM
DEPARTURE: 3PM
ARRIVE IN KEY WEST: 5:30PM
INDUSTRY DAY CONFERENCE QUESTIONS
Please state your name and company before you ask your question. Questions will be attempted to be addressed if it’s about the current acquisition milestone or project specification or drawings but if unable the questions may not be addressed until formal NPS Responses to the Pre-Bid Request for Information is issued via Amendment to the Solicitation. The main point of contact for the Solicitation is the CO and CS which can be reached here:
CO: john_babcock@nps.gov CS: michael_smith@contractor.nps.gov The intended purpose of this industry day was to encourage suitable contractors to respond to the Solicitation and also encourage teaming for interested teaming subcontractors.
PRE-PROPOSAL CONFERENCE QUESTIONS
Thank You For Your Interest in This Project E X P E R I E N C E Y O U R A M E R I C A
National Park Service U.S. Department of the Interior image2.jpeg image3.jpeg image4.png image5.jpeg image6.png image7.jpeg image8.jpeg image9.png image10.png image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.png image16.png image1.jpeg
File details come from the government source that posted it. Updated .