Sol_140P2020R0080_Amd_0003.pdf

PDF 86 KB Posted

Attached to
ANTI 225963 Rehabilitate Antietam Visitor Center
Solicitation number
140P2020R0080
Issued by

About this file

This document is an amendment to a solicitation for the rehabilitation of the Antietam Visitor Center. Amendment 0003 provides site visit attendance records and a meeting recording link from a virtual site visit held on July 02, 2020. It amends Clause 52.236-1 to reduce the percentage of work to be performed by the contractor's own organization to at least 15%. The amendment also changes the evaluation criteria for Section M 2.SUBFACTOR 1B by limiting the schedule narrative to two pages and emphasizing clear sequencing, consideration of procurement lead times and resource constraints, and demonstration of risk mitigation for successful completion within the period of performance. The period of performance is from August 15, 2020 to February 16, 2022. The National Park Service is the contracting agency.

View the file

Other files

File Type Posted
Sol_140P2020R0080_Amd_0007.pdf PDF
REMAINING RFI Questions and Answers_0006.pdf PDF
Sol_140P2020R0080_Amd_0006.pdf PDF
1977 Restroom Renovation 302_41007A-PLNS_ELEV_0005.pdf PDF
230923 Direct Digital Control (DDC) System for HVAC cc_0005.pdf PDF
Temp Visitor Center Life Safety Markup_07.24.2020_0005.pdf PDF
ANTI 225963 Final Q and A Amend 05_0005.pdf PDF
Sol_140P2020R0080_Amd_0005.pdf PDF
Sol_140P2020R0080_Amd_0004.pdf PDF
ANTI 225963 Site Visit Attendees July 02 2020_0003.pdf PDF
B09_ Amend 01 140P2020R0080_0002.pdf PDF
Sol_140P2020R0080_Amd_0002.pdf PDF
B11_ANTI 225963_PreBid_Agenda_0002.pdf PDF
Sol_140P2020R0080_Amd_0001.pdf PDF
B08_Attach 03 Drawings Vol 1 of 2.pdf PDF
B08_Attach 01 Specifications Vol 1 of 2.pdf PDF
B08_Attach 02 Specifications Vol 2 of 2.pdf PDF
B08_Attach 04 Drawings Vol 2 of 2.pdf PDF
B08_Attach 05 Appendix.pdf PDF
B08_140P2020R0080.pdf PDF
B08_Attach 06 Solit_PSP_Vol_II_PriceSched.xlsx XLSX spreadsheet
B08_Attach 08 Wage Decision 06-04-2020.pdf PDF
B08_Attach 13 Solit_PSP_Vol_II_GenRefs ANTI 225963.doc DOC document
B08_Attach 10 Solit_PSP_Vol_I_PastPerf_REQD ANTI 225963.doc DOC document
B08_Attach 14 Solit_PSP_Vol_II_SubKPlanForm_REQD ANTI 225963.doc DOC document
B08_Attach 09 Solit_PSP_Vol_I_Exp_REQD ANTI 225963.docx DOCX document
B08_Attach 11 SF24-16d.pdf PDF
Sol_140P2020R0080.pdf PDF
B08_Attach 07 Virtual Site Visit Floor Plans.pdf PDF
B08_Attach 15 Solit_PSP_Vol_II_HazMat ANTI 225963.doc DOC document
B08_Attach 12 Solit_PSP_Vol_II_Equals ANTI 225963.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2020R0080 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

ANTI 22596306/29/20200003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/25/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment 0003 is to:

A)Provide Site visit attendance records and meeting recording link for the virtual site visit held on July 02, 2020. (Link to recorded session included in the added attachment)

B)Clause 52.236-1 is hereby amended to "The Contractor shall perform on the site, and with its own organization, work equivalent to at least 15 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the

Government."

C)Section M 2.SUBFACTOR 1B - Schedule is hereby changed to "Construction schedules and narrative descriptions documenting (1) clear and efficient critical path and logical

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Anne Laporta

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2020R0080/0003 sequencing; (2) account for procurement lead-time, subcontractor/trade coordination, on-site storage and staging, resource and time constraints; and (3) demonstrate risk mitigation and successful completion within the required period of performance present lower levels of risk and will be more favorably rated. Schedule

Narrative is limited to two(2) pages. Schedules which do not demonstrate these attributes present higher levels or risk and will be less favorably rated..

All other terms and conditions remain unchanged.

Amendments must be acknowledged in proposal submissions.

Legacy Doc #: NPS

Period of Performance: 08/15/2020 to 02/16/2022