This document contains questions and answers related to the federal contract solicitation for the Rehabilitate Antietam Visitor Center project. Key details include that the solicitation is for rehabilitation of the Antietam Visitor Center located at Antietam National Battlefield in Maryland. The work includes construction of a new temporary visitor center facility while the existing center is under renovation, replacement of wood grille finishes to match existing materials, installation of category 6A security camera cabling in blue color, and provision and installation of all required telecommunications equipment and cabling by the contractor. The solicitation number is 140P2020R0080 and was issued by the National Park Service for the Department of the Interior.

View the file

Other files

File Type Posted
Sol_140P2020R0080_Amd_0007.pdf PDF
Sol_140P2020R0080_Amd_0006.pdf PDF
1977 Restroom Renovation 302_41007A-PLNS_ELEV_0005.pdf PDF
230923 Direct Digital Control (DDC) System for HVAC cc_0005.pdf PDF
Temp Visitor Center Life Safety Markup_07.24.2020_0005.pdf PDF
ANTI 225963 Final Q and A Amend 05_0005.pdf PDF
Sol_140P2020R0080_Amd_0005.pdf PDF
Sol_140P2020R0080_Amd_0004.pdf PDF
ANTI 225963 Site Visit Attendees July 02 2020_0003.pdf PDF
Sol_140P2020R0080_Amd_0003.pdf PDF
B09_ Amend 01 140P2020R0080_0002.pdf PDF
Sol_140P2020R0080_Amd_0002.pdf PDF
B11_ANTI 225963_PreBid_Agenda_0002.pdf PDF
Sol_140P2020R0080_Amd_0001.pdf PDF
B08_Attach 03 Drawings Vol 1 of 2.pdf PDF
B08_Attach 01 Specifications Vol 1 of 2.pdf PDF
B08_Attach 02 Specifications Vol 2 of 2.pdf PDF
B08_Attach 04 Drawings Vol 2 of 2.pdf PDF
B08_Attach 05 Appendix.pdf PDF
B08_140P2020R0080.pdf PDF
B08_Attach 06 Solit_PSP_Vol_II_PriceSched.xlsx XLSX spreadsheet
B08_Attach 08 Wage Decision 06-04-2020.pdf PDF
B08_Attach 13 Solit_PSP_Vol_II_GenRefs ANTI 225963.doc DOC document
B08_Attach 10 Solit_PSP_Vol_I_PastPerf_REQD ANTI 225963.doc DOC document
B08_Attach 14 Solit_PSP_Vol_II_SubKPlanForm_REQD ANTI 225963.doc DOC document
B08_Attach 09 Solit_PSP_Vol_I_Exp_REQD ANTI 225963.docx DOCX document
B08_Attach 11 SF24-16d.pdf PDF
Sol_140P2020R0080.pdf PDF
B08_Attach 07 Virtual Site Visit Floor Plans.pdf PDF
B08_Attach 15 Solit_PSP_Vol_II_HazMat ANTI 225963.doc DOC document
B08_Attach 12 Solit_PSP_Vol_II_Equals ANTI 225963.doc DOC document
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REMAINING RFIs for Solicitation ANTI 225963 140P2020R0080

13. Spec section 133423 part 1.5.A – Special Warranty – Does this apply as substantial completion will not be achieved until after the TVC is removed?

Specification 13 34 13, paragraph 1.5.A should be modified to read:

A. Special Warranty: Manufacturer agrees to repair finish or replace modular buildings that fail in materials or workmanship within specified warranty period.

1. Warranty Period: From the date the temporary visitor center is occupied by NPS to the final acceptance date of the permanent Visitor Center.

28. Bio-Retention Pond is shown in plan view on drawing C27 (sheet 32 of 195) with a section on drawing C32 (sheet 37 of 195) detail 3/C32 of the Bio- Retention Pond indicates Filter Fabric as its liner.

Normally, Bio-retention have a impervious rubber type liner not Filter Fabric. Is the Filter Fabric requirement correct?

The facility was designed as a modified Bio-Retention facility and is based on the MDE standard details, Filter fabric is proposed for this design in order to promote infiltration of the captured stormwater runoff into the surrounding soils. The intent with the facility is to treat the 2 year increase through filtration and infiltration, not just storage.

29. WD-2 indicates it is a finish that is existing-to-remain; WD-1 indicates it is to match WD-2. Could you please provide any additional information regarding WD-2 such as species, color, or finish, so that we can more accurately match WD-2?

See Drawing 2/A26 in conjunction with Finish Schedule. WD-2 is existing wood grille to remain. WD-1 is new wood grill to match existing WD-2 in member size and spacing and to match existing wood species and stain as closely as possible. As the area of new WD-1 is fairly limited, a portion of existing WD-2 which is being removed as part of the relocation of the entrance doors to the Auditorium can be salvaged and re-used where WD-1 is indicated.

92. Please provide color of Security Camera Category 6A cables.

Security cables shall be blue

101. Is the owner mounting their switches and networking gear?

Updated EYP Response: The contractor is responsible for providing and installing all telecom equipment indicated on the drawings including patch panels and data switches. Additionally the contractor is to provide associated cabling to provide a fully functional system.