6-PSP_Vol_II,_pkg.pdf

PDF 2 MB Posted

Attached to
Pullman National Monument, PULL 223195-253045 Federal contract opportunity
Solicitation number
140P2019R0048
Issued by
Department of the Interior National Park Service National Office

About this file

This pre-solicitation notice describes an upcoming small business set-aside solicitation for construction services at Pullman National Monument in Chicago, Illinois. The National Park Service seeks to stabilize the Administration Building and construct a new Visitor Center for approximately $5-10 million. Services include masonry repairs, structural reinforcement, and tenant improvements to convert portions of the Administration Building into a Visitor Center with exhibits, retail, and offices. The project also involves electrical, plumbing and HVAC work. The period of performance is September 1, 2019 through August 30, 2020. Interested small businesses should monitor www.fedbizopps.gov in July 2019 for full solicitation details and response requirements. Firms must register in SAM.gov and have a DUNS number to be eligible for award.

PSP volume II

View the file

Other files for this federal contract opportunity

Other files attached to Pullman National Monument, PULL 223195-253045, newest first.
File Type Posted
191024_RFI_Response_WSP_009-010_MEP_detail.pdf PDF
SF_30-Amendment_0007-140P2019R0048_10.28.19.pdf PDF
Amendment_Number_0007_Narrative.pdf PDF
1-140P2019R0048,_Amendment_No._0006.pdf PDF
9-A6.4_WINDDTLS_A6-Addendum_191022.pdf PDF
11-S1.0_01STRPLN_S1-Addendum_191024.pdf PDF
5-084413_Glazed_Aluminum_Curtain_Walls.pdf PDF
4-10.22.19_-_Pullman_Visitor_Center_Camera_Changes.pdf PDF
7-282000_FL_-_Video_Surveillance.pdf PDF
8-A2.4B_INT_ELEV_A2-Addendum_191022.pdf PDF
PULL_223195_Sustainability_Checklist_2019-0619.pdf PDF
SF_30_-_140P2019R0048-Amendment_0005.pdf PDF
PULL_VC_Contractor_Site_Visit_Attendees_191017.pdf PDF
PULL_223195_ARCH_Submittal_List_2019-0820.pdf PDF
PULL_Visitor_Center,_Bidding_Questions_as_of_10-21-2019-FINAL.pdf PDF
North_Bay_Electrical_Equipment.pdf PDF
SF_30_Amendment___4_140P2019R0048.pdf PDF
PULL_Prebid_Notes.pptx PPTX presentation
2-Amend__4,_Vol_II,_Instructions_.pdf PDF
B11_PULL_223195-253045_VC_prebid_attendees_191009.pdf PDF
1-Amendment__4_Narrative.pdf PDF
PULL_Visitor_Center,_Bidding_Questions,_10-1-2019.xlsx XLSX spreadsheet
Amendment_0003_140P2019R0048.pdf PDF
B02_SF_30,_Amend_No._002.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
B01_PULL_223195-253045_140P2019R0048_SF_1442,_Amend__1.pdf PDF
B08_PULL_223195-253045_Amend__1,_Narrative.pdf PDF
B08_PULL_223195-253045_Amend__1,_SF_30.pdf PDF
_B08_PULL_223195-253045_Amend__1,_page_175_of_180,_preproposal.pdf PDF
4-B03_PULL_223195-253045_General_Decision,_IL20190009_.pdf PDF
B08_Solit_PSP_Vol_II_SBSubKCalc.xlsx XLSX spreadsheet
C_-_Limited_Hazardous_Materials_Report_GSG.pdf PDF
A_-_Soils_Investigation_Report_TSC.pdf PDF
E2.1_-_VC_Exhibit_Design_Part1.pdf PDF
D1_-_Pullman_Stabilization_Drawings.pdf PDF
1-PULL_223195_FINAL_Spec_BOOK_1_2019-0913.pdf PDF
2-PULL_223195_FINAL_Spec_BOOK_2_2019-0913.pdf PDF
B08_PULL_223195-153045_140P2019R0048_Binder1.pdf PDF
E2.3_-_VC_Exhibit_Design_Part3.pdf PDF
E2.4_-_VC_Exhibit_Design_Part4.pdf PDF
3-PULL_223195_FINAL_Drawings_2019-0913.pdf PDF
E1.2_-_Site_Development_Drawings_DRAFT_2019-0719_Part2.pdf PDF
E2.2_-_VC_Exhibit_Design_Part2.pdf PDF
E1.3_-_Site_Development_Drawings_DRAFT_2019-0719_Part3.pdf PDF
B08_Solit_PSP_Vol_II_SubKPlanForm_REQD.doc DOC document
5-PSP_Vol_I,_pkg.pdf PDF
B_-_VC_Building_Soil_Sampling_Report_DAI.pdf PDF
D2_-_Pullman_Stabilization_Project_Manual.pdf PDF
E1.1_-_Site_Development_Drawings_DRAFT_2019-0719_Part1.pdf PDF
Show all 50

Pullman National Monument, PULL 223195-253045 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

INSERT OFFEROR'S COMPANY

NAME:

LEVEL OF COMMITMENT TO USE SMALL BUSINESS CONCERNS

SUBCONTRACTOR NAME

Socio-

Economic Status

Description of Supplies/Service

Subcontracted

Total Estimated Subcontract Value

SB

Estimated

SDB

HZSB

SDVO

WOSB

Explain and provide supporting documentation regarding the level of commitments to use SB concerns (for example, what types of committments, if any, are in place for this specific acquisition as a prime and/or written contract, verbal, enforceable, non-enforceable, joint venturing, mentor-protege, etc.

ABC Company $ 1,000.00 $ 1,000.00

XYZ Company $ 10,000.00 $ 5,000.00 $ 5,000.00

PDQ Company $ 20,000.00 $ 10,000.00 $ 10,000.00

Total Subcontracted Value $31,000.00 $1,000.00 $10,000.00 $5,000.00 $10,000.00 $5,000.00

Total Contract Value $ 10,000,000.00 $10,000,000.00 $10,000,000.00 $10,000,000.00 $10,000,000.00 $10,000,000.00 $10,000,000.00

Subcontracted Value Percent 0.31% 0.01% 0.10% 0.05% 0.10% 0.05%

NOTE 2: If supplies or services are projected to be subcontracted to small, small disadvantaged, women-owned, service disabled veteran owned, hubzone, or veteran owned small businesses, but large businesses are subsequently substituted, the contracting officer shall be provided with timely written notification.

Mark the appropriate socio-economic category of the subcontractor Small Business (SB) concern.

SB = Small Business, SDB = Small Disadvantaged SB, HZSB = HubZone SB, SDVO = Service-Disabled Veteran Owned SB, WOSB = Woman Owned SB

SMALL BUSINESS SUBCONTRACTING PLAN CALCULATIONS

NOTE 1: List the type of supplies and/or services to be subcontracted, estimated dollars, and the corresponding socio-economic status of the businesses

PSP VOL 2 Pkg

B08_Solit_PSP_RFP 2Cover

2-B08_Solit_PSP_Vol_II_BidBond

3-JECA 219033 03-30-18 ContractPriceSchedule

Price Schedule Blank

4-B08_Solit_PSP_Vol_II_GenRefs

5-B08_Solit_PSP_Vol_II_SubKPlanForm

6-B08_Solit_PSP_Vol_II_SBSubKCalc

Pullman National Monument

Solicitation #: 140P2018R0048

PROJECT TITLE: Stabilize Administration Building and Construct New Visitor Center

PULL 223195-253045

REQUEST FOR PROPOSAL

(RFP)

Proposal Submission Package

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

For Technical Volume I:

1. Experience Questionnaire

2. Subcontractor Reference

3. Past Performance Questionnaire

For Business & Price Volume II:

1. SF 24 Bid Bond

2. Contract Price Schedule

3. General References

4. Proposed Equals

5. Hazardous Materials Identification Listing

6. Small Business Subcontracting Plan

7. Subcontracting Calculations

PROPOSED EQUALS

In accordance with Provision 52.211-06 (Section L), the following products are being proposed as equals. Provide all attachments required by the provision, as applicable.

Use additional sheets of paper as necessary.

Section No. Paragraph No.

Product/Model No. Proposed Product/Model No.

A. By submitting the proposed equal, the contractor certifies that it:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide, as a minimum, the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

B. The Contractor is encouraged to submit for approval products that exceed accessibility standards, are sustainable and/or made from recycled or environmentally responsible material. Every effort will be made to approve these materials.

General References READ CAREFULLY: The purpose of this form is for the offeror to provide the Government with general references in the spaces provided as described in the Instructions, Conditions, and Notices to Offerors (Section L). Include Area Codes with all telephone numbers. Fill in the information by typing or printing legibly.

It is especially important that the offeror disclose instances in which their relationships with the references may be considered less than fully satisfactory. The offeror should tell their side of the story and describe remedial corrective action that has been taken or will be taken to correct the deficiency. Failure to do so may result in a determination that an offeror has been less than candid with the Government, which could result in an unfavorable assessment of the offeror’s past performance record. Provide explanations on separate sheets as necessary.

NAME OF CONTRACTOR/OFFEROR:

SURETY

Name of Surety:

Address of Surety:

Name of Agent:

Telephone Number:

CORPORATE BANK

Name of Bank:

Address of Bank:

Types and Numbers of Accounts:

CORPORATE BANK

Name of Bank:

Address of Bank:

Types and Numbers of Accounts:

INSURANCE COMPANY

Name:

Address:

Types of Policies:

SUBCONTRACTOR

Name of Contact:

Area of Specialized Work:

MATERIAL SUPPLIER

Types of Material:

HAZARDOUS MATERIALS IDENTIFICATION

LISTING

In accordance with Clause 52.223-3, Hazardous Material Identification and Material Safety

Data, of the Contract, contractor is required to identify any hazardous materials that will be delivered under this contract.

List below all known hazardous materials to be used in performance of the work and submit with the proposal/bid. If material components are unknown at the time of submission, respond with a statement to that effect.

SMALL BUSINESS SUBCONTRACTING PLAN

(Form Version Date 11/26/18)

***Blue text is offeror instructions and shall be deleted by the offeror prior to Plan submission. *** ***Red Text is sample and shall be tailored, by the offeror, to the specific acquisition***

Large business Offerors proposing a total price greater than $700,000 ($1,500,000 for construction) shall complete and submit this Subcontracting Plan with their proposal. Failure to complete and submit this form may result in rejection of an offer.

This form is consistent with contract clause 52.219-9. Refer to clause 52.219-9 for additional guidance.

Use of this form is not intended to waive other solicitation & contract requirements.

The term "Subcontract" within this document means any agreement (other than one involving an employer-employee relationship) entered into by a federal government prime contractor or subcontractor calling for supplies or services required for performance of the contract or subcontract.

The National Park Service (NPS) FY18 subcontracting goals are as follows:

o Small Business Concerns: 43%;

o Veteran Owned Business Concerns: 3.0%, o Service-Disabled Veteran Owned Concerns: 3.0%, o HUBZone Small Business Concerns: 3.0%;

o Small Disadvantaged Business Concerns: 5.0%;

o Small Women-Owned Business Concerns: 5.0%.

If your firm indicates in Item No. 2 below any percentages less than the above noted NPS goals then specify in an attachment the reason(s) your firm cannot meet the NPS goals.

Revisions:

11/26/18: Updated Small Business goals for FY19

7/17/18: Added Subcontractor DUNS # column to table in Part 3

Date of Submission:

Contractor:

State / Zip Code:

Contractor’s DUNS #:

Contract Information:

Contract or Solicitation #:

Contract Scope of Work:

Contract Period of Performance:

Total Proposed Price:

1. Type of Plan

Individual plan. This plan:

a. Covers the entire contract period of performance,

b. Applies to the specific contract noted above,

c. Includes subcontracting goals in support of the contract action referenced above,

2. Goals ***Response to this section corresponds to contract clause 52.219-9(d)(1) & (2)***

Following are the dollar and percentage goals for Small Businesses, Small Disadvantaged Businesses including Alaska Native Corporations and Indian Tribes, Women-Owned and Economically Disadvantaged Women-Owned Businesses, Historically Underutilized Business Zone concerns, Veteran Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses concerns as subcontractors.

***Include all subcontracts that contribute to contract performance. If noted in item 1 above you may include a proportionate share of products and services that are normally allocated as indirect costs in the following format.***

a. Total estimated dollar value of ALL planned subcontracting, with ALL types of concerns (large & small), under this contract:

Dollar Value: $

b. Total estimated dollar value and percent of planned subcontracting:

***Please note: Zero dollars is not an acceptable goal since it does not demonstrate a good faith effort***

SMALL BUSINESSES (SB):

(Including VOSB, SDVOSB, HUBZone SDB, and WOSB)

Dollar Value: $ % of “a” above: XX.X%

VETERAN-OWNED SMALL BUSINESSES (VOSB):

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (SDVOSB):

HUBZone SMALL BUSINESSES (HUBZone):

SMALL DISADVANTAGED BUSINESSES (SDB):

WOMEN-OWNED SMALL BUSINESSES (WOSB):

OTHER THAN SMALL BUSINESSES

(Defined by the Small Business Administration (SBA) as “any entity that is not classified as a U.S. small business. This includes large businesses, state and local governments, non-profit organizations, public utilities, educational institutions and foreign-owned firms.)

(This $ amount + the SB $ amount above must equal the $ amount in 2.a. above)

3. Subcontracted Products / Services and Subcontractors Following is a listing of 1) products and/or services to be subcontracted, 2) subcontractors that we used in preparing our proposal and 3) the business size and socio-economic status of each listed subcontractor. Refer to sections 12 & 13 for related information.

Subcontracted Products &

Services (List even if subcontractors are not yet known)

Subcontractors (Listed below are subcontractors that were used in preparing our proposal. Additional firms may be added during contract performance)

Business Size & Socio-Economic

Status

(SB / SDB / WOSB /

HUBZone / SDVOSB / Other)* DUNS No. Company Name

* Attached is SBA confirmation of current certification for each of the above listed HUBZone firms.

(SBA confirmation of current certification will also be provided for any HUBZone firms added during contract performance.)

4. Method for Determining Goals Following is a description of the method used to develop the subcontracting goals for SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns.

*** Address efforts made to ensure that maximum practicable subcontracting opportunities have been and will be made available for SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns.

Explain the method and state the quantitative basis (in dollars) used to establish the percentage goals. Expand this section or attach additional sheets and reference here if needed.***

5. Method for Identifying Potential Subcontractors The following sources were used to identify potential subcontractors for solicitation purposes:

***Check each line below as applicable.*** Existing company source lists, System for Award Management (SAM), Small Business Administration’s (SBA) Dynamic Small Business Search web page, Veterans service organizations, National Minority Purchasing Council Vendor Information Service, The Research & Infor. Div. of the Minority Business Dev. Agency in the Dept of Commerce, Small business trade associations.

***list other sources used***

The following narrative explains how the areas to be subcontracted to SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns were determined, how the capabilities of those concerns were considered contract opportunities and how such data relates to the proposal.

***Expand this section or attach additional sheets and reference here if needed.***

6. Indirect Costs Indirect costs have / have not been included in the dollar and percentage subcontracting goals above.

***If indirect costs have been included then include the following, otherwise delete. ***

Following is the method used to determine the proportionate share of such costs to be allocated as subcontracts to SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns:

7. Subcontracting Program Administrator (SPA):

The following named individual has general overall responsibility for the company’s subcontracting program, i.e., developing, preparing, and executing subcontracting plans and monitoring performance relative to the requirements of this subcontracting plan.

Title:

Phone #:

E-mail:

SPA Authorities and Responsibilities:

***Confirm the following authorities & responsibilities***

a. Develops and promotes company-wide policy initiatives that demonstrate the company’s support for awarding contracts and subcontracts to SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns; and for assuring that these concerns are included on the source lists for solicitations for products and services they are capable of providing;

b. Develops and maintains bidder source lists of SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns from all possible sources;

c. Ensures periodic rotation of potential subcontractors on bidder’s lists;

d. Assures that SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB businesses are included on the bidders’ list for every subcontract solicitation for products and services that they are capable of providing;

e. Ensures that Requests for Proposals (RFPs) are designed to permit the maximum practicable participation of SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns;

f. Reviews subcontract solicitations to remove statements, clauses, etc., which might tend to restrict or prohibit SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB participation;

g. Accesses various sources for the identification of SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns, including 1) SBA’s Dynamic Small Business Search web page (http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm), 2) the System for Awards Management (www.sam.gov), 3) local small business and minority associations, 4) local chambers of commerce and 5) Federal agencies’ Small Business Offices;

h. Establishes and maintains contract and subcontract award records;

i. Participates in Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, Procurement Conferences, etc;

j. Ensures that SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns are made aware of subcontracting opportunities and assists concerns in preparing responsive bids to the company;

k. Monitors the company’s subcontracting program performance and makes any adjustments necessary to achieve the subcontract plan goals;

l. Prepares and submits timely, required subcontract reports;

m. Conducts or arranges training for purchasing personnel regarding the intent and impact of 8(d) of the Small Business Act on purchasing procedures;

n. Coordinates the company’s activities during the conduct of compliance reviews by Federal agencies;

o. Other duties:

http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm http://www.sam.gov/

8. Equitable Opportunity The following efforts will be undertaken to ensure that SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns will have an equitable opportunity to compete for subcontracts.

a. Outreach efforts to obtain sources:

I. Contact minority and small business trade associations

II. Contact business development organizations and local chambers of commerce

III. Attend SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB procurement conferences and trade fairs

IV. Review sources from the Dynamic Small Business Search web page (http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm)

V. Review sources from the System for Award Management web page (www.sam.gov)

***Note additional efforts if any. ***

VI.

VII.

b. Internal efforts to guide and encourage purchasing personnel:

I. Conduct workshops, seminars and training programs;

II. Establish, maintain, and utilize SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB source lists, guides, and other data for soliciting subcontractors; and

III. Monitor activities to evaluate compliance with the subcontracting plan.

***Note additional efforts if any.***

IV.

V.

9. Flow-Down Clauses Clause 52.219-8, “Utilization of Small Business Concerns,” shall be included in all subcontracts that offer further subcontracting opportunities. All subcontractors (except small business concerns) that receive subcontracts in excess of $700,000 ($1,500,000 for construction) and possess further subcontracting opportunities will be required to adopt and comply with a subcontracting plan that complies with contract clause 52.219-9, “Small Business Subcontracting Plan.”

10. Reporting and Cooperation As the prime contractor we will:

a. Cooperate in any studies or surveys that may be required;

b. Submit periodic reports which illustrate compliance with the subcontracting plan;

c. Submit Individual Subcontracting Report (ISR) and Summary Subcontract Report (SSR);

via the Electronic Subcontracting Reporting System (eSRS) website (www.esrs.gov)

Reports will be submitted, per the schedule below, regardless of whether there has been any subcontracting activity since the inception of the contract or the previous reporting period.

Reporting Period Report Due Due Date

Oct 1 - Mar 31 ISR 4/30

Apr 1 - Sept 30 ISR 10/30

Oct 1 - Sept 30 SSR 10/30

Oct 1 – Sep 30 Year End SDB Report 90 days after SSR submission

Contract Completion Final ISR 30 days after completion http://dsbs.sba.gov/dsbs/search/dsp_dsbs.cfm http://www.sam.gov/ http://www.esrs.gov/

d. Ensure that subcontractors with subcontracting plans agree to submit an ISR and/or a SSR using eSRS.

e. Provide our prime contract number, our DUNS number, and the e-mail address of our official responsible for acknowledging receipt of or rejecting the ISRs, to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their ISRs; and

f. Require that each subcontractor with a subcontracting plan provide the prime contract number, its own DUNS number, and the e-mail address of the subcontractor’s official responsible for acknowledging receipt of or rejecting the ISRs, to its subcontractors with subcontracting plans.

11. Recordkeeping The following is a description of the types of records that will be maintained concerning procedures that have been adopted to comply with the requirements and goals in this subcontracting plan, including establishing source lists; and a description of our efforts to locate SB, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns and award subcontracts to them.

***Refer to contract clause 52.219-9(d)(11) for a listing of recordkeeping requirements. Also include a description of your firm’s records maintenance procedures for locating each category of small business for use as a subcontractor. ***

12. Acquiring Supplies & Services As the prime contractor we will make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that we used in preparing our proposal, in the same or greater scope, amount, and quality used in preparing and submitting our proposal.

13. Contracting Officer Notice Regarding the Acquisition of Supplies & Services As the prime contractor we will provide the Contracting Officer with a written explanation if we fail to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in section 12 above. This written explanation will be submitted to the Contracting Officer within 30 days of contract completion.

14. Prohibition of Subcontractor Discussions As the prime contractor we will not prohibit a subcontractor from discussing with the Contracting Officer any material matter pertaining to payment to or utilization of a subcontractor.

15. Subcontractor Payments As the prime contractor we will 1) pay our small business subcontractors on time and in accordance with the terms and conditions of the underlying subcontract, 2) notify the Contracting Officer when we make either a reduced or an untimely payment to a small business subcontractor, 3) accelerate payment to our subcontractors in accordance with contract clause 52.232-40.

***Refer to contract clause 52.242-5 for additional subcontractor payment requirements. ***

16. Description of Good Faith Effort Maximum practicable utilization of SB, SDB, WOSB, HUBZone, VOSB and SDVOSB concerns as subcontractors in Government contracts is a matter of national interest with both social and economic benefits. When a contractor fails to make a good faith effort to comply with a subcontracting plan, these objectives are not achieved and 15 U.S.C. 637(d) (4) (F) directs that liquidated damages shall be paid by the contractor.

Following is a description of our firm’s commitment to making a good faith effort towards the subcontracting goals noted above.

Required Signatures:

Contractor Company Name

This Subcontracting Plan is submitted by:

Signature:

Print Name: Date:

Title:

Contracting Officer, National Park Service – Denver Service Center

As the Contracting Officer I:

Have confirmed all subcontractors evaluated are included in this Subcontracting Plan, (Because a prime contract has not yet been awarded not all subcontractors have been determined and evaluated.)

Have confirmed certification for all submitted HUBZone firms are current, (We will also confirm current certification of any HUBZone firms added during contract performance.)

Will monitor the contractor to ensure subcontractors evaluated are used in performance of the work, Will monitor the prime contractor’s submitted eSRS reports to verify good faith efforts are made to meet the goals of this plan considering all future subcontracts, Will insure a copy of the final award document is submitted to the SBA Area Director, Office of Government Contracting, where the contract will be performed, Am committed to assuring compliance with applicable contract requirements.

In accordance with FAR Part 19.705-4 and based upon the information noted above I have determined the Contractor’s proposed Subcontracting Plan is acceptable.

Small Business Specialist, National Park Service - Denver Service Center

The Subcontracting Plan has been reviewed and determined:

Acceptable.

Acceptable contingent upon the comments noted below.

Rejected. Revise per the comments noted below and resubmit.

Comments:

Small Business Specialist, National Park Service – Headquarters (Washington Support Office)

Acceptable

Small Business Administration Procurement Center Representative

Acceptable. (Please retain a copy of this final negotiated subcontracting plan for SBA records to meet the requirement of FAR 19.705-6(c)(2)) and DOI-AAAP 0076.)

(Please retain a copy of this final negotiated subcontracting plan for SBA records to meet the requirement of FAR 19.705-6(c)(2)) and DOI-AAAP 0076.)

CONTRACT CONTRACT LINE ITEM (CLI) TITLE QUANTITY UNIT OF UNIT PRICE TOTAL PRICE

1 Visitors Center BUILD OUT 1 Lump Sum $0.00

Administration Building EXTERIOR

& STRUCTURAL STABILIZATION

1 Lump Sum $0.00

$0.00

All measurement and payment information is included in the project specifications, Section 012700.

Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ------------------------------------

PROJECT TITLE: PULLMAN VISITORS CENTER & ADMINISTRATION BUILDING EXTERIOR

CONTRACT PRICE SCHEDULE

SOLICITATION NUMBER: 140P2019R0048

PARK - PMIS: PULL - 223195/250678

DEVELOPED AREA: PULLMAN NATIONAL MONUMENT

PULL - 223195

CPS - 1

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 7/31/2019

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

NAME(S)

(Seal) (Seal)

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

2. Corporate

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

JOINT VENTURE

OTHER (Specify)

PARTNERSHIPINDIVIDUAL

CORPORATION

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

B

STATE OF INCORPORATION LIABILITY LIMIT ($)

2. Corporate

Corporate

LIABILITY LIMIT ($)STATE OF INCORPORATION

1.NAME(S) &

C

LIABILITY LIMIT ($)

D

E

F

G

STANDARD FORM 24 (REV. 8/2016) BACK

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 7/31/2019

PRINCIPAL (Legal name and business address)

TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT OF BID PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S)

THOUSAND(S)

HUNDRED(S)

CENTS

BID IDENTIFICATION

BID DATE

INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

3.

3.

(Seal)

(Seal)

(Seal)

Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal)

(Seal)

CORPORATE SURETY(IES)

SURETY A

NAME & ADDRESS

STATE OF INCORPORATION

LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or

Services)

OBLIGATION: We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum. CONDITIONS: The Principal has submitted the bid identified above. THEREFORE: The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid. Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid. WITNESS: The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 25 minutes to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

SURETY B

NAME & ADDRESS

STATE OF INCORPORATION

LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)

STATE OF INCORPORATION

2.

2.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY C

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY D

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY E

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY F

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY G

STANDARD FORM 24 (REV. 8/2016) BACK

8.2.0.3062.1.452232.445150

DATE BOND EXECUTED. Enter 2 digit month, 2 digit day and 4 digit year.:

PRINCIPAL (Legal Name and business Address):

STATE OF INCORPORATION :

SURETY(IES) (Name and business address):

PERCENT OF BID PRICE:

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. THOUSAND(S):

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. HUNDRED(S):

DATE Enter 2 digit month, 2 digit day and 4 digit year.:

BID IDENTIFICATION INVITATION NUMBER:

FOR (CONSTRUCTION SUPPLIES, OR SERVICES):

1. Name(s) and title(s) (types):

2. Name(s) and title(s) (types):

3. Name(s) and title(s) (types):

INDIVIDUAL SURETY(IES) 1. NAME(S) (TYPED) :

INDIVIDUAL SURETY(IES) 2. NAME(S) (TYPED) :

CORPORATE SURETY(IES), SURETY A NAME AND ADDRESS:

STATE OF INC.:

CORPORATE SURETY(IES), SURETY A 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY A 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES) LIABILITY LIMIT(S):

If Other was selected, specify here. :

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. CENTS:

CORPORATE SURETY(IES), SURETY B 2.SIGNATURES:

CORPORATE SURETY(IES), SURETY B NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY B STATE OF INC.:

CORPORATE SURETY(IES), SURETY B 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY E 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C STATE OF INC.:

CORPORATE SURETY(IES), SURETY C 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY D 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY D STATE OF INC.:

CORPORATE SURETY(IES), SURETY D 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY D NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY E STATE OF INC.:

CORPORATE SURETY(IES), SURETY E 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY E NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY F 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY F STATE OF INC.:

CORPORATE SURETY(IES), SURETY F 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY F NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY G 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY G STATE OF INC.:

CORPORATE SURETY(IES), SURETY G 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY G NAME AND ADDRESS:

CORPORATE SURETY(IES) B LIABILITY LIMIT(S):

CORPORATE SURETY(IES) C LIABILITY LIMIT(S):

CORPORATE SURETY(IES) D LIABILITY LIMIT(S):

CORPORATE SURETY(IES) E LIABILITY LIMIT(S):

CORPORATE SURETY(IES) F LIABILITY LIMIT(S):

CORPORATE SURETY(IES) G LIABILITY LIMIT(S):

3. The bond may express penal sun as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).:

File details come from the government source that posted it. Updated .