Amendment_0005_Attachment_1.pdf

PDF 77 KB Posted

Attached to
Replace Primary Potable Water Pumps 1&2 Which Provides Water to the South Rim - Indian Garden
Solicitation number
140P2018R0105
Issued by

About this file

Amendment 0005_Attachment 1

View the file

Other files

File Type Posted
SF30_Amendment_0008.pdf PDF
Q_and_A_Amendment_0008.pdf PDF
SF30_Amendment_0007.pdf PDF
Q_and_A_Amendment_0007.pdf PDF
SF30_Amendment_0006.pdf PDF
Amendment_0006_Valve_Replacement.pdf PDF
Q_and_A_Amendment_0006.pdf PDF
SF30_Amendment_0005.pdf PDF
SF30_Amendment_0004.pdf PDF
Pre-Proposal_Conference_Sign_In_Sheet_08.07.2018.pdf PDF
Q_and_A_Amendment_0004.pdf PDF
Amendment_0003_Revised_Section_J_08.02.18.pdf PDF
Attachment_7_Scope_of_Work_Sediment_Removal_and_Condition_Assessment.pdf PDF
SF30_Amendment_0003.pdf PDF
Amendment_0003_Revised_Contract_Price_Schedule.pdf PDF
SF30_Amendment_0002.pdf PDF
Amendment_0002_Section_J_of_RFP_08.02.18.pdf PDF
Attachment_1A_Specifications_Part_2_GRCA_182403_Div_02-49.pdf PDF
Amendment_0002_Technical_Specification_Section_01_11_00_1.9D_REVISED.pdf PDF
Attachment_5_IG_Pumphouses_Asbestos_and_LBP_Report_092816.pdf PDF
Attachment_6_Statement_of_Structural_Tests_and_Special_Inspections.pdf PDF
SF30_Amendment_0001_140P2018R0105_GRCA_182403.pdf PDF
02_80_00_Facility_Remediation_ACM_and_LBP_-_FINAL.pdf PDF
Attachment_1_Specifications_GRCA_182403.pdf PDF
Attachment_3_Construction_Wage_Determination.pdf PDF
Attachment_4_South_Rim_Map_with_Heli-base_location.pdf PDF
B08_Proposal_Submission_Package.zip ZIP file
Attachment_2_Drawings_GRCA_182403.pdf PDF
FINAL_RFP_GRCA_182403_Indian_Gardens_Phase_II.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRCA 182403 Indian Garden Pump Replacement

Solicitation No. 140P2018R0105

Amendment 0005

8/15/2018

ATTACHMENT #1

Reference Revision

1 Section 26 29 23

Section 2.5‐Harmonic Mitigation Requirements: Delete subpart B1, the 6 pulse rectifier will not be an option. VFDs shall be 18‐pulse per the contract specifications.

2 Sheets E2 and E5 All references to 6‐pulse VFD and all associated equipment shall be deleted. VFDs shall be 18‐pulse per specifications.

3 Section 27 21 00 Telemetry Systems – Frequency shall be changed from 400‐502 MHZ down to 150 MHZ band

Section 27 21 00 ‐

2.2.A.1

Trio QR450 changed to Trio QR150

Section 27 21 00 ‐

2.2.A.2

GE MDS SD4 changed to GE MDS SD1

Section 27 21 00 ‐

2.2.A.3

Esteem 195C changed to Esteem 195M

Section 27 21 00 ‐

2.2.B.4 change to read: Frequency(s): 150‐173 MHZ (exact band to be determined by NPS with licensing by NPS)

Section 27 21 00 ‐

2.2.B.7.a change to read ‐94 dBm at 19.6 Kbps with 0.000001 (10‐6) BER

9 Section 27 21 00 ‐3.2 FCC Licensing – Deleted – NPS will provide frequency bands to test and arrange licensing

Section 27 21 00 ‐

3.3B.b, D.1.a

Change 450 MHz to 150 MHz

11 Sheet E8 Change 450 MHZ to 150 MHz

12 Sheet Y2 Change Licensed UHF to Licensed VHF, VHF radio connection may be changed to serial or Ethernet

13 Sheet Y4 ‐ Y6 Change QR450 to QR150 (or equal is allowed). Change Antennas to equivalent gain for the 150 MHZ band

14 Sheet Y7 Change radio text from 450MHz to 150 MHz

File details come from the government source that posted it.