Amendment_0003_Revised_Section_J_08.02.18.pdf

PDF 11 KB Posted

Attached to
Replace Primary Potable Water Pumps 1&2 Which Provides Water to the South Rim - Indian Garden
Solicitation number
140P2018R0105
Issued by

About this file

Amendment 0003_Revised Section J_RFP

View the file

Other files

File Type Posted
SF30_Amendment_0008.pdf PDF
Q_and_A_Amendment_0008.pdf PDF
SF30_Amendment_0007.pdf PDF
Q_and_A_Amendment_0007.pdf PDF
SF30_Amendment_0006.pdf PDF
Amendment_0006_Valve_Replacement.pdf PDF
Q_and_A_Amendment_0006.pdf PDF
SF30_Amendment_0005.pdf PDF
Amendment_0005_Attachment_1.pdf PDF
SF30_Amendment_0004.pdf PDF
Pre-Proposal_Conference_Sign_In_Sheet_08.07.2018.pdf PDF
Q_and_A_Amendment_0004.pdf PDF
Attachment_7_Scope_of_Work_Sediment_Removal_and_Condition_Assessment.pdf PDF
SF30_Amendment_0003.pdf PDF
Amendment_0003_Revised_Contract_Price_Schedule.pdf PDF
SF30_Amendment_0002.pdf PDF
Amendment_0002_Section_J_of_RFP_08.02.18.pdf PDF
Attachment_1A_Specifications_Part_2_GRCA_182403_Div_02-49.pdf PDF
Amendment_0002_Technical_Specification_Section_01_11_00_1.9D_REVISED.pdf PDF
Attachment_5_IG_Pumphouses_Asbestos_and_LBP_Report_092816.pdf PDF
Attachment_6_Statement_of_Structural_Tests_and_Special_Inspections.pdf PDF
SF30_Amendment_0001_140P2018R0105_GRCA_182403.pdf PDF
02_80_00_Facility_Remediation_ACM_and_LBP_-_FINAL.pdf PDF
Attachment_1_Specifications_GRCA_182403.pdf PDF
Attachment_3_Construction_Wage_Determination.pdf PDF
Attachment_4_South_Rim_Map_with_Heli-base_location.pdf PDF
B08_Proposal_Submission_Package.zip ZIP file
Attachment_2_Drawings_GRCA_182403.pdf PDF
FINAL_RFP_GRCA_182403_Indian_Gardens_Phase_II.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation

Document No.

140P2018R0105

Document Title

GRCA 182403 – Replace Primary Potable Water Pumps 1&2 Which Provides Water To The South Rim

- Indian Garden

PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J – LIST OF ATTACHMENTS

TITLE DATE NO. OF PAGES

ATTACHMENT 1 Specifications – Part 1 6/25/18 207

ATTACHMENT

1A Specifications – Part 2 6/25/18 217

ATTACHMENT 2 Drawings 6/25/18 42 ATTACHMENT 3 Construction Wage Decision AZ180017 / AZ17 07/06/2018 6 ATTACHMENT 4 South Rim Map with Heli-base location 07/25/2018 1 ATTACHMENT 5 Asbestos and Lead-Based Paint Sampling Report 09/28/2016 57 ATTACHMENT 6 Statement of Structural Tests and Special Inspections 06/25/2018 4 ATTACHMENT 7 Scope of Work: Sediment Removal and Condition Assessment 08/02/2018 12

ATTACHMENT 8

Key Subcontractors – To be provided by selected contractor and incorporated herein