02_80_00_Facility_Remediation_ACM_and_LBP_-_FINAL.pdf

PDF 530 KB Posted

Attached to
Replace Primary Potable Water Pumps 1&2 Which Provides Water to the South Rim - Indian Garden
Solicitation number
140P2018R0105
Issued by

About this file

Specification 02 80 00_Facility Remediation_ACM and LBP

View the file

Other files

File Type Posted
SF30_Amendment_0008.pdf PDF
Q_and_A_Amendment_0008.pdf PDF
SF30_Amendment_0007.pdf PDF
Q_and_A_Amendment_0007.pdf PDF
SF30_Amendment_0006.pdf PDF
Amendment_0006_Valve_Replacement.pdf PDF
Q_and_A_Amendment_0006.pdf PDF
SF30_Amendment_0005.pdf PDF
Amendment_0005_Attachment_1.pdf PDF
SF30_Amendment_0004.pdf PDF
Pre-Proposal_Conference_Sign_In_Sheet_08.07.2018.pdf PDF
Q_and_A_Amendment_0004.pdf PDF
Amendment_0003_Revised_Section_J_08.02.18.pdf PDF
Attachment_7_Scope_of_Work_Sediment_Removal_and_Condition_Assessment.pdf PDF
SF30_Amendment_0003.pdf PDF
Amendment_0003_Revised_Contract_Price_Schedule.pdf PDF
SF30_Amendment_0002.pdf PDF
Amendment_0002_Section_J_of_RFP_08.02.18.pdf PDF
Attachment_1A_Specifications_Part_2_GRCA_182403_Div_02-49.pdf PDF
Amendment_0002_Technical_Specification_Section_01_11_00_1.9D_REVISED.pdf PDF
Attachment_5_IG_Pumphouses_Asbestos_and_LBP_Report_092816.pdf PDF
Attachment_6_Statement_of_Structural_Tests_and_Special_Inspections.pdf PDF
SF30_Amendment_0001_140P2018R0105_GRCA_182403.pdf PDF
Attachment_1_Specifications_GRCA_182403.pdf PDF
Attachment_3_Construction_Wage_Determination.pdf PDF
Attachment_4_South_Rim_Map_with_Heli-base_location.pdf PDF
B08_Proposal_Submission_Package.zip ZIP file
Attachment_2_Drawings_GRCA_182403.pdf PDF
FINAL_RFP_GRCA_182403_Indian_Gardens_Phase_II.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRCA - 182403 02 80 00 - 1

031414 FACILITY REMEDIATION - ASBESTOS AND LEAD IMPACT

SECTION 02 80 00

FACILITY REMEDIATION - ASBESTOS AND LEAD IMPACT

PART 1 - GENERAL

SUMMARY

A. The work of this section consists of asbestos and lead impact and lists environmental controls to be used during impact to asbestos containing materials (ACM), lead-based paint (LBP) and lead containing paint (LCP) during the renovation of the Grand Canyon Indian Gardens Pumphouses.

Scope items and requirements for asbestos and lead hazard management associated with LBP and lead-containing paint (LCP) are presented below in sections B through O.

B. The proposed improvements entail cutting into and drilling holes through wallboard that has been identified as Asbestos Containing Materials (ACM) and removing existing pipe materials that have been tested and confirmed to be coated with Lead Based Paint. The existing lead painted piping will be dismantled by unbolting the flanges, however there will be at least one location where the pipe will need to be cut, where it protrudes above the concrete floor of the pump station.

C. The Contractor shall take necessary reasonable measures to control air and water pollution by any material or equipment used during asbestos impact and lead hazard control activities.

D. Identified locations of ACM and LBP are contained in the HDR Asbestos and Lead-based Paint

Sampling Report dated Sept. 2016):

1. Asbestos Containing Materials;

a. North Pump House

(i) Wallboard behind fiberglass insulation along the interior south wall was tested and contained 12% Chrysotile asbestos.

(ii) Wallboard along the interior north wall was tested at 15% Chrysotile asbestos.

b. South Pump House

(i) In addition, the black tar and tan fibrous resinous material layers of the roof contain trace amounts of Chrysotile asbestos (less than 1%). Though this percentage of asbestos does not meet the definition of ACM, workers should be made aware of its presence.

E. The Contractor shall be responsible for the collection of personnel exposure samples for asbestos and lead in accordance with the Occupational Safety and Health Administration (OSHA) regulations.

F. If suspect ACM is encountered in wall or ceiling interiors in unanticipated locations, the unforeseen condition shall be documented and described, including location, extent and the quantity of suspect

ACM, and all immediate actions shall be taken for safety or housekeeping purposes. This information shall be immediately provided to the Industrial Hygienist (IH) and the Contracting Officer (CO).

G. Any ACMs of the nature shown or described, but not specifically called out or shown in the plans, but which are reasonably implied and necessary to construct the project shall be included without additional cost to the Government.

H. Applicable training shall be provided by the Contractor prior to personnel performing work that may impact asbestos containing materials as required by applicable regulation 29 CFR 1926.1101 (asbestos) and 29 CFR 1926.62 (lead).

1. Asbestos Training

a. Supervisors or foreman must be trained as OSHA Competent Persons. Such training shall be obtained in a comprehensive course for supervisors that meets the criteria of EPA’s Model

Accreditation Plan (40 CFR part 763, subpart E, Appendix C), such as a course conducted by an EPA-approved or state-approved training provider, certified by EPA or a state.

GRCA - 182403 02 80 00 - 2

b. Staff that will impact asbestos containing materials in the course of construction must be trained, at a minimum, to the level of OSHA Class III Asbestos Workers. Training for Class

III employees shall be consistent with EPA requirements for training of local education agency maintenance and custodial staff as set forth at 40 CFR 763.92(a)(2). Such a course shall also include ‘‘hands-on’’ training and shall take at least 16 hours.

2. Lead-based Paint Training

a. Staff that may come in contact with lead-containing materials must be trained in accordance with the requirements of the OSHA Lead in Construction standard 29 CFR 1926.62 (L).

I. Two hours of asbestos and lead awareness training shall be provided to applicable NPS personnel and subcontractors working in the project facilities that contain ACM/LBP/LCP that reasonably can be expected to be impacted as part of this Work.

J. Third party asbestos impact oversight shall be provided by an independent consultant contracted under the construction contractor. Oversight by the third party Industrial Hygienist shall be coordinated with the CO to provide project surveillance, perimeter and clearance air sampling, and visual inspections.

The clearance air samples shall be analyzed using Phase Contrast Microscopy (PCM) in accordance with applicable regulations. All work and material shall be subject to visual inspection by the

Industrial Hygienist. The Contractor shall provide reasonable and necessary facilities for such observation and shall render necessary assistance to permit the environmental oversight.

K. LBP and LCP have been identified on various surfaces within the Pumphouses as described in Table

K.1 & K.2 summarized below.

Table K.1 – Grand Canyon Lead Based Paint

Building: Material Code Material:

North Pump House NPH-LBP-02 Pipe NE area. Blue paint on metal pipes 3.0% lead

NPH-LBP-04 Pipe by east wall NE area. Green paint.

6.5% lead

NPH-LBP-05 Doorway west wall. Yellow paint on metal door and frame 1.2 % lead

Table K.2 – Grand Canyon Lead Containing Paint

Building: Material Code Material:

South Pump House SPH-LBP-01 North wall Yellow paint on concrete.

0.030% lead

SPH-LBP-02 Piping along north wall. White paint on pipe. 0.0039% lead

SPH-LBP-03 Piping SE portion. Blue paint on metal pipes. 0.0061% lead

SPH-LBP-04 Floor central area. Off-white paint. 0.028%

L. Due to the presence of lead in most tested painted surfaces, dust controls shall be required during all impacts to painted surfaces. Applicable training shall be provided by the Contractor prior to personnel impacting any painted surfaces as required by applicable regulation 29 CFR 1926.62 (lead).

GRCA - 182403 02 80 00 - 3

M. Personnel that may be exposed to lead in excess of OSHA’s action level (AL) of 30 micrograms per cubic meter over an 8-hour time weighted average must follow the requirements of OSHA lead construction standard 29 CFR1926.62. This applies to all construction activities that may impact LCP including any impacts to the LBP. Additionally, this work shall require the use of engineering controls to minimize dusts.

N. Any employee or visitor potentially exposed to lead levels in excess of the OSHA AL shall have at a minimum two hours of lead awareness training. During construction activities that impact lead painted building materials, a competent person must be present at all times.

O. The Contractor shall be responsible for the clean-up and testing of any area contaminated due to

Contractor negligence at no additional cost to the NPS.

CONTRACTOR’S USE OF THE PREMISES

A. Contractor shall at all times conduct operations to ensure the least inconvenience to the National Park

Service who will be conducting regular activities throughout the construction period and shall be undertaken in a manner that minimizes disruption to water service operations. All activities in and around the Pumphouses shall be coordinated with the Park officials through the Contracting Officer.

DEFINITIONS

A. AAS: Atomic absorption spectrometry, which is the laboratory method to determine lead in bulk and air samples.

B. Asbestos: Includes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these minerals that has been chemically treated and/or altered. Asbestos includes PACM, as defined below.

C. Asbestos-Containing Material (ACM): Any material containing more than one (1) percent asbestos.

D. Asbestos-Containing Waste Material (ACWM): Any material which is, or is suspected of being, a material contaminated with an asbestos-containing material which is to be removed from a work area for disposal.

E. Asbestos-Containing Construction Material: Any manufactured construction material which contains more than one-tenth of 1 percent asbestos by weight.

F. Asbestos Debris: Pieces of ACM that can be identified by color, texture, or composition, or means dust, if the dust is determined by an accredited inspector to be ACM.

G. Authorized Person: Any person authorized by the employer and required by work duties to be present in regulated areas.

H. Class III Asbestos Work: Class III asbestos work means repair and maintenance operations, where

‘‘ACM’’, including Thermal System Insulation (TSI) and surfacing ACM and PACM, is likely to be disturbed.

I. Critical Barrier: One or more layers of plastic sealed over all openings into a work area or any other similarly placed physical barrier sufficient to prevent airborne asbestos in a work area from migrating into an adjacent area.

J. Competent Person: The Contractor's employee who is capable of identifying existing asbestos and lead hazards in the workplace, who has the authority to take prompt corrective measures to eliminate them, and who is trained and accredited as defined in 29 CFR 1926.1101 and 29 CFR 1926.62. The duties of the Competent Person include, but are not limited to, the following: controlling entry to and exit from the asbestos work area, supervising any employee exposure monitoring required by the standards, ensuring that all employees working within a Regulated Area wear the appropriate personal protective equipment and are trained in the use of appropriate methods of exposure control and decontamination, and ensuring that engineering controls in use are functioning properly.

GRCA - 182403 02 80 00 - 4

K. Disposal Bag: A properly labeled 6-mil. thick, leak-tight polyethylene bag used for containerizing and/or transporting asbestos waste to the disposal site.

L. Disturbance: Activities that disrupt the matrix of ACM or PACM, crumble or pulverize ACM or

PACM, or generate visible debris from ACM or PACM. Disturbance includes cutting away small amounts of ACM and PACM, no greater than the amount which can be contained in one standard sized glove bag or waste bag in order to access a building component. Maximum glove bag or waste bag size referred to herein is 60 inches in length and width.

M. Friable Asbestos Material: Material that contains more than 1.0 percent asbestos by weight and that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.

N. HEPA Filter: A High Efficiency Particulate Air (HEPA) filter capable of trapping and retaining

O. 99.97 percent of all mono-dispersed particles (e.g. asbestos fibers) of 0.3 microns in diameter.

P. Industrial Hygiene: An area of specialization in the field of industrial safety and health that is concerned with predicting, recognizing, assessing, controlling, and preventing environmental stressors in the workplace that may lead to sickness, disease, or other forms of impaired health.

Q. Industrial Hygienist: A person having a college or university degree(s) in engineering, chemistry, physics, medicine, or related physical or biological sciences who, by virtue of special studies and training, has acquired competence in industrial hygiene.

R. Intact: ACM that has not crumbled, been pulverized, or otherwise deteriorated so that the asbestos is no longer likely to be bound with its matrix.

S. Lead-based Paint (LBP): Paint or other coatings containing at least 0.5% lead by weight or 1.0 milligrams (mg) per square centimeter.

T. Lead-containing Paint (LCP): Paint or other coatings containing a concentration of lead that is quantifiable through laboratory analysis.

U. Negative Initial Exposure Assessment: A demonstration by the employer, which demonstrates that employee exposure during an operation, is expected to be consistently below the permissible exposure limit (PEL) for representative 8-hour time-weighted average (TWA) samples and 30 minute excursion limit (EL) samples.

V. Personal Monitoring: Sampling of the asbestos fiber concentrations within the breathing zone of an employee.

W. PACM: Presumed Asbestos-Containing Material; means thermal system insulation and surfacing material found in buildings constructed no later than 1980.

X. Regulated Area: An area established by the employer to demarcate areas where Class I, II, and III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulate; and a work area within which airborne concentrations of asbestos, exceed or there is a reasonable possibility they may exceed, the permissible exposure limit.

Y. Removal: All operations where ACM and/or PACM are taken out or stripped from structures or substrates, and include demolition and renovation operations.

Z. Renovation: Modifying of any existing structure, or portion thereof.

AA. Surfactant: A chemical wetting agent added to water to improve wetting and penetration into a substrate.

BB. Time Weighted Average (TWA): The average concentration of a contaminant in air during a specific time period.

CC. Visible Emissions: Any emissions containing particulate asbestos material that are visually detectable without the aid of instruments.

GRCA - 182403 02 80 00 - 5

DD. Work Area: The area where asbestos-related work or removal operations are performed which is defined and/or isolated to prevent the spread of asbestos dust, fibers or debris, and entry by unauthorized personnel. A Work Area is a Regulated Area as defined by 29 CFR 1926.1101.

SUBMITTALS

A. See Specification Section 01 33 23 for requirements as to the mechanics and administration of the submittal process.

B. Required as specified in Sections 1.9, 1.10, and 1.11.

C. Notifications are required under the National Emission Standard for Hazardous Air Pollutants

(NESHAP) and the State of Arizona when greater than 160 square feet or 260 linear feet of materials are to be removed. If these thresholds are exceeded, proof that required Federal and/or State permits have been obtained, will be required.

D. The following shall be submitted:

1. Proof that all employees have passed appropriate medical examinations required by OSHA.

2. Certification that all employees have been instructed on the hazards of asbestos exposure, use and fitting of respirators and protective dress, use of showers, work area entry and exit procedures, work methods, and protective measures.

3. Certification that each employee has been properly fitted with a specified respirator.

4. Certification that HEPA vacuums, HEPA equipped negative pressure air machines, and other equipment required to contain airborne fibers meet ANSI Z9.2 79.

5. Description, accompanied by sketches to scale, of decontamination enclosure systems.

6. Description of asbestos waste handling procedures. Include name and address of waste disposal site; name, address, and telephone number of entity who will transport asbestos waste; and, a sample of transport manifest to be used to identify quantity of waste removed and accepted by disposal site.

7. After every disposal operation, provide copies of transport manifests, disposal receipts, and chain of custody forms for all asbestos waste materials removed from the site. Chain-of-custody form shall include date, address of pickup site, name and address of Contractor, names of persons responsible for pickup, name and address of disposal site, quantity of asbestos waste, and type of containers used. The form shall be signed by the Contractor, disposal site operator, and hauler if a private hauler is employed.

ASBESTOS-RELATED PRE-PROJECT SUBMITTALS

A. Before on site work begins, submit to the CO for approval an Asbestos-Specific Health and Safety

Program, a Respiratory Protection Program, a Medical Surveillance Program, and an Accident

Prevention Program.

B. Submit to the CO the resume and copies of professional registrations/certifications for the Contractor's employee who will act as the Competent Person for the project. The Competent person shall meet the qualifications and have the training and certifications defined by OSHA.

C. For each type of training session, the Contractor shall submit a proposed outline of the subjects to be covered to the CO for approval. The training shall not be conducted until the outline is approved.

D. Submit to the CO copies of attendance records and certificates for each employee for all asbestos training as required by this Section.

E. Submit to the CO copies of current physicians written medical opinions for all employees subject to medical surveillance requirements defined in OSHA respiratory Protection Standards.

ASBESTOS-RELATED PROJECT SUBMITTAL REQUIREMENTS

A. Results of all worker exposure assessment air samples shall be made available to applicable personnel per OSHA 29 CFR 1926.1101, and shall submitted to the CO, Industrial Hygienist or a designated on-site representative within 24-hours of receipt of analytical results. Submittals shall include sample collection logs and laboratory analysis sheets.

GRCA - 182403 02 80 00 - 6

ASBESTOS-RELATED POST-PROJECT SUBMITTAL REQUIREMENTS

A. All ACWM manifest documents shall be completed and signed by the Contractor, the Transporter, and the Disposal facility. The Contractor will submit all disposal records to the CO.

B. Submit a final compilation of the results of all worker exposure assessment air samples to the CO within 7 calendar days of completion of all activities that disturb ACMs or PACMs. The submittal shall be organized by sample collection date and shall include identification of the sampler, all sample collection logs, and laboratory analysis sheets.

QUALITY ASSURANCE

A. Qualifications: Workers shall be fully qualified and experienced in the techniques of impact, handling and disposal of ACMs.

B. Regulatory Requirements:

1. Comply with OSHA Safety and Health Standard (29 CFR 1910.1001); OSHA Asbestos

Regulation for the Construction Industry (29 CFR 1926.58); National Emission Standards for

Hazardous Air Pollutants (NESHAP) (40 CFR, Part 61, Subparts A and B); Asbestos Hazard

Emergency Response Act (AHERA) (40 CFR Part 763); Arizona Department of Environmental

Quality notification requirements, and DOT regulations for transporting asbestos-containing waste.

2. Notify all responsible state and local agencies in writing at least 10 days before removal work begins. Obtain all required permits before work begins. The Contractor shall be responsible for obtaining all necessary permits and certifications of personnel in conjunction with asbestos removal, hauling, and disposition and provide timely notification of such actions as may be required by Federal, state, regional and local authorities. Fees and/or charges for these permits shall be included in the Contractor's bid price. Provide copies of all obtained permits to the

Industrial Hygienist.

3. Dispose of asbestos waste at an authorized landfill site in accordance with requirements of

NESHAP and applicable state and local guidelines and regulations.

APPLICABLE STANDARDS AND GUIDELINES

A. All work under this contract shall be done in strict accordance with all applicable Federal, State, and

Local regulations, standards and codes governing asbestos impact and other trade work done in conjunction with the work. The most recent edition of any relevant regulation, standard, document or code shall be in effect. Where conflict among the requirements or with these specifications exists, the most stringent requirements shall be utilized.

B. Applicable Publications: The publications, codes, and safety regulations listed below form a part of this specification, and are included for reference only. It shall be the responsibility of the Contractor to observe and follow all applicable guidelines:

1. 29 CFR 1910.1001 General Industry Standards for Asbestos

2. 29 CFR 1926.1101 Construction Industry Standards for Asbestos

3. 29 CFR 1926.62 Construction Industry Standards for Lead

4. 29 CFR 1910.134 Respiratory Protection

5. 29 CFR 1910.145 Accident Prevention

6. 29 CFR 1910.38 Emergency Action Plans

7. 29 CFR 1910.1200 Hazard Communication

8. 40 CFR 61 Sub. A General Provisions

9. 40 CFR 61 Sub M USEPA

10. 49 CFR 171 And 172 USDOT

11. Z9.2-79 ANSI Fundamentals Governing the Design and Operation of Local

Exhaust Systems

12. 77-173 NIOSH Occupational Exposure Sampling Strategy

13. 76-189 NIOSH Guide to Industrial Respiratory Protection

14. 78-193A NIOSH Respiratory Protection Employers Manual

GRCA - 182403 02 80 00 - 7

15. 91-105 NIOSH Certified Equipment List

CODES AND REGULATIONS

A. General applicability of Codes, Regulations, and Standards: Except to the extent that more explicit or more stringent requirements are written directly into the Contract Documents, all applicable codes, regulations, and standards have the same force and effect (and are made a part of the Contract

Documents by reference) as if copied directly into the Contract Documents or as if published copies are bound herewith.

B. Contractor Responsibility: The Contractor shall assume full responsibility and liability for the compliance with all applicable federal, state and local regulations pertaining to work practices, hauling, disposal, and protection of workers, visitors at the site, and persons occupying areas adjacent to the site. The Contractor is responsible for providing medical examinations and maintaining medical records of personnel as required by the applicable federal, state, and local regulations. Copies of these records shall be kept available for review by the Contracting Officer.

C. Federal Requirements: Asbestos impact work or hauling and disposal of waste materials include, but are not limited to, the following:

1. OSHA: U.S. Department of Labor, Occupational Safety and Health Administration (OSHA) including but not limited to:

a. Respiratory Protection: Title 29, Part 1910, Section 134 of the Code of Federal

Regulations;

b. Access to Employee Exposure and Medical Records: Title 29, Part 1910, Section

1020 of the Code of Federal Regulations;

c. Hazard Communication: Title 29, Part 1910, Section 1200 of the Code of Federal

Regulations; and Specifications for Accident Prevention Signs and Tags: Title 29, Part 1910, Section 145 of the Code of Federal.

2. DOT: U.S. Department of Transportation, including but not limited to:

a. Hazardous Substance: Title 29, Part 171 and 172 of the Code of Federal Regulations.

3. EPA: U.S. Environmental Protection Agency (EPA), including but not limited to:

a. Conservation and Resource Recovery Act (RCRA): Title 40, Part 231-265 of the Code of

Federal Regulations.

4. State of Arizona Requirements: Abide by all state requirements, which govern asbestos impact work or hauling disposal of asbestos waste materials.

PROJECT CONDITIONS

A. Maintain emergency egress and building emergency equipment, such as fire alarms, and emergency lighting devices, in operating order.

B. Do not damage existing building materials which are not associated with the work or work area. Any damage to building materials not protected within the work area, or that are outside the work area and not associated with the work, shall be repaired or replaced by the Contractor to the Contracting

Officer’s satisfaction and at no cost to the Government.

C. Wall, ceiling and flooring systems can include multiple layers. Due to the inconsistency of these systems and the potential for overlay materials, all systems shall be assumed to be ACMs unless specifically sampled and confirmed to be non-ACM. If the work will impact the wall, ceiling or flooring systems, any material uncovered that was not previously sampled shall be assumed to be asbestos. Samples of the uncovered material shall be taken by a competent person and work shall be stopped until the competent person allows work to continue. If suspect ACM is encountered in wall or ceiling interiors in unanticipated locations, the unforeseen condition will be documented and described, including the location, and the extent and the quantity of suspect ACM, and any immediate actions taken for safety or housekeeping purposes. This information shall be provided immediately to the

Industrial Hygienist and the CO.

GRCA - 182403 02 80 00 - 8

D. The Government will supply electric service to the Project Site. An adequate supply of water to support wet methods during asbestos and lead impact work will be provided. The Contractor will be responsible for maintaining utilities to the point source of asbestos impact as required, complying with applicable regulations. If generators are provided by the Contractor for temporary electric service, written Spill Prevention, Control and Countermeasure (SPCC) plans and equipment shall be submitted to the CO for approval prior to the shipping of this equipment to the project site. The Contractor shall be required to operate generators at noise levels that do not exceed applicable regulatory limits.

PART 2 - PRODUCTS

PERSONAL PROTECTIVE EQUIPMENT

A. Respiratory Protection:

1. Workers who impact asbestos or create dusts from LCP shall be provided with personally issued, individually identified respirators that meet the required level of protection. During pre-cleaning, installation of critical barriers, impacting ACM and LCP, and HEPA vacuuming activities, the

Contractor shall utilize (at a minimum) half face air-purifying respirators with approved HEPA filter cartridges.

2. The Contractor shall provide workers with and require the use of respirators approved by NIOSH for asbestos in accordance with OSHA Standard 29 CFR 1926.1101. The minimum respiratory protection allowable shall be an approved half-mask air-purifying respirator with HEPA cartridges. Disposable single-use respirators will not be permitted.

3. Workers must perform positive and negative air pressure fit tests each time a respirator is put on, whenever the respirator design so permits.

4. Workers shall be given a qualitative fit test in accordance with procedures detailed in OSHA 29

CFR 1926.1101 for all respirators to be used. An appropriately administered quantitative fit test may be substituted for the qualitative fit test. Documentation of adequate respirator fit shall be provided to the Contractor with copies to the Contracting Officer. Fit tests shall be administered annually.

B. Personal Protection required for Asbestos Impact:

1. Prior to commencement of impact activities, all personnel who will be required to enter the work area for handling containerized ACMs must have received the required training. Special on-site training on equipment and procedures unique to this job site shall be performed as required.

Training in emergency response and evacuation procedures shall also be provided.

2. All respiratory protection shall be provided to workers through a written respiratory protection program. This program shall be posted on the jobsite.

3. Disposable clothing including head, foot and full body protection shall be provided in sufficient quantities and adequate sizes for all workers and authorized visitors. All personnel engaged in asbestos impact work shall wear approved disposable protective clothing constructed of spun-bonded olefin or polypropylene fabrics, or other material of equivalent resistance to penetration by asbestos. A full body suit is recommended in lieu of a separate set of coveralls, head covers, and shoe covers. Disposable whole-body clothing including head covers, gloves, and shoe coverings shall be provided to and worn by all personnel in the asbestos control area. If elastic sleeve closures are not provided, sleeves shall be secured with duct tape to gloves. Washable footwear having a non-skid tracking surface shall be provided and used by all personnel within the asbestos control area.

4. Persons having facial hair which may interfere with the seal of a respirator shall not be allowed to enter the work area.

5. Contaminated clothing shall be treated as ACM and undergo the same disposal procedures.

6. The Contractor shall, at all times, have available for use by the Industrial Hygienist and the CO, two clean sets of personal protective equipment and clothing. Air-purifying negative pressure respirators, shall be individually assigned and fit-tested, as required for entry in asbestos work areas by these specifications.

GRCA - 182403 02 80 00 - 9

7. Respirators shall be worn at all times if asbestos materials are impacted to the extent that airborne emissions are created.

8. Protective eye wear, gloves, rubber boots and/or other footwear shall be provided as required for workers and authorized visitors. Safety shoes are required.

9. Eating, drinking, smoking, and chewing gum or tobacco shall not be allowed in the work area.

C. Personnel Protection for Lead-Containing Paint

1. Prior to commencement of work that may impact LCP, all personnel who will be required to enter the work area for handling components with LCP must have received the required training.

Special on-site training on equipment and procedures unique to this job site shall be performed as required.

2. Respiratory protection is required for workers performing selective environmental demolition where airborne contaminates may exist or develop. Respiratory protection requirements are the same as previously listed for asbestos impact work.

3. Disposable clothing including head, foot and full body protection shall be provided in sufficient quantities and adequate sizes for all workers and authorized visitors. All personnel engaged in

LCP demolition work shall wear approved disposable protective clothing constructed of spun-bonded olefin or polypropylene fabrics, or other material of equivalent resistance to penetration by asbestos. A full body suit is recommended in lieu of a separate set of coveralls, head covers, and shoe covers. Disposable whole-body clothing including head covers, gloves, and shoe coverings shall be provided to and worn by all personnel in the asbestos control area. If elastic sleeve closures are not provided, sleeves shall be secured with duct tape to gloves. Washable footwear having a non-skid tracking surface shall be provided and used by all personnel within the asbestos control area.

4. Persons having facial hair which may interfere with the seal of a respirator shall not be allowed to enter the work area if respiratory protection is required.

5. Protective eye wear, gloves, rubber boots and/or other footwear shall be provided as required for workers and authorized visitors. Safety shoes are required.

6. Eating, drinking, smoking, and chewing gum or tobacco will not be allowed in the LCP work area.

EQUIPMENT

A. HEPA equipped filtration equipment.

1. Vacuum Equipment: HEPA filtered vacuuming equipment with a filter system capable of collecting and retaining asbestos fibers. Filters shall be 99.97 percent efficient for retaining fibers

0.3 microns or larger.

PLASTIC SHEETING

A. 6 mils. in thickness and sized to minimize the frequency of joints.

B. Polyethylene sheeting utilized for worker decontamination enclosure shall be opaque white or black in color.

TAPE

A. For use under dry and wet conditions, capable of being cleaned off surfaces without permanent marks or damage to substratum.

CONTAINERS

A. At a minimum, asbestos wastes shall be stored in air and water tight, 6-mil plastic bags. Label containers in accordance with OSHA 1926.1101.

B. Disposal drums (if applicable) shall be metal with locking ring tops and inner 6-mil. polyethylene liners.

C. Stick-on warning labels, as per EPA or OSHA requirements, shall be used on all disposal containers.

All drums must additionally be labeled with DOT code.

GRCA - 182403 02 80 00 - 10

OTHER MATERIALS

A. Surfactant (wetting agent) shall be a 50/50 mixture of polyoxyethylene ether and polyoxyethylene ester, or equivalent, mixed in a proportion as specified by manufacturer.

B. Encapsulation materials shall be either the penetrating or bridging type, pollution-free, non-toxic, with a Class A fire classification as specified herein. Material shall be flexible when cured, resistant to weathering, oxidation, aging, and abuse. The Contractor shall submit product data, use instructions, and recommendations from the manufacturer for products intended for use.

C. Provide all other materials required for temporary construction.

PART 3 - EXECUTION

HOUSEKEEPING

A. Establish Regulated Areas per OSHA 29 CFR 1926.1101. Demarcate all Regulated Areas per

OSHA.

B. Keep project neat, orderly, and in a safe condition at all times. Use wet methods and HEPA equipped vacuums only to collect all dust, waste, debris, etc., in areas where ACMs are impacted. The use of dry sweeping or vacuuming without using HEPA-equipped vacuums shall not be permitted.

C. All powered hand tools and equipment used to impact ACMs or PACMs must be equipped with point of contact HEPA-equipped vacuum attachments, and/or the materials must be thoroughly wetted with an effective wetting agent suitable for the material and operation.

D. Access to the work area must be restricted to “authorized persons” only as defined in OSHA 29 CFR

1926.1101. This may be accomplished by the use of properly demarcated critical barriers, securing adjacent access points, or installing barrier plastic sheeting.

E. The Contractor shall verify locations of utilities prior to construction, renovation, or demolition work.

Existing water, sewer, electrical, communications and gas lines located within the boundaries of the construction shall be located and non-essential utilities shall be properly locked and tagged out at the limits of the construction. This work shall utilize a qualified and licensed electrician to verify safety and proper lockout.

F. Unless and until a Negative Exposure Assessment is produced, establish a designated area or area adjacent to the regulated area for the decontamination of employees and their equipment that is contaminated with asbestos.

G. Provide enough containers for collecting asbestos-containing waste materials (ACWM) and construction debris.

H. Place drop cloths adjacent to areas where impacts to ACM will occur.

I. A HEPA equipped vacuum and/or wet methods shall be used to clean up any dust, debris, or other waste materials that may contain or be contaminated with ACWM.

J. No dry sweeping is permitted at any time during any activities conducted on or around any ACMs such that any waste dust, debris, or other item may be contaminated.

K. Thoroughly wet all dry or drying ACMs and general rubbish to prevent creating dust.

L. Keep ACWM in covered containers.

M. Ensure that employees do not smoke in work areas where they are occupationally exposed to asbestos as a result of activities in or around that work area

MINI-ENCLOSURE PREPARATION

A. Where utilized, mini-enclosure containments shall be constructed of 6-mil poly sheeting on all walls and floors not being impacted.

GRCA - 182403 02 80 00 - 11

B. Post caution signs in and around the work area to comply with OSHA 1910.1001(g)(1) and Federal, state, and local regulations.

C. Shut down and lockout all HVAC system components that supply or pass through the work area.

D. Critical barriers. Seal off openings, doorways, windows, vents, ducts, grilles, diffusers, with 1 layer of

6-mil poly sheeting sealed with duct tape.

E. Clean items to be removed from work area, using HEPA vacuum equipment and/or wet cleaning methods. Remove cleaned items to a temporary location as directed by IH.

F. Clean items to remain in the work area, using HEPA vacuum equipment and/or wet cleaning methods, and enclose with 1 layer of 6-mil poly sheeting sealed with duct tape. Protect items with temporary barricades, covers, or pads as necessary to prevent damage.

G. Clean work area using HEPA vacuum equipment and/or wet cleaning methods.

DECONTAMINATION

A. OSHA Class III Asbestos Work

1. The employer shall establish designated area that is adjacent to the regulated area for the decontamination of employees and their equipment which is contaminated with asbestos which shall consist of an area covered by an impermeable drop cloth on the floor or horizontal working surface.

2. The area must be of sufficient size as to accommodate cleaning of equipment and removing personal protective equipment without spreading contamination beyond the area (as determined by visible accumulations).

3. Work clothing must be cleaned with a HEPA vacuum before it is removed.

4. All equipment and surfaces of containers filled with ACM must be cleaned prior to removing them from the equipment room or area.

5. The Contractor shall ensure that employees enter and exit the regulated area through the equipment room or area.

B. Lead in Construction Work

1. Hand washing facilities.

a. The Contractor shall provide adequate handwashing facilities for use by employees exposed to lead in accordance with 29 CFR 1926.51(f).

b. Where showers are not provided the Contractor shall assure that employees wash their hands and face at the end of the work-shift.

WORKPLACE ENTRY AND EXIT PROCEDURES

A. All personnel shall put on required respiratory protection, disposable coveralls, head covering, and foot covering. Hard hats, eye protection, and gloves shall also be utilized where required. Clean respirators and protective clothing shall be provided and utilized by each authorized person for each separate entry into the work area.

B. Before leaving the work area, all personnel shall remove gross contamination from the outside of respirators and protective clothing by brushing and/or wet wiping procedures. Each person shall clean bottoms of protective footwear in the walk-off pan just prior to exiting work area. Deposit all disposable clothing into appropriately labeled containers.

ASBESTOS IMPACT WORK PRACTICES

A. The following sections describe protocols to be used for the various ACM impact tasks associated with this project. After all personal protection and containment controls are implemented; the task sequence will be as follows:

1. Shut down and lock out all HVAC systemswithin the work area.

2. Construct worker decontamination area at entrance to the work area.

GRCA - 182403 02 80 00 - 12

3. Pre-clean all mechanical equipment, floors, and walls.

4. Install critical barriers. Seal off any penetration or entrances into the work area using one (1) layer of 6-mil. polyethylene sheeting and tape. Polyurethane sealant foam may be used for small penetrations.

5. Complete containment barriers as per specification.

6. Approval of worker decontamination system(s) and containment system shall be approved by

Competent Person prior to initiation of impact activities.

7. Upon completion of impact activities, the Contractor shall request final inspection of the work area by the Industrial Hygienist. All surfaces shall be thoroughly cleaned prior to this request.

8. Upon the work area being declared visually clean, air sampling of the work area shall occur for air clearance. All but critical barriers will be removed prior to sampling.

9. If air sampling indicates area clearance in accordance with specifications, the area will be declared clean and all remaining polyethylene, tape, debris, etc. shall be removed and bagged as asbestos contaminated waste.

10. Encapsulating agent shall be applied to edges of impacted ACM surfaces. Approval from the

Industrial Hygienist shall be obtained before applying encapsulant.

11. All asbestos waste must be adequately wet as defined in the EPA/NESHAP Guidance dated

December 1990. Per the EPA Guidance, “adequately wet” means to “sufficiently mix or penetrate with liquid to prevent the release of particles”. If visible emissions are observed coming from

ACM waste, then the material is not adequately wet. The absence of visible emissions is not sufficient evidence of being adequately wet. All abated materials, regardless of whether they are first stripped from their substrate, must be adequately wet prior to disposal.

LEAD CONTAINING PAINT WORK PRACTICES

A. The following sections describe protocols to be used for the various LCP impact tasks associated with this project that may generate airborne lead dust. After all personal protection is donned and controls are constructed; the task sequence shall be as follows:

1. Install critical barriers or other temporary systems as necessary to prevent dust and debris from leaving the work area.

2. Disassembling pipe systems where LCP/LBP is present.

a. Utilize wet methods to reduce dust generation. (water, penetrating solvent)

b. Unbolt flanges minimizing impact to the paint.

3. Cutting pipe at floor level where LCP/LBP is present.

a. Use needle gun or power scaling tool with HEPA filtered ventilation shroud to remove paint in cut area prior to cutting.

b. Chemical paint removers may be utilized with full knowledge of hazard and proper risk assessment.

ASBESTOS AIR MONITORING

A. Air samples for personal exposure to asbestos shall be collected by the Contractor. The services may be performed by the Industrial Hygienist. Asbestos in air samples shall be analyzed by an independent accredited laboratory.

B. Visible emissions will be controlled and shall be the standard for requiring additional workplace controls.

LEAD AIR AND SURFACE MONITORING

A. Air samples for personal exposure to lead shall be collected by the Contractor. The services may be performed by the Industrial Hygienist. Lead in air samples shall be analyzed by an independent accredited laboratory.

B. Visible emissions will be controlled and shall be the standard for requiring additional workplace controls.

GRCA - 182403 02 80 00 - 13

ASBESTOS PROJECT DECONTAMINATION AND FINAL CLEARANCE

A. At the conclusion of the impact work, all surfaces in the work area should be thoroughly and completely HEPA-vacuumed. These surfaces include (but are not limited to) ceilings, walls, floors, doors, fixtures of any kind and appliances.

B. Wet wiping

1. Use Proper Wet Cleaning Procedures: At the conclusions of the impact work and after the first

HEPA vacuuming, all surfaces identified as requiring HEPA vacuuming earlier shall be thoroughly and completely washed with an amended water solution.

2. Change Cleaning Mixture Regularly: To avoid re-contaminating the area by using overly dirty water, users shall carefully follow surface area limits and change the cleaning mixture accordingly. Users must ensure that the dirty water does not re-contaminate the environment.

This dirty water is potentially hazardous and shall be treated accordingly

C. Final Inspection

1. After the final cleanup is complete, the final inspection will take place. Provide the Industrial

Hygienist (under contract with the Contractor) with 24-hour advanced notice of work areas prepared for final inspection. The objective of the inspection is to ensure and verify that no visible dust, dirt or debris is present.

2. At the conclusion of asbestos impact activities, final clearance air samples for asbestos will be collected in each asbestos impact area. The Industrial Hygienist shall collect clearance air samples for PCM analysis. If the air samples do not meet the post-impact standard of 0.010 f/cc, the work area will be re-cleaned until acceptable air levels are achieved.

3. At the conclusion of LCP/LBP impact activities, final clearance surface dust wipe samples for

Lead shall be collected in each Lead impact area. The Industrial Hygienist shall collect clearance dust wipe samples for Total Lead analysis. If the dust wipe samples of the floor do not meet the post-impact standard of 40 µg/ft2, the work area shall be re-cleaned until acceptable levels are achieved.

RE-ESTABLISHMENT OF THE WORK AREA AND SYSTEMS

A. Re-establishment of the work area to general access shall only occur following the completion of clean up procedures and/or after clearance sampling has been performed and documented to the satisfaction of Industrial Hygienist.

B. The Industrial Hygienist shall visually inspect the work area for any remaining visible residues.

Evidence of contamination shall necessitate additional cleaning and additional air monitoring.

Following satisfactory clearance of the work area, remaining polyethylene barriers may be removed and disposed of as asbestos-contaminated waste.

C. Upon successful completion of the final sampling, the barriers shall be disposed of as ACM. Removal of critical barriers and equipment shall be conducted using appropriate PPE.

ASBESTOS DISPOSAL

A. Asbestos wastes shall be thoroughly wetted and double-bagged in appropriately labeled asbestos disposal bags. Bags shall be sealed airtight while the material is still wet. Bag tops shall be twisted and sealed with duct tape, then bent over and sealed again with at least three wraps of duct tape.

Biological materials shall be disposed of in standard construction garbage bags in enclosed containers.

B. Additional material shall not be added to bags, and bags shall not be reopened after they have been sealed. Asbestos wastes shall be transported by a properly licensed transporter in a covered truck and disposed of at a landfill approved for asbestos. A manifest document shall be completed and signed by the Contractor, the Transporter, and the Disposal facility. The Contractor will submit all disposal records to the Industrial Hygienist with copies to the CO.

C. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner.

GRCA - 182403 02 80 00 - 14

D. Labels must be affixed to all bags, drums or other containers containing ACWMs. The following label shall be prominently displayed on the waste containers. All warning label print shall be readily visible, in large bold letter size printed on a contrasting background. Labels shall contain the following information:

DANGER

CONTAINS ASBESTOS FIBERS

AVOID CREATING DUST

CANCER AND LUNG DISEASE HAZARD

DO NOT DISTURB WITHOUT PROPER TRAINING AND EQUIPMENT

DO NOT BREATHE ASBESTOS FIBERS

LCP/LBP DISPOSAL

A. Lead painted pipe shall be wrapped with poly sheeting and sealed with duct tape.

B. Lead painted pipe may be reclaimed and recycled, avoiding distinction as hazardous waste.

C. Waste bags shall be sealed airtight by the Contractor prior to placement in containers. Bag tops shall be twisted and sealed with duct tape, then bent over and sealed again prior to placement in the drum(s).

D. Additional material shall not be added to bags, and bags shall not be reopened after they have been sealed. Lead wastes, such as paint scrapings, sludge or concentrated debris will need to be TCLP tested for lead content prior to disposal at an appropriate facility.

E. Labels must be affixed by the Contractor to all bags, drums or other containers containing lead waste.

The label shall be prominently displayed on the waste containers. All warning label print shall be readily visible, in large bold letter size printed on a contrasting background.

AIR AND WATER POLLUTION CONTROL

A. Initial exposure assessment sampling will be conducted by the Contractor’s Competent Person during activities that impact ACM or lead, until a record of potential exposure during each type of activity is established.

B. Samples shall be analyzed using PCM according to National Institute of Occupational Safety and

Health (NIOSH) Counting Method 7400 for Phase Contrast Microscopy.

C. Laboratories performing analysis of air samples shall be rated proficient by the American Industrial

Hygiene Association (AIHA) Proficiency Analytical Testing (PAT) program.

D. Results of the air samples shall be made available to applicable personnel and shall be submitted to the

Industrial Hygienist and CO.

E. Do not dispose of lead, coating wastes, or oils in storm or sanitary drains. Empty coating containers may be disposed of as trash as long as they are “drip free” and no liquids or powers remain.

F. ACWM, lead containing materials, or other waste materials shall not be washed into the any bodies of water.

G. The worker decontamination wash water shall be drained, collected, and filtered through a system with at least 5-micron particle size collection capability. All filtered water shall be stored for off-site discharge. Any shower unit shall be constructed to ensure against any leakage of any kind and shall be kept clean of all debris at all times.

END OF SECTION

GRCA - 182403 02 80 00 - 15

FACILITY REMEDIATION - ASBESTOS AND LEAD IMPACT
PART 1 - GENERAL
1.1 SUMMARY
A. The work of this section consists of asbestos and lead impact and lists environmental controls to be used during impact to asbestos containing materials (ACM), lead-based paint (LBP) and lead containing paint (LCP) during the renovation of the Gran...
B. The proposed improvements entail cutting into and drilling holes through wallboard that has been identified as Asbestos Containing Materials (ACM) and removing existing pipe materials that have been tested and confirmed to be coated with Lead Based...
C. The Contractor shall take necessary reasonable measures to control air and water pollution by any material or equipment used during asbestos impact and lead hazard control activities.
D. Identified locations of ACM and LBP are contained in the HDR Asbestos and Lead-based Paint Sampling Report dated Sept. 2016):
1. Asbestos Containing Materials;
a. North Pump House
(i)
(i) Wallboard behind fiberglass insulation along the interior south wall was tested and contained 12% Chrysotile asbestos.
(ii) Wallboard along the interior north wall was tested at 15% Chrysotile asbestos.
b. South Pump House
(i)
(i) In addition, the black tar and tan fibrous resinous material layers of the roof contain trace amounts of Chrysotile asbestos (less than 1%). Though this percentage of asbestos does not meet the definition of ACM, workers should be made aware of it...
E. The Contractor shall be responsible for the collection of personnel exposure samples for asbestos and lead in accordance with the Occupational Safety and Health Administration (OSHA) regulations.
F. If suspect ACM is encountered in wall or ceiling interiors in unanticipated locations, the unforeseen condition shall be documented and described, including location, extent and the quantity of suspect ACM, and all immediate actions shall be taken ...

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .