This is a Schedule of Items for a Request for Proposal (RFP) issued by the Bureau of Land Management, Colorado for the Park Center Well Main Valve Replacement project. The solicitation requires a single contractor to furnish all necessary labor, equipment, supervision, supplies, and materials to complete eight distinct line items, each priced as a lump sum (L.S.). All work must comply with the referenced Scope of Work and include all accessories and incidental items necessary to render the project fully operational.
The eight contract line items encompass: (1) Mobilization & Administrative Submittals, requiring preparation and submission of technical plans for Government review prior to construction; (2) Permitting & Environmental Compliance, including securing regulatory permits and managing water discharge per state criteria; (3) Flow Control & Well Isolation, with the contractor assuming full liability for well containment and blowout prevention; (4) API 6A Christmas Tree Installation & Valve Replacement, including furnishing and installing the complete assembly and connecting the new production valve to existing water district piping; (5) Building Height Modification, Hydronic Heating & Gas Detection Systems, encompassing structural building extension, geothermal heating, solar power integration, and gas monitoring; (6) Testing, Quality Control & NSF System Certification, requiring hydrostatic pressure testing and safety system certification; (7) Building Reset, Site Restoration & Structural Anchoring, including foundation anchoring, weatherproofing, and site drainage restoration; and (8) Hazardous Waste & Arsenic Scale Debris Disposal, requiring legal transportation and disposal of removed components at a licensed facility in compliance with Colorado Department of Public Health and Environment regulations. The contract total is currently shown as $0.00, indicating pricing has not yet been entered.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF ITEMS
Request for Proposal No. Contract No.
Job Title: Park Center Well Main Valve Replacement
BUREAU OF LAND MANAGEMENT, COLORADO
Furnish all necessary labor, equipment, supervision, supplies and materials to provide items listed below in accordance with the Scope of Work provided and all other provisions contained herein. Include all accessories and incidental items necessary to render the project fully operational in accordance with the scope of work.
Item Est. Unit Unit Total No. Quantity Price Amount
1 1 L.S.
2 1 L.S.
3 1 L.S.
4 1 L.S.
5 1 L.S.
6 1 L.S.
7 1 L.S.
8 1 L.S.
$0.00
CONTACT INFORMATION:
POC NAME:
COMPANY NAMTE/ADDRESS:
UEI:
Total (Written):
Contract Total
Total (All or None)
Mobilization & Administrative Submittals - The Contractor shall prepare and submit all required technical plans for Government review and approval within specified timeframes prior to initiating physical site construction.
Permitting & Environmental Compliance - The Contractor shall secure all applicable regulatory permits, strictly manage water discharge in accordance with state dilution criteria.
Testing, Quality Control & NSF System Certification - The Contractor shall perform hydrostatic pressure testing on the replaced Christmas tree assembly and certify full functionality of safety systems.
Description
Flow Control & Well Isolation (Contractor’s Risk) - The Contractor shall design, implement, and maintain the live-well isolation mechanism and assume full, unconditional liability for well containment and blowout prevention.
API 6A Christmas Tree Installation & Valve Replacement - The Contractor shall furnish and install the complete API 6A Christmas tree assembly and connect the new production valve directly to existing water district delivery piping.
Building Height Modification, Hydronic Heating & Gas Detection Systems - The Contractor shall design, modify, and install the structural building extension, radiant geothermal heating system, solar power integration, and hazardous gas monitoring network.
Hazardous Waste & Arsenic Scale Debris Disposal -The Contractor shall take ownership of all removed wellhead components and legally transport and dispose of all debris at a licensed facility in compliance with CDPHE hazardous waste regulations.
Building Reset, Site Restoration & Structural Anchoring - The Contractor shall safely reset and anchor the modified building onto the foundation, integrate all weatherproofing, and restore surrounding site drainage to as-new conditions.