B08_140L1726Q0022_UPDATED_SECTION_B_0005.pdf

PDF 67 KB Posted

Attached to
PARK CENTER WELL VALVE REPLACEMENT
Solicitation number
140L1726Q0022
Issued by

About this file

This document is a Bid Schedule for a Request for Proposal issued by the Bureau of Land Management, Colorado, for the Park Center Well Main Valve Replacement project. Bidders must provide lump sum pricing for eight distinct work items that collectively comprise the complete project scope. Each bid item must include all costs for materials, labor, expenses, fees, taxes, permitting, overhead, and profit associated with construction disciplines including civil, structural, mechanical, electrical, and control work. Additive Alternate Bids will be awarded as available funds allow.

The eight required bid items are: (1) Mobilization and Administrative Submittals, including preparation and submission of technical plans for government review and approval; (2) Permitting and Environmental Compliance, requiring the contractor to secure all applicable regulatory permits and manage water discharge according to state dilution criteria; (3) Flow Control and Well Isolation, with the contractor assuming full liability for well containment and blowout prevention; (4) API 6A Christmas Tree Installation and Valve Replacement, including furnishing and installing the complete assembly and connecting the new production valve to existing water district delivery piping; (5) Building Height Modification, Hydronic Heating and Gas Detection Systems, including structural building extension, geothermal heating, solar power integration, and hazardous gas monitoring; (6) Testing, Quality Control and NSF System Certification, requiring hydrostatic pressure testing and safety system certification; (7) Building Reset, Site Restoration and Structural Anchoring, including foundation anchoring, weatherproofing integration, and site drainage restoration; and (8) Hazardous Waste and Arsenic Scale Debris Disposal, requiring legal transport and disposal of all removed wellhead components at a licensed facility compliant with Colorado Department of Public Health and Environment regulations. The bid schedule includes spaces for unit prices and total amounts, with a contract total line and an "All or None" total requirement.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services/Prices was revised as follows.

Clauses was revised as follows.

BID SCHEDULE

Each Bid item shall include all cost for materials, labor, expenses, fees, and taxes plus permitting costs, overhead and profit associated with each bid item to construct the following areas of work in accordance with the contact documents. The unit costs shall include the costs for all construction disciplines (civil, structural, mechanical, electrical, control work, etc) associated with the work area. Additive Alternates Bids will be awarded as available funds allow.

SCHEDULE OF

ITEMS

Request for Proposal No. Contract No.

Job Title:

Park Center Well Main Valve Replacement

BUREAU OF LAND MANAGEMENT,

COLORADO

Furnish all necessary labor, equipment, supervision, supplies and materials to provide items listed below in accordance with the Scope of Work provided and all other provisions contained herein. Include all accessories and incidental items necessary to render the project fully operational in accordance with the scope of work.

Item Est. Unit Unit Total No. Description Quantity Price Amount

Mobilization & Administrative Submittals - The Contractor shall prepare and submit all required technical plans for Government review and approval within specified timeframes prior to initiating physical site construction.

1 L.S.

Permitting & Environmental Compliance - The Contractor shall secure all applicable regulatory permits, strictly manage water discharge in accordance with state dilution criteria.

1 L.S.

Flow Control & Well Isolation (Contractor¿s Risk) - The Contractor shall design, implement, and maintain the live-well isolation mechanism and assume full, unconditional liability for well containment and blowout prevention.

1 L.S.

API 6A Christmas Tree Installation & Valve Replacement - The Contractor shall furnish and install the complete API 6A Christmas tree assembly and connect the new production valve directly to existing water district delivery piping.

1 L.S.

Building Height Modification, Hydronic Heating & Gas Detection Systems - The Contractor shall design, modify, and install the structural building extension, radiant geothermal heating system, solar power integration, and hazardous gas monitoring network.

1 L.S.

Testing, Quality Control & NSF System Certification - The Contractor shall perform hydrostatic pressure testing on the replaced Christmas tree assembly and certify full functionality of safety systems.

1 L.S.

Building Reset, Site Restoration & Structural Anchoring - The Contractor shall safely reset and anchor the modified building onto the foundation, integrate all weatherproofing, and restore surrounding site drainage to as-new conditions.

1 L.S.

Hazardous Waste & Arsenic Scale Debris Disposal -The Contractor shall take ownership of all removed wellhead components and legally transport and dispose of all debris at a licensed facility in compliance with CDPHE hazardous waste regulations.

1 L.S.

Contract Total

Total (All or None) Total (Written):

CONTACT INFORMATION:

POC NAME:

COMPANY NAMTE/ADDRESS:

UEI:

- END OF BID SCHEDULE -