B08_140L1726Q0022_UPDATED_SECTION_C_0005.pdf

PDF 48 KB Posted

Attached to
PARK CENTER WELL VALVE REPLACEMENT
Solicitation number
140L1726Q0022
Issued by

About this file

This document is a Description/Specifications section from a federal contract solicitation for well intervention work at the Park Center Well. The primary objective is to replace failed primary and secondary control valves and modify the manifold valve piping as detailed in attached contract drawings and specifications. The project requires specialized "live-well" intervention capabilities to safely manage 200 PSI artesian flow conditions while the primary shut-off valve is non-functional. Key work elements include pressure control management during the intervention, manifold valve modifications to enable future rig connectivity, and full compliance with applicable environmental discharge permits. The scope demands technical expertise in high-pressure well intervention and adherence to specific engineering standards outlined in the referenced contract documents.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C - Description/Specifications

Clauses

The objective of this project is to replace the failed primary and secondary control valves and modify the manifold valve piping at the Park Center Well as shown in the contract drawings and specifications attached. The project requires a specialized "live-well" intervention to manage 200 PSI artesian flow without a functional primary shut-off. Work includes pressure control, manifold valve modification for future rig connectivity, and strict adherence to environmental discharge permits.

File details come from the government source that posted it. Updated .