This is a comprehensive set of federal contract specifications for the Park Center Well project located in Fremont County, Colorado. The project involves completing a partially constructed high-pressure artesian water well and supporting infrastructure.
The primary scope of work includes: drilling through existing cement plugs within the 12-inch diameter steel casing and installing 8 5/8-inch production casing with cement grouting between casings; constructing a water supply system to connect to the existing Park Center water system; building a concrete well house foundation and floor; constructing aggregate parking and trail surfaces; installing fire hydrants, valves, pipes, and meters; abandoning the existing high-pressure artesian well; installing chain-link fencing; and performing site restoration including seeding. All drilling operations must comply with Colorado 2 CCR 402-2 water well construction rules. The contractor must submit a drilling program, drilling plan, abandonment plan, and evidence of driller qualifications within 10 days of notice to proceed. The well is anticipated to flow 7,000-8,000 GPM at approximately 165 psi surface pressure. Key materials specified include American-made API 5L Grade J55 steel casing with short thread coupling joints, ready-mix concrete (4,000 psi), ductile iron pipe, PVC water line pipe, galvanized chain-link fencing with factory stain, and native seed mix. Payment terms include lump-sum compensation for mobilization (paid in phases), well drilling and casing, well abandonment, water supply and drain systems, traffic control, and other major contract items, with unit pricing for certain elements such as aggregate surfacing (per ton) and landscape installation (per each or linear foot).
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL INFORMATION AND REQUIREMENTS
Park Center Well 2014 11/01
01009-1
SECTION 01009
PART 1: GENERAL
1.1 SUMMARY
A. Description of Work: Furnishing labor, equipment, supplies, and materials to complete a partially completed high pressure artesian water well, including installing 8 5/8” steel casing within existing 12 inch diameter steel casing, cementing between the two casings, constructing a water supply system which will connect to an existing functioning private community water system, constructing a concrete building foundation and floor, aggregate parking and trail and abandoning of an existing high pressure artesian water well.
B. General: All drilling operations shall comply with the State of
Colorado 2 CCR 402-2.
C. Location: Work under this Contract is located in Fremont County, Colorado. The work locations are shown on the drawings.
D. Information Provided by the Government: In accordance with Federal
Acquisition Regulation Clause 52.236-4, Physical Data, electronic copies of the data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. The Government will provide attachments listed below in pdf format. In addition the Contractor may request to view a DVD of the downhole video of the existing well.
1. Replacement well casing cut sheet
2. Replacement well completion report
3. Gases present in both wells
4. Chemistry of the existing well
5. Chemistry of the replacement well
6. Previous well permit
7. Caliper log
8. Caliper report
9. First cement bond log
10. Final cement bond log
11. Downhole Video-Original Well
12. Downhole Video-Replacement Well
E. Storm Water Discharge Permit: Permit as required by the Colorado
Department of Public Health and Environment-Water Quality Control Division. Contractor shall submit 3 copies of their approved permit along with three copies of the Contractors Erosion Control Plan to control. Plan shall include types of erosions prevention materials and their locations to be installed during the construction process.
L15PC00089 / L14PS01277 Park Center Well 34/250
01009-2
1.2 REFERENCES
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms:
Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
AASHTO American Association of State Highway and Transportation
Officials 444 North Capitol Street, N.W., Suite 249 Washington, DC 20001 AASHTO M 147-65 Materials for Aggregate and Soil
Aggregate Subbase, Base and Surface Courses (R1993)
AASHTO T 99-93 Method of Test for the Moisture-Density Relations of Soils Using a 5.5 lb (2.5 kg) Rammer & a 12-inch (305 mm) Drop
ACI American Concrete Institute
P.O. Box 19150 Detroit, MI 48219
ACI 305R-91 Hot Weather Concreting ACI 306R-88 Cold Weather Concreting ACI 347R-94 Guide to Formwork for Concrete
ANSI American National Standards Institute
11 W 42nd St.
New York, NY 10036
ANSI B 16.1-89 Cast Iron Pipe Flanges and Flanged Fittings
API American Petroleum Institute 1220 L Street, N.W.
Washington, DC 20005
API RP 5A5-93 Recommended Practice for Field Inspection of New Casing, Tubing, and Plain-End Drill Pipe
ASTM American Society for Testing and Materials
100 Barr Harbor Dr.
West Conshohocken PA 19428-2959
ASTM A 53 REV A-95 Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A 392 REV B-91 Zinc-Coated Steel Chain Link Fence Fabric
ASTM A 536-84 Ductile Iron Castings ASTM A 615REV B-95 Deformed and Plain Billet Steel Bars for Concrete Reinforcement ASTM C 94-94 Ready-Mixed Concrete ASTM C 143 REV Methods for Slump of Hydraulic Cement
Concrete
L15PC00089 / L14PS01277 Park Center Well 35/250
01009-3
ASTM C 260-95 Air-Entraining Admixtures for Concrete
ASTM D 994-94 Preformed Expansion Joint Filler for Concrete (Bituminous Type)
ASTM F 477-95 Elastomeric Seals (Gaskets) for Joining Plastic Pipe
ASTM F 567-93 Installation of Chain Link Fence ASTM F 626 REV A-94 Fence Fittings ASTM F 1043-95 Strength and Protective Coatings on
Metal Industrial Chain Link Fence Framework
AWWA American Water Works Association
6666 West Quincy Avenue Denver, CO 80235
AWWA C 115/A 21.15-94 Flanged Ductile Iron or Gray Iron Threaded Flanges
AWWA C 502-94 Dry Barrel Fire Hydrants AWWA C 900-89 Polyvinyl Chloride (PVC) Pressure Pipe
MUTCD Manual on Uniform Traffic Control Devices for Streets and Highways
Superintendent of Documents Government Printing Office Washington, DC 20402
1.3 DEFINITIONS
A. Approvals: Approval of the submittals is an indication that the Contractor's submittals have been reviewed and that there are no objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting Officer's attention in writing. After approval of an item, submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
1.4 SUBMITTALS
A. General: Refer to the specifications for required submittals. A copy of all information required by the State of Colorado for the drilling of water wells, including but not limited to, drilling logs, well reports, shall be supplied to the Contracting Officer and/or the Contracting Officers Representative.
B. Bid Proposal Submittals: Refer to Specification Section 02527, 1.3 D for submittals required to be included with bid proposal.
C. Requirements: Allow at least 10 working days for review. Submittals shall be delivered to the Bureau of Land Management 2815 H Road Grand Junction, CO 81506.
D. Identification of Submittals: Completely identify each submittal by showing at least the following information:
L15PC00089 / L14PS01277 Park Center Well 36/250
01009-4
1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or resubmittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
1.5 CERTIFICATES OF CONFORMANCE
A. Requirements: The Contracting Officer may permit use, prior to sampling and testing, of materials when accompanied by Certificates of Conformance. Materials used on the basis of a Certificate of Conformance may be sampled and tested. Installation of materials on the basis of Certificates of Conformance shall not relieve the Contractor of responsibility for incorporating materials which conform to the requirements of the drawings and specifications. Material not conforming to those requirements will be subject to rejection, whether in place or not.
B. Format: The Certificate of Conformance provided by the supplier shall:
1. State that the named product conforms to the Contract requirements.
2. Either be accompanied with a certified copy of the test results, or certify that such test results are on file with the manufacturer and will be furnished to the Contracting Officer upon request.
3. Provide the name and address of the manufacturer, the testing agency, and the date of tests.
4. Set forth the means of identification which will permit field determination of the product delivered as being the product covered by the certification.
1.6 QUALITY ASSURANCE
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
C. Measurements: Where approved manufacturer's diagrams and shop drawings give specific measurements or rough-in dimensions for equipment, these dimensions shall take precedence over dimensions indicated on the drawings.
D. Equipment: Prior to ordering equipment, verify dimensions and functions of equipment proposed for use. Be certain the equipment is compatible with the structural and architectural features of the work, L15PC00089 / L14PS01277 Park Center Well 37/250
01009-5 avoids conflicts with equipment of other crafts, and that it will fit in the space provided.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Protect products incorporated into the work from damage while in transit to the site. Products must be delivered in original unopened containers with manufacturer's name, brand designation, and contents legibly indicated.
B. Storage: Provide temporary storage facilities for products. Storage shall comply with the manufacturer's instructions. The storage area shall permit access for inspection and handling.
C. Handling: Load and unload products protecting them from damage.
1.8 PROJECT/SITE CONDITIONS
A. Access to the Work: As per Federal Acquisitions Regulations Clause 52.236-10.
B. Environmental Considerations: As per Federal Acquisitions Regulations
Clause 52.236-9 and 52.236-10.
C. Cleaning of Vehicles and Equipment: Prior to being allowed within the work area, all heavy equipment and vehicles to be used at the worksite shall be cleaned and free of dirt, sod, and any foreign materials that may contain noxious weeds seed. Notify the Contracting Officer’s Representative a minimum of 24 hour in advance of the location of equipment to allow for inspection of all equipment and vehicles.
Equipment and/or vehicles will not be allowed within the work area until approved by the Contracting Officer’s Representative.
1.9 SEQUENCING AND SCHEDULING
A. Work Schedule: The schedule shall be submitted within 5 calendar days after signing the Notice to Proceed and as per Federal Acquisitions Regulations Clause 52.236-15. When requested, submit an updated schedule.
B. General Requirements: All work associated with the completion of the replacement well, construction of the water system including a functional connection to the existing Park Center water supply line, and abandonment of the existing well shall be completed and accepted prior to any other construction. Work not to be performed includes but is not limited to constructing the parking lot, trail, retaining walls, installing landscape boulders, re-habilitation of disturbed areas.
L15PC00089 / L14PS01277 Park Center Well 38/250
01009-6
PART 2: PRODUCTS
(There are no applicable requirements.)
PART 3: EXECUTION
3.1 PROJECT MEETINGS
A. Pre-Work Conference:
1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
3. Be prepared to summarize and explain procedures planned for the project and may present submittals requested in the specifications.
B. Progress Meetings:
1. To be held at the project site, or as determined by the Contracting Officer.
2. May be called by either the Contracting Officer or the Contractor.
Request shall state who should attend and include an agenda.
C. Final Inspection:
1. To be held at the project site, or as determined by the Contracting Officer.
2. Notify the Contracting Officer in writing at least 5 working days before the completion date so the Government can schedule final inspection.
3. The superintendent shall be present during this inspection.
3.2 PREPARATION
A. Contractor Staking: The Contractor shall be responsible for developing the stakeout plan and for the construction staking of the project. The Contractor shall be given electronic copies of the construction drawings. The electronic drawings are in version AutoCAD Civil 3D 2014 format. It is anticipated that a version of this AutoCAD Civil 3D 2014 will be required to develop the stakeout plan. Submit an electronic copy and paper printout to the Government upon completion of the stakeout plan. Printouts shall be of the same scale as the Government
B. Work Limits and Control Points: Will be established by the Contracting
Officer.
3.3 SALVAGEABLE ITEMS
A. Requirements: Salvageable items consisting of miscellaneous pipe, fittings, valves, etc. shall be stockpiled within the work area at a location to be determined by the Contracting Officer.
L15PC00089 / L14PS01277 Park Center Well 39/250
01009-7
3.4 DISPOSAL OF DEBRIS
A. Requirements: Items or debris not designated as salvage for the Government and material generated from clearing and grubbing shall become the property of the Contractor. Dispose of all materials in a legal manner.
3.5 WARRANTY
A. Requirements: Materials and equipment furnished under this Contract shall be covered by the most favorable commercial warranties given to customers for such materials or equipment. The rights or remedies provided herein are in addition to and do not limit rights afforded to the Government by other clauses of this Contract. With respect to warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract the Contractor shall:
1. Obtain warranties that would be given in normal commercial practices.
2. Require warranties to be executed, in writing, for the benefit of the Government.
3. Submit warranties to the Contracting Officer prior to the final inspection.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION
L15PC00089 / L14PS01277 Park Center Well 40/250
TESTING LABORATORY SERVICES
01458-1
SECTION 01458
A. Section Includes: Requirements for the Contractor to engage a qualified, independent testing laboratory to conduct specific tests where the Contractor is required to do so in this contract.
1.2 SUBMITTALS
A. Test Reports: The Contractor shall provide 3 copies of test reports to the Contracting Officer. Reports shall include testing facility name, address, telephone number, and names of full-time responsible officers.
1.3 QUALITY ASSURANCE
A. Approval of Laboratory: The qualified, independent testing laboratory, which will be conducting the specific tests required in this contract, must have authority or be licensed to operate in the State in which the project is located. The testing laboratory shall be approved by the Contracting Officer prior to the Contractor beginning work.
B. Responsibilities of Laboratory:
1. Test samples of mixes submitted by the Contractor.
2. Provide qualified personnel at project site. Cooperate with the
Contracting Officer and Contractor in performance of services.
3. Perform specified sampling and testing of products and materials in accordance with specified standards.
4. Ascertain compliance of materials and mixes with requirements of specifications.
5. Promptly notify the Contracting Officer and Contractor of observed irregularities or non-conformance of work, products, or materials.
6. Perform additional tests required by the Contracting Officer.
7. Attend preconstruction meetings and progress meetings.
C. Limitations on Laboratory:
1. Laboratory may not release, revoke, alter, or enlarge on requirements of specifications.
2. Laboratory may not approve or accept partial portions of the work.
3. Laboratory may not assume duties of the Contractor unless approved in writing by the Contracting Officer.
1.4 SEQUENCING AND SCHEDULING
A. Establishing Testing Schedule:
L15PC00089 / L14PS01277 Park Center Well 41/250
11/01
Park Center Well 2014
01458-2
1. By advance discussion with the testing laboratory, determine the time required for the laboratory to perform its test and to issue its findings.
2. Provide required time within the construction schedule.
B. Revising Testing Schedule: When construction schedule changes are necessary during construction, coordinate such changes with the testing laboratory as required.
2.1 Summary
A. Reports: Shall include:
1. Date issued.
2. Project title and number.
3. Name of inspector.
4. Date and time of sampling or inspection.
5. Identification of product and specification sections.
6. Location in the Project.
7. Type of inspection or test.
8. Date of test.
9. Results of tests.
10. Conformance with Contract Documents.
B. Interpretation: When requested by the Contracting Officer, provide interpretation of test results.
3.1 FIELD QUALITY CONTROL
A. Contractor Requirements: See individual specifications "Field Quality Control" paragraph for specific testing requirements. When applicable, the Contractor shall:
1. Deliver to agency or laboratory at designated location, adequate samples of materials proposed to be used which require testing, along with proposed mix designs.
2. Cooperate with laboratory personnel, and provide access to the Work.
3. Provide incidental labor and facilities:
a. To obtain, handle, and label or identify samples at the site or at source of products and materials to be tested.
b. To facilitate tests.
c. To provide storage and curing of test samples.
4. Ensure samples are taken by qualified testing personnel.
5. Coordinate the laboratory test frequency and timing with the
Contracting Officer.
6. Ensure tests are completed according to the testing schedule.
7. Furnish test reports within 5 working days after tests have been completed.
L15PC00089 / L14PS01277 Park Center Well 42/250
01458-3
A. Units: The work described in this section will not be measured for payment.
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
L15PC00089 / L14PS01277 Park Center Well 43/250
Park Center Well 2014 MOBILIZATION
01505-1
SECTION 01505
MOBILIZATION
1.1 SUMMARY
A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site.
(There are no applicable requirements.)
PART 3: EXECUTION
(There are no applicable requirements.)
PART 4: MEASUREMENT AND PAYMENT
4.01 METHOD OF MEASUREMENT:
A. Units: Progress payments will be made as follows:
1. When 5% of the original Contract amount is earned from other bid items, 50% of the amount bid for mobilization or 5% of the original total Contract amount, whichever is lesser, will be paid. Upon completion of work for the project, when all equipment and materials have been removed from the work site and the site has been approved by the Contracting Officer, the remaining Contract amount for mobilization/demobilization may be invoiced.
2. The total sum of all payments shall not exceed the original
Contract amount bid for mobilization, regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.
A. Payment: Payment will be made under:
Pay Item Pay Unit
01505(1) Mobilization. . . . . . . . . . . . . . . . . Lump Sum
L15PC00089 / L14PS01277 Park Center Well 44/250
SECTION 01570
TRAFFIC REGULATION
Park Center Well 2014 TRAFFIC REGULATIONS Rev. 07-11
01570-1
A. Section Includes: Requirements to provide safe and expeditious movement of traffic through constructions zones. Constructions zones include both the east and west sides of Fremont County Road 9 as shown on the
A. General: Submittals shall be according to Section 01009 - General
Information and Requirements.
B. Traffic Control Plan: Submit three copies for approval. Plan shall include at a minimum the following topics:
1. Specific signage, signals, channelizing and lighting devices, barricades, and flag persons that are detailed in the current MUTCD, and CDOT regulations and that will be used for the project.
2. Traffic Control requirements, if applicable, for working adjacent to county roads within Frement County, CO.
3. Provide for convenient access for authorized vehicles to the work site from the road or bypass road.
4. Provide for such guards as may be necessary to ensure against accidents and avoid damage or injury to passing traffic in areas where the nature of construction operations in progress and equipment and machinery in use pose a hazard.
5. Include a narrative and/or drawing showing the location of traffic control devices to be used.
2.1 MATERIALS
A. Signs: Shall have reflectorized sheeting, and meet the standards of the current Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD) for colors, sizes, and shapes.
B. Cones: Cones shall be a minimum of 18 inches high and shall be orange colored and highly visible both in daylight and darkness. For nighttime use, they shall be reflectorized or equipped with lighting devices for maximum visibility. Reflectorized material shall have a smooth, sealed outer surface, which will display the same approximate color day and night. Cones shall be capable of remaining upright during normal traffic flow and wind conditions.
L15PC00089 / L14PS01277 Park Center Well 45/250
01570-2
C. Barriers: Water filled barriers or barrels shall be orange colored and highly visible in daylight and darkness. For nighttime use, they shall be reflectorized or equipped with lighting devices for maximum visibility. Reflectorized material shall have a smooth, sealed outer surface, which will display the same approximate color day and night.
D. Traffic Control Devises: Either flag persons or traffic control signals shall be in place if the Contractor utilizes the bypass road. The bypass road only accommodates one-way traffic and may not be expanded in width.
3.1 PUBLIC SAFETY
A. Preparation: Provide, erect, and maintain all necessary traffic control devices as on the approved Traffic Control Plan and as required by the State and local authorities having jurisdiction. Mobilization or construction shall not begin until all traffic control persons or devices as approved are in place.
3.02 VEHICLE TRAFFIC CONTROL
A. Application: Maintain flow of public traffic and conduct operations, to offer the least possible obstruction and inconvenience to public traffic.
1. Protect all roads closed to traffic with effective barricades having acceptable warning and detour signs. Illuminate all barricades and obstructions at night, and keep illuminated from sunset until sunrise.
2. Maintain the condition, operation, and effectiveness of all traffic control devices throughout their period of use. Remove all temporary traffic control devices when no longer needed.
3.3 ROADWAYS, TEMPORARY AND PERMANENT
A. Detours: Construct detours, if applicable, that will allow safe, continuous traffic flow on the existing bypass road alignment.
1. If necessary to route traffic, grade the existing detour as shown on the drawings to a smooth uniform surface. Re-grade and water the detour road surface as necessary to maintain a smooth, dust free condition while being used. Perform all necessary earthwork required to produce a stable, serviceable detour.
2. Construct and/or maintain ditches as needed to handle surface water on the detour road.
3. If requested by the Contracting Officer, place and grade aggregate surfacing material on the as needed. Quantity of aggregate surfacing, if needed, will be paid for by the ton of material placed and approved. Aggregate surfacing material placed without the request of the Contracting Officer shall not be paid for.
4. Promptly perform maintenance that is needed to ensure against accidents and to avoid damage or injury to passing traffic.
L15PC00089 / L14PS01277 Park Center Well 46/250
01570-3
B. Maintenance of Traffic Control Devices: Signs and other devices shall be kept clean and readable.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will be measured and paid for on a lump sum basis. When the Traffic Control Plan has been approved and accepted, 25% of the amount bid for Traffic Control or 3% of the original total Contract amount, whichever is lesser, may be invoiced. Additional expenses in labor and material may be invoiced as they occur, with the final billing being invoiced once all Traffic Control is complete and materials and personnel are removed from the work location.
A. Payment: Prices and payment will be full compensation for all the work described in this section to implement the approved traffic control plan.
Payment will be made under the following line item:
01570(1) Traffic Control . . . . . . . . . . . . . . . . . . . . . . Lump Sum
L15PC00089 / L14PS01277 Park Center Well 47/250
EXCAVATION AND FILL
Park Center Well 2014 [7/00]
02315 - 1
SECTION 02315
A. Section Includes: Excavation, borrow excavation, embankment construction, placement, and disposal of materials as shown on the drawings.
1.2 DEFINITIONS
A. Unclassified Excavation: Consists of the material excavation and placement regardless of its nature.
B. Rock Excavation: Removal of material is rock excavation when it consists of igneous, metamorphic, and sedimentary rock which cannot be excavated without the use of a hydraulic excavator having a 170 net flywheel horsepower and a minimum operating weight of 60000 lbs.
1. Common Excavation: Removal of materials which can be excavated using a hydraulic excavator having a 170 net flywheel horsepower or less shall be considered common excavation.
2. Muck Excavation: Shall consist of the removal and disposal of deposits of saturated or unsaturated mixtures of soils and organic matter not suitable for foundation material regardless of moisture content.
3. Fill Material: Shall be mineral soil free from peat, frozen material, brush, trees, roots over 2 inches in diameter and rocks over 6 inches in greatest diameter obtained from site during excavation.
C. Topsoil: Soil that supports growth of vegetation and contains organic matter.
1.3 PROJECT/SITE CONDITIONS
A. Excess Material: Usable excess material excavated shall be used in the embankment construction before the use of borrow is allowed if material is approved by the Contracting Officer. Material not approved shall be disposed of onsite as directed by the Contracting Officer.
B. Borrow Material Area: Obtain borrow material and borrow topsoil as approved, from the north end of the existing well pad as shown on the
C. Drainage: Borrow area and waste or disposal areas shall be graded so that water will not collect and stand and to match existing adjacent slopes and/or grades.
A. General: See definitions.
L15PC00089 / L14PS01277 Park Center Well 48/250
02315 - 2
B. Fill Material: Shall be obtained from the common excavation, or from approved designated borrow areas if required. Material from excavation shall be used unless it contains ice or frozen earth, debris, high moisture content, or is specified in other sections to be replaced. Materials removed in clearing and grubbing shall not be used for backfill or embankment.
C. Topsoil (Borrow): Existing topsoil is located at the north end of the existing well pad and graded to match the existing slopes of the pad as shown on the drawings. Actual quantity of materials is unknown but estimated at less than 100 cubic yards.
3.1 PREPARATION
A. Clearing and Grubbing: The work area to be excavated, and the surface area to be covered by fill material, shall be thoroughly cleared and stripped of vegetative matter, brush, trees, stumps, roots, loose rocks, and other objectionable materials. Dispose of debris offsite in a legal manner.
B. Borrow Area: The area north of the proposed well location, outside of the proposed chain-link fence as shown on the drawings may be used as a borrow area as directed by the Contracting Officer. Borrow material(s), if approved, shall be excavated in a uniform manner so when complete the excavation will match existing adjacent grades and slopes.
C. Prewatering: Excavation areas and borrow pits may be prewatered before excavating the material. The application of water shall be controlled so that the excavated material will be near the optimum moisture content as specified in paragraph 3.3A Testing, below. When necessary, prewatering shall be supplemented to assure that embankment material and backfill material moisture content comply with paragraph 3.3A Testing, below. Water may be obtained from the fire hydrant as shown on the drawings.
D. Preparation for Grading: Prior to beginning work in an area, necessary clearing and grubbing in that area shall have been completed and accepted by the Contracting Officer. No fill materials shall be placed upon an unapproved surface.
3.2 INSTALLATION
A. Excavation: Excavate where shown on the drawings and typical sections, unless staked otherwise. Excavate on a straight grade between the control points shown on the drawings unless staked otherwise. Existing structures which are disturbed or damaged by construction activity shall be reset, repaired, or replaced at the Contractor's expense.
B. Disposal of Materials: Excess and unsuitable material, including rock and boulders that cannot be used in embankments, shall be disposed of onsite at a location as directed by the Contracting Officer.
L15PC00089 / L14PS01277 Park Center Well 49/250
02315 - 3
C. Use of Borrow Material: Do not use borrow material until after the materials obtained from required excavation have been placed in the fill, unless otherwise directed by the Contracting Officer.
D. Fill Material: Shall be spread over the full width of the cross section of the embankment to a maximum loose thickness of 8 inches, and shall be compacted as specified in paragraphs 3.3A before the next layer is spread.
The in-place materials shall be free of lenses, pockets, streaks, or layers of materials differing substantially in texture or gradation from the surrounding materials.
E. Topsoil: Spread topsoil from borrow area at the locations and depths directed by the Contracting Officer. Finish grade topsoil to a uniform smooth surface.
F. Frozen Material: Shall not be placed, nor be placed upon a frozen surface.
3.3 FIELD QUALITY CONTROL
A. Compaction-Fill Material: Immediately following final spreading and smoothing, each layer shall be compacted full width. Compaction shall be accomplished by means of a vibratory roller compactor, minimum 48 inch drum width, and minimum 10,000 centrifugal force or with the use of a mechanical rammer compacter (Jumping Jack) if work limits prevent the larger compactor from achieving the desired compaction. A minimum of three passes shall be made over the entire width of the area, and until the material visible stops compacting. Add or remove water when necessary to obtain compaction.
L15PC00089 / L14PS01277 Park Center Well 50/250
TRENCHING
Park Center Well 2014 [12/01]
02321 - 1
SECTION 02321
A. Section Includes: Trenching, backfilling, and compacting for the installation of water lines.
A. As described in Section 02315, Excavation and Fill.
1.3 PROJECT AND SITE CONDITIONS
A. Borrow Sources: Shall be as approved by the Contracting Officer prior to excavation.
B. Environmental Conditions:
1. Excavate areas that have become saturated with oil, gasoline, or bituminous products to a depth of 12 inches beyond contaminated materials; backfill with approved material.
2. Finish slopes according to the drawings. Hand rake as necessary to remove excess material in areas inaccessible to construction equipment. Final grade shall produce a well-drained surface.
C. Connection to Park Center Water System: Shall be as stated in Section 02516.
Excavate trench to the depth required to meet the approximate elevations for connection with the functioning Park Center Water Line.
A. General: Material excavated shall be considered unclassified.
B. Fill Material: Shall be approved before use. Material from excavations shall be used, unless it contains ice or frozen earth, debris, high moisture content, or is specified in other sections to be replaced. Materials removed in clearing and grubbing shall not be used for backfill.
C. Bedding: Shall be CDOT Class 6 crushed aggregate as described in Section
02730, Aggregate Surfacing.
A. Utilities: Before starting excavation, establish the location and extent of underground utilities in the work area. Protect active utility services uncovered by excavation. Notify the Contracting Officer immediately if utilities are damaged. Damage to utilities shall be repaired or replaced
L15PC00089 / L14PS01277 Park Center Well 51/250
02321 - 2 at the Contractor's expense. Repair to damaged utilities shall be started immediately unless otherwise authorized by the Contracting Officer.
B. Protection of Excavation: Construct and maintain shoring, bracing, underpinning, and sheet piling if necessary to protect the excavation.
Remove protection devices when safe to do so, or as authorized by the Contracting Officer.
A. Trench Excavation: Shall be as of sufficient depth and size to allow for the installation of the water line(s) and shall be constructed on a uniform grade. Depths of trench(s) shall be determined by the existing elevations of the applicable structures onsite, including the proposed foundation and footings for the well house, existing baffled outlet structures, and existing Park Center Water Supply line.
1. When over-excavation occurs, repair the area by backfilling with approved bedding material and compacting to 95 percent maximum dry density according to AASHTO T 99, Method C.
2. When frost action occurs, remove frozen soil and replace with approved soil compacted to 95% of maximum dry density as determined by AASHTO T 99, Method C.
3. When soil becomes saturated above the optimum moisture content, compact after it has dried, or remove soil down to firm material and place backfill before construction proceeds.
B. Removal of Materials by Explosives: The use of explosives is prohibited.
C. Bedding: Shall be placed in 6-inch maximum loose lifts. Bedding shall extend a minimum of 6 inches below the pipe to a minimum of 6 inches above the pipe. Fine grade the trench bottom throughout and provide uniform and continuous support for each section of pipe. Compact to 95 percent maximum dry density as determined by AASHTO T 99, Method C.
D. Trench Backfill: After testing and approval of interconnected piping, the trench backfilling shall be completed. Puddling or flooding of trench for consolidation of backfill or use of wheel rolling by construction equipment will not be permitted.
1. Provide uniform and continuous support for each section of pipe.
Place backfill in 8-inch maximum loose lifts. Compact to 95 percent maximum dry density as determined by AASHTO T 99, Method C. Prevent lateral displacement of the pipe and prevent damage to the pipe during compaction.
A. Testing of Soils Compaction: Arrange for a certified, independent testing laboratory, according to the requirements of Section 01458 - Testing Laboratory Services, to perform the required testing, recording, and distributing of the results.
B. Text Interval: Test soil compaction a minimum of every second lift at horizontal intervals no greater than 25 feet for the trench length. Soils
L15PC00089 / L14PS01277 Park Center Well 52/250
02321 - 3 not meeting compaction as stated above shall be re-worked until compaction requirements are met.
C. Testing of Pipe Lines: Ensure there are not leaks within the pipelines prior to covering with bedding material. Repair all areas where leaks occur.
L15PC00089 / L14PS01277 Park Center Well 53/250
EXCAVATION AND FILL FOR STRUCTURES
02322 - 1
SECTION 02322
A. Section Includes: Excavating, backfilling, and compacting for structures.
A. As described in Section 02315, Excavation and Fill.
A. Failure Criteria: Not limited to the following:
1. Settlement of backfill which would allow moisture to pond against the foundation or within a horizontal distance from the foundation equal to its design depth.
A. General: Material excavated shall be unclassified. Material from excavations shall be used unless it contains ice or frozen earth, debris, earth with high moisture content, or is specified in other sections to be replaced. Materials removed in clearing and grubbing shall not be used for backfill.
B. Bedding
1. Concrete: CDOT Class 6 Aggregate as defined in Section 02730, Aggregate Surfacing and as shown on the drawings.
C. Backfill
1. Footings and Foundations: Shall conform to the requirements for soil materials above, and shall not contain rock larger than 3 inches in diameter.
A. Utilities: Before starting excavation, establish the location and extent of underground utilities in the work area. Protect utility services uncovered by excavation. Notify the Contracting Officer immediately if utilities are damaged. Damage to utilities shall be repaired at the Contractor's expense. Repair to damaged utilities shall be started immediately unless otherwise authorized by the Contracting Officer.
B. Protection of Excavation: Construct and maintain shoring, bracing, underpinning, and sheet piling necessary to protect the excavation and adjacent structures. Remove protective devices when safe to do so.
L15PC00089 / L14PS01277 Park Center Well 54/250
02322 - 2
C. Dewatering: If water is encountered, keep the excavation dewatered so that installation of forming and concrete work can be carried on under dewatered conditions. Dispose of excess water by using natural drainageways near the site to the extent of their natural capacity, when no erosion or other damage will occur.
A. Excavation:
1. General: Perform excavation to the lines, grades, and elevations as shown on the drawings and to allow for safety, placing and removal of forms and inspection. Provide proper depth with allowance made for gravel fill and concrete slabs. When frost action occurs, remove frozen soil and replace with approved soil, compacted according to the requirements for bedding.
2. Footings and Foundations: Excavation for footings and foundation walls shall be level, clean, true-to-size, and free of loose material.
a. When excavations for foundations are carried below the specified levels, refill the excavation to the required levels with bedding material specified for footings, and compact as specified.
B. Bedding
1. Concrete Slabs: Excavate and dispose of unstable or undesirable materials encountered, and those materials designated by the Contracting Officer. This material shall be replaced by bedding material placed in 6-inch maximum loose lifts. Compact to 95 percent maximum dry density as determined by AASHTO T 99, Method C.
C. Backfilling
1. Footings and Foundations: Remove forms and clean the excavation of trash and debris prior to backfilling. Place and compact fill and backfill adjacent to structures in such a manner as to prevent wedging action or eccentric loading upon or against the structures. Rocks over 2 inches maximum diameter shall not be placed within 12-inches of foundations. Backfill shall not be placed against concrete footings until the 75% of the desired final design strength of the concrete has been achieved and verified by the independent test lab. Place backfill in horizontal layers not more than 8-inches thick loose. Flooding or puddling will not be allowed. The minimum distance to be maintained by heavy equipment for spreading and compacting backfill from a wall is a horizontal distance equal to the backfill height above the footing top. Compact each layer to 95 percent of maximum dry density as determined by AASHTO T 99, Method C.
A. Testing
1. Arrange for a certified, independent testing laboratory, according to the requirements of Section 01458 - Testing Laboratory Services, to perform the required testing, recording, and distributing of the results. Soils and aggregates not meeting compaction as stated above shall be re-worked until compaction requirements are met.
L15PC00089 / L14PS01277 Park Center Well 55/250
02322 - 3
2. Test Interval: Test soil compaction a minimum of every second lift and at a minimum of 5 locations each lift tested as directed by the Contracting Officer. Tests shall be performed for the subgrade and bedding material under the well house footings and slab.
L15PC00089 / L14PS01277 Park Center Well 56/250
FIRE HYDRANTS
Park Center Well 2014 [3/00]
02513 - 1
SECTION 02513
A. Section Includes: Furnishing and a Contractor-furnished fire hydrant.
A. General: Submittals shall be according to Section 0109 – General Information and Requirements.
B. Manufacturer's Literature: Submit three copies of the manufacturer's descriptive data for the fire hydrants to be used on this project.
C. Maintenance Instructions: Submit three copies of the manufacturer's maintenance instructions for the fire hydrants to be used on this project.
D. Certificates of Conformance: Submit three copies of written certification from the supplier of the fire hydrants that they conform to the referenced standards.
A. General: Hydrant shall be dry-barrel type hydrant.
B. Dry-barrel Type: Hydrants shall conform to ANSI/AWWA C 502. Hydrant shall be 3-way with the main valve 5 ¼” and two 2-1/2 inch hose connections.
Inlet shall have a flanged connection. Size and shape of operating nuts and threads on hose and pumper connections shall be as specified in AWWA C 502. Hydrant shall have breakable features as defined in AWWA C 502.
The traffic type hydrant shall have a stainless steel safety stem coupling.
The hydrant shall be the “Modern Centurion Fire Hydrant” as manufactured by Mueller Company-Water Products Division or approved equal.
C. Connections: The hydrant shall be connected to the main with ductile iron pipe, 6-inch shoe size. The joints in the connecting pipe between the auxiliary valve and the main including the joint at the valve shall be as shown on the drawings.
D. Color: Color of the shop-applied above ground paint shall be red.
E. Wrenches and Spare Parts: Two operating wrenches and a spare break-off riser and bar shall be furnished for each the hydrant.
L15PC00089 / L14PS01277 Park Center Well 57/250
02513 - 2
A. Excavation and Backfill: Shall be according to Section 02321 – Trenching.
A. Hydrants: Install hydrant as instructed by the manufacturer. Hydrant shall be installed with pumper outlet facing away from the well slab. Set hydrant at the location as shown on the drawing and at an elevation where the bottom of the safety flange above the finished ground surface is approximately 2”-3” and as recommended by the manufacturer. The lower barrel section of the hydrant shall be 40” minimum length. Install bottom of hydrant upon a slab of concrete block not less than 6 inches thick and 15 inches square and as instructed by the manufacturer.
B. Drainage Aggregate: Place drainage aggregate around the base of each hydrant to insure drainage. A layer geotextile fabric shall be placed around the gravel as shown to keep the backfill material from sifting into the gravel.
C. Backfill: Place and compact the backfill around hydrants to the finish grade line according to Section 02321 - Trenching.
D. Thrust Blocks: Provide concrete thrust blocks at fire hydrants and other accessories with the bearing surface against undisturbed soil normal to the direction of the thrust. Thrust blocks shall be square, 6 inches minimum thickness and twice the pipe diameter.
A. Testing of Soils Compaction: Arrange for a certified, independent testing laboratory, according to the requirements of Section 01458 - Testing Laboratory Services, to perform the required testing, recording, and distributing of the results.
B. Text Interval: Test soil compaction a minimum of every second lift at a minimum of 2 locations per lift tested as determined by the Contracting Officer. Soils not meeting compaction as stated above shall be re-worked until compaction requirements are met.
C. Testing of Hydrant: Ensure there are not leaks within the pipelines or hydrant prior to covering with bedding and or backfill material. Repair all areas where leaks occur.
A. Units: The work described in this section will be measured and paid for each fire hydrant, including appurtenances.
L15PC00089 / L14PS01277 Park Center Well 58/250
02513 - 3
A. Payment: Payment will be made under:
02513(1) Fire Hydrant (Dry-Barrel) . . . . . . . . . . . . .Each
L15PC00089 / L14PS01277 Park Center Well 59/250
VALVES, PIPES, AND METERS
Park Center Well 2014 [10/00]
02516 - 1
SECTION 02516
A. Section Includes: Furnishing and Installing Contractor-furnished valves, meters, and fittings.
B. Connection to Park Center Water System: The Contractor shall cap the proposed water line within approximate 5 feet horizontally and at approximately the same elevations as the existing Park Center Water line in the approximate area as shown on the drawings. Actual connection to the Park Center Water line shall be done by the Park Center Water District.
Contact “Wade” with Park Center Water District at 719-275-2055(W) or 719-240-6941(C) to determine the actual location and coordinate the connection of the water lines.
B. Manufacturer's Literature: Submit three copies of the manufacturer's descriptive data for the valves, meters, and strainers to be used on this project.
C. Installation Instructions: Submit three copies of the manufacturer's installation instructions for the valves, meters, and strainers to be used on this project.
2.1 VALVES
A. Strainer: Shall be 8” diameter, Class 125 Iron, “Y-Strainer”, flanged end with a minimum cold working pressure of 200 PSI with stainless steel screen.
B. Gate Valves: Sizes as shown on the drawings and shall have a ductile iron main body, resilient wedge, flange end, minimum 250 psi pressure rating, with hand wheel for operating.
C. Pressure Reducing Valve: Shall be 6” diameter with the main body ductile iron class 150 conforming to ASTM A536, with flanged ends. Trim and pilot system materials shall be stainless steel with an adjustment range of 30 psi-300 psi and a water temperature to 180 degrees Fahrenheit. Valve shall be the Cla-Val 90-01.
D. Flow Meter: Shall be 8” Sensus Omni T2 with flange ends and built in strainer.
L15PC00089 / L14PS01277 Park Center Well 60/250
02516 - 2
E. Ductile Iron Pipe: Shall be 8” diameter, flanged ends, with a minimum pressure rating of 250 psi according to ANSI/AWWA C115/A21.15 with flanges according to ANSI B16.1 Class 125. All materials associated with the ductile iron pipe flange connections, including but not limited to gaskets, bolts, washers, nuts, shall be as recommended by the pipe manufacturer.
F. Ductile Pipe Fittings: Shall be flanged fittings according to ANSI B16.1
Class 125. Fitting type and sizes area as shown on the drawings. All materials associated with the ductile iron pipe flange connections, including but not limited to gaskets, bolts, washers, nuts, shall be as recommended by the pipe manufacturer.
G. Pipe Support: Shall be an 8” adjustable height “Saddle” type support specifically designed to fit ductile iron pipe. Saddle shall cradle approximately 50% of the pipe circumference. Pipe shall have a attached base plate. Supports shall be the “Standon Model S92 Adjustable Pipe Saddle Support” or approved equal.
H. Flap Gate: Shall be constructed of 3/16” steel, powder coat black finish, duel-hinges. Model #FG12HD flap gate as manufactured by Agri-Drain Corporation or approved equal.
I. PVC Drain Pipe: Shall be 12” PVC, blue or white in color, according to AWWA
C900 and gaskets per ASTM F477. Pipe shall conform to AWWA C900-07, Pressure Class 165 psi (DR 25) minimum. Fittings shall be the same color of the pipe and shall meet or exceed the minimum pressure requirements of the pipe. Types and sizes of fittings are as shown on the drawings.
J. PVC Water Line Pipe: Shall be 8” PVC, blue or white in color, according to AWWA C900 and gaskets per ASTM F477. Pipe shall conform to AWWA C900-07, Pressure Class 235 psi (DR 18) minimum. Fittings shall be the same color of the pipe and shall meet or exceed the minimum pressure requirements of the pipe. Types and sizes of fittings are as shown on the drawings.
K. Mechanical Pipe Restraints: Shall be specifically designed to be installed on AWWA C900 PVC pipe, and shall be manufactured of ductile iron conforming to ASTM A536. Series 2500 for pipe fittings and Series 1500 for PVC pipe as manufactured by EBAA Iron, Inc. or approved equal.
L. Thrust Blocks: Concrete mix as per Specifications 03306. Thrust blocks shall be a minimum of 6” thick and shall have a surface area twice as wide as the pipe diameter and extend long enough to secure the entire pipe section being supported.
3.1 INSTALLATION
A. General: Elevations for pipelines shall be determined by the requirements as shown on the drawing “Plumbing Details” and by the existing elevations of the baffled outlet structure and existing Park Center Water line. Pipes shall be on a constant grade between these elevations.
L15PC00089 / L14PS01277 Park Center Well 61/250
02516 - 3
B. Strainers, Valves, and Meters: Install all items as instructed by the manufacturer of the item. Install at the locations as shown on the drawings. Set outlet pressure on pressure reducing valve to 60 psi.
C. Ductile Iron Pipe and Fittings: Install as instructed by the pipe manufacturer.
D. Pipe Support: Install under the ductile pipe in the approximate locations as shown on the drawings. Install as instructed by the manufacturer.
E. Flap Gate: Install flap gate onto the end of the PVC drain pipe as it extends into the baffled outlet structure. Install as per manufacturer’s instructions.
F. PVC Drain Pipe/ Mechanical Pipe Restraints: Install pipe as instructed by the pipe manufacturer and as shown on the drawings.