This is a Statement of Work (SOW) for HVAC modifications at the National Weather Service Forecast Office in Upton, NY, issued by NOAA's National Weather Service Eastern Region (Amendment 0001, dated September 1, 2026).
The SOW specifies three primary tasks: (1) replacement of humidification atmospheric steam lines serving air handling units AHU-1 and AHU-2 with 1 3/4" MED-L copper pipe and Condair Nortec Steam Hose (P/N 1328820), replacement of steam distributors with two Condair Nortec 255-3729 Steam Distributors BSD 18in units, and installation of condensate drain lines with specific pitch and trap requirements; (2) installation of a new two-filter manifold water filtration system (3M HF60-S or equivalent) upstream of the humidification supply line with three new ball valves for maintenance access; and (3) installation of 1" entry 45-degree cleanout fittings and ball valves on condensate lines for periodic maintenance. The Condair Nortec Electrode Steam Humidifier system specifications are: Model Nortec EL DUCT 50/440-480/3, 480 VAC, 3 PH, 60 HZ, refrigerant R410A. The contractor must comply with NFPA 70E and 29 CFR 1910 standards, provide factory-trained HVAC personnel with standard commercial HVAC licensing, and submit weekly service reports including startup test data and photographic documentation. The contract performance period shall not exceed 60 calendar days from award, with work performed Monday through Friday, 8:00 AM to 5:00 PM local time at the specified Upton, NY location. All personnel require REAL-ID compliant photographic identification and must be U.S. citizens for access to the Brookhaven National Laboratory site. The contractor furnishes all materials, equipment, and services except Government-provided site access, and the TPOC has three business days to review deliverables with seven business days allowed for contractor corrections.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)
STATEMENT OF WORK (SOW) FOR HUMIDIFICATION SYSTEM AND CONDENSATE DRAIN
LINE MODIFICATIONS
Amendment 0001 (9.1.2026)
1.0GENERAL
1.1BACKGROUND
The National Weather Service (NWS) Eastern Region has a requirement for heating, ventilation and air conditioning (HVAC) modifications at the National Weather Service Forecast Office located in Upton, NY.
Humidification atmospheric steam lines serving air handling units, AHU-1 and AHU-2 are not installed to manufacturer specifications; steam distributors serving air handling units, AHU-1 and AHU-2 require replacement; water filtration to the humidification supply line does not exist; and cleanout fittings to the AHU’s condensate drain lines are not accessible.
Humidifier nameplate data is listed as follows:
Manufacturer:Condair Model No.: Nortec EL DUCT 50/440-480/3 Electrical: 480 VAC, 3 PH, 60 HZ Refrigerant: R410A
1.2SCOPE
The scope of service includes the following modifications: (1) replace the humidification atmospheric steam lines serving air handling units, AHU-1 and AHU-2; (2) replace steam distributors serving air handling units, AHU-1 and AHU-2; (3) add water filtration to the humidification supply line; and (4) add cleanout fittings to the air handlers’ condensate drain lines.
Note: humidification atmospheric steam lines are to be installed within tolerance of manufacturer’s specifications.
1.3OBJECTIVE
The objective is to restore the humidification service lines for the Condair Nortec humidification system to manufacturer’s specifications and improve water quality and preventative maintenance capabilities.
1.4APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
NFPA 70E, Standard for Electrical Safety in the Workplace (National Fire Protection Association 2021)
29 CFR 1910, Occupational Safety and Health Standards (Occupational Safety and Health Administration 1970)
1.4.2 Reference Documents
April 28, 2026 Rev. 0 Page 1 of 6
The following documents may be helpful to the contractor in performance of their work:
Attachment 1: Nortec Electrode Steam Humidifier – Engineering Manual
Attachment 2: Nortec Electrode Steam Humidifier – Installation Manual
Attachment 3: Nortec Electrode Steam Humidifier – Operation and Maintenance Manual
Attachment 4: Nortec Condair EL-Series – Spare Parts List
Attachment 5: Nortec EL Electrode Steam Humidifier – Quick Start Installation Guide
Attachment 6: Nortec Atmospheric Steam Lines Quick Start Installation Guide
Attachment 7: Nortec Steam Distribution Installation Manual
Attachment 8: Existing Conditions - Humidifier drain line photos
2.0SPECIFIC REQUIREMENTS/TASKS
2.1TASK ONE: HUMIDIFICATION SERVICE LINE MODIFICATION AND STEAM
DISTRIBUTORS REPLACEMENT
The Contractor shall modify the humidifier service lines as follows:
1. Perform system power down lockout/tagout (LOTO) procedures on equipment.
2. Mechanically disconnect the service lines and remove insulation running from the steam valves for the humidifier on both of the AHU atmospheric steam lines.
3. Replace the existing atmospheric steam lines and drain lines. Current site conditions: 1 1/2”
MED-L copper pipe is installed with too many 90O elbows and radiuses that are out of tolerance with Condair Nortec specifications, along with an incorrect pitch. The 1/4” copper drain line P-trap bends are also out of tolerance.
4. Install new atmospheric steam line using 1 3/4” MED-L copper pipe and Condair Nortec Steam Hose, P/N 1328820 – 1-3/4 in (45 mm) and condensate drain line using Condair Nortec condensate hose P/N 1328840 – 3/8” diameter. Reference ATTACHMENT 6 Atmospheric Steam Line Installation Guide (orientation and geometry of installation, condensate trap installation).
5. Route new atmospheric steam lines following the shortest path. Bend radiuses in the steam line route shall minimally conform to Condair Nortec specifications, utilize 45 O copper fittings, long radius elbows, and/or Condair Nortec Steam Hose.
6. Atmospheric steam lines must be installed a minimum of 12” vertically from the humidifier before continuing onto the steam line route.
7. The condensate drain line from the steam distributor must have a constant minimum downslope of 1”/48” (1.2°).
8. All condensate p-traps must be a minimum 12” below the condensate outlet on the steam line. The condensate p-traps must have a minimum height of 6”.
9. Use 1/4” copper pipe or 3/8” Condair Nortec condensate hose appropriate for application.
10.Replace two (2) existing copper steam distributors (one in each unit’s HVAC discharge ductwork). The required steam distributors are two (2) Condair Nortec 255-3729 Steam Distributors BSD 18in, one for AHU-1, one for AHU-2. Install new, genuine Condair Nortec parts. An alternate part may not be proposed. Attach the new steam distributors to the new atmospheric steam lines. Confirm installation is secure and pitch angle follows the
April 28, 2026 Rev. 0 Page 2 of 6 recommended installation guide. Reference ATTACHMENT 7 Steam Distribution Installation Guide.
11.Install 1” pipe insulation as needed to all exposed joints and couplings.
12.Restore power to equipment and prepare systems for startup procedures.
13.Perform system startup procedures, inspect system for leaks.
14.Monitor system for multiple on/off cycles between AHU-1 and AHU-2 to ensure the humidification is operational.
15.Verify proper system operation as initially designed.
16.Provide a written report on system status with any other deficiencies found during this repair service.
17.Clean up the worksite and review all work performed with the LPOC or Government site manager.
2.2 TASK TWO: ADD WATER FILTRATION TO THE HUMIDIFICATION SUPPLY LINE
The Contractor shall install a new two (2) filter manifold system as follows:
1. Perform system power down lockout/tagout (LOTO) procedures on equipment.
2. Locate and turn off the water supply to the mezzanine (above the 1st floor corridor drop ceiling or elsewhere).
3. Remove the water supply gate valve in the mezzanine and the copper line to the humidifier.
Install new copper pipe, fittings, and one (1) new water filtration system that includes two
(2) filters, manifold together, upstream of the water supply line to the Condair Nortec humidifier (part# 3M HF60-S, or equivalent). Filter location shall be in an readily accessible space for easy replacement.
4. Include one (1) new full port quarter turn ball valve for the water supply upstream of the manifold system and two (2) new full port quarter turn ball valves for water filter maintenance/change out. Complete copper line feed from the manifold to the humidifier.
5. Turn water service on and observe the system for leaks.
6. Perform humidification system startup procedures, check for leaks, observe filling of humidification canisters and inspect system operating pressures and temperatures.
7. Clean up the worksite and review all work performed with the LPOC or Government site manager.
2.3 TASK THREE: ADD CLEAN OUT FITTINGS TO THE AHU CONDENSATE LINES
The Contractor shall install new copper fittings to the condensate lines to allow for periodic line snaking and vacuuming of lines during preventative maintenance as follows:
1. Locate cleanouts in an accessible area. Current site conditions: 1” copper condensate lines that run to the back side of the AHUs makes access to the drains difficult to service.
2. Install new 1” entry 45 O clean out fittings and new 1” full port copper ball valves to allow for periodic vacuuming and snaking of the drain lines in order to remove algae blockage and prevent condensate water build up into the evaporator pan and air ducts.
3. Clean up the worksite and review all work performed with the LPOC or Government site manager.
3.0CONTRACTOR PERSONNEL
3.1QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
All service personnel shall be factory trained in HVAC work and knowledgeable of equipment installation specifications and operating procedures.The Prime contractor must provide proof of
April 28, 2026 Rev. 0 Page 3 of 6 standard commercial HVAC licensing w/ their quote submission. If Prime Contractor will be using a subcontractor for a majority of the work, the Prime must provide the proof of the HVAC licensing for the subcontractor as part of the quote submission package. No permits are required.
3.2PROJECT MANAGER
The Contractor shall provide a Project Manager who shall be responsible for all Contractor work performed under this SOW. The Project Manager shall be a single point of contact for the Technical Point of Contact (TPOC).
3.3EMPLOYEE IDENTIFICATION
Contractor employees visiting Government facilities shall wear an identification badge that, at a minimum, displays the Contractor name, the employee’s photo, the employee’s name, and badge expiration date. Visiting Contractor employees shall comply with all Government escort rules and requirements. All Contractor employees shall identify themselves as Contractor employees when their status is not readily apparent and shall display all identification and visitor badges in plain view above the waist at all times.
Contractors shall sign in and out at the Weather Forecast Office upon arrival and departure daily.
It is the responsibility of the contractor for their employees to meet any clearance requirements at the Brookhaven National Laboratory (BNL) in order to gain access to the WFO. Site security will require advance submission of employee names by the contractor for entry onto BNL property.
Any attempts to arrive at BNL without proper clearance will result in non-access to the site for the day. Any expense or inconvenience will be borne by the Contractor. The Contractor is to coordinate with the LPOC or TPOC for access.
● This will require producing photographic identification (REAL-ID compliant State Driver’s License, Enhanced ID, or a valid US passport) for each worker and vehicle information.
● All contractor personnel who will be working within the BNL property must be a United States citizen.
3.4EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, etc.)
when visiting or working at Government facilities. The Project Manager shall ensure Contractor employees understand and abide by Department of Commerce (DOC) established rules, regulations and policies concerning safety and security.
3.5REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (in coordination with the CO where practical), direct the Contractor to remove any Contractor employee from DOC facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The CO will provide the Contractor with a written explanation to support any request to remove an employee.
4.0OTHER APPLICABLE CONDITIONS
4.1PERIOD OF PERFORMANCE
The period of performance for this contract shall not exceed sixty (60) calendar days from the date of award.
April 28, 2026 Rev. 0 Page 4 of 6
4.2PLACE OF PERFORMANCE
The primary place of performance will be the Department of Commerce at:
National Weather Service Forecast Office (OKX) 175 Brookhaven Avenue, NWS-1 Upton, NY 11973
The Site has no restrictions for work area in the mezzanine. There is a fixed ladder which is avaialble to scale in order to gain access into the mezzanine where the AHUs are located.
4.3HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 8:00 AM and 5:00 PM local time, Monday through Friday (except Federal holidays).
Any Shutdown windows must be coordinated with the LPOC and approved.
5.0GOVERNMENT TERMS & DEFINITIONS
CFR Code of Federal Regulations CO Contracting Officer DOC Department of Commerce LOTO lockout / tagout LPOC Local Point of Contact NOAA National Oceanic and Atmospheric Administration NWS National Weather Service SOW Statement of Work TPOC Technical Point of Contact
6.0GOVERNMENT FURNISHED RESOURCES
The Government will provide the Contractor with access to the job site as necessary for performance of the work.
7.0CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in this
SOW.
8.0GOVERNMENT ACCEPTANCE PERIOD
The TPOC will review deliverables prior to acceptance and provide the Contractor with notification via electronic mail that provides documented reasons for non-acceptance.
8.1 The TPOC will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing of the specific reasons for rejection.
8.2 The TPOC will have three (3) business days to review deliverables and make comments.
The Contractor shall have seven (7) business days to make corrections and redeliver.
9.0DELIVERABLES
April 28, 2026 Rev. 0 Page 5 of 6
The Project Manager shall provide a weekly service report to the TPOC via electronic mail. This report shall include a summary of all Contractor work performed including start-up test data, photographic documentation, warranty information, and any Contractor concerns or recommendations.The contractor personnel providing the training to local staff in the operation of the newly installed equipment must be Condair Factory-trained. Manufacturer-authorized commissioning is not required. This is installation of equipment and system startup upon completion of the work.
April 28, 2026 Rev. 0 Page 6 of 6
The Project Manager shall provide a weekly service report to the TPOC via electronic mail. This report shall include a summary of all Contractor work performed including start-up test data, photographic documentation, warranty information, and any Contractor concerns or recommendations.The contractor personnel providing the training to local staff in the operation of the newly installed equipment must be Condair Factory-trained. Manufacturer-authorized commissioning is not required. This is installation of equipment and system startup upon completion of the work.