SECTION_B.doc

DOC document 147 KB Posted

Attached to
FY19 DRYDOCK AND DOCKSIDE REPAIRS TO NOAA SHIP PISCES
Solicitation number
1305M218BNAAA0013
Issued by

About this file

SECTION B in word.doc format

View the file

Other files

File Type Posted
RFP_replacement_pages.doc DOC document
(004)Anchor_Windlass_rev2.pdf PDF
SH-202-FE25-Alarm_&_Control_Points_List_(I_O_List).pdf PDF
PISCES_FY19_DD_Specification_Rev_4.pdf PDF
Amendment_0003.pdf PDF
5.3_Reference_4_CPlath_NAVIKNOT_III_FNF_Flush_Mounted_Sensor_Manual.pdf PDF
5.1 Reference 3 SRD-500 Doppler Speed Log Installation Manual.pdf PDF
5.2_Reference_1_Furuno_Thru-Hull_High-Precision_Temperature_Guide_T42.pdf PDF
Amendment_0002.pdf PDF
PP3010-073_Piping_Resilient_Mounts.pdf PDF
AMC-300-1,_Overhaul_of_Electrical_Rotating_Machinery_(10_pages).pdf PDF
5.1_Reference_1_Consilium_SAL_T2_and_SAL_T2+_Speed_Logs_System_Manual_Articl.pdf PDF
5.3_Reference_2_EML500_General_Specification_GS_80B80M01E_13th_Ed.pdf PDF
11463-1_rev-C_SIGNED.pdf PDF
5.3_Reference_1_EML500_User_Manual_IM_80B80T10E_29th_Ed.pdf PDF
5.1_Reference_2_Consilium_Component_Information.pdf PDF
SH-110-FH03-Hull_Midbody_Scantlings_FR_19_-_FR_49.pdf PDF
R7M1023_WORK.pdf PDF
5.3_Reference_3_CPlath_Naviknot_EM_Speed_Log_Operator_Installation_and_Servi.pdf PDF
PISCES_FY19_DD_Specification-Rev_3.pdf PDF
RFP_replacement_pages.pdf PDF
SH-528-FP10-05-Scuppers_and_Drains_System_Diagram.pdf PDF
Amendment_0001.pdf PDF
FR05-002-0P_Resiliently_Mounted_Equipment.xls XLS spreadsheet
(122)Trawl_Ramp_Door.pdf PDF
SH-541-FP04-Fuel_Service_&_Transfer_System_Diagram.pdf PDF
SH-073-FP22-Generator_Intermediate_Mass_Raft_Details.pdf PDF
(014)_Machinery_Control_and_Automation_System.pdf PDF
SH-163-FP19-Seachest_Diagram.pdf PDF
(028)engine3508.pdf PDF
PISCES_FY19_DD_Specification_Rev_2.pdf PDF
(029)engine3512.pdf PDF
ATTACHMENT_J.1_PISCES_FY19_DD_Specification_8-2-18.pdf PDF
ATTACHMENT_J.3_Past_Performance_Information_Form.docx DOCX document
ATTACHMENT_J.4_Past_Performance_Questionnaire.doc DOC document
ATTACHMENT_J.6_AS_WORD_DOC.doc DOC document
RFP.pdf PDF
ATTACHMENT_J.2__Optional_Form_(OF)_17-BidProposal_Envelope_Label.pdf PDF
ATTACHMENT_J.5_U_S_DOL_POSTER.pdf PDF
ATTACHMENT_J.6.pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP4.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP1.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP9.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP_17.zip ZIP file
PISCES_FY19_DD_Specification_Rev_1_(3).pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP25.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP23.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP15.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP18.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP10.zip ZIP file
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B

SUPPLIES OR SERVICES AND PRICES

B.1 SCHEDULE OF PRICES

BASE ITEMS

CLIN
SPECIFICATION WORK ITEM
SPECIFICATION WORK ITEM TITLE
QTY
UNIT
UNIT PRICE
EXTENDED PRICE
0001
301
TEMPORARY SERVICES
1
JOB
$________
$___________
0002
302
ABS SPECIAL SURVEY NO. 5
1
JOB
$________
$___________
0003
303
DRYDOCKING AND ROUTINE DRYDOCK WORK
1
JOB
$________
$___________
0004
304
ANODE RENEWALS
1
JOB
$________
$___________
0005
305
CATHODIC PROTECTION SYSTEM INSPECTION AND ANODE REPLACEMENTS
1
JOB
$________
$___________
0006
306
RUDDER AND TAIL SHAFT REMOVAL AND INSPECTION
1
JOB
$________
$___________
0007
307
PROPULSION SHAFT THRUST BEARING INSPECTION
1
JOB
$________
$___________
0008
308
SEA Valve overhauls
1
JOB
$________
$___________
0009
309
engine room preservation
1
JOB
$________
$___________
0010
310
ground tackle inspection and preservation
1
JOB
$________
$___________
0011
311
underwater hull coating
1
JOB
$________
$___________
0012
312
freeboard coating
1
JOB
$________
$________
0013
313
superstructure coating
1
JOB
$________
$________
0014
314
marine sanitation device (MSD) and waste water tank maintenance
1
JOB
$________
$________
0015
315
centerboard overhaul
1
JOB
$________
$________
0016
316
port hole window repairs
1
JOB
$________
$________
0017
317
bow thruster maintenance
1
JOB
$________
$________
0018
318
rescue boat davit annual inspection
1
JOB
$________
$________
0019
319
annual fire inspection
1
JOB
$________
$________
320
annual life raft inspection
1
JOB
$________
$________
0021
321
N/A
0022
322
dock and sea trials
1
JOB
$________
$________

SUBTOTAL CLINS 0001 – 0022: $______________

ADDITIONAL ITEM REQUIREMENTS (AIRs): These items relate to Growth Work. The Unit Price column will be used throughout the life of the contract if growth work is added to the scope of the contract [reference Commerce Acquisition Regulation (CAR) clause 1352.271-72]. If AIRs are issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered.

0023
401
AIRS/Growth (estimated)

**Provide breakdown, as follows:

AIRs/Growth Labor Rate

Unit Price: $________; Quantity: 1,500; Unit of Issue: Hour; Extended Price: $____________

AIRs/Growth Material Markup/Handling Fee

Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent ________%;

Extended Price: [$100,000.00 X percentage quoted]: $______________

LT

N/A

LAYDAYS (see CAR clause 1372.271-86)

EST.

DAY

N/A

ADDITIONAL TEMPORARY SERVICES (SEE CAR CLAUSE 1372.271-89)

EST. 1

DAY

SUBTOTAL CLINS 0023 – 0025): $______________

OPTION CLINS

CLIN

SPECIFICATION WORK ITEM

SPECIFICATION WORK ITEM TITLE

QTY

UNIT

UNIT PRICE

EXTENDED PRICE

EM SPEED LOG DOPPLER (ELECTRONICS ITEM)

JOB

SHIPS TEMPERATURE SENSOR REPAIR (ELECTRONICS ITEM)

JOB

EK80 UPGRADE (ELECTRONICS ITEM)

JOB

TRANSDUCER SURVEY

JOB

VSAT SAFETY RAIL INSTALLATION

JOB

MAIN SEAWATER SYSTEM COOLING PIPING ULTRASONIC TESTING

JOB

THRUST BEARING RTD INSTALLATION

JOB

DECK TILE REPLACEMENT

JOB

HVAC SYSTEM REPAIRS (HABITABILITY)

JOB

HYDRAULIC HOSE RENEWALS

JOB

MAIN SWITCHBOARDS CLEANING

JOB

HVAC HOUSE DUCT CLEANING

JOB

CABLE AND PIPE PENETRATION REPLACEMENT

JOB

SSDG GENERAL MAINTENANCE AND CLEANING

JOB

n/a

HVAC SYSTEM REPAIRS

JOB

FO TRANSFER PUMP OVERHAUL

JOB

MAIN MOTOR LIFT PUMP REPLACEMENT

JOB

MAIN MOTOR AIR COOLER REPLACEMENT

JOB

MISCELLANEOUS REPAIRS

JOB

OVERHAUL FO PURIFIERS

JOB

SSDG RESILIENT MOUNT REPLACEMENT

JOB

GAUGE CALIBRATION

JOB

TLI CALIBRATION

JOB

SSDG HEAT EXCHANGER MAINTENANCE

JOB

MAIN DECK MOTOR REPAIRS

JOB

01 LEVEL ISO DECK SOCKET RELOCATION

JOB

n/a

EXTERIOR STEEL LADDER REPLACEMENT

JOB

ANTI-ROLL TANK MOV REPLACEMENT

JOB

ANNUAL SYSTEM GROOMS (TECO-WESTINGHOUSE)

JOB

ANNUAL SYSTEM GROOMS (ROCKWELL)

JOB

OILY WATER SEPARATOR (OWS) MAINTENANCE AND INSPECTION

JOB

MISCELLANEOUS DECK REPAIRS

JOB

REFRIGERATION SYSTEM REPAIRS

JOB

SUBTOTAL OPTION CLINS (CLINS 0026 – 0060): $______________

GRAND TOTAL ALL CLINS (BASE, AIRS, AND OPTION ITEMS, 0001 – 0060): $______________

File details come from the government source that posted it.