(122)Trawl_Ramp_Door.pdf

PDF 5 MB Posted

Attached to
FY19 DRYDOCK AND DOCKSIDE REPAIRS TO NOAA SHIP PISCES
Solicitation number
1305M218BNAAA0013
Issued by

About this file

REFERENCE DOCUMENT

View the file

Other files

File Type Posted
RFP_replacement_pages.doc DOC document
(004)Anchor_Windlass_rev2.pdf PDF
SH-202-FE25-Alarm_&_Control_Points_List_(I_O_List).pdf PDF
PISCES_FY19_DD_Specification_Rev_4.pdf PDF
Amendment_0003.pdf PDF
5.3_Reference_4_CPlath_NAVIKNOT_III_FNF_Flush_Mounted_Sensor_Manual.pdf PDF
5.1 Reference 3 SRD-500 Doppler Speed Log Installation Manual.pdf PDF
5.2_Reference_1_Furuno_Thru-Hull_High-Precision_Temperature_Guide_T42.pdf PDF
Amendment_0002.pdf PDF
PP3010-073_Piping_Resilient_Mounts.pdf PDF
AMC-300-1,_Overhaul_of_Electrical_Rotating_Machinery_(10_pages).pdf PDF
5.1_Reference_1_Consilium_SAL_T2_and_SAL_T2+_Speed_Logs_System_Manual_Articl.pdf PDF
5.3_Reference_2_EML500_General_Specification_GS_80B80M01E_13th_Ed.pdf PDF
11463-1_rev-C_SIGNED.pdf PDF
5.3_Reference_1_EML500_User_Manual_IM_80B80T10E_29th_Ed.pdf PDF
5.1_Reference_2_Consilium_Component_Information.pdf PDF
SH-110-FH03-Hull_Midbody_Scantlings_FR_19_-_FR_49.pdf PDF
R7M1023_WORK.pdf PDF
5.3_Reference_3_CPlath_Naviknot_EM_Speed_Log_Operator_Installation_and_Servi.pdf PDF
PISCES_FY19_DD_Specification-Rev_3.pdf PDF
RFP_replacement_pages.pdf PDF
SH-528-FP10-05-Scuppers_and_Drains_System_Diagram.pdf PDF
Amendment_0001.pdf PDF
FR05-002-0P_Resiliently_Mounted_Equipment.xls XLS spreadsheet
SECTION_B.doc DOC document
SH-541-FP04-Fuel_Service_&_Transfer_System_Diagram.pdf PDF
SH-073-FP22-Generator_Intermediate_Mass_Raft_Details.pdf PDF
(014)_Machinery_Control_and_Automation_System.pdf PDF
SH-163-FP19-Seachest_Diagram.pdf PDF
(028)engine3508.pdf PDF
PISCES_FY19_DD_Specification_Rev_2.pdf PDF
(029)engine3512.pdf PDF
ATTACHMENT_J.1_PISCES_FY19_DD_Specification_8-2-18.pdf PDF
ATTACHMENT_J.3_Past_Performance_Information_Form.docx DOCX document
ATTACHMENT_J.4_Past_Performance_Questionnaire.doc DOC document
ATTACHMENT_J.6_AS_WORD_DOC.doc DOC document
RFP.pdf PDF
ATTACHMENT_J.2__Optional_Form_(OF)_17-BidProposal_Envelope_Label.pdf PDF
ATTACHMENT_J.5_U_S_DOL_POSTER.pdf PDF
ATTACHMENT_J.6.pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP4.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP1.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP9.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP_17.zip ZIP file
PISCES_FY19_DD_Specification_Rev_1_(3).pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP25.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP23.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP15.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP18.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP10.zip ZIP file
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRV40-226-122-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Trawl Ramp Door

Halter Marine, Inc.

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

50-SPNA-1-00031

PUBLISHED BY DIRECTION OF NOAA

FRV40-226-122-010

DESCRIPTION, OPERATION, INSTALLATION AND

MAINTENANCE INSTRUCTIONS

Halter Marine, Inc.

13085 Seaway Rd.

P.O. Box 3029 Gulfport, MS 39505

PUBLISHED BY DIRECTION OF NOAA

15 OCT 2007

RECORD OF CHANGES

Change No.

Date Title and/or Brief Description Signature of Validating Officer

APPROVAL AND PROCUREMENT RECORD PAGE

APPROVAL DATA FOR: FRV40-226-122-010

TITLE OF MANUAL: Trawl Ramp Door

APPROVAL AUTHORITY: NOAA

Contract Ship Qty Of Building Number Applicability Manuals Yard

50-SPNA-1-00031 FRV40-226 2 EA Halter Marine Inc.

REMARKS:

CERTIFICATION: It is hereby certified that FRV40-226-122-010 to be provided under contract 50-SPNA-1- 00031 has been approved by the approval data shown above.

Date:________________

CHAND, LLC

Mathews, LA 70375

CAGE CODE: 0D5X4

VALIDATION PERFORMANCE

Title of Publication

Contractor Sub-Contractor(If Performing Validation)

Halter Marine Inc.

Contract No. (s) and Purchase Orders, If Applicable

Chapter Section Paragraph Date Check here if Validation Not validated Completed

Contents of this manual have been validated and certified to be applicable to the equipment furnished under the above procurement as specified for Validation.

Name & Authority of Validating Officer: Signature of Validating Officer:

FOREWORD

This manual is intended to clearly and accurately reflect the actual configuration of the installed equipment described for the FRV40-226 Trawl Ramp Door. Users are urged to report instances noted wherein the manual does not achieve this objective.

This technical manual provides the instructions necessary to operate, to perform maintenance on and troubleshooting of the Trawl Ramp Door. The text is broken down as follows:

Section 1- General Information and Safety Precautions

Section 2- Operation

Section 3- Functional Description

Section 4- Scheduled Maintenance

Section 5- Troubleshooting

Section 6- Corrective Maintenance

Section 7- Drawings and Parts Listing

Section 8- Installation

(122)Trawl Ramp Door.pdf
FRV40-224-122-010
Trawl Ramp Door
Approval & Procurement Record Page
Validation Performance
Foreword
Hydraulically Operated Ramp Trawl Door, Installation, Operation & Service Manual
Table of Contents
List of Illustrations
List of Tables
Safety Summary
1. General Information & Safety Precautions
2. Operation
3. Functional Description
4. Scheduled Maintenance
5. Troubleshooting
6. Corrective Maintenance
7. Drawings & Parts Listings
8. Installation
Metric Chart

File details come from the government source that posted it.