ATTACHMENT_J.3_Past_Performance_Information_Form.docx

DOCX document 18 KB Posted

Attached to
FY19 DRYDOCK AND DOCKSIDE REPAIRS TO NOAA SHIP PISCES
Solicitation number
1305M218BNAAA0013
Issued by

About this file

RFP ATTACHMENT J.3, PAST PERFORMANCE INFORMATION FORM

View the file

Other files

File Type Posted
RFP_replacement_pages.doc DOC document
(004)Anchor_Windlass_rev2.pdf PDF
SH-202-FE25-Alarm_&_Control_Points_List_(I_O_List).pdf PDF
PISCES_FY19_DD_Specification_Rev_4.pdf PDF
Amendment_0003.pdf PDF
5.3_Reference_4_CPlath_NAVIKNOT_III_FNF_Flush_Mounted_Sensor_Manual.pdf PDF
5.1 Reference 3 SRD-500 Doppler Speed Log Installation Manual.pdf PDF
5.2_Reference_1_Furuno_Thru-Hull_High-Precision_Temperature_Guide_T42.pdf PDF
Amendment_0002.pdf PDF
PP3010-073_Piping_Resilient_Mounts.pdf PDF
AMC-300-1,_Overhaul_of_Electrical_Rotating_Machinery_(10_pages).pdf PDF
5.1_Reference_1_Consilium_SAL_T2_and_SAL_T2+_Speed_Logs_System_Manual_Articl.pdf PDF
5.3_Reference_2_EML500_General_Specification_GS_80B80M01E_13th_Ed.pdf PDF
11463-1_rev-C_SIGNED.pdf PDF
5.3_Reference_1_EML500_User_Manual_IM_80B80T10E_29th_Ed.pdf PDF
5.1_Reference_2_Consilium_Component_Information.pdf PDF
SH-110-FH03-Hull_Midbody_Scantlings_FR_19_-_FR_49.pdf PDF
R7M1023_WORK.pdf PDF
5.3_Reference_3_CPlath_Naviknot_EM_Speed_Log_Operator_Installation_and_Servi.pdf PDF
PISCES_FY19_DD_Specification-Rev_3.pdf PDF
RFP_replacement_pages.pdf PDF
SH-528-FP10-05-Scuppers_and_Drains_System_Diagram.pdf PDF
Amendment_0001.pdf PDF
FR05-002-0P_Resiliently_Mounted_Equipment.xls XLS spreadsheet
SECTION_B.doc DOC document
(122)Trawl_Ramp_Door.pdf PDF
SH-541-FP04-Fuel_Service_&_Transfer_System_Diagram.pdf PDF
SH-073-FP22-Generator_Intermediate_Mass_Raft_Details.pdf PDF
(014)_Machinery_Control_and_Automation_System.pdf PDF
SH-163-FP19-Seachest_Diagram.pdf PDF
(028)engine3508.pdf PDF
PISCES_FY19_DD_Specification_Rev_2.pdf PDF
(029)engine3512.pdf PDF
ATTACHMENT_J.1_PISCES_FY19_DD_Specification_8-2-18.pdf PDF
ATTACHMENT_J.4_Past_Performance_Questionnaire.doc DOC document
ATTACHMENT_J.6_AS_WORD_DOC.doc DOC document
RFP.pdf PDF
ATTACHMENT_J.2__Optional_Form_(OF)_17-BidProposal_Envelope_Label.pdf PDF
ATTACHMENT_J.5_U_S_DOL_POSTER.pdf PDF
ATTACHMENT_J.6.pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP4.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP1.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP9.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP_17.zip ZIP file
PISCES_FY19_DD_Specification_Rev_1_(3).pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP25.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP23.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP15.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP18.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP10.zip ZIP file
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION # 1305M218BNAAA0013

ATTACHMENT: J.3

PAST

PERFORMANCE

INFORMATION

FORM

Form of

CONTRAC

TOR NAME:

AGENCY

OR

CLIENT:

1. Refer to Section L of the Solicitation, Instructions to Offerors, REQUIREMENTS FOR PROPOSAL CONTENT.

** * The offeror shall complete this form in its entirety for each contract identified in the offeror’s Volume I – Past Performance Proposal.***

2. Check one of the following statements:

CPARS - The referenced Contract Number has a completed CPAR and can be located in the Past Performance Information Retrieval System (PPIRS).

Past Performance Questionnaire (Fill-in Data under item 3 prior to sending to Agency/Client POC)

The Point of Contact or Project Manager associated with the work completed under the referenced Contract Number has been sent this form and the Past Performance Questionnaire to complete and return to Contract Specialist, Michelle Blake, email michelle.blake@noaa.gov, prior to the closing date of the solicitation.

3. Provide the following data in its entirety.

a. Contract Number and 2 client points of contact with telephone numbers: _____________________

POC #1:/Phone:
POC #2:/Phone:

b. Ship Name, Hull Number:

c. Dollar Value of the contract (Original: $ and Final: $ )

d. Type of service performed and whether Prime or Sub Contractor: Type: , Prime or Sub:

e. Contract performance period at the start of the contract: Start: End:

f. Actual performance dates upon completion: Begun: Completed:

g. Contract Type:

h. Percentage of growth in contract price (Additional work divided by award price) and the extent of Subcontracting:

Growth Percentage: % Extent of Subcontracting:

NOTE: IT IS THE RESPONSIBILITY OF THE OFFEROR TO FOLLOW-UP AND TO ENCOURAGE REFERENCES TO SUBMIT THE QUESTIONNAIRE PRIOR TO THE SOLICITATION CLOSING DATE.

File details come from the government source that posted it.