Amendment_0002.pdf

PDF 339 KB Posted

Attached to
FY19 DRYDOCK AND DOCKSIDE REPAIRS TO NOAA SHIP PISCES
Solicitation number
1305M218BNAAA0013
Issued by

About this file

AMENDMENT 0002

View the file

Other files

File Type Posted
RFP_replacement_pages.doc DOC document
(004)Anchor_Windlass_rev2.pdf PDF
SH-202-FE25-Alarm_&_Control_Points_List_(I_O_List).pdf PDF
PISCES_FY19_DD_Specification_Rev_4.pdf PDF
Amendment_0003.pdf PDF
5.3_Reference_4_CPlath_NAVIKNOT_III_FNF_Flush_Mounted_Sensor_Manual.pdf PDF
5.1 Reference 3 SRD-500 Doppler Speed Log Installation Manual.pdf PDF
5.2_Reference_1_Furuno_Thru-Hull_High-Precision_Temperature_Guide_T42.pdf PDF
PP3010-073_Piping_Resilient_Mounts.pdf PDF
AMC-300-1,_Overhaul_of_Electrical_Rotating_Machinery_(10_pages).pdf PDF
5.1_Reference_1_Consilium_SAL_T2_and_SAL_T2+_Speed_Logs_System_Manual_Articl.pdf PDF
5.3_Reference_2_EML500_General_Specification_GS_80B80M01E_13th_Ed.pdf PDF
11463-1_rev-C_SIGNED.pdf PDF
5.3_Reference_1_EML500_User_Manual_IM_80B80T10E_29th_Ed.pdf PDF
5.1_Reference_2_Consilium_Component_Information.pdf PDF
SH-110-FH03-Hull_Midbody_Scantlings_FR_19_-_FR_49.pdf PDF
R7M1023_WORK.pdf PDF
5.3_Reference_3_CPlath_Naviknot_EM_Speed_Log_Operator_Installation_and_Servi.pdf PDF
PISCES_FY19_DD_Specification-Rev_3.pdf PDF
RFP_replacement_pages.pdf PDF
SH-528-FP10-05-Scuppers_and_Drains_System_Diagram.pdf PDF
Amendment_0001.pdf PDF
FR05-002-0P_Resiliently_Mounted_Equipment.xls XLS spreadsheet
SECTION_B.doc DOC document
(122)Trawl_Ramp_Door.pdf PDF
SH-541-FP04-Fuel_Service_&_Transfer_System_Diagram.pdf PDF
SH-073-FP22-Generator_Intermediate_Mass_Raft_Details.pdf PDF
(014)_Machinery_Control_and_Automation_System.pdf PDF
SH-163-FP19-Seachest_Diagram.pdf PDF
(028)engine3508.pdf PDF
PISCES_FY19_DD_Specification_Rev_2.pdf PDF
(029)engine3512.pdf PDF
ATTACHMENT_J.1_PISCES_FY19_DD_Specification_8-2-18.pdf PDF
ATTACHMENT_J.3_Past_Performance_Information_Form.docx DOCX document
ATTACHMENT_J.4_Past_Performance_Questionnaire.doc DOC document
ATTACHMENT_J.6_AS_WORD_DOC.doc DOC document
RFP.pdf PDF
ATTACHMENT_J.2__Optional_Form_(OF)_17-BidProposal_Envelope_Label.pdf PDF
ATTACHMENT_J.5_U_S_DOL_POSTER.pdf PDF
ATTACHMENT_J.6.pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP4.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP1.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP9.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP_17.zip ZIP file
PISCES_FY19_DD_Specification_Rev_1_(3).pdf PDF
PISCES_ADDITIONAL_REF_DOCS_GRP25.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP23.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP15.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP18.zip ZIP file
PISCES_ADDITIONAL_REF_DOCS_GRP10.zip ZIP file
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

SF30 (continued) 1305M218BNAAA0013 Amendment 0002

A. SOLICITATION 1305M218BNAAA0013 IS AMENDED AS FOLLOWS:

1. Remove solicitation page 2, SECTION B, B.2, SPECIFICS, and replace it with the revised page 6 attached hereto. The revised page updates the specification to Revision 3 and corrects the contact telephone number for scheduling attendance at the additional ship inspection opportunity. A summary of the specification changes has been added to the specification at the end of the “Table of Contents”.

2. Remove solicitation page 12, SECTION G, CONTRACT ADMINISTRATION DATA, and replace it with revised 12 attached hereto. The revised page updates the information in paragraph G.3, CAR 1352.245-70 GOVERNMENT FURNISHED PROPERTY (APR 2010).

3. Remove solicitation page 25, SECTION J, LIST OF ATTACHMENTS, and replace it with revised page 25 attached hereto. The revised page updates Attachment J.1 Specification, to Revision 3. The revised specification and related reference documents have been uploaded to https://www.fbo.gov

B. QUESTIONS AND ANSWERS:

All questions and responses/clarifications given to date are identified below and, if necessary, have been further addressed in this Amendment and/or Attachments hereto. The following questions and answers are provided for informational purposes only.

1. QUESTION: WI 303: Is ABS survey no. 5 required? NDT contractor believes that the

no. 2 surveyor is required.

ANSWER: Specification work item 302, paragraph 3.2.4.1 is modified to clarify and specify required annual ABS surveys.

2. QUESTION: WI 315: Is an installation or removal procedure available for the centerboard?

ANSWER: No. However, see the requirements of specification paragraph 3.15.4.1 for OEM guidance during the Centerboard removal and reinstallation.

3. QUESTION: WI 320: Please provide brand and type FRB life vests?

ANSWER: Specification updated to clarify FRB life vest brand as Viking, Product No.

PV9274.

4. QUESTION: WI 504: Please provide and that references 5.6.2.1 and 5.6.2.3 are correct.

ANSWER: See Amendment 0001, Question & Answers, No. 44.

5. QUESTION: WI 524: Please provide reference 5.24.2.2 and any other pertinent TLI information available.

ANSWER: That information was provided as part of Amendment 0001.

6. QUESTION: Items 501, 502 and 503 - Please provide the referenced installation drawings and manuals for all items.

ANSWER: The references are uploaded now on FBO.

https://www.fbo.gov/

7. QUESTION: Work item 5.3., paragraph 5.3.2 ……we do not have the references. Please provide the references.

ANSWER: The references are now uploaded on FBO.

8. QUESTION: Paragraph 5.3.3.1., sub item 13 calls for a LV9013 zinc plate drawing, that says is provided. It was not provided. Please provide this drawing.

ANSWER: Drawing is provided with the GFE and will be provided to the Contractor when the GFE is received by the Government. For reference to a similar installation on NOAA Ship SHIMADA, please refer to Reference 5.3.2.9 Sheet 15.

9. QUESTION: Work item 5.11, paragraph 5.11.4.5 calls out to dry ice clean the bow thruster drive cabinet. We have contacted the company you provided in the specifications (Irby). Irby has contacted Rockwell and they are not familiar with this process. Our in-house electrical department states that dry ice cleaning should not be done on a VFD drive cabinet. Generally, dry ice cleaning is used to clean electrical windings in place.

ANSWER: Specification has been modified to clarify the cleaning requirement.

10. QUESTION: Work Item 5.11, paragraph 5.11.4.2.4 states to clean the shore power transformer located in the winch room. According to the 480 VAC SWBD Placard located on the front of the switchboard, there is no such transformer.

ANSWER: Specification has been updated to remove reference to a shore power transformer. Transformer to be cleaned is a 480V Transformer.

11. QUESTION: Work item 5.20 paragraph 5.20.4.4 states the new shelving to be 316 stainless Steel. The shelving is unavailable in 316 SS, however it is available in 304 stainless steel. May we substitute 304 for the 316?

ANSWER: Yes, 304 stainless steel shelving is acceptable.

12. QUESTION: Work item 5.22, SSDG Resilient Mount Replacement. Amendment 0001 changed the mounts from GFM to Contractor Furnished. We have contacted Christie Grey about providing the mounts. They are working on the bid, but they said the lead time is going to be 10-12 weeks. Also, the holidays will be a factor affecting delivery.

Shipping on a ship will be another 5-6 weeks. Air freight is an option but will be costly.

ANSWER: The specification has been updated at 5.22.2.1 and the items have been added to G.3, CAR 1352.245-70 GOVERNMENT FURNISHED PROPERTY (APR 2010) of the solicitation.

13. QUESTION: I would like to double check something with you regarding the coatings specifications on the NOAA Pisces. Reading the drydock specifications for the Pisces, it states that all surface preparations must be done by a QP-1 certified contractor. Will NOAA accept a NACE inspector to perform the surface preparations?

ANSWER: Where QP-1 is not specified, NACE is acceptable.

14. QUESTION: For the Subcontracting Plan Outline, could you tell me if it is required, and if so could you advise where we should insert it in our package? The instructions do not outline if this document goes in Volume I or Volume II.

ANSWER: A Subcontracting Plan is only required from large businesses, and only if they are being awarded a contract. It is not required with the proposal but, if the large business is the proposed awardee, they must submit the plan quickly so it can be reviewed and approved prior to contract award because it is actually incorporated into and made a part of the contract.

15. QUESTION: We would like to confirm, if we submit CPARS reports do we need to still have the Past Performance Questionnaire completed.

ANSWER: No. If you do not have actual copies of the completed CPARS, you may submit solicitation Attachment J.3 with the relevant information and we can download the reports from the CPAR System (CPARS).

THE FOLLOWING QUESTIONS ARE IN REFERENCE TO NUMBERED

QUESTIONS/ANSWERS (Qs&As) FROM AMENDMENT 0001:

16. QUESTION: Regarding Amendment 0001 Question 10 regarding Specification Paragraph 3.8.4.10.3, the answer provided does not address what is expected. The machining will need to be addressed as growth work. It is recommended that the Government use CLIN 0023, Item 401 for compensation.

ANSWER: The specification has been updated to clarify the estimated % of surfaces that will need to be machined.

17. QUESTION: Regarding Amendment 0001 Questions 14-26 item 309 refer to line drawings and do not give linear dimensions or fittings required to accomplish the items.

Please provide the information requested regarding the fittings and the length of pipes.

ANSWER: Some additional clarifying information has been added at 3.9.4.8 and 3.9.4.9.

There are multiple ways to make this run and the material will vary accordingly.

Recommend you attend the second scheduled ship inspection to review this work item and bid it as you see it.

18. QUESTION: Regarding Amendment 0001 Question 21, the answer provided about pipe hangers does not clarify the issue. Will a knowledgeable person be available during the ship check? If not, please provide the type and sizes and attachment details for the hangers.

ANSWER: 3.9.4.11 has been modified to add further details. Reference 3.9.4.12 also added.

19. QUESTION: Regarding Amendment 0001 Question 23 (sic 22), please clarify the statement “install a fiberglass sleeve in the elbow”. Is the contractor to layer fiberglass and resin in the elbow?

ANSWER: To clarify, yes.

20. QUESTION: Regarding Amendment 0001 Question 46, what amount of “repair” is to be quoted?

ANSWER: Specification 5.9.4.29 has been revised to clarify the amount of required repair.

21. QUESTION: Regarding Amendment 0001 Question 59, paragraphs 5.30.2.1 and

5.30.2.2 reference drawings that do not provide any information for the valves or motors to be removed and refurbished. Please provide pertinent information necessary to accomplish the items intent.

ANSWER: Reference 5.30.2.3 has been uploaded to FBO.

22. QUESTION: Regarding Amendment 0001 Question 60, the drawings do not provide the information required. Please submit the requested information.

ANSWER: There are no OEM recommended type or model covers. The contractor shall select and provide appropriate covers that meet the requirements of paragraph 5.30.4.6 based on best commercial practices and experience.

C. DUE DATE/TIME FOR RESPONSES: The due date/time of October 12, 2018, 3:00 P.M.

local time (Norfolk, VA) for submission of offers is extended through October 18, 2018, 3:00 P.M. local time (Norfolk, VA)

D. Except for the changes stated herein, all else remains unchanged.

End of Amendment 0002

SECTION B

SUPPLIES OR SERVICES AND PRICES

RFP 1305M218BNAAA0013

B.2 SPECIFICS:

1. The contractor shall perform all work in accordance with the specification titled “NOAA SHIP PISCES (R226) FY2019 5-YEAR REGULATORY DRYDOCK DETAIL SPECIFICATION”, Rev. 3 dated 27 September 2018 (See Section J).

2. The Government anticipates award of all Base Items. Option Items may be exercised by the Contracting Officer at the time of award or at any time during the contract performance period.

3. The NOAA Ship PISCES’ home port is located in Pascagoula, MS. The PLACE OF PERFORMANCE for the work specified herein shall be the CONTRACTOR’s FACILITY.

4. This is a Request for Proposals (RFP). See Sections L and M, respectively, for instructions for submission of offers and the evaluation factors for award.

5. This acquisition is being solicited on an unrestricted basis. The applicable NAICS code is 336611, which has a corresponding size standard of 1,500 employees.

6. FAR, Commerce Acquisition Regulations (CAR), and NOAA Acquisition and Grants Office (AGO) or Eastern Region Acquisition Division (ERAD) provisions and clauses that are included in this solicitation are annotated by the applicable acronym.

7. A ship inspection was conducted on August 29, 2018 at 9:00 a.m. (local time) at the ship’s home port in PASCAGOULA, MS. An additional ship inspection is scheduled for October 9, 2018, 9:00 a.m. (local time) at the ship’s home port in PASCAGOULA, MS. All contractors, vendors and visitors must make pre-arrival arrangements on or before noon (local time) on October 8, 2018 for access in advance by contacting the Port Engineer, Mr. Stephen Spindler, (251) 776-3099 or by e-mail at Stephen.Spindler@noaa.gov. Only individuals on the access list will be permitted onto the site to participate in the site inspection.

END OF SECTION B

SECTION G

CONTRACT ADMINISTRATION DATA

507 3 RTDs 1 LO $1,200 518 Main Motor Teco-Westinghouse Lift Pumps 3 EA $8,000/$24,000 519 2 Main MotorAir Coolers 1 LO $50,000 522 Resilient Mounts, Christie & Gray Mounts 1 LO $25,000

Model 10.103.70 (QTY 72) and Model

10.103.75 (QTY 40)

529 Exterior Steel Ladders 5 EA $5,000/$25,000

(End of clause)

END OF SECTION G

SECTION J

LIST OF ATTACHMENTS

The following attachments are hereby incorporated by reference and made a part of this solicitation and any resultant contract.

Attachment Title Number of

Pages

J.1

Specification entitled “NOAA SHIP PISCES FY 2019 5-YEAR REGULATORY DRYDOCK DETAIL SPECIFICATION”, Rev. 3 dated September 27, 2018. Standard Specifications, Drawings, and Technical Manuals have been uploaded to https://www.fbo.gov

J.2 Bid/Proposal Envelope Label (Optional Form 17) http://www.gsa.gov/portal/forms/type/OP 1

J.3 Past Performance Information Form 1

J.4 Past Performance Questionnaire 5

J.5 U.S. Department of Labor Wage and Hour Division Poster 2

J.6 Subcontracting Plan Outline 11

END OF SECTION J

https://www.fbo.gov/ http://www.gsa.gov/portal/forms/type/OP

SF30
Amendment 2 continuation
RFP replacement pages
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0002
Code[0]: AJ930073
Code[1]: 00008411
AccountingData[0]: N/A
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: NOAA SHIP PISCES (r 226) FY 2019 DRYDOCK REPAIRS

(continued on page 2 of 2)

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NOAA/ERAD

200 GRANBY STREET

NORFOLK, VA 23510

NameandAddress[0]:
AdministeredBy[0]: See Block 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]:
ModificationNo[0]: 1305M218BNAAA0013
ProjectNo[0]:
Page[0]: 1
Pages[0]: 8
EffectiveDate[0]: 10/05/2018
Dated9B[0]:
Dated10B[0]: 09/13/2018
CheckBox9[0]: Off
CheckBox10[0]: 1
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it.