CaldorTrailBridgeRelief_2.pdf

PDF 637 KB Posted

Attached to
Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Pony Express Trail Bridge Repairs
Solicitation number
12970224R0029
Issued by

About this file

This document is a federal solicitation from the USDA Forest Service for the fabrication, construction, and installation of four trail bridges along the Pony Express trail between Kyburz and Echo Summit in the Eldorado National Forest.

The key details are:

  • The contract has a value range of $250,000 to $500,000.
  • The period of performance is August 15, 2024 through November 15, 2025.
  • The work includes removing any existing logs that served as waterway crossings, and constructing new wooden trail bridges to Forest Service standard specifications, including minimum dimensions of 72" width and 42" tall railings.
  • Two bridge sites are located near dirt roads, while the other two are 0.5 to 0.67 miles from staging areas.
  • A pre-bid site visit will be held on May 16, 2024, and requests for information are due by May 23, 2024.
  • The NAICS code is 237310 Other Heavy and Civil Engineering Construction, with a $45M size standard.
  • Bonds are required for projects valued at $35,000 or more, and Davis-Bacon wages apply.

View the file

Other files

File Type Posted
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
CaldorTrailBridgeRelief_1.pdf PDF
8. Forest Service Supplemental Specifications.pdf PDF
5. Drawings - Sheet 2.pdf PDF
9. Specs FP-14.pdf PDF
6. NRE_Construction_RFP.pdf PDF
2. Scope of Work.pdf PDF
4. Drawings - Sheet 1.pdf PDF
1. SF 1442_12970224R0029.pdf PDF
10. Davis-Bacon Act WD# CA20240007(El Dorado County).txt TXT text file
3. Schedule of Items.pdf PDF
7. Evaluation Factors.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WILDERNESS

BOUNDARY

TA

HO

E

BA

SI

N

MANAGEMENT

UNIT

P L A C

E R V I

L L E

RANGER

DISTRICT

E L D O R A D O

N A T I O N A L

F O R E S T

SK

I

LI

FT

Phillips

Pinecrest Camp

SKI

LIFT

Nebelhorn

SK

I

LIFT

SKI LIFTSCamp Sacramento

SKI

LIFTS

Sierra at Tahoe

SK

I L

IF

T

Little Norway

Tamarack Creek

Lake Audrian

Bryan

Creek

Pyramid

Creek

So uth

Fork

Am eri ca n

River

Aspen

Creek

Sayles Flat

Huckleberry Flat

PYRAMID CREEK

SIERRA AT TAHOE

ECHO

LAKESD e s o la t i o nD e s o la t i o n

W i ld e r n e s sW i ld e r n e s s Lake

Audrian

Cup Lake

T11 N R17 E T11 N R18 E

12 7

13E19 13E19 1 7E

17E 14

17E

17E2 5

13E19

13E19

11NY32

11N 11 11N10

11N16A

11N

11N06

N0

9A

N0

11N06A

N1

11N

11N10 A

T:\FS\NFS\Eldorado\Program\2300Recreation\GIS\Workspace\Requests\TrailBridgeDistasterRelief\MXD\CaldorTrailBridgeRelief.mxd 0 0.5 1 1.5 20.25

Miles

Legend Bridge Point U.S. Highway Roads Open to All Vehicles, Seasonal Roads Open to Highway Legal Vehicles Only, Yearlong Roads Open to Highway Legal Vehicles Only, Seasonal State or US Highway Other Public Roads Trails Open to All Vehicles, Yearlong Non-Motorized Trail

Administrative Boundary Township Section Ranger District Boundary Stream/River: Perennial Stream/River: Intermittent Stream/River: Ephemeral Wilderness

USDA FOREST SERVICE

NON-FS

M o k e l u m n e W i l d e r n e s sM o k e l u m n e W i l d e r n e s s

D e s o la t i o n W i l d e r n e s sD e s o la t i o n W i l d e r n e s s

Pony Express Trail Bridges Page2 of 2 donomorrill Sticky Note Sayles Canyon trail bridge 13E19 elevation 6,600' complex 66' length 38.799290, -120.111170 Steel Side Truss Ground Snow Load is 368 PSI donomorrill Sticky Note Aspen Creek 13E19 elevation 7,000' major 22' length 38.807764, -120.081643 replace standard bridge design Ground Snow Load 422 PSI donomorrill Sticky Note Huckleberry Flat trail bridge 13E19 elevation 7200' minor 20' length 38.815951, -120.057104 replace standard bridge design Ground Snow Load 411 PSI

File details come from the government source that posted it. Updated .