A10 1124263 SAM.gov Q&A.pdf

PDF 76 KB Posted

Attached to
Eldorado National Forest; Placerville Ranger District; 03 - CON - Disaster, Pony Express Trail Bridge Repairs
Solicitation number
12970224R0029
Issued by

About this file

This document appears to be a set of questions and answers related to a federal contract opportunity for the fabrication, construction, and installation of four trail bridges on the Pony Express Trail in the Eldorado National Forest.

The key details are:

  • The contract opportunity is for bridge repairs and replacements, with a total estimated value between $250,000 and $500,000.
  • The four bridge sites are Clubhouse, Fred's Place, Aspen, and Huckleberry, with varying distances from nearby access roads.
  • The bridge design is specified by the Forest Service standard for a 72-inch wide wooden trail bridge.
  • Construction of the bridge footings/foundation must be completed at least 3 weeks before the superstructure installation to allow concrete curing.
  • A pre-bid site visit is scheduled for May 22, 2024, with contractors meeting at the Clubhouse bridge site at 9:00 AM local time.
  • RFIs are due by 12:00 CDT on May 23, 2024.
  • The contract performance period is August 15, 2024 to November 15, 2025.
  • Davis-Bacon wages apply, and bonds are required for projects valued at $35,000 or more.

View the file

Other files

File Type Posted
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
A10 1124263 SAM.gov Q&A.pdf PDF
CaldorTrailBridgeRelief_2.pdf PDF
CaldorTrailBridgeRelief_1.pdf PDF
8. Forest Service Supplemental Specifications.pdf PDF
5. Drawings - Sheet 2.pdf PDF
9. Specs FP-14.pdf PDF
6. NRE_Construction_RFP.pdf PDF
2. Scope of Work.pdf PDF
4. Drawings - Sheet 1.pdf PDF
1. SF 1442_12970224R0029.pdf PDF
10. Davis-Bacon Act WD# CA20240007(El Dorado County).txt TXT text file
3. Schedule of Items.pdf PDF
7. Evaluation Factors.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Received Answers Could you clarify who’s doing the final design? the highlighted lines attached below seem to conflict.

Is a geotechnical engineer required; will the government approve subgrade? There is not a need for a geotechnical engineer and the subgrade will be inspected by the project COR.

Could you provide the site visit date / time? A pre-bid site visit will be held May 22, 2024 :

Contractors will meet Forest Service (FS) personnel at 9:00 AM (local time) at the staging area of the lowest elevation bridge, which would be "Clubhouse". This would be found on the left (west) side of map Caldor Trail Bridge Relief #1. Traveling eastbound on Hwy. 50, and less than a mile east of the town of Kyburz is FS Road # 11N43, where a sharp left turn is required. This road is not signed on Hwy.50 nor is there a left-hand turn lane. It is unknown how long it will take the group to hike in, assess, and hike out, so it would be best if perspective offerors and FS personnel caravan to the other bridge sites together after the first one.

I understand the conflict. “H” would supersede “A” since R-1739-01 (Plan & Elevation) and R-1739-02 (Abutment & Railing Details) have both been approved and signed by the USFS Regional Engineer, Leonard Job upon recommendation of the USFS Regional Bridge Engineer, Darrell Pereira.