Amendment 3 Attachment 5a Specifications 22 00 00 - Copy.pdf
PDF 122 KB Posted
- Solicitation number
- 12805B24R0012
About this file
This document is a section from a contract specification for a federal construction project titled "CNRC Critical Upgrades to Insulation, Piping & HVAC". The specification covers the requirements for plumbing, including references, submittals, materials, installation, testing, and identification. Key details include:
The project is a 100% small business set-aside with a NAICS code of 236220 and a magnitude between $1-5 million. The plumbing work must comply with the International Plumbing Code and includes requirements for water supply piping, drainage and vent systems, pipe hangers and supports, drains, and identification. Specific requirements are provided for materials, installation methods, testing procedures, and disinfection of the plumbing systems. This section outlines the technical specifications for the plumbing work, but does not include the full Performance Work Statement or contracting details.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CNRC CRI TI CAL UPGRADES 2923EP1UPGRADES
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 00 01 01/ 20 WARRANTY OF CONSTRUCTI ON
01 00 11 06/ 20 GENERAL PARAGRAPHS
01 00 21 01/ 20 CONTRACTOR QUALI TY CONTROL
01 01 00 03/ 21 GENERAL REQUI REMENTS
01 33 00 08/ 18 SUBMI TTAL PROCEDURES
01 35 26 01/ 20 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 02/ 19, CHG 1: 08/ 23 SOURCES FOR REFERENCE PUBLI CATI ONS
01 50 00 01/ 20 PROJECT CLOSEOUT
01 57 50 10/ 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 78 23 08/ 15 OPERATI ON AND MAI NTENANCE DATA
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 08/ 22 DEMOLI TI ON
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 27 36 08/ 23 SPRAY FOAM AI R BARRI ERS
07 84 00 05/ 10, CHG 1: 08/ 13 FI RESTOPPI NG
07 92 00 08/ 23 JOI NT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 16 05/ 17, CHG 2: 11/ 18 ALUMI NUM DOORS AND FRAMES
08 44 00 05/ 19 CURTAI N WALL AND GLAZED ASSEMBLI ES
08 81 00 05/ 19 GLAZI NG
DI VI SI ON 09 - FI NI SHES
09 22 00 02/ 10, CHG 2: 08/ 18 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 22 36 01/ 08, CHG 2: 11/ 18 LATH
09 23 00 08/ 16, CHG 1: 11/ 18 GYPSUM PLASTERI NG
09 29 00 08/ 16, CHG 4: 02/ 20 GYPSUM BOARD
DI VI SI ON 11 - EQUI PMENT
11 41 11 08/ 17 REFRI GERATED STORAGE
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 21 26 02/ 16, CHG 1: 08/ 18 COLD- STORAGE ROOMS ( PREFABRI CATED
PANEL TYPE)
DI VI SI ON 22 - PLUMBI NG
22 00 00 11/ 15, CHG 4: 05/ 21 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 07 00 02/ 13, CHG 7: 05/ 20 THERMAL I NSULATI ON FOR MECHANI CAL
SYSTEMS
23 09 13 11/ 15, CHG 2: 05/ 21 I NSTRUMENTATI ON AND CONTROL DEVI CES
FOR HVAC
23 29 23 02/ 20, CHG 1: 05/ 21 ADJUSTABLE SPEED DRI VE ( ASD) SYSTEMS
UNDER 600 VOLTS
PROJECT TABLE OF CONTENTS Page 1
23 63 00. 00 08/ 22 COLD STORAGE REFRI GERATI ON SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 20 00 08/ 19, CHG 3: 11/ 21 I NTERI OR DI STRI BUTI ON SYSTEM
26 51 00 05/ 20, CHG 2: 11/ 21 I NTERI OR LI GHTI NG
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 2
SECTI ON 22 00 00
PLUMBI NG, GENERAL PURPOSE
11/ 15, CHG 4: 05/ 21
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY OF MECHANI CAL ENGI NEERS ( ASME)
ASME A112. 6. 4 ( 2003: R 2012) Roof , Deck and Bal cony Dr ai ns
ASME B31. 1 ( 2022) Power Pi pi ng
AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)
AWWA 10084 ( 2017) St andar d Met hods f or t he Exami nat i on of Wat er and Wast ewat er
AWWA C651 ( 2014) St andar d f or Di s i nf ect i ng Wat er Mai ns
AWWA C652 ( 2019) Di s i nf ect i on of Wat er - St or age Faci l i t i es
ASTM I NTERNATI ONAL ( ASTM)
ASTM A888 ( 2021a) St andar d Speci f i cat i on f or Hubl ess Cast I r on Soi l Pi pe and Fi t t i ngs f or Sani t ar y and St or m Dr ai n, Wast e, and Vent Pi pi ng Appl i cat i ons
ASTM B117 ( 2019) St andar d Pr act i ce f or Oper at i ng Sal t Spr ay ( Fog) Appar at us
ASTM C920 ( 2018) St andar d Speci f i cat i on f or El ast omer i c Joi nt Seal ant s
CAST I RON SOI L PI PE I NSTI TUTE ( CI SPI )
CI SPI 301 ( 2018) Hubl ess Cast I r on Soi l Pi pe and Fi t t i ngs f or Sani t ar y and St or m Dr ai n, Wast e, and Vent Pi pi ng Appl i cat i ons
CI SPI 310 ( 2012) Coupl i ng f or Use i n Connect i on wi t h Hubl ess Cast I r on Soi l Pi pe and Fi t t i ngs f or Sani t ar y and St or m Dr ai n, Wast e, and Vent Pi pi ng Appl i cat i ons
I NTERNATI ONAL CODE COUNCI L ( I CC)
I CC I PC ( 2021) I nt er nat i onal Pl umbi ng Code
SECTI ON 22 00 00 Page 1
MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS
I NDUSTRY ( MSS)
MSS SP- 58 ( 2018) Pi pe Hanger s and Suppor t s - Mat er i al s, Desi gn and Manuf act ur e, Sel ect i on, Appl i cat i on, and I nst al l at i on
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 90A ( 2024) St andar d f or t he I nst al l at i on of Ai r Condi t i oni ng and Vent i l at i ng Syst ems
NSF I NTERNATI ONAL ( NSF)
NSF/ ANSI 14 ( 2022) Pl ast i cs Pi pi ng Syst em Component s and Rel at ed Mat er i al s
NSF/ ANSI 61 ( 2022) Dr i nki ng Wat er Syst em Component s - Heal t h Ef f ect s
PLASTI C PI PE AND FI TTI NGS ASSOCI ATI ON ( PPFA)
PPFA Fi r e Man ( 2016) Fi r est oppi ng: Pl ast i c Pi pe i n Fi r e Resi st i ve Const r uct i on
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
40 CFR 141. 80 Nat i onal Pr i mar y Dr i nki ng Wat er Regul at i ons; Cont r ol of Lead and Copper ;
Gener al Requi r ement s
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 02 Shop Dr awi ngs
Pl umbi ng Syst em; G
Det ai l dr awi ngs consi st i ng of schedul es, per f or mance char t s, i nst r uct i ons, di agr ams, and ot her i nf or mat i on t o i l l ust r at e t he r equi r ement s and oper at i ons of syst ems t hat ar e not cover ed by t he Pl umbi ng Code. Det ai l dr awi ngs f or t he compl et e pl umbi ng syst em i ncl udi ng pi pi ng l ayout s and l ocat i ons of connect i ons; di mensi ons f or r oughi ng- i n, f oundat i on, and suppor t poi nt s; schemat i c di agr ams and wi r i ng di agr ams or connect i on and i nt er connect i on di agr ams. Det ai l dr awi ngs shal l i ndi cat e c l ear ances r equi r ed f or mai nt enance and oper at i on. Wher e pi pi ng and equi pment ar e t o be suppor t ed ot her t han as i ndi cat ed, det ai l s shal l i ncl ude l oadi ngs and pr oposed suppor t met hods. Mechani cal dr awi ng pl ans, el evat i ons, v i ews, and det ai l s, shal l be dr awn t o scal e.
SD- 03 Pr oduct Dat a
Pl umbi ng Syst em
SECTI ON 22 00 00 Page 2
Di agr ams, i nst r uct i ons, and ot her sheet s pr oposed f or post i ng.
Manuf act ur er ' s r ecommendat i ons f or t he i nst al l at i on of bel l and spi got and hubl ess j oi nt s f or cast i r on soi l pi pe.
SD- 06 Test Repor t s
Test s, Fl ushi ng and Di si nf ect i on
Test r epor t s i n bookl et f or m showi ng al l f i el d t est s per f or med t o adj ust each component and al l f i el d t est s per f or med t o pr ove compl i ance wi t h t he speci f i ed per f or mance cr i t er i a, compl et i on and t est i ng of t he i nst al l ed syst em. Each t est r epor t shal l i ndi cat e t he f i nal posi t i on of cont r ol s.
SD- 07 Cer t i f i cat es
Mat er i al s and Equi pment
SD- 10 Oper at i on and Mai nt enance Dat a
Pl umbi ng Syst em; G
Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND
MAI NTENANCE DATA.
1. 3 STANDARD PRODUCTS
Speci f i ed mat er i al s and equi pment shal l be st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of such pr oduct s.
Speci f i ed equi pment shal l essent i al l y dupl i cat e equi pment t hat has per f or med sat i sf act or i l y at l east t wo year s pr i or t o bi d openi ng.
St andar d pr oduct s shal l have been i n sat i sf act or y commer ci al or i ndust r i al use f or 2 year s pr i or t o bi d openi ng. The 2- year use shal l i ncl ude appl i cat i ons of equi pment and mat er i al s under s i mi l ar c i r cumst ances and of s i mi l ar s i ze. The pr oduct shal l have been f or sal e on t he commer ci al mar ket t hr ough adver t i sement s, manuf act ur er s ' cat al ogs, or br ochur es dur i ng t he 2 year per i od.
1. 3. 1 Al t er nat i ve Qual i f i cat i ons
Pr oduct s havi ng l ess t han a t wo- year f i el d ser vi ce r ecor d wi l l be accept abl e i f a cer t i f i ed r ecor d of sat i sf act or y f i el d oper at i on f or not l ess t han 6000 hour s, excl usi ve of t he manuf act ur er ' s f act or y or l abor at or y t est s, can be shown.
1. 3. 2 Ser vi ce Suppor t
The equi pment i t ems shal l be suppor t ed by ser vi ce or gani zat i ons. Submi t a cer t i f i ed l i s t of qual i f i ed per manent ser vi ce or gani zat i ons f or suppor t of t he equi pment whi ch i ncl udes t hei r addr esses and qual i f i cat i ons. These ser vi ce or gani zat i ons shal l be r easonabl y conveni ent t o t he equi pment i nst al l at i on and abl e t o r ender sat i sf act or y ser vi ce t o t he equi pment on a r egul ar and emer gency basi s dur i ng t he war r ant y per i od of t he cont r act .
1. 3. 3 Manuf act ur er ' s Namepl at e
Each i t em of equi pment shal l have a namepl at e bear i ng t he manuf act ur er ' s name, addr ess, model number , and ser i al number secur el y af f i xed i n a
SECTI ON 22 00 00 Page 3 conspi cuous pl ace; t he namepl at e of t he di st r i but i ng agent wi l l not be accept abl e.
1. 3. 4 Modi f i cat i on of Ref er ences
I n each of t he publ i cat i ons r ef er r ed t o her ei n, consi der t he advi sor y pr ovi s i ons t o be mandat or y, as t hough t he wor d, " shal l " had been subst i t ut ed f or " shoul d" wher ever i t appear s. I nt er pr et r ef er ences i n t hese publ i cat i ons t o t he " aut hor i t y havi ng j ur i sdi ct i on" , or wor ds of s i mi l ar meani ng, t o mean t he Cont r act i ng Of f i cer .
1. 3. 4. 1 Def i ni t i ons
For t he I nt er nat i onal Code Counci l ( I CC) Codes r ef er enced i n t he cont r act document s, advi sor y pr ovi s i ons shal l be consi der ed mandat or y, t he wor d " shoul d" shal l be i nt er pr et ed as " shal l . " Ref er ence t o t he " code of f i c i al " shal l be i nt er pr et ed t o mean t he " Cont r act i ng Of f i cer . " For Navy owned pr oper t y, r ef er ences t o t he " owner " shal l be i nt er pr et ed t o mean t he " Cont r act i ng Of f i cer . " For l eased f aci l i t i es, r ef er ences t o t he " owner " shal l be i nt er pr et ed t o mean t he " l essor . " Ref er ences t o t he " per mi t hol der " shal l be i nt er pr et ed t o mean t he " Cont r act or . "
1. 3. 4. 2 Admi ni st r at i ve I nt er pr et at i ons
For I CC Codes r ef er enced i n t he cont r act document s, t he pr ovi s i ons of Chapt er 1, " Admi ni st r at or , " do not appl y. These admi ni st r at i ve r equi r ement s ar e cover ed by t he appl i cabl e Feder al Acqui s i t i on Regul at i ons ( FAR) i ncl uded i n t hi s cont r act and by t he aut hor i t y gr ant ed t o t he Of f i cer i n Char ge of Const r uct i on t o admi ni st er t he const r uct i on of t hi s pr oj ect . Ref er ences i n t he I CC Codes t o sect i ons of Chapt er 1, shal l be appl i ed appr opr i at el y by t he Cont r act i ng Of f i cer as aut hor i zed by hi s admi ni st r at i ve cogni zance and t he FAR.
1. 4 DELI VERY, STORAGE, AND HANDLI NG
Handl e, st or e, and pr ot ect equi pment and mat er i al s t o pr event damage bef or e and dur i ng i nst al l at i on i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons, and as appr oved by t he Cont r act i ng Of f i cer . Repl ace damaged or def ect i ve i t ems.
1. 5 PERFORMANCE REQUI REMENTS
1. 6 REGULATORY REQUI REMENTS
Unl ess ot her wi se r equi r ed her ei n, pl umbi ng wor k shal l be i n accor dance wi t h I CC I PC.
1. 7 PROJECT/ SI TE CONDI TI ONS
The Cont r act or shal l become f ami l i ar wi t h det ai l s of t he wor k, ver i f y di mensi ons i n t he f i el d, and advi se t he Cont r act i ng Of f i cer of any di scr epancy bef or e per f or mi ng any wor k.
1. 8 I NSTRUCTI ON TO GOVERNMENT PERSONNEL
When speci f i ed i n ot her sect i ons, f ur ni sh t he ser vi ces of compet ent i nst r uct or s t o gi ve f ul l i nst r uct i on t o t he desi gnat ed Gover nment per sonnel i n t he adj ust ment , oper at i on, and mai nt enance, i ncl udi ng per t i nent saf et y r equi r ement s, of t he speci f i ed equi pment or syst em.
SECTI ON 22 00 00 Page 4
I nst r uct or s shal l be t hor oughl y f ami l i ar wi t h al l par t s of t he i nst al l at i on and shal l be t r ai ned i n oper at i ng t heor y as wel l as pr act i cal oper at i on and mai nt enance wor k.
I nst r uct i on shal l be gi ven dur i ng t he f i r st r egul ar wor k week af t er t he equi pment or syst em has been accept ed and t ur ned over t o t he Gover nment f or r egul ar oper at i on. The number of man- days ( 8 hour s per day) of i nst r uct i on f ur ni shed shal l be as speci f i ed i n t he i ndi v i dual sect i on.
When mor e t han 4 man- days of i nst r uct i on ar e speci f i ed, use appr oxi mat el y hal f of t he t i me f or c l assr oom i nst r uct i on. Use ot her t i me f or i nst r uct i on wi t h t he equi pment or syst em.
When si gni f i cant changes or modi f i cat i ons i n t he equi pment or syst em ar e made under t he t er ms of t he cont r act , pr ovi de addi t i onal i nst r uct i on t o acquai nt t he oper at i ng per sonnel wi t h t he changes or modi f i cat i ons.
1. 9 ACCESSI BI LI TY OF EQUI PMENT
I nst al l al l wor k so t hat par t s r equi r i ng per i odi c i nspect i on, oper at i on, mai nt enance, and r epai r ar e r eadi l y accessi bl e. I nst al l conceal ed val ves, expansi on j oi nt s, cont r ol s, damper s, and equi pment r equi r i ng access, i n l ocat i ons f r eel y accessi bl e t hr ough access door s.
PART 2 PRODUCTS
2. 1 MATERI ALS
Mat er i al s f or var i ous ser vi ces shal l be i n accor dance wi t h TABLES I and I I .
Pi pe f i t t i ngs shal l be compat i bl e wi t h t he appl i cabl e pi pe mat er i al s.
Pl ast i c pi pe, f i t t i ngs, and sol vent cement shal l meet NSF/ ANSI 14 and shal l be NSF l i st ed f or t he ser vi ce i nt ended. Cast I r on f i t t i ngs, and sol vent cement used f or pot abl e hot and col d wat er ser vi ce shal l bear t he NSF seal " NSF- PW. "
2. 1. 1 Pi pe Joi nt Mat er i al s
a. Coupl i ng f or Cast - I r on Pi pe: For hubl ess t ype: CI SPI 310. Joi nt Mat er i al shal l have a f l ame spr ead r at i ng of 25 or l ess, and a smoke spr ead r at i ng of 50 or l ess. .
2. 1. 2 Pi pe I nsul at i on Mat er i al
I nsul at i on shal l be as speci f i ed i n Sect i on 23 07 00 THERMAL I NSULATI ON
FOR MECHANI CAL SYSTEMS.
2. 2 PI PE HANGERS, I NSERTS, AND SUPPORTS
Maxi mum hanger and suppor t spaci ng shal l be 10 f t f or al l pi pe s i zes.
Pr ovi de mi ni mum of one hanger per pi pe sect i on c l ose t o j oi nt on bar r el , at each pi pe f i t t i ng, at change of di r ect i on and br anch connect i ons.
Suppor t Cast I r on No- Hub pi pe as r ecommended i n CI SPI Publ i cat i on " Cast I r on Soi l Pi pe and Fi t t i ngs Handbook, Chapt er I V - I nst al l at i on of Cast I r on Soi l Pi pe and Fi t t i ngs. "
2. 3 DRAI NS
2. 3. 1 Si ght Dr ai ns
Si ght dr ai ns shal l consi st of body, i nt egr al seepage pan, and adj ust abl e
SECTI ON 22 00 00 Page 5 st r ai ner wi t h per f or at ed or s l ot t ed gr at e and f unnel ext ensi on. The st r ai ner shal l have a t hr eaded col l ar t o per mi t adj ust ment t o f l oor t hi ckness. Dr ai ns shal l be of doubl e dr ai nage pat t er n sui t abl e f or embeddi ng i n t he f l oor const r uct i on. A c l ampi ng devi ce f or at t achi ng f l ashi ng or wat er pr oof i ng membr ane t o t he seepage pan wi t hout damagi ng t he f l ashi ng or membr ane shal l be pr ovi ded f or ot her t han concr et e const r uct i on. Dr ai ns shal l have a gal vani zed heavy cast - i r on body and seepage pan and chr omi um- pl at ed br onze, ni ckel - br onze, or ni ckel - br ass st r ai ner and f unnel combi nat i on. Dr ai ns shal l be pr ovi ded wi t h t hr eaded connect i on and wi t h a separ at e cast - i r on " P" t r ap, unl ess ot her wi se i ndi cat ed. Dr ai ns shal l be c i r cul ar , unl ess ot her wi se i ndi cat ed. The f unnel shal l be secur el y mount ed over an openi ng i n t he cent er of t he st r ai ner . Mi ni mum di mensi ons shal l be as f ol l ows:
Ar ea of st r ai ner and col l ar : 36 squar e i nches
Hei ght of f unnel : 3- 3/ 4 i nches
Di amet er of l ower por t i on: 2 i nches of f unnel
Di amet er of upper por t i on: 4 i nches of f unnel
2. 3. 2 Roof Dr ai ns and Expansi on Joi nt s
Roof dr ai ns shal l conf or m t o ASME A112. 6. 4, wi t h dome and i nt egr al f l ange, and shal l have a devi ce f or maki ng a wat er t i ght connect i on bet ween r oof i ng and f l ashi ng. The whol e assembl y shal l be gal vani zed heavy pat t er n cast i r on. For aggr egat e sur f ace r oof i ng, t he dr ai n shal l be pr ovi ded wi t h a gr avel st op. On r oof s ot her t han concr et e const r uct i on, r oof dr ai ns shal l be compl et e wi t h under deck cl amp, sump r ecei ver , and an ext ensi on f or t he i nsul at i on t hi ckness wher e appl i cabl e. A c l ampi ng devi ce f or at t achi ng f l ashi ng or wat er pr oof i ng membr ane t o t he seepage pan wi t hout damagi ng t he f l ashi ng or membr ane shal l be pr ovi ded when r equi r ed t o sui t t he bui l di ng const r uct i on. St r ai ner openi ngs shal l have a combi ned ar ea equal t o t wi ce t hat of t he dr ai n out l et . The out l et shal l be equi pped t o make a pr oper connect i on t o t hr eaded pi pe of t he same si ze as t he downspout . An expansi on j oi nt of pr oper s i ze t o r ecei ve t he conduct or pi pe shal l be pr ovi ded. The expansi on j oi nt shal l consi st of a heavy cast - i r on housi ng, br ass or br onze sl eeve, br ass or br onze f ast eni ng bol t s and nut s, and gasket s or packi ng. The sl eeve shal l have a nomi nal t hi ckness of not l ess t han 0. 134 i nch. Gasket s and packi ng shal l be c l ose- cel l neopr ene, O- r i ng packi ng shal l be c l ose- cel l neopr ene of 70 dur omet er . Packi ng shal l be hel d i n pl ace by a packi ng gl and secur ed wi t h bol t s.
2. 4 MI SCELLANEOUS PI PI NG I TEMS
2. 4. 1 Escut cheon Pl at es
Pr ovi de one pi ece or spl i t hi nge met al pl at es f or pi pi ng ent er i ng f l oor s, wal l s, and cei l i ngs i n exposed spaces. Pr ovi de chr omi um- pl at ed on copper al l oy pl at es or pol i shed st ai nl ess st eel f i ni sh i n f i ni shed spaces.
Pr ovi de pai nt f i ni sh on pl at es i n unf i ni shed spaces.
2. 4. 2 Pi pe Sl eeves
Pr ovi de wher e pi pi ng passes ent i r el y t hr ough wal l s, cei l i ngs, r oof s, and f l oor s. Sl eeves ar e not r equi r ed wher e dr ai n, wast e, and vent ( DWV) pi pi ng passes t hr ough concr et e f l oor s l abs l ocat ed on gr ade, except wher e penet r at i ng a membr ane wat er pr oof f l oor .
SECTI ON 22 00 00 Page 6
2. 4. 2. 1 Sl eeves i n Masonr y and Concr et e
Pr ovi de st eel pi pe s l eeves. Sl eeves ar e not r equi r ed wher e dr ai n, wast e, and vent ( DWV) pi pi ng passes t hr ough concr et e f l oor s l abs l ocat ed on gr ade. Cor e dr i l l i ng of masonr y and concr et e may be pr ovi ded i n l i eu of pi pe s l eeves when cavi t i es i n t he cor e- dr i l l ed hol e ar e compl et el y gr out ed smoot h.
2. 4. 2. 2 Sl eeves Not i n Masonr y and Concr et e
Pr ovi de 26 gage gal vani zed st eel sheet s l eeves.
2. 4. 3 Pi pe Hanger s ( Suppor t s)
Pr ovi de MSS SP- 58 Type 1 wi t h adj ust abl e t ype st eel suppor t r ods, except as speci f i ed or i ndi cat ed ot her wi se. At t ach t o st eel j oi st s wi t h Type 19 or 23 cl amps and r et ai ni ng st r aps. At t ach t o St eel W or S beams wi t h Type 21, 28, 29, or 30 cl amps. At t ach t o st eel angl es and ver t i cal web st eel channel s wi t h Type 20 cl amp wi t h beam cl amp channel adapt er . At t ach t o hor i zont al web st eel channel and wood wi t h dr i l l ed hol e on cent er l i ne and doubl e nut and washer . At t ach t o concr et e wi t h Type 18 i nser t or dr i l l ed expansi on anchor . Pr ovi de Type 40 i nsul at i on pr ot ect i on shi el d f or i nsul at ed pi pi ng.
2. 4. 3. 1 Cast I r on Pi pe Hanger s
Suppor t Cast I r on No- Hub pi pe as r ecommended i n CI SPI Publ i cat i on " Cast I r on Soi l Pi pe and Fi t t i ngs Handbook, Chapt er I V - I nst al l at i on of Cast I r on Soi l Pi pe and Fi t t i ngs. "
2. 4. 4 Namepl at es
Pr ovi de 0. 125 i nch t hi ck mel ami ne l ami nat ed pl ast i c namepl at es, bl ack mat t e f i ni sh wi t h whi t e cent er cor e, f or equi pment , gages, t her momet er s, and val ves; val ves i n suppl i es t o f aucet s wi l l not r equi r e namepl at es.
Accur at el y al i gn l et t er i ng and engr ave mi ni mum of 0. 25 i nch hi gh nor mal bl ock l et t er i ng i nt o t he whi t e cor e. Mi ni mum si ze of namepl at es shal l be
1. 0 by 2. 5 i nches. Key namepl at es t o a char t and schedul e f or each syst em. Fr ame char t s and schedul es under gl ass and pl ace wher e di r ect ed near each syst em. Fur ni sh t wo copi es of each char t and schedul e.
2. 4. 5 Label s
Pr ovi de l abel s f or sensor oper at or s at f l ush val ves and f aucet s. I ncl ude t he f ol l owi ng i nf or mat i on on each l abel :
a. I dent i f i cat i on of t he sensor and i t s oper at i on wi t h gr aphi c descr i pt i on.
b. Range of t he sensor .
c. Bat t er y r epl acement schedul e.
PART 3 EXECUTI ON
3. 1 GENERAL I NSTALLATI ON REQUI REMENTS
Pi pi ng l ocat ed i n ai r pl enums shal l conf or m t o NFPA 90A r equi r ement s.
SECTI ON 22 00 00 Page 7
Pi pi ng l ocat ed i n shaf t s t hat const i t ut e ai r duct s or t hat encl ose ai r duct s shal l be noncombust i bl e i n accor dance wi t h NFPA 90A. I nst al l at i on of pl ast i c pi pe wher e i n compl i ance wi t h NFPA may be i nst al l ed i n accor dance wi t h PPFA Fi r e Man. The pl umbi ng syst em shal l be i nst al l ed compl et e wi t h necessar y f i x t ur es, f i t t i ngs, t r aps, val ves, and accessor i es. Wat er and dr ai nage pi pi ng shal l be ext ended 5 f eet out si de t he bui l di ng, unl ess ot her wi se i ndi cat ed. Pi pi ng shal l be connect ed t o t he ext er i or ser vi ce l i nes or capped or pl ugged i f t he ext er i or ser vi ce i s not i n pl ace. Sewer and wat er pi pes shal l be l ai d i n separ at e t r enches, except when ot her wi se shown.
3. 1. 1 Wat er Pi pe, Fi t t i ngs, and Connect i ons
3. 1. 1. 1 Ut i l i t i es
The pi pi ng shal l be ext ended t o f i x t ur es, out l et s, and equi pment . The hot - wat er and col d- wat er pi pi ng syst em shal l be ar r anged and i nst al l ed t o per mi t dr ai ni ng. The suppl y l i ne t o each i t em of equi pment or f i x t ur e, except f aucet s, f l ush val ves, or ot her cont r ol val ves whi ch ar e suppl i ed wi t h i nt egr al st ops, shal l be equi pped wi t h a shut of f val ve t o enabl e i sol at i on of t he i t em f or r epai r and mai nt enance wi t hout i nt er f er i ng wi t h oper at i on of ot her equi pment or f i x t ur es. Suppl y pi pi ng t o f i x t ur es, f aucet s, hydr ant s, shower heads, and f l ushi ng devi ces shal l be anchor ed t o pr event movement .
3. 1. 1. 2 Cut t i ng and Repai r i ng
The wor k shal l be car ef ul l y l ai d out i n advance, and unnecessar y cut t i ng of const r uct i on shal l be avoi ded. Damage t o bui l di ng, pi pi ng, wi r i ng, or equi pment as a r esul t of cut t i ng shal l be r epai r ed by mechani cs ski l l ed i n t he t r ade i nvol ved.
3. 1. 1. 3 Pr ot ect i on of Fi xt ur es, Mat er i al s, and Equi pment
Pi pe openi ngs shal l be c l osed wi t h caps or pl ugs dur i ng i nst al l at i on.
Fi xt ur es and equi pment shal l be t i ght l y cover ed and pr ot ect ed agai nst di r t , wat er , chemi cal s, and mechani cal i nj ur y. Upon compl et i on of t he wor k, t he f i x t ur es, mat er i al s, and equi pment shal l be t hor oughl y c l eaned, adj ust ed, and oper at ed. Saf et y guar ds shal l be pr ovi ded f or exposed r ot at i ng equi pment .
3. 1. 1. 4 Mai ns, Br anches, and Runout s
Pi pi ng shal l be i nst al l ed as i ndi cat ed. Pi pe shal l be accur at el y cut and wor ked i nt o pl ace wi t hout spr i ngi ng or f or c i ng. St r uct ur al por t i ons of t he bui l di ng shal l not be weakened. Abovegr ound pi pi ng shal l r un par al l el wi t h t he l i nes of t he bui l di ng, unl ess ot her wi se i ndi cat ed. Br anch pi pes f r om ser vi ce l i nes may be t aken f r om t op, bot t om, or s i de of mai n, usi ng cr ossover f i t t i ngs r equi r ed by st r uct ur al or i nst al l at i on condi t i ons.
Suppl y pi pes, val ves, and f i t t i ngs shal l be kept a suf f i c i ent di st ance f r om ot her wor k and ot her ser vi ces t o per mi t not l ess t han 1/ 2 i nch bet ween f i ni shed cover i ng on t he di f f er ent ser vi ces. Bar e and i nsul at ed wat er l i nes shal l not bear di r ect l y agai nst bui l di ng st r uct ur al el ement s so as t o t r ansmi t sound t o t he st r uct ur e or t o pr event f l exi bl e movement of t he l i nes. Wat er pi pe shal l not be bur i ed i n or under f l oor s unl ess speci f i cal l y i ndi cat ed or appr oved. Changes i n pi pe si zes shal l be made wi t h r educi ng f i t t i ngs. Use of bushi ngs wi l l not be per mi t t ed except f or use i n s i t uat i ons i n whi ch st andar d f act or y f abr i cat ed component s ar e f ur ni shed t o accommodat e speci f i c accept ed i nst al l at i on pr act i ce. Change
SECTI ON 22 00 00 Page 8 i n di r ect i on shal l be made wi t h f i t t i ngs, except t hat bendi ng of pi pe 4 i nches and smal l er wi l l be per mi t t ed, pr ovi ded a pi pe bender i s used and wi de sweep bends ar e f or med. The cent er - l i ne r adi us of bends shal l be not l ess t han si x di amet er s of t he pi pe. Bent pi pe showi ng ki nks, wr i nkl es, f l at t eni ng, or ot her mal f or mat i ons wi l l not be accept abl e.
3. 1. 1. 5 Expansi on and Cont r act i on of Pi pi ng
Al l owance shal l be made t hr oughout f or expansi on and cont r act i on of wat er pi pe. Each hot - wat er and hot - wat er c i r cul at i on r i ser shal l have expansi on l oops or ot her pr ovi s i ons such as of f set s and changes i n di r ect i on wher e i ndi cat ed and r equi r ed. Ri ser s shal l be secur el y anchor ed as r equi r ed or wher e i ndi cat ed t o f or ce expansi on t o l oops. Br anch connect i ons f r om r i ser s shal l be made wi t h ampl e swi ng or of f set t o avoi d undue st r ai n on f i t t i ngs or shor t pi pe l engt hs. Hor i zont al r uns of pi pe over 50 f eet i n l engt h shal l be anchor ed t o t he wal l or t he suppor t i ng const r uct i on about mi dway on t he r un t o f or ce expansi on, evenl y di v i ded, t owar d t he ends.
Suf f i c i ent f l exi bi l i t y shal l be pr ovi ded on br anch r unout s f r om mai ns and r i ser s t o pr ovi de f or expansi on and cont r act i on of pi pi ng. Fl exi bi l i t y shal l be pr ovi ded by i nst al l i ng one or mor e t ur ns i n t he l i ne so t hat pi pi ng wi l l spr i ng enough t o al l ow f or expansi on wi t hout st r ai ni ng. I f mechani cal gr ooved pi pe coupl i ng syst ems ar e pr ovi ded, t he devi at i on f r om desi gn r equi r ement s f or expansi on and cont r act i on may be al l owed pendi ng appr oval of Cont r act i ng Of f i cer .
3. 1. 1. 6 Thr ust Rest r ai nt
Pl ugs, caps, t ees, val ves and bends def l ect i ng 11. 25 degr ees or mor e, ei t her ver t i cal l y or hor i zont al l y, i n wat er l i nes 4 i nches i n di amet er or l ar ger shal l be pr ovi ded wi t h t hr ust bl ocks, wher e i ndi cat ed, t o pr event movement . Thr ust bl ocki ng shal l be concr et e of a mi x not l eaner t han: 1 cement , 2- 1/ 2 sand, 5 gr avel ; and havi ng a compr essi ve st r engt h of not l ess t han 2000 psi af t er 28 days. Bl ocki ng shal l be pl aced bet ween sol i d gr ound and t he f i t t i ng t o be anchor ed. Unl ess ot her wi se i ndi cat ed or di r ect ed, t he base and t hr ust bear i ng s i des of t he t hr ust bl ock shal l be pour ed agai nst undi st ur bed ear t h. The si de of t he t hr ust bl ock not subj ect t o t hr ust shal l be pour ed agai nst f or ms. The ar ea of bear i ng wi l l be as shown. Bl ocki ng shal l be pl aced so t hat t he j oi nt s of t he f i t t i ng ar e accessi bl e f or r epai r . St eel r ods and cl amps, pr ot ect ed by gal vani z i ng or by coat i ng wi t h bi t umi nous pai nt , shal l be used t o anchor ver t i cal down bends i nt o gr avi t y t hr ust bl ocks.
3. 1. 2 Joi nt s
I nst al l at i on of pi pe and f i t t i ngs shal l be made i n accor dance wi t h t he manuf act ur er ' s r ecommendat i ons. Mi t er i ng of j oi nt s f or el bows and not chi ng of st r ai ght r uns of pi pe f or t ees wi l l not be per mi t t ed. Joi nt s shal l be made up wi t h f i t t i ngs of compat i bl e mat er i al and made f or t he speci f i c pur pose i nt ended.
3. 1. 2. 1 Mechani cal Coupl i ngs
Mechani cal coupl i ngs may be used i n conj unct i on wi t h gr ooved pi pe f or abovegr ound, f er r ous or non- f er r ous, domest i c hot and col d wat er syst ems, i n l i eu of uni ons, br azed, sol der ed, wel ded, f l anged, or t hr eaded j oi nt s.
Mechani cal coupl i ngs ar e per mi t t ed i n accessi bl e l ocat i ons i ncl udi ng behi nd access pl at es. Fl exi bl e gr ooved j oi nt s wi l l not be per mi t t ed, except as v i br at i on i sol at or s adj acent t o mechani cal equi pment . Ri gi d
SECTI ON 22 00 00 Page 9 gr ooved j oi nt s shal l i ncor por at e an angl e bol t pad desi gn whi ch mai nt ai ns met al - t o- met al cont act wi t h equal amount of pad of f set of housi ngs upon i nst al l at i on t o ensur e posi t i ve r i gi d c l ampi ng of t he pi pe.
Desi gns whi ch can onl y c l amp on t he bot t om of t he gr oove or whi ch ut i l i ze gr i ppi ng t eet h or j aws, or whi ch use mi sal i gned housi ng bol t hol es, or whi ch r equi r e a t or que wr ench or t or que speci f i cat i ons wi l l not be per mi t t ed.
Gr ooved f i t t i ngs and coupl i ngs, and gr oovi ng t ool s shal l be pr ovi ded f r om t he same manuf act ur er . Segment al l y wel ded el bows shal l not be used.
Gr ooves shal l be pr epar ed i n accor dance wi t h t he coupl i ng manuf act ur er ' s l at est publ i shed st andar ds. Gr oovi ng shal l be per f or med by qual i f i ed gr oovi ng oper at or s havi ng demonst r at ed pr oper gr oovi ng pr ocedur es i n accor dance wi t h t he t ool manuf act ur er ' s r ecommendat i ons.
The Cont r act i ng Of f i cer shal l be not i f i ed 24 hour s i n advance of t est t o demonst r at e oper at or ' s capabi l i t y , and t he t est shal l be per f or med at t he wor k s i t e, i f pr act i cal , or at a s i t e agr eed upon. The oper at or shal l demonst r at e t he abi l i t y t o pr oper l y adj ust t he gr oovi ng t ool , gr oove t he pi pe, and t o ver i f y t he gr oove di mensi ons i n accor dance wi t h t he coupl i ng manuf act ur er ' s speci f i cat i ons.
3. 1. 2. 2 Gr ooved Mechani cal Joi nt s
Gr ooves shal l be pr epar ed accor di ng t o t he coupl i ng manuf act ur er ' s i nst r uct i ons. Gr ooved f i t t i ngs, coupl i ngs, and gr oovi ng t ool s shal l be pr oduct s of t he same manuf act ur er . Pi pe and gr oove di mensi ons shal l compl y wi t h t he t ol er ances speci f i ed by t he coupl i ng manuf act ur er . The di amet er of gr ooves made i n t he f i el d shal l be measur ed usi ng a " go/ no- go" gauge, ver ni er or di al cal i per , nar r ow- l and mi cr omet er , or ot her met hod speci f i cal l y appr oved by t he coupl i ng manuf act ur er f or t he i nt ended appl i cat i on. Gr oove wi dt h and di mensi on of gr oove f r om end of pi pe shal l be measur ed and r ecor ded f or each change i n gr oovi ng t ool set up t o ver i f y compl i ance wi t h coupl i ng manuf act ur er ' s t ol er ances. Gr ooved j oi nt s shal l not be used i n conceal ed l ocat i ons.
3. 1. 2. 3 Ot her Joi nt Met hods
3. 1. 3 Di ssi mi l ar Pi pe Mat er i al s
Connect i ons bet ween f er r ous and non- f er r ous copper wat er pi pe shal l be made wi t h di el ect r i c uni ons or f l ange wat er ways. Di el ect r i c wat er ways shal l have t emper at ur e and pr essur e r at i ng equal t o or gr eat er t han t hat speci f i ed f or t he connect i ng pi pi ng. Wat er ways shal l have met al connect i ons on bot h ends sui t ed t o mat ch connect i ng pi pi ng. Di el ect r i c wat er ways shal l be i nt er nal l y l i ned wi t h an i nsul at or speci f i cal l y desi gned t o pr event cur r ent f l ow bet ween di ssi mi l ar met al s. Di el ect r i c f l anges shal l meet t he per f or mance r equi r ement s descr i bed her ei n f or di el ect r i c wat er ways. Connect i ng j oi nt s bet ween pl ast i c and met al l i c pi pe shal l be made wi t h t r ansi t i on f i t t i ng f or t he speci f i c pur pose.
3. 1. 4 Pi pe Sl eeves and Fl ashi ng
Pi pe sl eeves shal l be f ur ni shed and set i n t hei r pr oper and per manent l ocat i on.
SECTI ON 22 00 00 Page 10
3. 1. 4. 1 Sl eeve Requi r ement s
Unl ess i ndi cat ed ot her wi se, pr ovi de pi pe sl eeves meet i ng t he f ol l owi ng r equi r ement s:
a. Secur e s l eeves i n posi t i on and l ocat i on dur i ng const r uct i on. Pr ovi de sl eeves of suf f i c i ent l engt h t o pass t hr ough ent i r e t hi ckness of wal l s, cei l i ngs, r oof s, and f l oor s.
b. A modul ar mechani cal t ype seal i ng assembl y may be i nst al l ed i n l i eu of a wat er pr oof i ng c l ampi ng f l ange and caul k i ng and seal i ng of annul ar space bet ween pi pe and sl eeve. The seal s shal l consi st of i nt er l ocki ng synt het i c r ubber l i nks shaped t o cont i nuousl y f i l l t he annul ar space bet ween t he pi pe and sl eeve usi ng gal vani zed st eel bol t s, nut s, and pr essur e pl at es. The l i nks shal l be l oosel y assembl ed wi t h bol t s t o f or m a cont i nuous r ubber bel t ar ound t he pi pe wi t h a pr essur e pl at e under each bol t head and each nut . Af t er t he seal assembl y i s pr oper l y posi t i oned i n t he s l eeve, t i ght eni ng of t he bol t shal l cause t he r ubber seal i ng el ement s t o expand and pr ovi de a wat er t i ght seal bet ween t he pi pe and t he sl eeve. Each seal assembl y shal l be s i zed as r ecommended by t he manuf act ur er t o f i t t he pi pe and sl eeve i nvol ved.
c. Sl eeves shal l not be i nst al l ed i n st r uct ur al member s, except wher e i ndi cat ed or appr oved. Rect angul ar and squar e openi ngs shal l be as det ai l ed. Each sl eeve shal l ext end t hr ough i t s r espect i ve f l oor , or r oof , and shal l be cut f l ush wi t h each sur f ace, except f or speci al c i r cumst ances. Pi pe sl eeves passi ng t hr ough f l oor s i n wet ar eas such as mechani cal equi pment r ooms, l avat or i es, k i t chens, and ot her pl umbi ng f i xt ur e ar eas shal l ext end a mi ni mum of 4 i nches above t he f i ni shed f l oor .
d. Unl ess ot her wi se i ndi cat ed, s l eeves shal l be of a s i ze t o pr ovi de a mi ni mum of one i nch cl ear ance bet ween bar e pi pe or i nsul at i on and i nsi de of s l eeve or bet ween i nsul at i on and i nsi de of s l eeve. Sl eeves i n bear i ng wal l s and concr et e s l ab on gr ade f l oor s shal l be st eel pi pe or cast - i r on pi pe. Sl eeves i n nonbear i ng wal l s or cei l i ngs may be st eel pi pe, cast - i r on pi pe, gal vani zed sheet met al wi t h l ock- t ype l ongi t udi nal seam, or pl ast i c.
e. Except as ot her wi se speci f i ed, t he annul ar space bet ween pi pe and sl eeve, or bet ween j acket over i nsul at i on and sl eeve, shal l be seal ed as i ndi cat ed wi t h seal ant s conf or mi ng t o ASTM C920 and wi t h a pr i mer , backst op mat er i al and sur f ace pr epar at i on as speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS. The annul ar space bet ween pi pe and sl eeve, bet ween bar e i nsul at i on and sl eeve or bet ween j acket over i nsul at i on and sl eeve shal l not be seal ed f or i nt er i or wal l s whi ch ar e not desi gnat ed as f i r e r at ed.
f . Sl eeves t hr ough bel ow- gr ade wal l s i n cont act wi t h ear t h shal l be r ecessed 1/ 2 i nch f r om wal l sur f aces on bot h s i des. Annul ar space bet ween pi pe and sl eeve shal l be f i l l ed wi t h backi ng mat er i al and seal ant s i n t he j oi nt bet ween t he pi pe and concr et e wal l as speci f i ed above. Seal ant sel ect ed f or t he ear t h s i de of t he wal l shal l be compat i bl e wi t h damppr oof i ng/ wat er pr oof i ng mat er i al s t hat ar e t o be appl i ed over t he j oi nt seal ant . Pi pe sl eeves i n f i r e- r at ed wal l s shal l conf or m t o t he r equi r ement s i n Sect i on 07 84 00 FI RESTOPPI NG.
SECTI ON 22 00 00 Page 11
3. 1. 4. 2 Fl ashi ng Requi r ement s
Pi pes passi ng t hr ough r oof shal l be i nst al l ed t hr ough a 16 ounce copper f l ashi ng, each wi t hi n an i nt egr al ski r t or f l ange. Fl ashi ng shal l be sui t abl y f or med, and t he ski r t or f l ange shal l ext end not l ess t han 8 i nches f r om t he pi pe and shal l be set over t he r oof or f l oor membr ane i n a sol i d coat i ng of bi t umi nous cement . The f l ashi ng shal l ext end up t he pi pe a mi ni mum of 10 i nches. For c l eanout s, t he f l ashi ng shal l be t ur ned down i nt o t he hub and caul ked af t er pl aci ng t he f er r ul e. Pi pes passi ng t hr ough pi t ched r oof s shal l be f l ashed, usi ng l ead or copper f l ashi ng, wi t h an adj ust abl e i nt egr al f l ange of adequat e s i ze t o ext end not l ess t han 8 i nches f r om t he pi pe i n al l di r ect i ons and l apped i nt o t he r oof i ng t o pr ovi de a wat er t i ght seal . The annul ar space bet ween t he f l ashi ng and t he bar e pi pe or bet ween t he f l ashi ng and t he met al - j acket - cover ed i nsul at i on shal l be seal ed as i ndi cat ed. Fl ashi ng f or dr y vent s shal l be t ur ned down i nt o t he pi pe t o f or m a wat er pr oof j oi nt . Pi pes, up t o and i ncl udi ng 10 i nches i n di amet er , passi ng t hr ough r oof or f l oor wat er pr oof i ng membr ane may be i nst al l ed t hr ough a cast - i r on s l eeve wi t h caul k i ng r ecess, anchor l ugs, f l ashi ng- cl amp devi ce, and pr essur e r i ng wi t h br ass bol t s. Fl ashi ng shi el d shal l be f i t t ed i nt o t he s l eeve cl ampi ng devi ce. Pi pes passi ng t hr ough wal l wat er pr oof i ng membr ane shal l be s l eeved as descr i bed above.
A wat er pr oof i ng c l ampi ng f l ange shal l be i nst al l ed.
3. 1. 4. 3 Wat er pr oof i ng
Wat er pr oof i ng at f l oor - mount ed wat er c l oset s shal l be accompl i shed by f or mi ng a f l ashi ng guar d f r om sof t - t emper ed sheet copper . The cent er of t he sheet shal l be per f or at ed and t ur ned down appr oxi mat el y 1- 1/ 2 i nches t o f i t bet ween t he out si de di amet er of t he dr ai npi pe and t he i nsi de di amet er of t he cast - i r on or st eel pi pe s l eeve. The t ur ned- down por t i on of t he f l ashi ng guar d shal l be embedded i n seal ant t o a dept h of appr oxi mat el y 1- 1/ 2 i nches; t hen t he seal ant shal l be f i ni shed of f f l ush t o f l oor l evel bet ween t he f l ashi ng guar d and dr ai npi pe. The f l ashi ng guar d of sheet copper shal l ext end not l ess t han 8 i nches f r om t he dr ai npi pe and shal l be l apped bet ween t he f l oor membr ane i n a sol i d coat i ng of bi t umi nous cement . I f cast - i r on wat er c l oset f l oor f l anges ar e used, t he space bet ween t he pi pe sl eeve and dr ai npi pe shal l be seal ed wi t h seal ant and t he f l ashi ng guar d shal l be upt ur ned appr oxi mat el y 1- 1/ 2 i nches t o f i t t he out si de di amet er of t he dr ai npi pe and t he i nsi de di amet er of t he wat er c l oset f l oor f l ange. The upt ur ned por t i on of t he sheet f i t t ed i nt o t he f l oor f l ange shal l be seal ed.
3. 1. 4. 4 Opt i onal Count er f l ashi ng
I nst ead of t ur ni ng t he f l ashi ng down i nt o a dr y vent pi pe, or caul k i ng and seal i ng t he annul ar space bet ween t he pi pe and f l ashi ng or met al - j acket - cover ed i nsul at i on and f l ashi ng, count er f l ashi ng may be accompl i shed by ut i l i z i ng t he f ol l owi ng:
a. A st andar d r oof coupl i ng f or t hr eaded pi pe up t o 6 i nches i n di amet er .
b. A t ack- wel ded or banded- met al r ai n shi el d ar ound t he pi pe.
3. 1. 4. 5 Pi pe Penet r at i ons of Sl ab on Gr ade Fl oor s
Wher e pi pes, f i x t ur e dr ai ns, f l oor dr ai ns, c l eanout s or s i mi l ar i t ems penet r at e s l ab on gr ade f l oor s, except at penet r at i ons of f l oor s wi t h wat er pr oof i ng membr ane as speci f i ed i n par agr aphs FLASHI NG REQUI REMENTS and WATERPROOFI NG, a gr oove 1/ 4 t o 1/ 2 i nch wi de by 1/ 4 t o 3/ 8 i nch deep
SECTI ON 22 00 00 Page 12 shal l be f or med ar ound t he pi pe, f i t t i ng or dr ai n. The gr oove shal l be f i l l ed wi t h a seal ant as speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS.
3. 1. 4. 6 Pi pe Penet r at i ons
Pr ovi de seal ant s f or al l pi pe penet r at i ons. Al l pi pe penet r at i ons shal l be seal ed t o pr event i nf i l t r at i on of ai r , i nsect s, and ver mi n.
3. 1. 5 Fi r e Seal
Wher e pi pes pass t hr ough f i r e wal l s, f i r e- par t i t i ons, f i r e- r at ed pi pe chase wal l s or f l oor s above gr ade, a f i r e seal shal l be pr ovi ded as speci f i ed i n Sect i on 07 84 00 FI RESTOPPI NG.
3. 1. 6 Suppor t s
3. 1. 6. 1 Gener al
Hanger s used t o suppor t pi pi ng 2 i nches and l ar ger shal l be f abr i cat ed t o per mi t adequat e adj ust ment af t er er ect i on whi l e st i l l suppor t i ng t he l oad. Pi pe gui des and anchor s shal l be i nst al l ed t o keep pi pes i n accur at e al i gnment , t o di r ect t he expansi on movement , and t o pr event buckl i ng, swayi ng, and undue st r ai n. Pi pi ng subj ect ed t o ver t i cal movement when oper at i ng t emper at ur es exceed ambi ent t emper at ur es shal l be suppor t ed by var i abl e spr i ng hanger s and suppor t s or by const ant suppor t hanger s. I n t he suppor t of mul t i pl e pi pe r uns on a common base member , a c l i p or c l amp shal l be used wher e each pi pe cr osses t he base suppor t member . Spaci ng of t he base suppor t member s shal l not exceed t he hanger and suppor t spaci ng r equi r ed f or an i ndi v i dual pi pe i n t he mul t i pl e pi pe r un. Thr eaded sect i ons of r ods shal l not be f or med or bent .
3. 1. 6. 2 Pi pe Hanger s, I nser t s, and Suppor t s
I nst al l at i on of pi pe hanger s, i nser t s and suppor t s shal l conf or m t o MSS SP- 58 except as modi f i ed her ei n.
a. Types 5, 12, and 26 shal l not be used.
b. Type 3 shal l not be used on i nsul at ed pi pe.
c. Type 18 i nser t s shal l be secur ed t o concr et e f or ms bef or e concr et e i s pl aced. Cont i nuous i nser t s whi ch al l ow mor e adj ust ment may be used i f t hey ot her wi se meet t he r equi r ement s f or t ype 18 i nser t s.
d. Type 19 and 23 C- cl amps shal l be t or qued per MSS SP- 58 and shal l have bot h l ocknut s and r et ai ni ng devi ces f ur ni shed by t he manuf act ur er .
Fi el d- f abr i cat ed C- cl amp bodi es or r et ai ni ng devi ces ar e not accept abl e.
e. Type 20 at t achment s used on angl es and channel s shal l be f ur ni shed wi t h an added mal l eabl e- i r on heel pl at e or adapt er .
f . Type 24 may be used onl y on t r apeze hanger syst ems or on f abr i cat ed f r ames.
g. Type 39 saddl es shal l be used on i nsul at ed pi pe 4 i nches and l ar ger when t he t emper at ur e of t he medi um i s 60 degr ees F or hi gher . Type 39 saddl es shal l be wel ded t o t he pi pe.
SECTI ON 22 00 00 Page 13
h. Type 40 shi el ds shal l :
( 1) Be used on i nsul at ed pi pe l ess t han 4 i nches.
( 2) Be used on i nsul at ed pi pe 4 i nches and l ar ger when t he t emper at ur e of t he medi um i s 60 degr ees F or l ess.
( 3) Have a hi gh densi t y i nser t f or al l pi pe s i zes. Hi gh densi t y i nser t s shal l have a densi t y of 8 pcf or gr eat er .
i . Hor i zont al pi pe suppor t s shal l be spaced as speci f i ed i n MSS SP- 58 and a suppor t shal l be i nst al l ed not over 1 f oot f r om t he pi pe f i t t i ng j oi nt at each change i n di r ect i on of t he pi pi ng. Pi pe suppor t s shal l be spaced not over 5 f eet apar t at val ves. Oper at i ng t emper at ur es i n det er mi ni ng hanger spaci ng f or PVC or CPVC pi pe shal l be 120 degr ees F f or PVC and 180 degr ees F f or CPVC. Hor i zont al pi pe r uns shal l i ncl ude al l owances f or expansi on and cont r act i on.
j . Ver t i cal pi pe shal l be suppor t ed at each f l oor , except at s l ab- on- gr ade, at i nt er val s of not mor e t han 15 f eet nor mor e t han 8 f eet f r om end of r i ser s, and at vent t er mi nat i ons. Ver t i cal pi pe r i ser s shal l i ncl ude al l owances f or expansi on and cont r act i on.
k. Type 35 gui des usi ng st eel , r ei nf or ced pol yt et r af l uor oet hyl ene ( PTFE) or gr aphi t e s l i des shal l be pr ovi ded t o al l ow l ongi t udi nal pi pe movement . Sl i de mat er i al s shal l be sui t abl e f or t he syst em oper at i ng t emper at ur es, at mospher i c condi t i ons, and bear i ng l oads encount er ed.
Lat er al r est r ai nt s shal l be pr ovi ded as needed. Wher e st eel s l i des do not r equi r e pr ovi s i ons f or l at er al r est r ai nt t he f ol l owi ng may be used:
( 1) On pi pe 4 i nches and l ar ger when t he t emper at ur e of t he medi um i s 60 degr ees F or hi gher , a Type 39 saddl e, wel ded t o t he pi pe, may f r eel y r est on a st eel pl at e.
( 2) On pi pe l ess t han 4 i nches a Type 40 shi el d, at t ached t o t he pi pe or i nsul at i on, may f r eel y r est on a st eel pl at e.
( 3) On pi pe 4 i nches and l ar ger car r y i ng medi um l ess t hat 60 degr ees F a Type 40 shi el d, at t ached t o t he pi pe or i nsul at i on, may f r eel y r est on a st eel pl at e.
l . Pi pe hanger s on hor i zont al i nsul at ed pi pe shal l be t he s i ze of t he out si de di amet er of t he i nsul at i on. The i nsul at i on shal l be cont i nuous t hr ough t he hanger on al l pi pe s i zes and appl i cat i ons.
m. Wher e t her e ar e hi gh syst em t emper at ur es and wel di ng t o pi pi ng i s not desi r abl e, t he t ype 35 gui de shal l i ncl ude a pi pe cr adl e, wel ded t o t he gui de st r uct ur e and st r apped secur el y t o t he pi pe. The pi pe shal l be separ at ed f r om t he sl i de mat er i al by at l east 4 i nches or by an amount adequat e f or t he i nsul at i on, whi chever i s gr eat er .
n. Hanger s and suppor t s f or pl ast i c pi pe shal l not compr ess, di st or t , cut or abr ade t he pi pi ng, and shal l al l ow f r ee movement of pi pe except wher e ot her wi se r equi r ed i n t he cont r ol of expansi on/ cont r act i on.
3. 1. 6. 3 St r uct ur al At t achment s
At t achment t o bui l di ng st r uct ur e concr et e and masonr y shal l be by cast - i n concr et e i nser t s, bui l t - i n anchor s, or masonr y anchor devi ces. I nser t s
SECTI ON 22 00 00 Page 14 and anchor s shal l be appl i ed wi t h a saf et y f act or not l ess t han 5.
Suppor t s shal l not be at t ached t o met al decki ng. Suppor t s shal l not be at t ached t o t he under si de of concr et e f i l l ed f l oor or concr et e r oof decks unl ess appr oved by t he Cont r act i ng Of f i cer . Masonr y anchor s f or over head appl i cat i ons shal l be const r uct ed of f er r ous mat er i al s onl y.
3. 1. 7 Wel ded I nst al l at i on
Pl umbi ng pi pe wel dment s shal l be as i ndi cat ed. Changes i n di r ect i on of pi pi ng shal l be made wi t h wel di ng f i t t i ngs onl y; mi t er i ng or not chi ng pi pe t o f or m el bows and t ees or ot her s i mi l ar t ype const r uct i on wi l l not be per mi t t ed. Br anch connect i on may be made wi t h ei t her wel di ng t ees or f or ged br anch out l et f i t t i ngs. Br anch out l et f i t t i ngs shal l be f or ged, f l ar ed f or i mpr ovement of f l ow wher e at t ached t o t he r un, and r ei nf or ced agai nst ext er nal st r ai ns. Bevel i ng, al i gnment , heat t r eat ment , and i nspect i on of wel d shal l conf or m t o ASME B31. 1. Wel d def ect s shal l be r emoved and r epai r s made t o t he wel d, or t he wel d j oi nt s shal l be ent i r el y r emoved and r ewel ded. Af t er f i l l er met al has been r emoved f r om i t s or i gi nal package, i t shal l be pr ot ect ed or st or ed so t hat i t s char act er i st i cs or wel di ng pr oper t i es ar e not af f ect ed. El ect r odes t hat have been wet t ed or t hat have l ost any of t hei r coat i ng shal l not be used.
3. 1. 8 Pi pe Cl eanout s
Pi pe cl eanout s shal l be t he same si ze as t he pi pe except t hat c l eanout pl ugs l ar ger t han 4 i nches wi l l not be r equi r ed. A c l eanout i nst al l ed i n connect i on wi t h cast - i r on soi l pi pe shal l consi st of a l ong- sweep 1/ 4 bend or one or t wo 1/ 8 bends ext ended t o t he pl ace shown. An ext r a- heavy cast - br ass or cast - i r on f er r ul e wi t h count er sunk cast - br ass head scr ew pl ug shal l be caul ked i nt o t he hub of t he f i t t i ng and shal l be f l ush wi t h t he f l oor . Cl eanout s i n connect i on wi t h ot her pi pe, wher e i ndi cat ed, shal l be T- pat t er n, 90- degr ee br anch dr ai nage f i t t i ngs wi t h cast - br ass scr ew pl ugs, except pl ast i c pl ugs shal l be i nst al l ed i n pl ast i c pi pe.
Pl ugs shal l be t he same si ze as t he pi pe up t o and i ncl udi ng 4 i nches.
Cl eanout t ee br anches wi t h scr ew pl ug shal l be i nst al l ed at t he f oot of soi l and wast e st acks, at t he f oot of i nt er i or downspout s, on each connect i on t o bui l di ng st or m dr ai n wher e i nt er i or downspout s ar e i ndi cat ed, and on each bui l di ng dr ai n out si de t he bui l di ng. Cl eanout t ee br anches may be omi t t ed on st acks i n s i ngl e st or y bui l di ngs wi t h s l ab- on- gr ade const r uct i on or wher e l ess t han 18 i nches of cr awl space i s pr ovi ded under t he f l oor . Cl eanout s on pi pe conceal ed i n par t i t i ons shal l be pr ovi ded wi t h chr omi um pl at ed br onze, ni ckel br onze, ni ckel br ass or st ai nl ess st eel f l ush t ype access cover pl at es. Round access cover s shal l be pr ovi ded and secur ed t o pl ugs wi t h secur i ng scr ew. Squar e access cover s may be pr ovi ded wi t h mat chi ng f r ames, anchor i ng l ugs and cover scr ews.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .