B3_Sawdust PlansDrawings.pdf

PDF 12 MB Posted

Attached to
Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Solicitation number
1256A120R0003
Issued by

About this file

This document provides details for a road and general construction multiple award indefinite delivery indefinite quantity contract opportunity for the Chequamegon-Nicolet National Forest. The government intends to make multiple awards of IDIQ contracts over five years with a maximum value of $7 million. Task orders will be competed amongst IDIQ holders for specific projects, which may include road, bridge, structure, and site work such as construction, repair, and reconstruction. Project locations will primarily be in the Chequamegon-Nicolet National Forest but may also be in other Forest Service units in Wisconsin, Minnesota, and Michigan. The NAICS code is 237310 and the small business size standard is $39.5 million. This solicitation is set aside for small businesses. A full solicitation will be available on or around February 26, 2020 on the listed website.

View the file

Other files

File Type Posted
Amendment 2_Questions and Answers 2.docx DOCX document
Amendment 2_C1_Jackson Price Schedule_revision 2.DOCX DOCX document
Amendment 2 SF30.pdf PDF
Questions and Answers 03182020.docx DOCX document
Amendment 1_ A1_Shawano Price Schedule_revision 1.docx DOCX document
Amendment 1_C1_Jackson Price Schedule_revision 1.DOCX DOCX document
Amendment 1 SF30.pdf PDF
C4_Jackson GP Coverage.pdf PDF
C1_Jackson Price Schedule.DOCX DOCX document
B1_Sawdust Price Schedule.docx DOCX document
C3_Jackson PlansDrawings.pdf PDF
Wage Determination.pdf PDF
RFP 1256A120R0003.pdf PDF
A3_Shawano PlansDrawings.pdf PDF
B2_Sawdust Supplemental Specifications.docx DOCX document
A1_Shawano Price Schedule.docx DOCX document
A2_Shawano Supplemental Specifications.docx DOCX document
C2_Jackson Supplemental Specifications.DOCX DOCX document
A4_Shawano Ck GP Coverage.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C U s e r s p h a m p s t o n D o c u m e n t s C

N N

F

C o n t r a c t s S a w d u s t

L a k e

A c c e s s D

W G

S

A W

D U

S T

B

A Y

F I E

L D

P

Q H d w g

S e p

P

M

C-XXXX

NTS

CONSTRUCTION NOTES

SAWDUST LAKE ACCESS

08/31/15

08/31/15

06/18/15

P. HAMPSTON

P. HAMPSTON

E. LYNCH

CONSTRUCTION NOTES:

-The intent of this contract is to reconstruct existing roadways, except where noted on the drawings.

-Existing roadway width is approximately 8-10'

-Clearing and grubbing waste shall be disposed of at locations on site, as determined in the field by the COR.

-Silt fence shall be installed in all areas of disturbed soil according to best management practices.

-All quantities are compacted, in place volumes.

-Construct the roadway to the typical section before placing crushed aggregate. Prior to placement of crushed aggregate, the subgrade must be approved by the COR.

-Compact all fill by operating spreading and hauling equipment over the full width of the roadway.

-Crushed aggregate shall be obtained from a commercial source.

-Boulders shall be a minimum of 36" in their smallest dimension and final placement location shall be determined in the field by the COR.

-Maximum clearing width shall be 28' except at landing and turnout locations.

-The existing spur road off of the north end of the FR267 loop is to be decommissioned and converted to a walking trail. The entrenched roadbed shall be filled to match the surrounding elevations and outsloped to sheet drain evenly. Estimated quantity is 95 CY. Fill is considered incidental to road decommissioning and no additional payment will be made. Stumps from clearing and grubbing operations may be disposed of in this fill area but must be completely covered with fill. Excess roadway excavation shall be used to fill this area. A 24" wide, 4" deep, tread shall be constructed using 2" minus crushed aggregate. The filled area outside the tread shall be covered with 4" of topsoil (~31CY), seeded, and mulched. Aggregate and topsoil will be paid for under bid items 30103 and 62403, respectively. Some slash may be scattered outside the tread to return the area to a more natural condition.

-The northeast entrance of FR 267 shall be decommissioned and the road rerouted to make a loop with one entrance onto FR241. Fill the cut section of the decommissioned road to match surrounding elevations and slopes. Estimated quantity is 10 cy. Fill is considered incidental to road decommissioning and no additional payment will be made. Cover filled area with 4" of topsoil (~7CY). Topsoil will be paid for under bid item 62403. Scatter logs, rocks, and plant small trees to effectively make the old road disappear.

-All signage shall be installed per MUTCD specifications.

-Seed, fertilize, and mulch all disturbed areas.

U s e r s p h a m p s t o n D o c u m e n t s C

N N

F

C o n t r a c t s S a w d u s t

L a k e

A c c e s s D

W G

S

A W

D U

S T

B

A Y

F I E

L D

P

Q H d w g

S e p

P

M

C-XXXX

NTS

TYPICALS

SAWDUST LAKE ACCESS

8/31/15

8/31/15

6/18/15

P.HAMPSTON

P. HAMPSTON

E. LYNCH

R35'R35'

20'

R35'R35'

12'

2.0 %2.0 %

C

L

12'

TYPICAL ROAD CROSS-SECTION

1'

6"

28' MAX CLEARING LIMIT

2.0 %2.0 %

C

L

20'

TYPICAL LANDING CROSS-SECTION

1'

6"

36' MAX CLEARING LIMIT

TYPICAL LANDING ENTRANCETYPICAL ROAD ENTRANCE

TYPICAL ROAD CROSS-SECTION TYPICAL LANDING CROSS-SECTION

TYPICAL LANDING ENTRANCETYPICAL ROAD ENTRANCE

C U s e r s p h a m p s t o n D o c u m e n t s C

N N

F

C o n t r a c t s S a w d u s t

L a k e

A c c e s s D

W G

S

A W

D U

S T

B

A Y

F I E

L D

P

Q H d w g

S e p

P

M

SITE PLAN

1" = 200'

C-XXXX

4 8

SAWDUST LAKE ACCESS

6/18/15

8/31/15

8/31/15

P. HAMPSTON

P. HAMPSTON

E. LYNCH

SAWDUST LAKE

POND

Feet

0 200 400

U s e r s p h a m p s t o n D o c u m e n t s C

N N

F

C o n t r a c t s S a w d u s t

L a k e

A c c e s s D

W G

S

A W

D U

S T

B

A Y

F I E

L D

P

Q H d w g

S e p

P

M

PLAN AND PROFILE

BOAT LANDING

1" = 80'

C-XXXX

5 8

SAWDUST LAKE ACCESS

6/18/15

8/31/15

8/31/15

P. HAMPSTON

P. HAMPSTON

E. LYNCH

Feet

0 80 160

FR 241

ESTIMATED QUANTITIES

BOAT LANDING ROAD (STA 10+00 TO 23+80)

CUT VOLUME: 179 CY

FILL VOLUME: 160 CY

SURFACING VOLUME: 232 CY

VERTICAL EXAGERATION = 4

BOAT LANDING ROAD

U s e r s p h a m p s t o n D o c u m e n t s C

N N

F

C o n t r a c t s S a w d u s t

L a k e

A c c e s s D

W G

S

A W

D U

S T

B

A Y

F I E

L D

P

Q H d w g

S e p

P

M

PLAN AND PROFILE

BOAT LANDING (2)

1" = 80'

C-XXXX

6 8

SAWDUST LAKE ACCESS

6/18/15

8/31/15

8/31/15

P. HAMPSTON

P. HAMPSTON

E. LYNCH

Feet

0 80 160

POND

ESTIMATED QUANTITIES

BOAT LANDING ROAD

(STA 10+00 TO 23+80)

CUT VOLUME: 179 CY

FILL VOLUME: 160 CY

SURFACING VOLUME: 232 CY

BOAT LANDING ROAD

U s e r s p h a m p s t o n D o c u m e n t s C

N N

F

C o n t r a c t s S a w d u s t

L a k e

A c c e s s D

W G

S

A W

D U

S T

B

A Y

F I E

L D

P

Q H d w g

S e p

P

M

PLAN AND PROFILE

FR 267

1" = 80'

C-XXXX

7 8

SAWDUST LAKE ACCESS

6/18/15

8/31/15

8/31/15

P. HAMPSTON

P. HAMPSTON

E. LYNCH

Feet

0 80 160

FR 241

ESTIMATED QUANTITIES

FR 267 (STA 10+00 TO 27+67)

CUT VOLUME: 315 CY

FILL VOLUME: 202 CY

SURFACING VOLUME: 307 CY

TRAIL SURFACING: 5 CY

FR 267

U s e r s p h a m p s t o n D o c u m e n t s C

N N

F

C o n t r a c t s S a w d u s t

L a k e

A c c e s s D

W G

S

A W

D U

S T

B

A Y

F I E

L D

P

Q H d w g

S e p

P

M

PLAN AND PROFILE

FR 267 (2)

1" = 80'

C-XXXX

8 8

SAWDUST LAKE ACCESS

6/18/15

8/31/15

8/31/15

P. HAMPSTON

P. HAMPSTON

E. LYNCH

Feet

0 80 160

FR 241

ESTIMATED QUANTITIES

FR 267 (STA 10+00 TO 27+67)

CUT VOLUME: 315 CY

FILL VOLUME: 202 CY

SURFACING VOLUME: 307 CY

TRAIL SURFACING: 5 CY