Amendment 1_ A1_Shawano Price Schedule_revision 1.docx

DOCX document 20 KB Posted

Attached to
Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Solicitation number
1256A120R0003
Issued by

About this file

This document contains a price schedule amendment and details for a federal contract opportunity on the Chequamegon-Nicolet National Forest. The price schedule amendment provides estimated quantities and unit pricing for various road construction and repair items needed for a project over Shawano Creek. These include items such as mobilization, erosion control, structure removal, borrow material, geogrid, separation geotextile, excavation, aggregate base, culverts, seeding, and erosion control mats. Offerors are requested to provide unit pricing for each item. The federal contract opportunity posting is for multiple road and general construction IDIQ contracts across the Chequamegon-Nicolet National Forest over five years, with a maximum value of $7 million. Task orders will be competed amongst IDIQ holders and include road, bridge, structure, and site work such as construction, repair, reconstruction, decommissioning, demolition, and stream restoration. The NAICS code is 237310 and the small business size standard is $39.5 million. This opportunity is set aside for small businesses.

View the file

Other files

File Type Posted
Amendment 2_Questions and Answers 2.docx DOCX document
Amendment 2_C1_Jackson Price Schedule_revision 2.DOCX DOCX document
Amendment 2 SF30.pdf PDF
Questions and Answers 03182020.docx DOCX document
Amendment 1_C1_Jackson Price Schedule_revision 1.DOCX DOCX document
Amendment 1 SF30.pdf PDF
C4_Jackson GP Coverage.pdf PDF
C1_Jackson Price Schedule.DOCX DOCX document
B1_Sawdust Price Schedule.docx DOCX document
C3_Jackson PlansDrawings.pdf PDF
Wage Determination.pdf PDF
RFP 1256A120R0003.pdf PDF
A3_Shawano PlansDrawings.pdf PDF
B2_Sawdust Supplemental Specifications.docx DOCX document
A1_Shawano Price Schedule.docx DOCX document
A2_Shawano Supplemental Specifications.docx DOCX document
B3_Sawdust PlansDrawings.pdf PDF
C2_Jackson Supplemental Specifications.DOCX DOCX document
A4_Shawano Ck GP Coverage.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A1_Shawano Creek Price Schedule 2 PART I - SCHEDULE OF ITEMS –Revision 1 OFFEROR NAME: ____________________________________________________________ Offeror DUNS _______________________ FR2349 over Shawano Creek Lakewood-Laona Ranger District Chequamegon-Nicolet National Forest Forest County

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum

15713

Soil Erosion & Pollution Control

Lump Sum

20304

Removal of Structure, disposal method ‘A’-remove from project

Lump Sum

20407

Select Borrow, Compaction Method 2

Cubic Yard

20415

Unsuitable Excavation

Cubic Yard

26201

Geogrid, Category 3

Square Yard

20702

Class 2-C Non Woven Separation Geotextile

Square Yard

20801

Structure Excavation

Cubic Yard

20802

Foundation Fill, 1.5” Washed Aggregate Foundation

Cubic Yard

20805

Diversion and Dewatering

Lump Sum

20855

Select Granular Backfill

Cubic Yard

25101

Placed Riprap Class IV

Cubic Yard

30103

Aggregate Base, Grading D, Compaction Method B (with Additional Shoulder Material)

Cubic Yard

60350

10’-6” Span x 5’-7” Rise Aluminum Box Culvert with Full Invert, 3N Supplemental Plates, and Toe Walls. Load Rating = HL-93

Foot

40.5

62503

Seeding, Dry Method (Including Fertilizing)

Lump Sum

62901
Erosion Control Mat Type ENS2 (or Equal)
Square Yard
80
$________
$________

Total

NOTE: There is no requirement for a bid guarantee for this task order. A payment bond will be required within 10 days of task order award. Include bond premiums under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

Directions to the Site: Shawano Creek at FR 2349: WI-32S from Laona, East on HWY C, Right on FR 2349.

Period of Performance: Complete work by September 15, 2020.

Proposed Alternate Period of Performance: ______________________________ (if you can complete the project in the time specified above, leave this blank.

Limitations: __________________________________________________________________________________ Enter any limitations affecting your offer (ie: Can only accept award of one task order due to capacity issues)

File details come from the government source that posted it. Updated .