A3_Shawano PlansDrawings.pdf

PDF 2 MB Posted

Attached to
Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Solicitation number
1256A120R0003
Issued by

About this file

This solicitation package includes plans and drawings for a road construction project on the Chequamegon-Nicolet National Forest in Wisconsin, as well as details on a related multiple award IDIQ contract opportunity. The road construction project involves replacing a culvert on National Forest System Road 2349 near Shawano Creek and includes clearing, grubbing, excavation, installation of erosion control measures, seeding and mulching. The multiple award IDIQ contract makes available up to $7 million over five years for road, bridge and general construction projects across the Chequamegon-Nicolet and other Wisconsin, Minnesota and Michigan national forests. Contemplated work includes road, trail and bridge construction and repair, as well as stream restoration, gravel pit development and general excavation. Task orders will be competed among IDIQ holders. The NAICS code is 237310 and the small business size standard is $39.5 million. This opportunity is set aside for small businesses.

View the file

Other files

File Type Posted
Amendment 2_Questions and Answers 2.docx DOCX document
Amendment 2_C1_Jackson Price Schedule_revision 2.DOCX DOCX document
Amendment 2 SF30.pdf PDF
Questions and Answers 03182020.docx DOCX document
Amendment 1_ A1_Shawano Price Schedule_revision 1.docx DOCX document
Amendment 1_C1_Jackson Price Schedule_revision 1.DOCX DOCX document
Amendment 1 SF30.pdf PDF
C4_Jackson GP Coverage.pdf PDF
C1_Jackson Price Schedule.DOCX DOCX document
B1_Sawdust Price Schedule.docx DOCX document
C3_Jackson PlansDrawings.pdf PDF
Wage Determination.pdf PDF
RFP 1256A120R0003.pdf PDF
B2_Sawdust Supplemental Specifications.docx DOCX document
A1_Shawano Price Schedule.docx DOCX document
A2_Shawano Supplemental Specifications.docx DOCX document
B3_Sawdust PlansDrawings.pdf PDF
C2_Jackson Supplemental Specifications.DOCX DOCX document
A4_Shawano Ck GP Coverage.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

PROJECT SITE

VICINITY MAP:

SHEET OF1

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 COVER SHEET

C-01 GENERAL NOTES AND QUANTITIES

C-02 DIVERSION CHANNEL

C-03 PLAN & ROAD PROFILE VIEW

C-04 CULVERT AND ROAD INSTALLATION

C-05 ROAD SECTIONS

C-06 ROAD SECTIONS

FROM THE LAKEWOOD-LAONA RANGER DISTRICT

OFFICE IN LAONA, WI, TRAVEL EAST ON US-8 E

TOWARD MILL ROAD FOR 0.2 MILES. TURN RIGHT

ONTO WI-32 S FOR 9.9 MILES. TURN LEFT ON ROGERS

ST (CTY HWY C) FOR 6.1 MILES. TURN RIGHT ONTO

FR 2349 (KNOWLES CREEK RD) FOR 2.8 MILES TO

REACH SHAWANO CK CROSSING AT FR 2349.

RECOMMENDED BY:

APPROVED:

FOREST ENGINEER DATE

DISTRICT RANGER

DATE

5/2 2/1

9 1 7:

G

RE

GO

RY

.O

RU

M

C:

\U

SE

RS

\G

RE

GO

RY

.O

RU

M\

DO

CU

ME

NT

S\

_W I\_

CU

RR

EN

T

PR

OJ

EC

TS

\S

HA

W

AN

O\

CA

D\

SH

AW

NO

CK

_U

SF

S_

ST

D_

V1 .D

W G;

SHAWANO CREEK AOP AT NFSR 2349

United States Department of Agriculture Forest Service

R9 - EASTERN REGION

CHEQUAMEGON - NICOLET NATIONAL FOREST

FOREST COUNTY

WISCONSIN

TYPICAL DETAIL

SILT FENCE

NOT TO SCALE

PLAN VIEW - FENCE TURNAROUND

NOT TO SCALE

SIDE VIEW

NOT TO SCALE

FILTER FABRIC

MATERIAL

USE STITCHED LOOPS

OVER 2"X2" POSTS

4+ IN

20+ IN.

SILT FENCE

30" (MIN.)

36" (MAX.)

POST (TYP.)

12" (MIN.)

18" (MAX.)

OPENING

20FT MIN.

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/2 2/1

9 1 7:

G

RE

GO

RY

.O

RU

M

C:

\U

SE

RS

\G

RE

GO

RY

.O

RU

M\

DO

CU

ME

NT

S\

_W I\_

CU

RR

EN

T

PR

OJ

EC

TS

\S

HA

W

AN

O\

CA

D\

SH

AW

NO

CK

_U

SF

S_

ST

D_

V1 .D

W G;

REGION 9

REGION NAME

SHAWANO CREEK

AOP AT NFSR 2349

CHEQUAMEGON-NICOLET

NATIONAL FOREST

LAKEWOOD-LAONA

RANGER DISTRICT

GENERAL NOTES,

DESIGN DATA, AND

EST. OF QUANTITIES

05/20/2019

C.ESTER, G.ORUM

G.ORUM

X.XXX

C-01

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text General Notes: 1. CONSTRUCTION SPECIFICATIONS: Standard Specifications for Construction of Roads CONSTRUCTION SPECIFICATIONS: Standard Specifications for Construction of Roads : Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14 U.S. Customary Units, and the Forest Service Supplemental Specifications, shall apply to this contract. 2. Minor amounts of clearing and grubbing are required for culvert replacement. Limbs, Minor amounts of clearing and grubbing are required for culvert replacement. Limbs, logs, & stumps may be scattered outside the clearing limits but not in wetlands/floodplain or outside of the road right of way unless agreed upon by CO, these areas shall be designated by the Forest Service. This work shall be considered incidental to Pay Item 20304-Removal. 3. Maintenance for traffic will be the responsibility of the Contractor. Road closures will Maintenance for traffic will be the responsibility of the Contractor. Road closures will be accompanied by road detours in accordance with the Manual of Uniform Traffic Control Devices (2003) guidelines. This work shall be considered to Pay Item 15101-Mobilization. 4. The Contractor is responsible for identifying, in advance, any utility conflicts, and The Contractor is responsible for identifying, in advance, any utility conflicts, and coordinating any necessary relocations. 5. Contractor shall not construct these projects during abnormally high flows. Contractor shall not construct these projects during abnormally high flows. 6. All in-stream work to be performed shall take place between May 15 and All in-stream work to be performed shall take place between May 15 and September 15. 7. The Contracting Officer shall be notified of any road closures one week prior. The Contracting Officer shall be notified of any road closures one week prior. 8. Contractor is responsible for properly disposing of old culverts off of Forest Service Contractor is responsible for properly disposing of old culverts off of Forest Service lands. 9. Culvert shall be installed in a "dry" environment. Culvert shall be installed in a "dry" environment. 10. Dewatering may be accomplished by utilizing pumping methods or by constructing a Dewatering may be accomplished by utilizing pumping methods or by constructing a lined diversion channel. 11. Top of coffer dams shall be set at an elevation of 997 feet or higher. Coffer dams Top of coffer dams shall be set at an elevation of 997 feet or higher. Coffer dams shall be constructed of non-erodable material. 12. No excavated materials shall be wasted outside of the clearing limits unless No excavated materials shall be wasted outside of the clearing limits unless Approved by the Contracting Officer. Excavated material shall not be stockpiled in the floodplain or wetlands. 13. All backfill material shall be a free-draining granular material conforming to FP-14 All backfill material shall be a free-draining granular material conforming to FP-14 Subsection 704.04. 14. Riprap shall be embedded into the embankment such that the final surface of Riprap shall be embedded into the embankment such that the final surface of riprap will be flush with surrounding embankment. 15. Seed mixture (WI DOT Mix #75): Big Bluestem, 10%; Sideoats Grama, 20%; Canada Seed mixture (WI DOT Mix #75): Big Bluestem, 10%; Sideoats Grama, 20%; Canada Wild Rye, 35%; Annual Rye, 10%; Little Bluestem, 10%; Indiangrass, 10%; Purple Prairie Clover, 4%; Black-eyed Susan, 1%: Seeding Rate: 30.49 lb. per acre. 16. All disturbed areas shall be seeded. Any disturbed areas not receiving erosion All disturbed areas shall be seeded. Any disturbed areas not receiving erosion control mat shall be mulched.

AutoCAD SHX Text

17. Pay Item 62901, Erosion Control Mat shall be type "ENS2" or equivalent. Product Pay Item 62901, Erosion Control Mat shall be type "ENS2" or equivalent. Product must be double-netted and consist of 100% organic, biodegradable netting. 18. The proposed improvements covered by these plans are in accordance with The proposed improvements covered by these plans are in accordance with AASHTO: "Geometric Design of Very Low Volume Local Roads <400 ADT (2001)."

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/2 2/1

9 1 7:

G

RE

GO

RY

.O

RU

M

C:

\U

SE

RS

\G

RE

GO

RY

.O

RU

M\

DO

CU

ME

NT

S\

_W I\_

CU

RR

EN

T

PR

OJ

EC

TS

\S

HA

W

AN

O\

CA

D\

SH

AW

NO

CK

_U

SF

S_

ST

D_

V1 .D

W G;

REGION 9

REGION NAME

SHAWANO CREEK

AOP AT NFSR 2349

CHEQUAMEGON-NICOLET

NATIONAL FOREST

LAKEWOOD-LAONA

RANGER DISTRICT

DIVERSION CHANNEL

05/20/2019

C.ESTER, G.ORUM

G.ORUM

X.XXX

C-02

VARIABLE

DEPTH

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text NOTES: 1. WIDTH OF CHANNEL SHALL BE WIDE ENOUGH TO PREVENT WIDTH OF CHANNEL SHALL BE WIDE ENOUGH TO PREVENT FLOODING AND EROSION DURING PEAK WATER FLOWS. 2. PUMPING METHODS MAY BE USED IN LIEU OF DIVERSION PUMPING METHODS MAY BE USED IN LIEU OF DIVERSION CHANNEL. IF WATER FROM DIVERSION IS MAINTAINED IN A CLEAN STATE, IT MAY BE PUMPED DIRECTLY INTO DOWNSTREAM SIDE OF STREAM. 3. DEWATERING OF CONSTRUCTION WASTEWATER NEEDS TO BE DEWATERING OF CONSTRUCTION WASTEWATER NEEDS TO BE PUMPED TO A SETTLING BASIN OR TO AN UPLAND LOCATION TO INFILTRATE INTO THE GROUND. THIS WATER CANNOT BE DISCHARGED DIRECTLY TO WATERWAYS OR WETLANDS, AND SHALL COMPLY WITH DNR 1061 TECHNICAL STANDARDS. WATER MAY BE DISCHARGED INTO AN APPROVED FILTER BAG.

AutoCAD SHX Text

2:1 SLOPE

AutoCAD SHX Text

2:1 SLOPE

AutoCAD SHX Text

FABRIC LINER

AutoCAD SHX Text

SAND BAGS OR ROCKS TO HOLD FABRIC LINER IN PLACE

HIGH WATER SURFACE

E L E

V A

T I O

N

F

E E

T

E L E

V A

T I O

N

F

E E

T

STATION (FEET)

0+50 0+75 1+00 1+25 1+50 1+75 2+00 2+25 2+50 2+75 3+00

E G

F G

E G

F G

E G

F G

E G

F G

E G

F G

E G

F G

E G

F G

E G

F G

E G

F G

E G

F G

E G

F G

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/2 2/1

9 1 7:

G

RE

GO

RY

.O

RU

M

C:

\U

SE

RS

\G

RE

GO

RY

.O

RU

M\

DO

CU

ME

NT

S\

_W I\_

CU

RR

EN

T

PR

OJ

EC

TS

\S

HA

W

AN

O\

CA

D\

SH

AW

NO

CK

_U

SF

S_

ST

D_

V1 .D

W G;

REGION 9

REGION NAME

SHAWANO CREEK

AOP AT NFSR 2349

CHEQUAMEGON-NICOLET

NATIONAL FOREST

LAKEWOOD-LAONA

RANGER DISTRICT

PLAN & ROAD

PROFILE VIEW

05/20/2019

C.ESTER, G.ORUM

G.ORUM

X.XXX

C-03

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text Survey Notes: 1. Coordinates refer to local arbitrary Coordinates refer to local arbitrary coordinates. 2. Contour interval = 1 feet. Contour interval = 1 feet. 3. Site survey was performed in May Site survey was performed in May 22, 2018 by TU survey team personnel: L. MacFarland, and G. Orum using a Total Station Setup. 4. Contractor required to verify utility Contractor required to verify utility locations prior to work.

AutoCAD SHX Text Plan Scale: 1" = 20'

AutoCAD SHX Text Point Table Point # Description Northing Easting Elevation Description Northing Easting Elevation Northing Easting Elevation Easting Elevation Elevation 101 Birch Root 4952.915' 10000.813' 997.9' Birch Root 4952.915' 10000.813' 997.9' 4952.915' 10000.813' 997.9' 10000.813' 997.9' 997.9' 102 Ash Root 5089.712' 9990.066' 998.4' Ash Root 5089.712' 9990.066' 998.4' 5089.712' 9990.066' 998.4' 9990.066' 998.4' 998.4'

AutoCAD SHX Text Extends of river

AutoCAD SHX Text Edge of road

AutoCAD SHX Text Major contour

AutoCAD SHX Text Minor contour

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text %%ULegend

AutoCAD SHX Text

EXISTING SHAWANO CK THALWEG ALIGNMENT

AutoCAD SHX Text

EXISTING APPROXIMATE CHANNEL BANK

AutoCAD SHX Text

FLOW

AutoCAD SHX Text %%UProfile View of Road CL

AutoCAD SHX Text

SILT FENCE

AutoCAD SHX Text Limits of Disturbance

AutoCAD SHX Text

LIMITS OF DISTURBANCE, NO EARTHWORK ALLOWED BEYOND LIMITS

AutoCAD SHX Text

EXISTING 59"X37" PIPE ARCH CULVERT TO BE REPLACED

AutoCAD SHX Text

PT# 101

AutoCAD SHX Text

NFSR 2349

AutoCAD SHX Text

ROAD RIGHT OF WAY

AutoCAD SHX Text

ROAD RIGHT OF WAY

AutoCAD SHX Text

PT# 102

AutoCAD SHX Text 10'-6"x5'-7" ALBC STA: 1+52 INVERT ELEV: 992.5-FT

AutoCAD SHX Text

EXISTING 59"X37" PIPE ARCH CULVERT TO BE REPLACED

AutoCAD SHX Text

40.5-FT LONG ALUMINUM BOX CULVERT 10'-6" SPAN X 5'-7" RISE

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

CONSTRUCT LEFT AND RIGHT BANK TO NARROW CHANNEL

AutoCAD SHX Text

REALIGN UPSTREAM CHANNEL TO CREATE A SINGLE THREAD

AutoCAD SHX Text

CLASS 4 RIPRAP UP TO ELEVATION 997-FT

AutoCAD SHX Text

EXISTING CENTERLINE

FINAL CENTERLINE

TYPICAL SECTION

PROPOSED ROAD

NOT TO SCALE

8.0'8.0'

TYPICAL SECTION

PROPOSED ROAD

NOT TO SCALE

E L E

V A

T I O

N

F

E E

T

STATION (FEET)

1+25 1+50 1+75 2+00 2+25 2+50

SUPPLEMENTAL PLATE

INVERT

NOT TO SCALE

3N

X 0.100" THICK

18N WIDE

X 0.100" THICK

CULVERT INSTALLATION

CL STA. 1+73

LOOKING DOWNSTREAM

NOT TO SCALE

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/2 2/1

9 1 7:

G

RE

GO

RY

.O

RU

M

C:

\U

SE

RS

\G

RE

GO

RY

.O

RU

M\

DO

CU

ME

NT

S\

_W I\_

CU

RR

EN

T

PR

OJ

EC

TS

\S

HA

W

AN

O\

CA

D\

SH

AW

NO

CK

_U

SF

S_

ST

D_

V1 .D

W G;

REGION 9

REGION NAME

SHAWANO CREEK

AOP AT NFSR 2349

CHEQUAMEGON-NICOLET

NATIONAL FOREST

LAKEWOOD-LAONA

RANGER DISTRICT

CULVERT AND ROAD

INSTALLATION

05/20/2019

C.ESTER, G.ORUM

G.ORUM

X.XXX

C-04

CULVERT WIDTH 3-FT3-FT

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text 40.5-FT LONG 10'-6"x5'-7" ALUMINUM BOX CULVERT WITH FULL INVERT

AutoCAD SHX Text

INVERT ELEVATION 992.5'

AutoCAD SHX Text

CLASS 4 RIPRAP

AutoCAD SHX Text

2:1 MAX

AutoCAD SHX Text

2:1 MAX

AutoCAD SHX Text

0.04 FT/FT

AutoCAD SHX Text

0.04 FT/FT

AutoCAD SHX Text

6-IN (COMPACTED DEPTH) CRUSHED GRAVEL SURFACE COURSE

AutoCAD SHX Text

2:1 MAX

AutoCAD SHX Text

EXISTING CHANNEL BOTTOM

AutoCAD SHX Text

EXISTING ROAD CENTERLINE ELEVATION 1000.2'

AutoCAD SHX Text

FLOW

AutoCAD SHX Text

SURVEYED WATER SURFACE

AutoCAD SHX Text

2-FT TOE WALL TO PREVENT SCOUR

AutoCAD SHX Text CLASS 2-C NON-WOVEN SEPARATION GEOTEXTILE WRAP FULLY UNDER STONE AND EMBEDDED UNDER CULVERT 3-FT MINIMUM, TYP

AutoCAD SHX Text

GEOGRID, 6-INCH LIFT SPACING

AutoCAD SHX Text

NEW ROAD SURFACE ELEVATION

AutoCAD SHX Text

INVERT EL=992.5'

AutoCAD SHX Text

GEOGRID, 6-INCH LIFT SPACING

AutoCAD SHX Text

CULVERT SHALL SUPPORT A MINIMUM OF 1.4-FT OF COVER AND MAXIMUM OF 5-FT OF COVER

AutoCAD SHX Text

CLASS 2-C NON-WOVEN SEPARATION GEOTEXTILE EMBEDDED UNDER BOX 3-FT MINIMUM, TYP

AutoCAD SHX Text

SUPPLEMENTAL PLATE 3N

AutoCAD SHX Text

FINISHED ROAD CENTERLINE ELEVATION 1000.6'

AutoCAD SHX Text

SURVEYED DEPTH OF REFUSAL

CLASS 2-C NON-WOVEN SEPARATION GEOTEXTILE

20.3, 992.5-20.2, 992.5

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/2 2/1

9 1 7:

G

RE

GO

RY

.O

RU

M

C:

\U

SE

RS

\G

RE

GO

RY

.O

RU

M\

DO

CU

ME

NT

S\

_W I\_

CU

RR

EN

T

PR

OJ

EC

TS

\S

HA

W

AN

O\

CA

D\

SH

AW

NO

CK

_U

SF

S_

ST

D_

V1 .D

W G;

REGION 9

REGION NAME

SHAWANO CREEK

AOP AT NFSR 2394

CHEQUAMEGON-NICOLET

NATIONAL FOREST

LAKEWOOD-LAONA

RANGER DISTRICT

ROAD SECTIONS

05/20/2019

C.ESTER, G.ORUM

G.ORUM

X.XXX

C-05

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text -4.00%

AutoCAD SHX Text -4.00%

AutoCAD SHX Text -4.00%

AutoCAD SHX Text -4.00%

AutoCAD SHX Text 2:1

AutoCAD SHX Text 2:1

AutoCAD SHX Text -4.00%

-4.00%

DRAWING TITLE

DRAWN

DESIGNER

CHECKED

ARCHIVE NO.

DATE

PROJECT NO.

DWG SHEET NO.

OFSHEET

United States Department of Agriculture Forest Service

5/2 2/1

9 1 7:

G

RE

GO

RY

.O

RU

M

C:

\U

SE

RS

\G

RE

GO

RY

.O

RU

M\

DO

CU

ME

NT

S\

_W I\_

CU

RR

EN

T

PR

OJ

EC

TS

\S

HA

W

AN

O\

CA

D\

SH

AW

NO

CK

_U

SF

S_

ST

D_

V1 .D

W G;

REGION 9

REGION NAME

SHAWANO CREEK

AOP AT NFSR 2349

CHEQUAMEGON-NICOLET

NATIONAL FOREST

LAKEWOOD-LAONA

RANGER DISTRICT

ROAD SECTIONS

05/20/2019

C.ESTER,G.ORUM

G.ORUM

X.XXX

C-06

AutoCAD SHX Text

PROJECT NAME

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text V

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text C

AutoCAD SHX Text U

AutoCAD SHX Text L

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text -4.00%

AutoCAD SHX Text -4.00%

AutoCAD SHX Text -4.00%

-4.00%

2020-02-06T13:09:27-0600
MARK BEUNING

File details come from the government source that posted it. Updated .