This letter provides coverage under a statewide general permit for a culvert replacement project in Shawano Creek in the Town of Wabeno, Forest County, Wisconsin. The municipality has certified that the project meets eligibility criteria for general permit WDNR-GP2-2017 to construct, reconstruct or maintain highways, bridges, arches and culverts. The project involves replacing a culvert on Knowles Creek Road/Forest Road 2349 over Shawano Creek. The permit is valid for 5 years and authorizes 900 square feet of wetland fill. It constitutes the state's water quality certification and natural heritage inventory review found no likely impact to protected species. The municipality must implement erosion control measures, avoid work in waterways from September 15 to May 15, and follow protocols for bats and swallows.

This federal contract opportunity posting is for multiple road and general construction indefinite delivery/indefinite quantity contracts on the Chequamegon-Nicolet National Forest over 5 years with a maximum value of $7 million. Work includes road, bridge, structure and site construction and repair. Task orders will be competed among IDIQ holders and may include signs; trails; road decommissioning; buildings; bridges; culverts; stream restoration; gravel pits; excavation; and septic systems. The NAICS code is 237310 and the small business set-aside size standard is $39.5 million. The solicitation will be available on or around February 26, 2020 on this website.

View the file

Other files

File Type Posted
Amendment 2_Questions and Answers 2.docx DOCX document
Amendment 2_C1_Jackson Price Schedule_revision 2.DOCX DOCX document
Amendment 2 SF30.pdf PDF
Questions and Answers 03182020.docx DOCX document
Amendment 1_ A1_Shawano Price Schedule_revision 1.docx DOCX document
Amendment 1_C1_Jackson Price Schedule_revision 1.DOCX DOCX document
Amendment 1 SF30.pdf PDF
C4_Jackson GP Coverage.pdf PDF
C1_Jackson Price Schedule.DOCX DOCX document
B1_Sawdust Price Schedule.docx DOCX document
C3_Jackson PlansDrawings.pdf PDF
Wage Determination.pdf PDF
RFP 1256A120R0003.pdf PDF
A3_Shawano PlansDrawings.pdf PDF
B2_Sawdust Supplemental Specifications.docx DOCX document
A1_Shawano Price Schedule.docx DOCX document
A2_Shawano Supplemental Specifications.docx DOCX document
B3_Sawdust PlansDrawings.pdf PDF
C2_Jackson Supplemental Specifications.DOCX DOCX document
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

November 14, 2019 GP-NO-2019-21-T03984

RE: Coverage under the wetland and waterway statewide general permit for municipalities to construct, reconstruct or maintain highways, bridges, arches and culverts, located in the Town of Wabeno, Forest County.

Dear Mr. Ester:

Thank you for submitting an application for coverage under the wetland and waterway statewide general permit for municipalities to construct, reconstruct or maintain highways, bridges, arches and culverts,

30.206. Please note, additional permitting information can be found by following the hyperlinks throughout the electronic version of this document.

Project Description USFS Town cooperative culvert replacement. Knowles Creek Rd./ Forest Rd 2349 at Shawano Creek.

You have certified that your project meets the eligibility criteria and conditions for this activity. Based upon your signed certification you may proceed with your project. Please take this time to re-read the permit eligibility standards and conditions. The eligibility standards can be found on your application checklist or in the statewide general permit, WDNR-GP2-2017. The permit conditions are attached to this letter.

You are responsible for meeting all general permit eligibility standards and permit conditions. This includes notifying the Department before starting the project, and submitting photographs within one week of project completion. Please note your coverage is valid for 5 years from the date of the department’s determination or until the activity is completed, whichever occurs first.

Wetlands According to the project information submitted, 900 square feet of wetland fill will occur. This permit coverage constitutes the state of Wisconsin’s wetland water quality certification under USCS s. 1341 (Clean Water Act s. 401).

Endangered Resources The Natural Heritage Inventory (NHI)* was reviewed. It is unlikely the proposed project will negatively impact protected species or critical habitat.

Waterway BMPs This reach of Shawano Creek is a cold water trout stream. Therefore, culvert replacement work should not take place between September 15 and May 15th, both dates inclusive.) This construction BMP minimizes impacts to fish and other aquatic organisms during sensitive time periods such as spawning, winter dormancy, and migration.

Inspections The Department conducts routine inspections and may follow up to inspect your project to verify compliance with state statutes and codes. If you decide to modify your project, please contact your local Department Transportation Liaison to discuss any proposed modifications.

State of Wisconsin

DEPARTMENT OF NATURAL RESOURCES

107 Sutliff Avenue Rhinelander, WI 54501-3349 wisconsin.gov Printed on

Recycled Paper dnr.wi.gov

Tony Evers, Governor Preston D. Cole, Secretary

Telephone 608-266-2621 Toll Free 1-888-936-7463

TTY Access via relay - 711 http://dnr.wi.gov/topic/Sectors/documents/Transportation/WDNR-GP2-2017FINAL.pdf http://dnr.wi.gov/topic/Sectors/documents/Transportation/WDNR-GP2-2017FINAL.pdf

Federal & Local Permitting The municipality is responsible for obtaining any local, state or federal permits that may be required before starting your project.

If you have any questions regarding the contents of this letter, please call me at or email .

Sincerely, Jon Simonsen WDNR Transportation Liaison

WDNR-GP2-2017 Permit Conditions – Local Roads, Bridges, Arches, Culverts

You agree to comply with the following conditions:

1. Application. You shall submit a complete application package to the Department as outlined in Section 2 of this permit. If requested, you shall furnish the Department, within a reasonable timeframe, any information the department needs to verify compliance with the terms and conditions of this permit.

2. Certification. Acceptance of general permit WDNR-GP2-2017 and efforts to begin work on the activities authorized by this general permit signifies that you have certified the project meets all eligibility standards outlined in Section 1 of this permit and that you have read, understood and have agreed to follow all terms and conditions of this general permit.

3. Project Plans. This permit does not authorize any work other than what is specifically described in the notification package and plans submitted to the Department and you certified is in compliance with the terms and conditions of WDNR-GP2-2017.

4. Reliance on Applicant’s Data. The determination by this office that a confirmation of authorization is not contrary to wetland water quality standards will be based upon the information provided by the applicant and any other information required by the DNR.

5. Expiration. This WDNR-GP2-2017 is valid for a period of 5 years from the date of issuance. Any activity that the department determines is authorized by WDNR-GP2-2017 remains authorized under WDNR-GP2-2017 for a period of 5 years from the date of the department’s determination or until the activity is completed, whichever occurs first, regardless of whether WDNR-GP2-2017 expired before the activity is completed.

6. Project Start. You must notify the department using the information provided on the confirmation of coverage letter you receive before starting any activity and again not more than 5 days after each activity is completed.

7. Permit Posting. You must post a copy of this permit at a conspicuous location on the project site for at least 5 days prior to the project starting, and the copy must remain posted on the project site at least five days after the project is complete. You must also have a copy of the permit and approved plan available at the project site at all times until the project is complete.

8. Permit Compliance. The department may modify or revoke coverage of this permit if it is not constructed in compliance with the terms and conditions of this permit, or if the department determines the project will be detrimental to the public interest or water quality standards. Any act of noncompliance with this permit constitutes a permit violation and is grounds for enforcement action. Additionally, if any conditions of this permit are found to be invalid or unenforceable, authorization for all activities to which that condition applies is denied.

9. Construction Timing. Once waterway work below the OHWM commences, all construction activities in those waterways must be continuous until the work is completed and the site is stabilized. Once wetland work commences, all construction activities in those wetlands must be continuous to the extent practicable. During periods of inactivity in wetlands, the site must be made stable until the work is resumed and completed.

10. Construction. No other portion of the wetland or waterway may be disturbed beyond the area designated in the submitted plans.

11. Project Completion. Within one week of project completion you shall submit to the DNR Transportation Liaison a statement certifying project is in compliance with all the terms and conditions of this permit and photographs of the activities authorized by this permit.

12. Proper Maintenance. You must maintain the activity authorized by WDNR-GP2-2017 in good condition and in conformance with the terms and conditions of this permit, and must avoid additional impacts to waterways and wetlands. Remove accumulated brush, debris or other obstructions that are trapped in or underneath the structure regularly.

13. Site Access. Upon reasonable notice, you shall allow access to privately owned area of the site to any department employee who is investigating the project’s construction, operation, maintenance or permit compliance the terms and conditions of WDNR-GP2-2017 and applicable laws.

14. Erosion and Sediment Control Practices. The project site must implement erosion and sediment control measures that adequately control or prevent erosion, and prevent damage to waterways and wetlands as outlined in Wis. Admin. Code s. NR 151.11(6m). These standards can be found at the following website:

http://dnr.wi.gov/topic/Stormwater/standards/const_standards.html. Any area where topsoil is exposed during the project should be immediately seeded and mulched to stabilize disturbed areas and prevent soils from being eroded and washed into the waterway.

Note: If the project includes any grading, excavation or land-disturbance activity in excess of one acre, you may also need to receive coverage under a Construction Site Stormwater Permit in addition to this permit. Contact the DNR Transportation Liaison to determine the need for additional review.

15. Bats. There are four species of bats listed as Threatened in Wisconsin including one species that is Federally Threatened. As a result, bridge work shallow follow the protocols listed in the Broad Incidental Take Permit and Authorization for Wisconsin Cave Bats.

16. Swallows. Swallows may nest under bridges. Nesting swallows are protected under the Migratory

Bird Treaty Act. The nesting season for swallows has been established as April 20 through August http://dnr.wi.gov/topic/Stormwater/standards/const_standards.html http://dnr.wi.gov/topic/Stormwater/standards/const_standards.html http://dnr.wi.gov/topic/stormwater/construction/ http://dnr.wi.gov/topic/stormwater/construction/ http://dnr.wi.gov/topic/Sectors/documents/transportation/Liaisons.pdf http://dnr.wi.gov/topic/Sectors/documents/transportation/Liaisons.pdf http://dnr.wi.gov/topic/ERReview/Documents/BatConservationPlan.pdf http://dnr.wi.gov/topic/ERReview/Documents/BatConservationPlan.pdf http://dnr.wi.gov/topic/ERReview/Documents/BatConservationPlan.pdf http://dnr.wi.gov/topic/ERReview/Documents/BatConservationPlan.pdf

30. The need for a US Fish and Wildlife Service depredation permit may be avoided by removing the existing bridge superstructure prior to nest occupation by swallows, and clearing the nests from and installing a suitable netting device on the remaining existing superstructure prior to nesting activity to prevent the swallows from nesting.

17. Contaminated Sites. The department provides an on-line database of contaminated sites, called the Contaminated Lands Environmental Action Network (CLEAN). You must check the site to see if a hazardous substance release has been reported in your project area, and if there has been a release, contact DNR before submitting your application for WDNR-GP2-2017.

18. Asbestos. Any bridge or culvert that is not wood, metal, glass or fiberglass may contain asbestos.

DNR must be notified by the Asbestos removal and notification forms 10 days before the demolition of any existing structure, which may contain asbestos.

19. Hazardous Sites. You must determine if there are any Environmental Repair and Solid Waste disposal sites may be within the project boundaries by checking the Historic Registry of Waste Disposal Sites. You must check the site to see if a hazardous substance release has been reported in your project area, and if there has been a release, contact DNR before submitting your application for WDNR-GP2-2017.

20. Invasive Species. To stop the spread of invasive species and viruses from one navigable waterway to another navigable waterway, all equipment or portions of equipment used for constructing, operating, or maintaining the project, including tracked vehicles, barges, boats, silt or turbidity curtains, hoses, sheet piles, and pumps, must be decontaminated for invasive species and viruses before and after use or prior to use within another navigable waterway. Follow the most recent department approved washing and disinfection protocols and Department approved best management practices to avoid the spread of invasive species as outlined in Wis. Admin. Code NR

40. These protocols and practices can be found on the department website at http://dnr.wi.gov/topic/Invasives/bmp.html Keyword: “equipment operator” or “invasive bmp” and at http://dnr.wi.gov/topic/Invasives/documents/EquipOper.pdf

21. Wetland protection. You shall not store any vegetation, material, or equipment in wetlands. The project will be constructed in a manner that will maintain wetland hydrology in the remaining wetland complex.

22. Temporary fills. Any temporary fills must be removed in their entirety and the affected areas returned to their preexisting elevation and vegetated.

23. Federal and State Threatened and Endangered Species. WDNR-GP2-2017 does not affect the DNR’s responsibility to insure that all authorizations comply with Wisconsin’s Endangered Species Law (s. 29.604 Wis. Stats) and Section 7 of the Federal Endangered Species Act. No DNR authorization under this permit will be granted for projects found not to comply with these laws/Acts. In order to be in compliance, documentation is required showing Endangered Resources (ER) concerns have been addressed. Please note: Documents associated with Endangered Resources are valid one year from the date they are prepared. Documentation options include:

a. An ER Review Verification Form showing that the project is covered by the Broad

Incidental Take Permit for no/low impact activities and therefore does not require a review.

http://dnr.wi.gov/topic/Brownfields/WRRD.html http://dnr.wi.gov/topic/Brownfields/WRRD.html http://dnr.wi.gov/topic/Demo/Asbestos.html http://dnr.wi.gov/topic/Demo/Asbestos.html http://dnr.wi.gov/topic/Landfills/registry.html http://dnr.wi.gov/topic/Landfills/registry.html http://dnr.wi.gov/topic/Landfills/registry.html http://dnr.wi.gov/topic/Landfills/registry.html http://dnr.wi.gov/topic/Invasives/bmp.html http://dnr.wi.gov/topic/Invasives/bmp.html http://dnr.wi.gov/topic/Invasives/documents/EquipOper.pdf http://dnr.wi.gov/topic/Invasives/documents/EquipOper.pdf http://dnr.wi.gov/topic/erreview/ http://dnr.wi.gov/topic/erreview/ http://dnr.wi.gov/topic/erreview/ http://dnr.wi.gov/topic/erreview/ http://dnr.wi.gov/files/PDF/forms/1700/1700-079.pdf http://dnr.wi.gov/files/PDF/forms/1700/1700-079.pdf http://dnr.wi.gov/topic/ERReview/ITNoLowImpact.html http://dnr.wi.gov/topic/ERReview/ITNoLowImpact.html http://dnr.wi.gov/topic/ERReview/ITNoLowImpact.html http://dnr.wi.gov/topic/ERReview/ITNoLowImpact.html

b. An ER Preliminary Assessment from the NHI Public Portal stating that no further actions are necessary or that further actions are recommended. The NHI Public Portal is located here: http://dnr.wi.gov/topic/ERReview/PublicPortal.html.

c. If the ER Preliminary Assessment from the NHI Public Portal shows that “Further actions are required” then submit one of the following:

a. A DNR ER Review letter. The request form for an ER Review letter is located here:

http://dnr.wi.gov/files/PDF/forms/1700/1700-047fillable.pdf.

b. A Certified ER Review letter. The list of Certified Reviewers is available here:

http://dnr.wi.gov/topic/ERReview/Documents/CertifiedReviewers.pdf.

24. Special Concern Species. If the Wisconsin National Heritage Inventory lists a known special concern species to be present in the project area you will take reasonable activities to prevent significant adverse impacts and/or to enhance the habitat for the species of concern.

25. Historic Properties and Cultural Resources. WDNR-GP2-2017 does not affect the DNR’s responsibility to ensure that all authorizations comply with Section 106 of the National Historic Preservation Act and Wis. Stats. s. 44.40. No department authorization under this permit will be granted for projects found not to comply with these laws. The project must avoid impacts to archaeological sites or historic structures and is subject to departmental and Wisconsin Historical Society review and approval before authorization under this general permit is valid. Information on the location and existence of historic resources can be obtained from the State Historic Preservation Office and the National Register of Historic Places. If cultural, archaeological, or historical resources are unearthed during activities authorized under this permit, work must be stopped immediately and the State Historic Preservation Officer must be contacted for further instruction.

26. Preventive Measures. Measures must be adopted to prevent potential pollutants from entering a wetland or waterbody. Construction materials and debris, including fuels, oil, and other liquid substances, may not be stored in the construction work area in a manner that would allow them to enter a wetland or waterbody as a result of spillage, natural runoff, or flooding. In addition, if feasible, biodegradable hydraulic fluid should be used in equipment that is operated below the Ordinary High Water Mark. If a spill of any potential hazardous substance should occur, it is the responsibility of the permittee to remove such material, minimize any contamination resulting from this spill, and immediately notify the State Duty Officer at 1-800-943-0003.

27. Suitable Fill Material. All fill authorized under this permit shall be free from hazardous substances as defined by Wis. Stats. §. 289.01(11), free from solid waste as defined by Wis. Stats § 289.01(11) and (33), and must consist of clean, suitable soil as defined by Wis. Admin. Code NR 500.03(214). Fill to create public road bed may consist of rock, gravel and sand, where appropriate.

28. Standards for Coverage. Wetland impacts from the project will cause only minimal adverse environmental impacts as determined by the department.

29. Transfers. Coverage under this permit is not transferable to any person or entity unless the project has already been completed at the time of transfer.

http://dnr.wi.gov/topic/ERReview/PublicPortal.html http://dnr.wi.gov/topic/ERReview/PublicPortal.html http://dnr.wi.gov/files/PDF/forms/1700/1700-047fillable.pdf http://dnr.wi.gov/files/PDF/forms/1700/1700-047fillable.pdf http://dnr.wi.gov/topic/ERReview/Documents/CertifiedReviewers.pdf http://dnr.wi.gov/topic/ERReview/Documents/CertifiedReviewers.pdf

The municipality is responsible for obtaining any local, state or federal permits that may be required before starting your project.
The municipality is responsible for obtaining any local, state or federal permits that may be required before starting your project.
If you have any questions regarding the contents of this letter, please call me at or email .
If you have any questions regarding the contents of this letter, please call me at or email .
WDNR-GP2-2017 Permit Conditions – Local Roads, Bridges, Arches, Culverts
WDNR-GP2-2017 Permit Conditions – Local Roads, Bridges, Arches, Culverts