Amendment 1_C1_Jackson Price Schedule_revision 1.DOCX
DOCX document 16 KB Posted
- Solicitation number
- 1256A120R0003
About this file
This document includes a price schedule and statement of work for a road construction project on the Chequamegon-Nicolet National Forest in Wisconsin. The project involves replacing a culvert on Jackson Creek at Forest Road 374, and includes line items for mobilization, construction staking, erosion control, clearing and grubbing, removal of an existing culvert, structure excavation, riprap installation, aggregate base installation, corrugated steel pipe arch installation, seeding and mulching. Bids are due by September 15, 2020. This project is related to a multiple award IDIQ contract for road and general construction projects on the Chequamegon-Nicolet National Forest over the next five years with a maximum value of $7 million. The scope of work under the IDIQ includes road, bridge, structure and site construction, repair, and restoration. The contract is set aside for small businesses with a NAICS code of 237310 and size standard of $39.5 million.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2_Questions and Answers 2.docx | DOCX document | |
| Amendment 2_C1_Jackson Price Schedule_revision 2.DOCX | DOCX document | |
| Amendment 2 SF30.pdf | ||
| Questions and Answers 03182020.docx | DOCX document | |
| Amendment 1_ A1_Shawano Price Schedule_revision 1.docx | DOCX document | |
| Amendment 1 SF30.pdf | ||
| C4_Jackson GP Coverage.pdf | ||
| C1_Jackson Price Schedule.DOCX | DOCX document | |
| B1_Sawdust Price Schedule.docx | DOCX document | |
| C3_Jackson PlansDrawings.pdf | ||
| Wage Determination.pdf | ||
| RFP 1256A120R0003.pdf | ||
| A3_Shawano PlansDrawings.pdf | ||
| B2_Sawdust Supplemental Specifications.docx | DOCX document | |
| A1_Shawano Price Schedule.docx | DOCX document | |
| A2_Shawano Supplemental Specifications.docx | DOCX document | |
| B3_Sawdust PlansDrawings.pdf | ||
| C2_Jackson Supplemental Specifications.DOCX | DOCX document | |
| A4_Shawano Ck GP Coverage.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1_Jackson Creek Price Schedule Schedule of Items ROAD 374 JACKSON CREEK CROSSING REPLACEMENT-Revision 1 Chequamegon-Nicolet National Forest Bayfield County WI
| ITEM # |
| DESCRIPTION |
| UNIT |
| UNIT COST |
| QUANTITY |
| TOTAL |
| 151.01 |
| MOBILIZATION & BONDING |
| LS |
| 152.01 |
| CONSTRUCTION STAKING |
| LS |
| 157.01 |
| SOIL EROSION & POLLUTION CONTROL |
| LS |
| 201.01 |
| CLEARING & GRUBBING |
| ACRE |
0.5
| 203.01 |
| REMOVAL OF EXISTING CULVERT |
| EACH |
| 209.01 |
| STRUCTURE EXCAVATION |
| YD³ |
| 251.01 |
| RIPRAP CLASS 3 |
| YD³ |
| 302.01A |
| MINOR CRUSHED AGGREGATE- COMMERCIAL SOURCE |
| YD³ |
| 602.01 |
| 10 GAUGE CORRUGATED STEEL POLYMER COATED PIPE ARCH |
| FOOT |
46.5
| 625.01 |
| SEED AND MULCH (DRY METHOD) |
| ACRE |
0.5
TOTAL
Contractor Name ____________________________________ DUNS ___________________________ NOTE: There is no requirement for a bid guarantee for this task order. A payment bond will be required within 10 days of task order award. Include bond premiums under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
Directions to the Site: Jackson Creek at FR 374: WI-77W from Glidden, North on HWY M, NW on FR 191, North on HWY D, Left on FR 374 Period of Performance: Complete work by September 15, 2020.
Proposed Alternate Period of Performance: ______________________________ (if you can complete the project in the time specified above, leave this blank.
Limitations: __________________________________________________________________________________ Enter any limitations affecting your offer (ie: Can only accept award of one task order due to capacity issues)