WayneNF_ForestryIDIQ_Pre-Proposal_Mtg.pdf
PDF 6 MB Posted
- Attached to
- Forestry Vegetation Management Treatment Federal contract opportunity
- Solicitation number
- 1255N920R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q_A.docx | DOCX document | |
| Amendment 1.pdf | ||
| Microsoft_TEAMS_Screen-shots.docx | DOCX document | |
| Attachment 2_QAP.pdf | ||
| Attachment 5_Herbicide Daily Log.pdf | ||
| Attachment 11_Technical Approach.pdf | ||
| Attachment 9_Wage Determination.pdf | ||
| Attachment 4_Sample Task Order.pdf | ||
| Attachment 1_SOW.pdf | ||
| Attachment 10_Experience.pdf | ||
| Attachment 3_Maps.pdf | ||
| Attachment 6_Notice of Herbicide Spraying.pdf | ||
| 1255N920R0001.pdf | ||
| Attachment 8_Trees Planted in an Unsatisfactory Manner.pdf | ||
| Attachment 7_How to Plant Forest Tree Seedlings.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Forest Service
Eastern Region
Wayne National Forest Forestry Vegetation Management Treatment
IDIQ Contract
Wayne NF
Estimate
IDIQ Acreage Estimates for Base Year
Eastern Region
Estimates for Base Year Contract Base Year
Tree Planting 5
Site Prep-Herbicide 459
Site Prep-Manual 345
MSC-Manual/Chainsaw 250
MSC-Herbicide 226
Crop Tree-Herb (sapl) 309
CTR-Chainsaw 0
Estimated Location of Treatments over 5 Year IDIQ
Eastern Region
Estimated Percentage of Work by WNF Management Unit
Athens Marietta Ironton Acres
Tree Planting 0% 10% 90% 309
Site Prep-Herbicide 0% 0% 100% 1,782
Site Prep-Manual 36% 8% 56% 1,306
MSC-Manual/Chainsaw 77% 0% 23% 1,616
MSC-Herbicide 0% 0% 100% 1,692
Crop Tree-Herb (sapl) 0% 0% 100% 309
CTR-Chainsaw 100% 0% 0% 100
Percentage of Work by Unit 26% 2% 72% 7,115
Harvest Types on the Wayne NF
• Even-Age Management
• Clearcut w/Reserves: Hardwood
• Clearcut-White pine
• Oak Shelterwood Regime
• Prep Cut: Pre-commercial:
• Prep Cut: Commercial:
• Release Cut:
• Final Cut:
• Uneven-Age Management
• Heavy Single Tree Selection
(Historic Forest)
• Group Selection
Even-age Harvests
Hardwood Clearcut w/ Reserves or Oak-Two-Aged Cut White Pine Clearcut
Oak Shelterwood-Preparatory Cut (Thinning)
Oak Shelterwood-Release Cut Native Pine Shelterwood
Uneven-age Harvests
Historic Forest Heavy Selection with Group Selection Openings Mixed In
Prescribed Burns
Question Break
1.5 Treatment Methods and Specifications
Eastern Region
• 1.5.1: Hack n’ Squirt
• 1.5.2 Basal Bark
• 1.5.3 Cut Stem
• 1.5.4 Foliar
• 1.5.5 Manual
• 1.5.6 Tree Planting USFS publication NRS-GTR-96;
https://www.nrs.fs.fed.us/pubs/gtr/gtr_nrs96.pdf https://www.nrs.fs.fed.us/pubs/gtr/gtr_nrs96.pdf
1.5.1 Hack n’ Squirt Treatment
Eastern Region
• One hack per inch of diameter.
• Spaced injections, 1 to 2 inches apart.
• Herbicides: triclopyr, imazapyr, glyphosate (w/ imazapyr mix)
• Timing: Best applied June 15 to November 1st
1.5.2 Basal Bark Treatment
Eastern Region
• Follow label directions for low volume basal spray method
• Treat stems up to 5 inch basal diameter
• Spray lower 12-15 inches above ground line
• Timing: dormant or growing season, but above freezing
• Herbicides: triclopyr, imazapyr
1.5.3 Cut Stem (Stump) Treatment
Eastern Region
• Stumps: 6” or less
• High stumps allowed on <2” DRC trees.
• Timing: Best applied June 15 to November 1.
• Herbicides: triclopyr, imazapyr, glyphosate
1.5.4 Foliar Spray Treatment
Eastern Region
• For undesirable; stumps, re-sprouts & small trees <6 ft.
tall.
• Timing: Typically May 1 to early October.
• Herbicides: triclopyr, imazapyr, glyphosate
1.5.5 Manual Slashdown Treatment
Eastern Region
• Stumps: 6” or less.
• Slash trees to the ground, eliminating hangups.
• General Timing and Slash Disposal: Variable by Task Order and Scheduled Line Item.
• Site Prep and Midstory: Preferred Late April-Early
October to reduce sprouting
• Crop Tree: Year round
1.5.6 Tree Planting (Manual)Treatment
Eastern Region
• Timing: Typical late February to early April (March).
• Quantity Variable by Task Order and Scheduled Line Item.
• If contractors have required minimums, please explain on
Technical Proposal
• Communication key for delivery and daily exchange of trees
• Tree Storage:
• Forest Service is planning to rent a semi-reefer cooler
• Contractor must keep trees shaded and cool
Proposed Treatment Timing Schedule
Estimated Location of Treatments over 5 Year IDIQ
Eastern Region
Estimated Percentage of Work by WNF Management Unit
Athens Marietta Ironton Acres
Tree Planting 0% 10% 90% 309
Site Prep-Herbicide 0% 0% 100% 1,782
Site Prep-Manual 36% 8% 56% 1,306
MSC-Manual/Chainsaw 77% 0% 23% 1,616
MSC-Herbicide 0% 0% 100% 1,692
Crop Tree-Herb (sapl) 0% 0% 100% 309
CTR-Chainsaw 100% 0% 0% 100
Percentage of Work by Unit 26% 2% 72% 7,115
Site Prep Treatments
Eastern Region
• 2.1: Site Preparation for Natural or Artificial Regeneration
• Following a variety of harvest treatments, use herbicide or chainsaw to treat stems 1” at ground (basal diameter) and up to 8 inches DBH.
• 2.1.1: Site Prep: Manual Slashdown- Chainsaw
• 2.1.2: Site Prep: Herbicide by “Agreed To” Method (Hack ‘n’ Squirt, Cut Stem/Stump, Basal, Foliar)
• Herbicide includes spraying stumps/sprouts of undesirables cut or damaged during harvest.
Site Prep Condition Examples
Historic Forest/Shelterwood Release Type Cut: Spur A Timber Sale
Historic Forest/Shelterwood Release Type Cut: Wolcott Timber Sale
Historic Forest/Shelterwood Release Type Cut: Wolcott Timber Sale
White Pine Clearcut: Beech Grove Timber Sale
White Pine Clearcut: Beech Grove Timber Sale
White Pine Clearcut : Iron Point Timber Sale
Midstory Control Treatments
Eastern Region
• 2.2: Midstory Control
• Typically a pre-harvest treatment.
• Use herbicide or chainsaw to fell or treat stems 1” at ground (basal diameter) and up to 8 inches DBH.
Midstory Control Treatments
Eastern Region
• 2.2: Midstory Control
• Can occur following a light, thinning harvest or a prescribed burn.
• Conditions following harvesting or burning can greatly reduce small stem numbers.
Midstory Control: Manual Slashdown
Eastern Region
• 2.2.1: Midstory manual slashdown by chainsaw/mechanical
• 2.2.2: Midstory manual slashdown by chainsaw/mechanical, with Slash Treatment
• Follows slash guidelines in Section 1.4.5.
• 2.2.3: Midstory Herbicide - Application by “Agreed To” Method (Hack ‘n’ Squirt, Cut Stem/Stump, Basal, Foliar).
• Typically hack n’ squirt method is recommended.
• If post thinning, can also include foliar to spray stumps/sprouts of undesirables cut or damaged during harvest.
Midstory Control: Herbicide
Midstory Control Condition Examples
Long Ridge Project Area-Athens Unit
Pine Creek Project Area-Ironton Unit
Ironton Unit
Crop Tree Release Treatments
Eastern Region
• 2.3 and 2.4: Crop Tree Release (CTR)
• Seedling/Sapling vs Sapling/Pole size classes
• Manual Slashdown vs Herbicide
CTR Seedling/Sapling Treatments
Eastern Region
• 2.3 and 2.4: Crop Tree Release: Seedling/Sapling
• Treat w/in 4 ft. radius from base of the crop tree.
• Treat grapevines threatening crop tree
• Manual Slashdown or Herbicide
• Herbicide: Hack/Squirt and Foliar most commonly recommended treatment
CTR-Seedling/Sapling Condition Examples
Pine Creek Project Area- Ironton Unit
CTR-Seedling/Sapling Condition Examples
Pine Creek Project Area- Ironton Unit
CTR: Sapling/Pole Treatments
Eastern Region
• 2.3 and 2.4: Crop Tree Release: Sapling/Pole
• Treat all stems competing with;
• the upper ½ of crown AND
• w/in 6 ft. radius from outer edge of the crop tree crown.
• Treat grapevines threatening crop trees
• Manual Slashdown or Herbicide
• Herbicide: Hack/Squirt most commonly recommended treatment.
• Incorporate manual slashdown on multiple stem trees
CTR-Sapling/Pole Condition Examples
CTR-Sapling/Pole Treatment Examples
Work Previously Completed: Pine Creek Project Area-Ironton Unit
CTR-Sapling/Pole Treatment Examples
Work Previously Completed: Pine Creek Project Area-Ironton Unit
Pine Creek Project Area-Ironton Unit
Tree Planting: Pine
Eastern Region
• 2.5: Bare Root Pine Seedlings
• 2.6: Containerized Pine Seedlings
• Anticipating planting shortleaf and pitch pine.
• Sites may be site prep burned prior
• WNF will be determining if we want to have pine seedlings grown as;
• bare root (bagged or boxed) OR
• containerized (loose, boxed)
• Preferences?
Tree Planting: Hardwood
Eastern Region
• 2.7: Bare Root Hardwood Seedlings
• Planting at various densities using extended bars or spade shovels
• Locations To Be Determined: Possibility for hardwood supplemental plantings to enrich natural regeneration.
• Typically hard mast species, but could be others.
Fireline Construction
Eastern Region
• Use chainsaws, leaf blowers, and hand tools (rakes, etc.) to construct fireline.
• Cut trees and brush 6 feet width, exposing 4 feet to bare mineral soil within center of corridor.
• Cut vegetation 8 feet above the corridor.
• Timing: Variable, but timed with other ongoing task orders in the general vicinity.
• AQL:
• 90% of the specified distance is satisfactorily constructed.
• Brush is scattered, not piled
IDIQ Acreage Estimates for Base Year
Eastern Region
Estimates for Base Year Contract Base Year
Tree Planting 5
Site Prep-Herbicide 459
Site Prep-Manual 345
MSC-Manual/Chainsaw 250
MSC-Herbicide 226
Crop Tree-Herb (sapl) 309
IDIQ Acreage Considerations
Eastern Region
• Is your firm adaptable if we receive money sooner than we expect?
• Not required, but apprise us in your Technical Approach submittal
Estimates for Base Year Contract Base Year
Tree Planting 5
Site Prep-Herbicide 459
Site Prep-Manual 345
MSC-Manual/Chainsaw 400
MSC-Herbicide 1300
Crop Tree-Herb (sapl) 309
Sample Task Order
• Questions specific to this example?
1.6 Herbicide
Eastern Region
• Follow label directions
• Tap water or non-petroleum based oil carriers
• Use dye to track progress
• State of Ohio Commercial Pesticide Applicator Licensing is Required (Core, 4A)
• Record keeping: Daily Log required to meet AQL’s
• Post signs at obvious entrance areas to treatment unit
Safety
Eastern Region
• Safety Plan Outlines actions
• A part of the Technical Approach submission
• Report All Accidents To CO within 24 hours
• Herbicides: Take preventative measures for personnel, clothing, transportation, handling, mixing, and spills.
• Spill Prevention & Cleanup Plan: Approved by COR prior to starting work.
• Spills: Prevent off-site movement or entering waterways.
• Follow cleanup measures in 40CFR117
1.9 Communication
Eastern Region
• Key to success on the overall IDIQ and every Task Order.
• Review all correspondence and specifications and reach out to COR for clarification.
• Provide regular notifications of work locations and status of completion.
• Correspond with email and phone
• Contracting Officer Representative (COR) and Contracting Officer (CO) are the Government representatives for every Task Order.
• Contractor representative and COR will review special conditions or areas prior to treatment implementation.
Inspections
Eastern Region
• Normal business hours, but exceptions are allowed
• Discuss with COR prior to the start of the Task Order
• Conducted by COR and possibly assistant(s)
• Timely for all treatments
• Visual and Plot Based Methods
• Randomly Distributed throughout unit
Herbicide Inspections
Eastern Region
• Herbicide treatments need three weeks during growing season for AQL evidence of kill.
• Early Growing Season and Dormant Season Inspections must wait to at least June 1st to be inspected.
• Dormant season herbicide: Consideration for partial payment (50%) if meets AQL
• Based on visual verification of dye
• Inspections within one week of full completion of at least one treatment unit of a Task Order line item.
Acceptable Quality Limits
Eastern Region
• Meet or exceed target kill rate (90%)
• Do not exceed kill to non-targets;
• 5%: Hack n’ Squirt, Cut Stem/Stump, Slashdown, Planting, Fireline
• 15%: Basal bark and Foliar
• Herbicide Daily Herbicide Logs :
• Must turn in completed prior to or at invoicing.
Submitting Bids to this IDIQ
Eastern Region
• Offer: SF1449
• Cost Proposal: Schedule of Items
• Technical Proposal
• Attachment #10: Experience / Past Performance Questionnaire
• Attachment #11: Technical Approach
• FAR 52.204-24: Representation Regarding Certain
Telecommunications and Video Surveillance Services or Equipment
• FAR 52.2.2-3: Offeror Representations ad Certifications – Commercial
Items
• Workforce Certification
• Be Registered in DUNS and SAM
Submitting Bids to this IDIQ
Eastern Region
• Carrie Edwards: carrie.edwards@usda.gov
• Offers or modification of offers received at the address specified for the receipt of offers after the exact time specified for receipt of offers are late and will not be considered.
• Completed packages should be received by 4:00 p.m., EST on June 3, 2020 at the following address:
mailto:carrie.edwards@usda.gov
Final Exam
Thank You For Your Time Today
Any Last Questions?