Atach 5 Supplemental Specs
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
Supplemental Specifications to
Region 6 Trail Specifications (7/05)
Section 901- Abbreviations, Acronyms, and Terms
901.01 (b) Abbreviations and Acronyms pcf Change square to cubic
905 Control of Material Add the following:
Rock Source – Commercial source shall be approved by the CO. Submit rock samples for CO’s approval.
906.02 Determination of Quantities
Unless otherwise specified, measure when the work is in place, complete, and accepted.
Section 906 Measurement and Payment
906.06 Scope of Payment. Payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule.
(a) Direct payment. Payment is provided directly under a pay item shown in the bid schedule when one of the following applies:
(1) The work is measured in the Measurement Subsection of the Section ordering the work, and the bid schedule contains a pay item for the work from the Section ordering the work.
(2) The Measurement Subsection, of the Section ordering the work, references another Section for measuring the work and the bid schedule contains a pay item for the work from the referenced Section.
(b) Indirect payment. Work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid schedule. This includes instances when the Section ordering the work references another Section for performing the work and the work is not referenced in the Measurement Subsection of the Section ordering the work.
Compensation provided by the pay items included in the contract bid schedule is full payment for performing all contract work in a complete and acceptable manner. All risk, loss, damage, or expense arising out of the nature or execution of the work is included in the compensation provided by the contract pay items.
Work measured and paid for under one pay item will not be paid for under any other pay item.
Limit pay quantities to the quantities staked, ordered, or otherwise authorized before performing the work. Payment will be made for the actual quantities of work performed and accepted or material furnished according to the contract. No payment will be made for work performed in excess of that staked, ordered, or otherwise authorized.
912.10 Basis
Add the following PAY ITEMS / PAY UNITS:
| 912 (16) Rolling dip | mi |
| 912 (17) Grade dip | EA |
| 912 (18) Grade dip | mi |
915.01 Work.
At the end of the sentence add:
trees and logs.
915.08 Drainage.
In the first sentence, after “drainage”, add:
in accordance with Section 991
In the second sentence, change 923 to 991.07
915.11 Switchbacks.
Change 914 to 990.
915.12 Waterbars.
Change 922 to 991.
915.13 Turnpikes.
Change 913 to 989.
915.15 Reshaping and Finishing Trailbed and Backslopes
Add the following section:
915.15A Road to Trail Conversion This work consists of restoring cross drainage and relocating trail tread within the existing road bed as shown on drawing 915-3. Includes clearing, removing slough and berm, borrow, filling ruts and troughs, reshaping backslopes, excavation, reshaping trail tread, restoring drainage and other trail structures, constructing check dams, and removing protruding rocks, roots, stumps, slough, and berms.
915.17 Basis
Add the following PAY UNITS:
915 (05) Trail Restoration mi
933.08 Pinned Stairway
In the second sentence, change ¾” to 1”
941.01 Work
Add:
| This work includes backfilling structures with crushed aggregate when suitable on-site material is | |
| not available. Backfill shall be any of the following gradations as directed by the CO: | |
| Grade D (crusher run) | |
| Block material | |
| Chat | |
| Grade 10 | |
| Grade 57 | |
| Grade 3 |
Add the following Section:
Section 917 – Trail Construction
Description
917.01 Work. Work consists of constructing trail as marked on the ground in accordance with Sections 911, 912, and 914.
Materials
917.02 Requirements. Use materials specified in Sections 911, 912 and 914.
Construction
Construct trail as shown on drawings for Sections 911, 912 and 914.
Section 937 - Rock Masonry Construction
Description
937.01 Work. Work consists of furnishing and constructing rock masonry structures including stone masonry walkways, rock culverts, rock retaining walls, and stone veneer. Work shall include excavation and backfill.
Materials
937.02 Requirements. Use materials meeting the requirements of the following subsections:
905 – Control of Materials
Masonry cement shall comply with ASTM C-91 and ASTM C-270, Type N, S, or M.
Construction
Do not mix brands or types.
All masonry work shall be uniform and built to dimensions, and pattern as indicated on the drawings.
Joints shall be 3/8" min to 1 ¼” max width, tooled concave.
All rocks shall be "buttered" on all contact surfaces with mortar.
| 1. Tight, full mortar joints shall be placed between concrete and masonry. |
| 2. There shall be full mortar coverage of the rock faces in both horizontal and vertical joints. |
All exposed wall surfaces shall be kept clean and free of mortar or concrete splotches.
| 1. Walls and all joints shall be pointed and masonry cleaned. |
| 2. Completed walls shall be cleaned with a detergent cleaner containing no muriatic acid. |
No placing of masonry shall be done in freezing weather.
In hot or dry weather, the masonry shall be protected from the sun and shall be kept wet for a period of three days after completion.
Masonry Cement - Shall be delivered in unbroken bags and stored above ground under cover.
Add the following Section:
Section 938 – Treated Timber Bridge
Description
938.01 Work. The work consists of constructing treated timber bridges, including sills, bulkheads, rails, curbs, decking, excavation, backfill, and approach fills as SHOWN ON THE DRAWINGS and DESIGNATED ON THE GROUND.
Materials
938.02 Requirements. Use materials meeting the requirements of Section 962.
Construction
938.03 General. Construct treated timber bridges at location SHOWN ON THE DRAWINGS or DESIGNATED ON THE GROUND. Pre-drill holes for fasteners when necessary to prevent splitting. Use oversized steel washers with bolts and as SHOWN ON THE DRAWINGS.
938.04 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912.
938.05 Sills. Construct sills at each end of the span AS SHOWN ON DRAWINGS and in the location staked on the ground.
938.06 Stringers. Connect blocking, stringers, and rail posts AS SHOWN ON DRAWINGS.
938.07 Decking. Decking shall be attached AS SHOWN ON DRAWINGS.
938.08 Curbs. Curbing is required on both sides when called for in Schedule of Items. Install as SHOWN ON DRAWINGS.
931.09 Handrails. Railing is required when called for in Schedule of Items. Rails shall be spliced with a diagonal butt joint at a post location. Use 4x4 rail posts, 2x6 railing cap, 2x4 railing. Connect blocking, stringers, and rail posts as SHOWN ON DRAWINGS. Finish handrails and posts smooth and free from splinters and sharp projections.
938.10 Approach Fills. Construct the approach fills with compacted suitable material.
Measurement
938.11 Method. Measure the quantities in accordance with Section 906.
Payment
938.12 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
Make payment under:
PAY ITEM PAY UNIT
938 (01) Treated Timber Bridge EA
938 (02) Treated Timber Bridge LS
938 (03) Treated Timber Bridge LF
938 (04) Approach Fills LF
Section 945 –Hardening with Interlocking Articulated Concrete Block system (ACB)
Description
945.01 Work. The work consists of furnishing and installing ACB units, including excavation, backfilling, and geosynthetics. Install in accordance with the manufacturer’s instructions. ACB is NOT intended for slope stabilization.
Materials
945.02 Requirements. Use materials meeting the requirements of Sections 961, 962, and 964.
Construction
945.03 Excavation and Embankment. Perform excavation and embankment in accordance with Section 912.
945.04 Site Preparation. All slopes and the ground must be stable before ACB can be installed. Ground shall be well compacted. ACB system is not intended for installation on slopes steeper than 2H:1V.
Before placing either the concrete block system or the under-laying filter fabric, the ground shall be inspected to insure that it is free from obstructions, such as tree roots projecting stones or other foreign matter. Voids or soft areas should be filled with suitable material and well compacted. Although some variation in contour will be permitted, no sudden changes in level can be accepted. The maximum difference in level between any cuts will be 1.5”. Hand dress where necessary.
945.05 Installation. The entire perimeter of the cellular concrete block system shall be turned into, and buried beneath the adjacent ground level to a depth of not less than three (3) feet, or as specified in the Task Order. Any junction with other structures shall be made as noted on drawings, but shall always provide a permanent soil-tight joint to prevent the migration of soil between the structures, grouting if necessary. Protrusions such as culverts, piles, or trees may be facilitated by hand placing blocks around the obstruction and grouting as required.
Penetrations through the block system may be made by omitting sufficient blocks to provide space for the penetration. It will be necessary to provide extra filter fabric in the form of a tightly fitting flange around the pipe or device so that it may be overlaid with the erosion control system filter fabric. (Minimum overlap 18".) Any voids around the penetration should be filled with grout and floated smooth.
If specified in Task Order, dress installation with top soil and apply fertilizer and seed with native grass as approved by the Contracting Officer. If the Task Order does not indicate that revegetation is required, then dress with suitable soil as approved by the Contracting Officer.
945.06 Geotextile Specifications. Filter Fabric: The cellular concrete block system shall be laid over a plastic filter fabric if called for in the Task Order, as specified 964.
945.07 Trenching.
Install anchor trenches (key, toe, and lateral trench protection) as required for a stable installation. See manufacture’s installation instructions.
Upon completion of installation, all key, toe, and lateral trenches should be backfilled.
Measurement
945.08 Method. Measure the quantities in accordance with Section 906.
Payment
945.09 Basis. Pay for the accepted quantities in accordance with Section 906 at the contract unit price for each PAY ITEM SHOWN IN THE SCHEDULE OF ITEMS.
Make payment under:
PAY ITEM PAY UNIT
945 (01) Hardening with ACB, Type___ SF
945 (02) Hardening with ACB, Type___ LF
954.10 Basis
Add the following PAY UNIT:
954 (09) Obliteration mi
983.04 Basis
983 (02) Danger Tree Removal mi
984.04 Basis
Add the following PAY UNIT:
984 (02) Loose Rock Removal mi
985.04 Basis
Add the following PAY UNIT:
985 (02) Rock and Root Removal mi
988.04 Basis
Add the following PAY UNIT:
988 (03) Slough and Berm Removal mi
990.04 Basis
990 (03) Maintain Switchbacks mi
991.10 Basis
991 (07) Maintain Grade Dips mi
Section 992 – Rock Retaining Wall
992.04 Method Change meter to foot
992.05 Basis
PAY ITEM
992(01) Rock Retaining Wall Change LF to SF
ATTACHMENT 5