Atch_1B__-_Brown_Mtn_OHV_Estimate-Bid_Schedule.xlsx

XLSX spreadsheet 24 KB Posted

Attached to
Trail Maintenance and Constrcution IDIQ
Solicitation number
12467018R0077
Issued by

About this file

Atch 1 B Brown Mtn Schedule of Items

View the file

Other files

File Type Posted
scan0070.pdf PDF
Atch_1A__-_Star_Gap_Trail_Map.pdf PDF
Atch_1_D_-_Badin_OHV_Trail_Map.pdf PDF
Atch_1B_-_Brown_Mtn_OHV_SOW-Trail_Log.doc DOC document
ATCCH_1C__-_Larry-Helen-Woodrun_SOW-Trail_Log.docx DOCX document
Atch_1A_-_Star_Gap_SOW-Trail_Log.docx DOCX document
ATCH_1C_-_Larry-Helen-Woodrun_Estimate-Bid_Schedule.xlsx XLSX spreadsheet
Atch_1C_-_Woodrun_Map.pdf PDF
Atch_1C_-_Larry-Helen_Map.pdf PDF
ATch_1A_-_Star_Gap_Estimate-Bid_Schedule.xlsx XLSX spreadsheet
Atch_1_D_-_Badin_OHV_Estimate-Bid_Schedule.xls XLS spreadsheet
Atch_1B_-_Brown_Mtn_Map_Map.pdf PDF
Atch_1_D_-_Badin_OHV_SOW-Trail_Log.docx DOCX document
Atch_1C_-_Woodrun_Trail_Bridge_Dwgs.pdf PDF
TR_IDIQ_Att3_General_Specs.docx DOCX document
18R0077_Body.rtf RTF text file
18R0077_SF1449.doc DOC document
Attachment_2_DOL_Wage_Rates.pdf PDF
TR_IDIQ_Att5_Supplemental_Specs.docx DOCX document
TR_IDIQ_Att8_Experience_Questionnaire_and_PPQ.doc DOC document
TR_IDIQ_Att6_Drawings.pdf PDF
TR_IDIQ_Att7_Design_Parameters.pdf PDF
ATTACHMENT_1_General_Information.docx DOCX document
TR_IDIQ_Att4_Customary_Specs.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eng Estimate

Trail IDIQ - TASK ORDER - ENGINEER'S ESTIMATE
Base Bid #1 - Brown Mountain Trail #1A, TRBM-1A; STA. 192+76 to STA. 270+86
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
915, 991, 983, 954.03, 955Trail Maintenance - Existing Trail Restoration, Drainage Maintenance, Danger Tree Removal, Obliteration by brushing in, Erosion ControlAQLF7,810
954.05Obliteration earthworkAQLF350
985Rock ChiselingAQSF25
TOTAL BASE BID #1:$0
Base Bid #2 - Brown Mountain Trail #1B, TRBM-1B; STA. 0+00 to STA. 74+21
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
915, 991, 983, 954.03, 955Trail Maintenance - Existing Trail Restoration, Drainage Maintenance, Danger Tree Removal, Obliteration by brushing in, Erosion ControlAQLF7,421
954.05Obliteration earthworkAQLF400
985Rock ChiselingAQSF100
TOTAL BASE BID #2:$0
Base Bid #3 - Brown Mountain Trail #10, TRBM-10; STA.0+00 to 12+30
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
915, 991, 983, 954.03, 955Trail Maintenance - Existing Trail Restoration, Drainage Maintenance, Danger Tree Removal, Obliteration by brushing in, Erosion ControlAQLF1,230
944ACB-Block ArmoringAQSF1,375
TOTAL BASE BID #3:$0

TOTAL BASE BIDS: $0

Option Bid - Brown Mountain Trails #1A, #1B, and #10
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
941Rip rap - NCDOT Class AAQTON100$0
TOTAL OPTION BID:$0

TOTAL BASE + OPTION BIDS: $0

Bid Schedule

Trail IDIQ - TASK ORDER - BID SCHEDULE
Base Bid #1 - Brown Mountain Trail #1A, TRBM-1A; STA. 192+76 to STA. 270+86
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
915, 991, 983, 954.03, 955Trail Maintenance - Existing Trail Restoration, Drainage Maintenance, Danger Tree Removal, Obliteration by brushing in, Erosion ControlAQLF7,810
954.05Obliteration earthworkAQLF350
985Rock ChiselingAQSF25
TOTAL BASE BID #1:
Base Bid #2 - Brown Mountain Trail #1B, TRBM-1B; STA. 0+00 to STA. 74+21
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
915, 991, 983, 954.03, 955Trail Maintenance - Existing Trail Restoration, Drainage Maintenance, Danger Tree Removal, Obliteration by brushing in, Erosion ControlAQLF7,421
954.05Obliteration earthworkAQLF400
985Rock ChiselingAQSF100
TOTAL BASE BID #2:
Base Bid #3 - Brown Mountain Trail #10, TRBM-10; STA.0+00 to 12+30
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
915, 991, 983, 954.03, 955Trail Maintenance - Existing Trail Restoration, Drainage Maintenance, Danger Tree Removal, Obliteration by brushing in, Erosion ControlAQLF1,230
944ACB-Block ArmoringAQSF1,375
TOTAL BASE BID #3:

TOTAL BASE BIDS:

Option Bid - Brown Mountain Trails #1A, #1B, and #10
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
941Rip rap - NCDOT Class AAQTON100
TOTAL OPTION BID:

TOTAL BASE + OPTION BIDS:

Payment for all contract work is provided, either directly or indirectly, under the pay items shown in the bid schedule. Work for which direct payment is not provided is a subsidiary obligation of the Contractor. Payment for such work is indirectly included under other pay items shown in the bid shedule.

&D

File details come from the government source that posted it.