Atch 1C Larry Helen Woodrun Schedule of items

View the file

Other files for this federal contract opportunity

Other files attached to Trail Maintenance and Constrcution IDIQ, newest first.
File Type Posted
scan0070.pdf PDF
Atch_1B_-_Brown_Mtn_OHV_SOW-Trail_Log.doc DOC document
Atch_1_D_-_Badin_OHV_Trail_Map.pdf PDF
Atch_1B__-_Brown_Mtn_OHV_Estimate-Bid_Schedule.xlsx XLSX spreadsheet
ATCCH_1C__-_Larry-Helen-Woodrun_SOW-Trail_Log.docx DOCX document
Atch_1C_-_Woodrun_Map.pdf PDF
Atch_1_D_-_Badin_OHV_SOW-Trail_Log.docx DOCX document
Atch_1C_-_Woodrun_Trail_Bridge_Dwgs.pdf PDF
Atch_1A__-_Star_Gap_Trail_Map.pdf PDF
Atch_1A_-_Star_Gap_SOW-Trail_Log.docx DOCX document
Atch_1C_-_Larry-Helen_Map.pdf PDF
ATch_1A_-_Star_Gap_Estimate-Bid_Schedule.xlsx XLSX spreadsheet
Atch_1_D_-_Badin_OHV_Estimate-Bid_Schedule.xls XLS spreadsheet
Atch_1B_-_Brown_Mtn_Map_Map.pdf PDF
18R0077_SF1449.doc DOC document
TR_IDIQ_Att5_Supplemental_Specs.docx DOCX document
TR_IDIQ_Att8_Experience_Questionnaire_and_PPQ.doc DOC document
TR_IDIQ_Att6_Drawings.pdf PDF
ATTACHMENT_1_General_Information.docx DOCX document
TR_IDIQ_Att4_Customary_Specs.pdf PDF
TR_IDIQ_Att3_General_Specs.docx DOCX document
18R0077_Body.rtf RTF text file
Attachment_2_DOL_Wage_Rates.pdf PDF
TR_IDIQ_Att7_Design_Parameters.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Eng Estimate

Trail IDIQ - TASK ORDER - WOOD RUN TRL EXT. ENGINEER'S ESTIMATE
Base Bid 1 - Wood Run Trail Extension #396 STA. 00+00 to STA. 47+23
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
981, 982, 983Work items on Trail Maintenance & Construction sections to include: Brush Cutting, Logging Out, Danger Tree Removal, Erosion Control (includes dual trail length)AQMile0.94
915, 991Existing 8 ft. wide trail tread maintenance / restoration (includes 8 ft. wide crowned tread grading with on-site soil, ditches, grade dips, etc.)AQLF919
9413 ft. wide Stone Layer -imported aggregate armoringAQLF402
9413 ft. wide Crowned Turnpike / No Excavation (imported soil-aggregate turnpike)AQLF831
9413 ft. wide Crowned Turnpike (imported soil-aggregate turnpike)AQLF263
911, 9122 ft. wide new trail construction (includes dual trail length)AQLF2,552
935Crib wall - on-site rockAQSF15
TOTAL BASE BID 1:$0
Option Bid 1 - Wood Run Trail Bridge
Special Project Specs & DwgsBridge, including 30 LF turnpiked approachesAQLS1
TOTAL BASE 1 + OPTION 1 BID:$0
Trail IDIQ - TASK ORDER -HELEN'S LOOP & LARRY'S LINK TRLS ENGINEER'S ESTIMATE
Base Bid 2 - Larry's Link Trail: TR711 STA. 0+00 to 32+91
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
912, 915, 981, 982,983, 985, 988, 991Tread Maintenance - including tread & drainage restoration, turnpike construction, brushing & clearing, logging out, danger tree removal, erosion controlAQmile0.62
944Armoring of trail tread at stream approaches - ACB with GeotextileAQSF100
912Imported suitable soil for tread restoration & turnpike constructionAQCY110
941Imported #57 stone for turnpike constructionAQTon8
TOTAL Base 2:$0
Base Bid 3 - Helen's Loop Trail: TR712A STA. 0+00 to 43+84
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
912, 915, 916,981, 982,983, 985, 988, 991Tread Maintenance - including tread & drainage restoration, turnpike construction, brushing & clearing, logging out, danger tree removal, erosion controlAQmile0.83
912Imported suitable soil for tread restoration & turnpike constructionAQCY170
941Imported #57 stone for turnpike constructionAQTon25
TOTAL Base 3:$0

TOTAL BASE BIDS 2&3: $0

Option Bid 2 - Helen's Loop Trail: TR712B STA. 0+00 to 19+07
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
912, 915, 981, 982,983, 985, 988, 991Tread Maintenance - including tread & drainage restoration, clearing & brushing, road to trail conversion, logging out, danger tree removal, erosion controlAQmile0.36
TOTAL Option Bid 2:$0

TOTAL BASE 2&3 and OPTION BID 2: $0

TOTAL ALL BASE BIDS: $0

TOTAL ALL OPTION BIDS: $0

TOTAL ALL BIDS: $0

Bid Schedule

Trail IDIQ - TASK ORDER - WOOD RUN TRL EXT. BID SCHEDULE
Base Bid 1 - Wood Run Trail Extension #396, STA. 00+00 to STA. 47+23
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
981, 982, 983Work items on Trail Maintenance & Construction sections to include: Brush Cutting, Logging Out, Danger Tree Removal, Erosion Control (includes dual trail length)AQMile0.94
915, 991Existing 8 ft. wide trail tread maintenance / restoration (includes 8 ft. wide crowned tread grading with on-site soil, ditches, grade dips, etc.)AQLF919
9413 ft. wide Stone Layer -imported aggregate armoringAQLF402
9413 ft. wide Crowned Turnpike / No Excavation (imported soil-aggregate turnpike)AQLF831
9413 ft. wide Crowned Turnpike (imported soil-aggregate turnpike)AQLF263
911, 9122 ft. wide new trail construction (includes dual trail length)AQLF2,552
935Crib wall - on-site rockAQSF15
TOTAL BASE BID 1:
Option Bid 1 - Wood Run Trail Bridge
Special Project Specs & DwgsBridge, including 30 LF turnpiked approachesAQLS1
TOTAL BASE 1 + OPTION 1 BID:
Trail IDIQ - TASK ORDER -HELEN'S LOOP & LARRY'S LINK TRLS BID SCHEDULE
Base Bid 2 - Larry's Link Trail: TR711 STA. 0+00 to 32+91
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
912, 915, 981, 982,983, 985, 988, 991Tread Maintenance - including tread & drainage restoration, turnpike construction, brushing & clearing, logging out, danger tree removal, erosion controlAQmile0.62
944Armoring of trail tread at stream approaches - ACB with GeotextileAQSF100
912Imported suitable soil for tread restoration & turnpike constructionAQCY110
941Imported #57 stone for turnpike constructionAQTon8
TOTAL Base 2:
Base Bid 3 - Helen's Loop Trail: TR712A STA. 0+00 to 43+84
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
912, 915, 916,981, 982,983, 985, 988, 991Tread Maintenance - including tread & drainage restoration, turnpike construction, brushing & clearing, logging out, danger tree removal, erosion controlAQmile0.83
912Imported suitable soil for tread restoration & turnpike constructionAQCY170
941Imported #57 stone for turnpike constructionAQTon25
TOTAL Base 3:

TOTAL BASE BID 2&3:

Option Bid 2 - Helen's Loop Trail: TR712B STA. 0+00 to 19+07
ITEM NO.DESCRIPTIONMEASUREUNITQuantityUnit PriceTOTALS
912, 915, 981, 982,983, 985, 988, 991Tread Maintenance - including tread & drainage restoration, clearing & brushing, road to trail conversion, logging out, danger tree removal, erosion controlAQmile0.36
TOTAL Option Bid 2:

TOTAL BASED BIDS 2 & 3 AND OPTION BID 2:

TOTAL ALL BASE BIDS:

TOTAL ALL OPTION BIDS:

TOTAL ALL BIDS: