This is a Schedule of Items pricing template for the AFD Visitor Center Remodel project (Solicitation 1240LU26Q0022) located in Missoula, Montana. The document outlines base construction work and four optional line items with associated quantities, unit costs, and total costs for bidding purposes.
Base items total $299,760.00 and include: demolition work (sidewalk drainage, masonry openings, interior demo); framing for interior wall assemblies and furr walls ($17,420.00); windows and doors including exterior doors and various interior door sizes ($7,720.00); HVAC systems with furnace, ductwork, controls, and testing ($94,010.00); electrical upgrades totaling $175,760.00 covering metering, service upgrades, distribution panels, receptacles, lighting, exterior pole lights, fire alarm system, and ICT upgrades for IT and access control; plumbing systems with fixtures and water treatment ($99,606.00); restroom interior improvements including grab bars, ceiling, wall repair, and fiberglass panels ($5,200.00); and interiors with floor finish, wall base, wall finish, wood ceiling work, and a vertical stair lift ($25,000.00). Optional items include Option 1 (civil work with sidewalk, seating, landscaping, and exterior restoration), Option 2 (windows/doors storefront recreation and interior improvements), Option 3 (fire tower removal and storage), and Option 4 (landmark signage). The schedule was updated on March 9, 2026, with a question deadline of March 11, 2026, and site visits scheduled for February 27, 2026 at 11:00 MT.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| QTY | UNIT | UNIT COST | ITEM TOTAL COST | |||
| BASE ITEMS | ||||||
| 1 | DEMOLITION | Sidewalk for drainage | 20 | SY | $0.00 | |
| Openings in existing masonry Walls General Building | 84 | SF | $0.00 | |||
| Interior Demo | 3200 | SF | $0.00 |
| 2 | FRAMING | Wall Assembly- Interior | 550 | SF | $5.90 | $3,245.00 |
| Wall Assembly Furr Wall | 2700 | SF | $5.25 | $14,175.00 |
| 3 | WINDOWS/ DOORS | Exterior Doors | 1 | EA | ||
| Cased Openings @ Ext wall | 4 | EA | $300.00 | $1,200.00 | ||
| Interior 32"x7 doors | 2 | EA | $800.00 | $1,600.00 | ||
| Interior 3x7 doors | 6 | EA | $820.00 | $4,920.00 |
| 4 | HVAC ESTIMATE | HVAC Demo | 3960 | SF | $2.50 | $9,900.00 |
| Furnace, Ductwork, ref.piping, CA&V, gas piping | 3960 | SF | $19.75 | $78,210.00 | ||
| Controls, Start-up | 1 | EA | $3,500.00 | $3,500.00 | ||
| Testing, Adjusting, Balancing | 1 | EA | $2,400.00 | $2,400.00 |
| 4 | ELECTRICAL | Metering of existing facility | 1 | Sys | $6,000.00 | $6,000.00 |
| Electrical service upgrade | 1 | Sys | $12,500.00 | $12,500.00 | ||
| Electrical distribution panels upgrade | 1 | Sys | $30,000.00 | $30,000.00 | ||
| Receptacles | 3960 | SF | $4.00 | $15,840.00 | ||
| Lighting fixtures and controls | 3960 | SF | $13.00 | $51,480.00 | ||
| Exterior pole lights for parking area | 3 | EA | $4,800.00 | $14,400.00 | ||
| Fire alarm system upgrade | 3960 | SF | $5.00 | $19,800.00 | ||
| ICT upgrades (IT) | 3960 | SF | $3.50 | $13,860.00 | ||
| ICT upgrades (Access Control) | 3960 | SF | $3.00 | $11,880.00 | ||
| $175,760.00 | ||||||
| 5 | PLUMBING | Plumbing Demo | 3960 | SF | $2.00 | $7,920.00 |
| Fixtures, Dom.water, Waste & Vent, Insulation | 3960 | SF | $22.85 | $90,486.00 | ||
| Water Treatment | 1 | EA | $1,200.00 | $1,200.00 |
| 6 | RESTROOM INTERIOR | Grab Bars | 2 | EA | $250.00 | $500.00 |
| Interior ACT Ceiling & Grid | 320 | SF | $5.00 | $1,600.00 | ||
| Repair wall @ fixture demo | 300 | SF | $5.00 | $1,500.00 | ||
| Demo Fixtures | 5 | EA | $200.00 | $1,000.00 | ||
| New Fiberglass Reinforced Panels | 160 | SF | $3.75 | $600.00 |
| 7 | INTERIORS | Floor Finish | 3960 | SF | $0.00 | |
| Rubber Wall Base | 1000 | LF | $0.00 | |||
| Wall Finish | 4000 | SF | $0.00 | |||
| Wood Ceiling Reseal/clean | 1600 | SF | $0.00 | |||
| Vertical Stair Lift | 1 | EA | $25,000.00 | $25,000.00 | ||
| $25,000.00 | ||||||
| BASE ITEMS TOTAL |
| OPTION #1 | ||||
| 0001A | CIVIL | New Sidewalk @ Front New seating @ Front | 110 | LF |
| Seeding & Fertilizing w/ new landscaping | 2 | EA | ||
| Perforated pipe & underground drainage | 20 | LF | ||
| Remove and replace walk at rear of building | 20 | 4454 | ||
| Irrigation system |
| EXTERIOR | Façade Restoration/Paint | 1900 | SF |
| Wood Column and Beam Exterior surface prep | 325 | SF | |
| Column Restoration & Paint | 2 | EA | |
| Roof Leak Repair Work | 1 | LS | |
| Screening @ Mech Elec | 25 | LF | |
| Misc. Exterior Caulking & Touch-Up | 1 | LS | |
| Window Exterior Prep & Paint | 120 | SF |
OPTION 1 TOTAL
| 0002A | OPTION #2 | |||
| WINDOWS/DOORS | Storefront- Recreate Leaf Pattern Fiber Glass sidelites | 65 | SF | |
| Exterior Entry doors - new entry way | 1 | EA |
| INTERIORS | Countertop | 15 | LF |
| Front Desk w/ Casework | 15 | LF | |
| New GWB @ confrence room | 1 | LS |
OPTION 2 TOTAL
| 0003A | OPTION #3 | |||
| FIRE TOWER | Fire Tower Removal and Storage | 1 | EA |
OPTION 3 TOTAL
| 0004A | OPTION #4 | |||
| SIGNAGE | Landmark Sign - sheet A101A | 1 | LS |
OPTION 4 TOTAL
BASE ITEMS + ALL OPTIONS TOTAL
| COMPANY |
| UEI |
| POC |
| PHONE NUMBER |
SIGNATURE