Attachment 2 UPDATED 9 March Schedule of Items.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
AFD Visitor Center Remodel Federal contract opportunity
Solicitation number
1240LU26Q0022
Issued by
Department of Agriculture Forest Service

About this file

This is a Schedule of Items pricing template for the AFD Visitor Center Remodel project (Solicitation 1240LU26Q0022) located in Missoula, Montana. The document outlines base construction work and four optional line items with associated quantities, unit costs, and total costs for bidding purposes.

Base items total $299,760.00 and include: demolition work (sidewalk drainage, masonry openings, interior demo); framing for interior wall assemblies and furr walls ($17,420.00); windows and doors including exterior doors and various interior door sizes ($7,720.00); HVAC systems with furnace, ductwork, controls, and testing ($94,010.00); electrical upgrades totaling $175,760.00 covering metering, service upgrades, distribution panels, receptacles, lighting, exterior pole lights, fire alarm system, and ICT upgrades for IT and access control; plumbing systems with fixtures and water treatment ($99,606.00); restroom interior improvements including grab bars, ceiling, wall repair, and fiberglass panels ($5,200.00); and interiors with floor finish, wall base, wall finish, wood ceiling work, and a vertical stair lift ($25,000.00). Optional items include Option 1 (civil work with sidewalk, seating, landscaping, and exterior restoration), Option 2 (windows/doors storefront recreation and interior improvements), Option 3 (fire tower removal and storage), and Option 4 (landmark signage). The schedule was updated on March 9, 2026, with a question deadline of March 11, 2026, and site visits scheduled for February 27, 2026 at 11:00 MT.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI

QTYUNITUNIT COSTITEM TOTAL COST
BASE ITEMS
1DEMOLITIONSidewalk for drainage20SY$0.00
Openings in existing masonry Walls General Building84SF$0.00
Interior Demo3200SF$0.00
2FRAMINGWall Assembly- Interior550SF$5.90$3,245.00
Wall Assembly Furr Wall2700SF$5.25$14,175.00
3WINDOWS/ DOORSExterior Doors1EA
Cased Openings @ Ext wall4EA$300.00$1,200.00
Interior 32"x7 doors2EA$800.00$1,600.00
Interior 3x7 doors6EA$820.00$4,920.00
4HVAC ESTIMATEHVAC Demo3960SF$2.50$9,900.00
Furnace, Ductwork, ref.piping, CA&V, gas piping3960SF$19.75$78,210.00
Controls, Start-up1EA$3,500.00$3,500.00
Testing, Adjusting, Balancing1EA$2,400.00$2,400.00
4ELECTRICALMetering of existing facility1Sys$6,000.00$6,000.00
Electrical service upgrade1Sys$12,500.00$12,500.00
Electrical distribution panels upgrade1Sys$30,000.00$30,000.00
Receptacles3960SF$4.00$15,840.00
Lighting fixtures and controls3960SF$13.00$51,480.00
Exterior pole lights for parking area3EA$4,800.00$14,400.00
Fire alarm system upgrade3960SF$5.00$19,800.00
ICT upgrades (IT)3960SF$3.50$13,860.00
ICT upgrades (Access Control)3960SF$3.00$11,880.00
$175,760.00
5PLUMBINGPlumbing Demo3960SF$2.00$7,920.00
Fixtures, Dom.water, Waste & Vent, Insulation3960SF$22.85$90,486.00
Water Treatment1EA$1,200.00$1,200.00
6RESTROOM INTERIORGrab Bars2EA$250.00$500.00
Interior ACT Ceiling & Grid320SF$5.00$1,600.00
Repair wall @ fixture demo300SF$5.00$1,500.00
Demo Fixtures5EA$200.00$1,000.00
New Fiberglass Reinforced Panels160SF$3.75$600.00
7INTERIORSFloor Finish3960SF$0.00
Rubber Wall Base1000LF$0.00
Wall Finish4000SF$0.00
Wood Ceiling Reseal/clean1600SF$0.00
Vertical Stair Lift1EA$25,000.00$25,000.00
$25,000.00
BASE ITEMS TOTAL
OPTION #1
0001ACIVILNew Sidewalk @ Front New seating @ Front110LF
Seeding & Fertilizing w/ new landscaping2EA
Perforated pipe & underground drainage20LF
Remove and replace walk at rear of building204454
Irrigation system
EXTERIORFaçade Restoration/Paint1900SF
Wood Column and Beam Exterior surface prep325SF
Column Restoration & Paint2EA
Roof Leak Repair Work1LS
Screening @ Mech Elec25LF
Misc. Exterior Caulking & Touch-Up1LS
Window Exterior Prep & Paint120SF

OPTION 1 TOTAL

0002AOPTION #2
WINDOWS/DOORSStorefront- Recreate Leaf Pattern Fiber Glass sidelites65SF
Exterior Entry doors - new entry way1EA
INTERIORSCountertop15LF
Front Desk w/ Casework15LF
New GWB @ confrence room1LS

OPTION 2 TOTAL

0003AOPTION #3
FIRE TOWERFire Tower Removal and Storage1EA

OPTION 3 TOTAL

0004AOPTION #4
SIGNAGELandmark Sign - sheet A101A1LS

OPTION 4 TOTAL

BASE ITEMS + ALL OPTIONS TOTAL

COMPANY
UEI
POC
PHONE NUMBER

SIGNATURE

File details come from the government source that posted it. Updated .