Attachment 10 NE concrete walk removal.pdf

PDF 331 KB Posted

Attached to
AFD Visitor Center Remodel Federal contract opportunity
Solicitation number
1240LU26Q0022
Issued by
Department of Agriculture Forest Service

About this file

This is an instructional photograph documenting concrete sidewalk removal and replacement procedures. The image shows two contractors on a residential property demonstrating the scope of work required for a concrete remediation project. The photograph identifies five key work areas marked with colored arrows: removal of non-expanded aggregate concrete (red arrows), removal of concrete at the joint line (red arrows), location of the storm drain under the removed concrete (red annotation), patching sawcuts with matching concrete (magenta arrows), and retention of the existing walk section (red annotation indicating "walk to remain"). A sawcut is visible on the right side of the image, indicating the boundary between areas to be removed and areas to remain. The visual demonstrates the technical requirements for selective concrete removal while maintaining structural integrity of remaining portions and accounting for underground drainage infrastructure during the demolition and reconstruction process.

View the file

Other files for this federal contract opportunity

Show all 21

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JeffD Line

JeffD Line

JeffD Line

JeffD Callout sawcut

JeffD Callout

REMOVE AT

JOINT LINE

JeffD Callout

REMOVE NON-EXP. AGG. CONCRETE

JeffD Arrow

JeffD Callout

WALK TO REMAIN

JeffD Text Box

PATCH SAWCUT

WITH MATCHING

CONCRET

JeffD Line

JeffD Callout

LOCATE STORM

DRAIN UNDER REMOVED

CONCRETE

File details come from the government source that posted it. Updated .