This is an instructional photograph documenting concrete sidewalk removal and replacement procedures. The image shows two contractors on a residential property demonstrating the scope of work required for a concrete remediation project. The photograph identifies five key work areas marked with colored arrows: removal of non-expanded aggregate concrete (red arrows), removal of concrete at the joint line (red arrows), location of the storm drain under the removed concrete (red annotation), patching sawcuts with matching concrete (magenta arrows), and retention of the existing walk section (red annotation indicating "walk to remain"). A sawcut is visible on the right side of the image, indicating the boundary between areas to be removed and areas to remain. The visual demonstrates the technical requirements for selective concrete removal while maintaining structural integrity of remaining portions and accounting for underground drainage infrastructure during the demolition and reconstruction process.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JeffD Line
JeffD Line
JeffD Line
JeffD Callout sawcut
JeffD Callout
REMOVE AT
JOINT LINE
JeffD Callout
REMOVE NON-EXP. AGG. CONCRETE
JeffD Arrow
JeffD Callout
WALK TO REMAIN
JeffD Text Box
PATCH SAWCUT
WITH MATCHING
CONCRET
JeffD Line
JeffD Callout
LOCATE STORM
DRAIN UNDER REMOVED
CONCRETE