Attachment 14 Smokejumper Vis Ctr - Lim Asb Insp Report.pdf
PDF 6 MB Posted
- Attached to
- AFD Visitor Center Remodel Federal contract opportunity
- Solicitation number
- 1240LU26Q0022
- Issued by
- Department of Agriculture Forest Service
About this file
This is a Limited Inspection Report for Asbestos Containing Building Materials (ACBM) conducted by Abatement Contractors of Montana (ACM) for the Smokejumper Visitor Center located at 5765 US Highway 10 West in Missoula, Montana. The inspection was performed on August 8, 2022, by James Parker (MTA-5024), a Montana Department of Environmental Quality (DEQ)-accredited asbestos inspector, and prepared for the United States Forest Service. ACM collected 63 bulk samples representing 21 homogeneous areas of suspected ACBM within the facility that will be impacted during planned renovations. Samples were analyzed by Quest Micro-Analytics Laboratory using Polarized Light Microscopy (PLM) coupled with dispersion staining and the Positive Stop method.
The inspection identified asbestos-containing materials in six categories requiring removal by accredited abatement contractors prior to demolition renovation: gypsum wall and ceiling joint compound (2% Chrysotile texture in approximately 2,400 square feet and 325 square feet respectively); fiberglass reinforced panel mastic behind urinals (3% Tremolite in approximately 40 square feet); stair tread mastic (3% Tremolite in approximately 64 square feet); boiler insulation (20% Chrysotile and 10% Amosite in approximately 30 square feet, classified as friable ACBM in significantly damaged condition); and fireplace flue insulation (60% Chrysotile in approximately 3 linear feet, classified as friable ACBM). All positive samples are highlighted in the detailed results table, with photographs and building diagrams indicating sample locations and asbestos-containing material locations provided in the appendices. The report notes that materials not discovered or specifically evaluated must be tested prior to disturbance, and vermiculite insulation is presumed to contain asbestos.
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number: IH 22-088 August 25, 2022
Abatement Contractors of Montana Specializes In:
• Asbestos Abatement
• Lead Based Paint Removal
• Historical Renovation
• General Construction & Remodel
• Asbestos Inspections
• Meth Lab Clean-up
• Industrial Hygiene
• Certification & Safety Training
Limited Inspection Report For
Asbestos Containing Building Materials
Project Number:
IH 22-088
Subject Property:
Smokejumper Visitor Center
5765 US Highway 10 West Missoula, Montana 59808
Prepared For:
United States Forest Service
2880 Skyway Drive Helena, Montana 59602
Prepared By:
Abatement Contractors of Montana
208 Commerce Street
(406) 549-8489 www.acm-contracting.com
5765 US Highway 10 West http://www.acm-contracting.com/
APPENDIX I ………………………...REPORT
APPENDIX II ………………………RESULTS
APPENDIX III …………………..DRAWINGS
APPENDIX IV …………….PHOTOGRAPHS
APPENDIX V ………………..CITY LETTER
APPENDIX I
REPORT
ABATEMENT CONTRACTORS OF MONTANA, LLC
208 Commerce St
Missoula, MT 59807 P 406-549-8489
F 406-728-9416 SPECIALTY CONSTRUCTION & ENVIRONMENTAL REMEDIATION SERVICES www.acm-contracting.com
August 25, 2022
United States Forest Service Attn: Reid Stovall 2880 Skyway Drive Phone: (406) 390-1701 Helena, Montana 59602 E-Mail: reid.stovall@usda.gov
Subject: ACM Project Number IH-22-088 Limited Asbestos Inspection
Smokejumper Visitor Center 5765 US Highway 10 West Missoula, Montana 59808
Dear Mr. Stovall:
Abatement Contractors of Montana, LLC (ACM) is pleased to provide this sampling report for a limited asbestos inspection conducted of the Smokejumper Visitor Center located at 5765 US Highway 10 West in Missoula, Montana. The asbestos inspection was performed on August 8th, 2022, by James Parker, MTA- 5024, a Montana Department of Environmental Quality (DEQ)-accredited asbestos inspector. The results of this inspection can be found in the enclosed report.
INTRODUCTION
ACM collected a total of sixty three (63) bulk samples representing twenty one (21) homogeneous areas (HA) of suspected asbestos-containing building materials (ACBM) within the Smokejumper Visitor Center that will be impacted during the planned renovation within the subject property. Any materials found to contain greater than one percent (>1%) asbestos by weight are considered to be Asbestos Containing Building Materials (ACBM). This inspection considered all accessible materials of the building and ACM’s scope of work. This inspection was limited only to the materials that were readily accessible and only included those materials based on the information provided by the client during our site visit and/or phone conversations. All samples were collected from previously damaged or inconspicuous locations to help retain the aesthetics of the building for the occupants. Although ACM’s Inspector took every effort to evaluate all of the materials that will be impacted during the renovation, it is possible that other hidden materials may exist. Therefore, any materials that have not been discovered AND have not been specifically evaluated by bulk sampling in this inspection report must be tested and evaluated for asbestos content prior to disturbance of these materials. A complete list of all samples that were collected is located in Table 1.
The detailed laboratory results are presented in Appendix II. A diagram of the building indicating where samples were collected and a map showing where any asbestos containing materials are located is enclosed within Appendix III. Photographs of materials sampled and asbestos containing materials can be found in Appendix VI. The letter to the City of Missoula to obtain the necessary work permits can be found in Appendix V.
Some of the samples tested POSITIVE for asbestos. Positive samples are highlighted in BOLD in Table 1.
SCOPE OF INSPECTION
ACM was contracted by Mr. Reid Stovall of the United States Forest Service to conduct a limited asbestos inspection for the planned renovation in the Smokejumper Visitor Center at the subject site. This inspection only focused on those materials that will be impacted during the planned renovation.
INSPECTION
http://www.acm-contracting.com/ mailto:reid.stovall@usda.gov
Inspection Number IH-22-088 Page 2 of 7 August 25, 2022
The limited asbestos inspection was performed in accordance with Occupational Safety and Health Administration 29 Code of Federal Regulations (CFR) 1926.1101(k), the Montana DEQ Administrative Rules of Montana (ARM) 17.74.354 and National Emission Standards for Hazardous Air Pollutants (NESHAP) 40 CFR 61, Subparts A and M, and applicable portions of the currently recognized standard protocol developed for schools under the Asbestos Hazard Emergency Response Act (AHERA) and as promulgated in Title 40, Code of Federal Regulations (40 CFR), Part 763 and as amended in the Federal Register. The Quest Micro- Analytics Laboratory Analysis Report are enclosed for reference.
Representative bulk material samples were collected from the suspect asbestos-containing surfacing (S) materials, thermal system insulation (TSI) materials and miscellaneous (M) materials from each of the assigned homogeneous areas (HAs) that will be impacted at the time of the renovation. The suspect ACBM were visually identified and touched to assess friability prior to sampling. The samples were placed in HA groups using a coding method to classify each suspect ACBM by type, texture, color, era of installation and location. The asbestos inspection included:
• Identification of HA suspect ACBM on an area-by-area basis within ACM’s scope of work;
• Bulk samples were collected in discrete or previously damaged locations when possible;
• Collection and analysis of bulk samples to confirm or deny the presence of asbestos.
• Positive Stop methods were utilized in the laboratory analysis
• Roofing materials were not sampled during this inspection as penetrations are not required during the renovation and to avoid any possible leaks and voidance of the roofs warranty
• Vermiculite Insulation was assumed to be an asbestos containing material
• No other materials were presumed to be asbestos containing materials
• Bulk samples were not collected from any materials that are made of 100% metal, wood, foam, glass or rubber.
Although this building did not reveal Vermiculite insulation within the wall cavities or in the attic during our inspection, it is possible that this material may be present. Due to the nature of Vermiculite and the uncertainties in the variations with testing techniques, it has been assumed that this material contains asbestos. If this material is encountered during demolition, the contractor should stop work, seal off the area and removal of this material should be accomplished by an accredited abatement contractor who will properly remove the material, containerize it in the recommended containers and dispose of at a certified landfill.
Roofing materials were not sampled during this inspection. The renovations planned for this property will not be disturbing or making penetrations in the roofing materials. If needed, these roofing materials can be sampled at a later date under a separate contract when the assistance of the Client’s roofing contractor is available to repair the sample locations to avoid leaks and/or voidance of the current warranty.
A minimum of three (3) suspect ACBM samples were collected from random locations within the subject area. Selected suspect ACBM were limited to HA that will be impacted at the time of the renovation. When possible, suspect ACBM samples were collected from existing damaged areas. These samples were placed in pre-labeled plastic containers for shipment to the laboratory. Although every attempt was made to identify and sample suspect ACBM within ACM’s scope of services, any materials that have not been specifically evaluated by bulk sampling in this inspection must be tested prior to disturbance of these materials.
The samples were shipped, under chain-of-custody protocol for standard analyses, to Quest Micro-Analytics Laboratory (NVLAP Lab# 200249) in Dallas, Texas for bulk sample analysis utilizing Polarized Light Microscopy (PLM) coupled with dispersion staining for asbestos identification. The ‘Positive Stop’ method was utilized in the laboratory analysis where if a sample from a single homogenous area, asbestos is present, the rest of the samples for that homogenous area are not analyzed. However, if the sample analysis does not indicate that asbestos is present, the laboratory will continue to analyze the rest of the samples for that homogenous area. The detailed laboratory results are presented in Appendix II.
Materials in the following table that are highlighted in BOLD were found to be asbestos containing.
Inspection Number IH-22-088 Page 3 of 7 August 25, 2022
Table 1. Suspect ACBM that were identified, collected, shipped and analyzed at the laboratory.
Sample Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-01 M-1
Carpet Mastic (Yellow) Over
Floor Tile (Tan) & Mastic (Black)
Center of Main Level Display Area
ND N/A N/A N/A AB-02 Northeast Corner of Receptionist Desk
AB-03 Southwest Corner of Display Room
AB-04
M-2
4” Cove Base
(Dark Brown) & Mastic (Yellow)
Main Level – Women’s Restroom
ND N/A N/A N/A AB-05 Basement – Bottom of Northeast Stairs
AB-06 Basement – HVAC Mechanical Room
AB-07 M-3
Gypsum Wall (White) Joint Compound
(White) Texture
(Smooth)
Main Level – Men’s Restroom
2% Chrysotile
Texture
2%
Joint Compound
Good
RACM
Category II Non-Friable
~2,400
SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-08 Basement – Electrical Room
AB-09 Basement – HVAC Mechanical Room
AB-10
M-4
CMU Block
(Gray) & Mortar (Gray)
Basement – Bottom of Northeast Stairs
ND N/A N/A N/A AB-11 Basement – Top of South Stairs
AB-12 Basement – Inside Boiler Room
AB-13
M-5
Caulking (White)
Around Sink Perimeter in Men’s Restroom
ND N/A N/A N/A AB-14 Around Sink Perimeter in Women’s Restroom
AB-15 Around Sink Perimeter in Women’s Restroom
AB-16
M-6
Gypsum
Ceiling (White) Joint
Compound (White) Texture
(Smooth)
Main Level – Center of Women’s Restroom
2%
Texture
2%
Joint Compound
Non-Friable
~325 SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-17 Main Level – Center of Men’s Restroom
AB-18 Main Level – Restroom Hallway
Inspection Number IH-22-088 Page 4 of 7 August 25, 2022
Sample Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-19 M-7
Fiberglass Reinforced
Panel Mastic (Brown)
Main Level – Behind Urinals of Men’s Restroom
3% Tremolite
Mastic
Non-Friable
~40 SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-20 Main Level – Behind Urinals of Men’s Restroom
AB-21 Main Level – Behind Urinals of Men’s Restroom
AB-22
M-8
(Brown and Yellow)
Stair Treads in Northeast Corner of Building
3% Tremolite
Non-Friable
~64 SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-23 Stair Treads in Northeast Corner of Building
AB-24 Stair Treads in Northeast Corner of Building
AB-25
M-9
Stair Cove
Base (Brown) & Mastic (Brown)
Northeast Stairwell
ND N/A N/A N/A AB-26 Northeast Stairwell
AB-27 Northeast Stairwell
AB-28
M-10
9”x9” Floor Tile
(Brown) & Mastic (Black)
Northeast Stairwell – Upper Landing
ND N/A N/A N/A AB-29 Northeast Stairwell – Lower Landing
AB-30 Northeast Stairwell – Lower Landing
AB-31
M-11
(Light Brown) & Mastic (Black)
Basement Landing of Northeast Stairwell
ND N/A N/A N/A AB-32 Basement Landing of Northeast Stairwell
AB-33 Basement Landing of Northeast Stairwell
AB-34
M-12
(Beige/Gray) & Mastic (Black)
Basement – Display Room
ND N/A N/A N/A AB-35 Basement – Projection Room
AB-36 Basement – Northwest Mechanical Room
Inspection Number IH-22-088 Page 5 of 7 August 25, 2022
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-37
M-13
Boiler
Insulation (Gray)
Basement – Northeast Boiler Room 20%
Chrysotile 10%
Amosite
Significantly Damaged
Friable
ACBM
~30 SF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-38 Basement – Northeast Boiler Room
AB-39 Basement – Northeast Boiler Room
AB-40
M-14
Concrete (Gray)
Main Level – South Stairwell
ND N/A N/A N/A AB-41 Basement – East Side of Electrical Room
AB-42 Basement – West Wall of West Mechanical Room
AB-43
M-15
2’x2’ Ceiling
Tile (White with Lumpy Texture)
Basement – Display Room
ND N/A N/A N/A AB-44 Basement – Display Room
AB-45 Basement – Display Room
AB-46 M-16
1’x1’ Ceiling Tile (White with Long Fissures and Medium
Holes)
Basement – South Wall of Training Room
ND N/A N/A N/A AB-47 Basement – East Wall of Training Room
AB-48 Basement – West Wall of Training Room
AB-49 TSI-1
2” Pipe
(Yellow) &
Wrap (Beige)
Basement – Mechanical Room
ND N/A N/A N/A AB-50 Basement – Mechanical Room
AB-51 Basement – Mechanical Room
AB-52 TSI-2
2” Pipe
(Yellow) &
Wrap (White)
Basement – Mechanical Room
ND N/A N/A N/A AB-53 Basement – Mechanical Room
AB-54 Basement – Mechanical Room
Inspection Number IH-22-088 Page 6 of 7 August 25, 2022
Number
Homogenous Area Number
Sample
Description
Location of Sample Collection
Percent of
Asbestos
Condition
Category
Quantity
SF / LF /
EA
Response Action
AB-55
S-1
Spray Applied
Sound Proofing (White)
Basement – Training Room
ND N/A N/A N/A AB-56 Basement – Training Room
AB-57 Basement – Training Room
AB-58 TSI-3
HVAC Duct
(Brown) &
Wrap (Silver)
Basement – Mechanical Rooms
ND N/A N/A N/A AB-59 Basement – Mechanical Rooms
AB-60 Basement – Mechanical Rooms
AB-61
M-17
Fireplace Flue
(White)
Main Level – Fire Tower Display Chimney
60%
Friable
ACBM
~3 LF
Removal by an
Accredited Abatement Contractor
Prior to Demolition Renovation
AB-62 Main Level – Fire Tower Display Chimney
AB-63 Main Level – Fire Tower Display Chimney
LEGEND
ND None Detected N/A Not Applicable LF Linear Feet SF Square Feet EA Each S Surfacing Material M Miscellaneous TSI Thermal System Insulation C Chrysotile A Amosite RACM Regulated Asbestos Containing Material
Our inspection has revealed the presence of ACM at the subject property. This inspection was limited to the materials which will be impacted at the time of renovation and may not have located any potentially hidden ACBM within the subject property. However, we have taken every effort to sample all obvious and accessible suspect materials within the scope of this inspection. Most of these materials appeared to be in a good to significantly damaged condition at the time of our inspection.
Based on ACM Inspector’s understanding that the Smokejumper Visitor Center is scheduled for renovations, ACM recommends that any materials highlighted in BOLD in Table 1 above shall be removed by an accredited abatement contractor prior to disturbance of these materials. These materials should be handled, containerized and disposed of according to State and Federal Regulations. Quantities of the above mentioned materials are estimates only. The abatement contractor should verify all quantities prior to bidding work.
Inspection Number IH-22-088 Page 7 of 7 August 25, 2022
Limitations
This asbestos inspection summary was prepared based on information gathered during our site visit, phone conversations and interpretations of laboratory results of bulk samples collected during the inspection. The inspection was limited to the interior of the structure(s). All samples were collected from previously damaged or inconspicuous locations to help retain the aesthetics of the building for the occupants. Although ACM’s Inspector took every effort to evaluate all of the materials that will be impacted during the renovation, it is possible that other hidden materials may exist. Therefore, any materials that have not been discovered AND have not been specifically evaluated by bulk sampling in this inspection report must be tested and evaluated for asbestos content prior to disturbance of these materials. Additional sampling may be required if additional HA’s are exposed during material removal, or the scope of work is expanded to include HA’s that have not been inspected or analyzed for asbestos content.
Any ACBM that might be impacted during renovation activities must be addressed prior to start of such activities by a qualified and accredited abatement company.
Abatement Contractors of Montana (ACM) greatly appreciates this opportunity to assist the United States Forest Service and look forward to providing our services to you on future projects. If you have any questions regarding this sampling report, please call us at 406-549-8489. We look forward to working with you in the future.
Sincerely, James Parker Project Manager / QA-QC Montana DEQ-Accredited Asbestos Inspector: MTA-5024
Enclosures: Quest Micro-Analytics Laboratory Analysis Report
Sample Location Diagrams Positive ACBM Location Diagrams Photographs City Permit Letter
APPENDIX II
ANALYTICAL RESULTS
11052 Shady Trail, Suite 217, Dallas, Texas 75229
214-351-4441 questmicro@gmail.com
PLM REPORT
Testing
TDSHS License No. 30-0218
Project: Smokejumper Visitor Center
Project No.: IH-22-088
Identification: Polarized Light Microscopy/Dispersion Staining (PLM/DS)
Test Method: 40 CFR, Part 763, Appendix E to Subpart E
Request No.: 33547
Sample Date: 8/9/22
The results are outlined below:
On 8/10/22, 63 bulk material Jim Parker of ACM for PLM/DS analysis.
Report Date: 8/11/22 Client: Abatement Contractors of Montana samples were submitted by
Client No. Sample Description Fibrous Components Asbestos Content
Lab No. 200249-0
A) None Detected B) None Detected C) None Detected
C) 2% CelluloseAB-01 Yellow Carpet Mastic (A) over Tan Floor Tile (B) with Black Mastic (C), Center of Main Level Display Area
A) None Detected B) None Detected C) None Detected
C) 2% CelluloseAB-02 Yellow Carpet Mastic (A) over Tan Floor Tile (B) with Black Mastic (C), North East Corner of Receptionist Desk
A) None Detected B) None Detected C) None Detected
C) 2% CelluloseAB-03 Yellow Carpet Mastic (A) over Tan Floor Tile (B) with Black Mastic (C), South West Corner of Display Room
A) None Detected B) None Detected
NoneAB-04 4" Dark Brown Cove Base (A) with Yellow Mastic (B), Main Level Women's Restroom
A) None Detected B) None Detected
NoneAB-05 4" Dark Brown Cove Base (A) with Yellow Mastic (B), Basement, Bottom of North East Stairs
A) None Detected B) None Detected
NoneAB-06 4" Dark Brown Cove Base (A) with Yellow Mastic (B), Basement, HVAC Mechanical Room
A) None Detected B) 2% Chrysotile C) None Detected D) 2% Chrysotile E) None Detected F) None Detected
C) 98% Cellulose E) 98% Cellulose F) 35% Gypsum 15% Fiberglass
AB-07 Wallboard: White Paint (A), White Smooth Texture (B), White Tape (C), White Joint Compound (D), Tan Paper (E) and White Drywall (F), Main Level Men's Restroom
Not Analyzed per Positive Stop
NAAB-08 Wallboard
Not Analyzed per Positive Stop
NAAB-09 Wallboard
A) None Detected B) None Detected
NoneAB-10 Gray CMU Block (A) with Gray Mortar (B), Basement, Bottom of NE Stairs
A) None Detected B) None Detected
NoneAB-11 Gray CMU Block (A) with Gray Mortar (B), Basement, Top of South Stairs
Page 1 of 4 33547Lab Request No
A) None Detected B) None Detected
NoneAB-12 Gray CMU Block (A) with Gray Mortar (B), Basement, inside Boiler Room
None DetectedNoneAB-13 White Caulking, around Sink Perimeter in Men's Restroom
None DetectedNoneAB-14 White Caulking, around Sink Perimeter in Women's Restroom
None DetectedNoneAB-15 White Caulking, around Sink Perimeter in Women's Restroom
A) None Detected B) 2% Chrysotile C) None Detected D) 2% Chrysotile E) None Detected F) None Detected
C) 98% Cellulose E) 98% Cellulose F) 35% Gypsum 15% Fiberglass
AB-16 Ceiling Board: White Paint (A), White Smooth Texture (B), White Tape (C), White Joint Compound (D), Tan Paper (E) and White Drywall (F), Main Level, Center Women's Restroom
Not Analyzed per Positive Stop
NAAB-17 Ceiling Board
Not Analyzed per Positive Stop
NAAB-18 Ceiling Board
3% TremoliteNoneAB-19 Brown FRP Mastic, Behind Urinals in Men's Restroom
Not Analyzed per Positive Stop
NAAB-20 Brown FRP Mastic, Behind Urinals in Men's Restroom
Not Analyzed per Positive Stop
NAAB-21 Brown FRP Mastic, Behind Urinals in Men's Restroom
3% TremoliteNoneAB-22 Brown Stair Tread Mastic, Stair Tread in North East Corner
Not Analyzed per Positive Stop
NAAB-23 Brown Stair Tread Mastic, Stair Tread in North East Corner
Not Analyzed per Positive Stop
NAAB-24 Brown Stair Tread Mastic, Stair Tread in North East Corner
A) None Detected B) None Detected
B) 5% WollastoniteAB-25 Brown Stair Cove Base (A) with Brown Mastic (B), North East Stairwell
A) None Detected B) None Detected
B) 5% WollastoniteAB-26 Brown Stair Cove Base (A) with Brown Mastic (B), North East Stairwell
A) None Detected B) None Detected
B) 5% WollastoniteAB-27 Brown Stair Cove Base (A) with Brown Mastic (B), North East Stairwell
A) None Detected B) None Detected
B) 5% CelluloseAB-28 9"x9" Brown Floor Tile (A) with Black Mastic (B), North East Stairs, Upper Landing
A) None Detected B) None Detected
B) 5% CelluloseAB-29 9"x9" Brown Floor Tile (A) with Black Mastic (B), North East Stairs, Lower Landing
A) None Detected B) None Detected
B) 5% CelluloseAB-30 9"x9" Brown Floor Tile (A) with Black Mastic (B), North East Stairs, Lower Landing
A) None Detected B) None Detected
B) 5% CelluloseAB-31 9"x9" Light Brown Floor Tile (A) with Black Mastic (B), Basement Landing of North East Stairs
A) None Detected B) None Detected
B) 5% CelluloseAB-32 9"x9" Light Brown Floor Tile (A) with Black Mastic (B), Basement Landing of North East Stairs
Page 2 of 4 33547Lab Request No
B) None Detected
B) 5% CelluloseAB-33 9"x9" Light Brown Floor Tile (A) with Black Mastic (B), Basement Landing of North East Stairs
A) None Detected B) None Detected
B) 5% CelluloseAB-34 9"x9" Beige/Gray Floor Tile (A) with Black Mastic (B), Basement Display Room
A) None Detected B) None Detected
B) 5% CelluloseAB-35 9"x9" Beige/Gray Floor Tile (A) with Black Mastic (B), Basement Projection Room
A) None Detected B) None Detected
B) 5% CelluloseAB-36 9"x9" Beige/Gray Floor Tile (A) with Black Mastic (B), Basement North West Mechanical Room
None DetectedNoneAB-37 Gray Block Boiler Insulation, Basement North East Boiler Room
20% Chrysotile 10% Amosite
NoneAB-38 Gray Fibrous Boiler Insulation, Basement North East Boiler Room
Not Analyzed per Positive Stop
NAAB-39 Gray Boiler Insulation
None DetectedNoneAB-40 Gray Concrete, South Stairwell on Main Level
None DetectedNoneAB-41 Gray Concrete, East Wall of Slop Sink Room
None DetectedNoneAB-42 Gray Concrete, West Wall of West Mechanical Room
A) None Detected B) None Detected
B) 40% Cellulose 30% Fiberglass 20% Perlite
AB-43 White Paint (A) on 2'x2' Gray Lumpy Texture Ceiling Tile (B), Basement Display Room
A) None Detected B) None Detected
B) 40% Cellulose 30% Fiberglass 20% Perlite
AB-44 White Paint (A) on 2'x2' Gray Lumpy Texture Ceiling Tile (B), Basement Display Room
A) None Detected B) None Detected
B) 40% Cellulose 30% Fiberglass 20% Perlite
AB-45 White Paint (A) on 2'x2' Gray Lumpy Texture Ceiling Tile (B), Basement Display Room
A) None Detected B) None Detected
B) 99% CelluloseAB-46 White Paint (A) on 1'x1' Long Fissure and Medium Hole Pattern Ceiling Tile (B), Soundproofing on South Wall of Training Room
A) None Detected B) None Detected
B) 99% CelluloseAB-47 White Paint (A) on 1'x1' Long Fissure and Medium Hole Pattern Ceiling Tile (B), Soundproofing on South Wall of Training Room
A) None Detected B) None Detected
B) 99% CelluloseAB-48 White Paint (A) on 1'x1' Long Fissure and Medium Hole Pattern Ceiling Tile (B), Soundproofing on West Wall of Training Room
A) None Detected B) None Detected
A) 99% Fiberglass B) 20% Cotton
AB-49 Yellow 2" Pipe Insulation (A) with Beige Wrap (B), Basement Mechanical Rooms
A) None Detected B) None Detected
A) 99% Fiberglass B) 20% Cotton
AB-50 Yellow 2" Pipe Insulation (A) with Beige Wrap (B), Basement Mechanical Rooms
A) None Detected B) None Detected
A) 99% Fiberglass B) 20% Cotton
AB-51 Yellow 2" Pipe Insulation (A) with Beige Wrap (B), Basement Mechanical Rooms
A) None Detected B) None Detected C) None Detected
A) 99% Fiberglass C) 100% Fiberglass D) 98% Cellulose
AB-52 Yellow 2" Pipe Insulation (A) with Silver Foil (B), White Loose Weave (C) and White Paper Backing (D), Basment Mechanical
Page 3 of 4 33547Lab Request No
D) None DetectedRooms
B) None Detected C) None Detected D) None Detected
A) 99% Fiberglass C) 100% Fiberglass D) 98% Cellulose
AB-53 Yellow 2" Pipe Insulation (A) with Silver Foil (B), White Loose Weave (C) and White Paper Backing (D), Basment Mechanical Rooms
A) None Detected B) None Detected C) None Detected D) None Detected
A) 99% Fiberglass C) 100% Fiberglass D) 98% Cellulose
AB-54 Yellow 2" Pipe Insulation (A) with Silver Foil (B), White Loose Weave (C) and White Paper Backing (D), Basment Mechanical Rooms
None Detected99% CelluloseAB-55 White Spray-Applied Soundproofing, Basement Training Room
None Detected99% CelluloseAB-56 White Spray-Applied Soundproofing, Basement Training Room
None Detected99% CelluloseAB-57 White Spray-Applied Soundproofing, Basement Training Room
A) None Detected B) None Detected
A) 99% FiberglassAB-58 Brown HVAC Duct Insulation (A) with Silver Plastic Wrap (B), Basement Mechanical Rooms
A) None Detected B) None Detected
A) 99% FiberglassAB-59 Brown HVAC Duct Insulation (A) with Silver Plastic Wrap (B), Basement Mechanical Rooms
A) None Detected B) None Detected
A) 99% FiberglassAB-60 Brown HVAC Duct Insulation (A) with Silver Plastic Wrap (B), Basement Mechanical Rooms
60% Chrysotile25% CelluloseAB-61 White Fireplace Flue Insulation, Firetower Display on Main Level
Not Analyzed per Positive Stop
NAAB-62 White Fireplace Flue Insulation, Firetower Display on Main Level
Not Analyzed per Positive Stop
NAAB-63 White Fireplace Flue Insulation, Firetower Display on Main Level
Lab Director: Jennifer D. Jaber
Analyst: Jennifer Jaber
Approved Signatory :
Samples are analyzed by layers, and percentages estimated visually during microscopic examination. Individual analysis sheets available upon request. Results may not be reproduced except in full. This test report relates only to the samples tested, and results must not be used to claim product endorsement by NVLAP or any agency of the U.S. Government.
The EPA test method for bulk analysis (EPA/600/R-93/116) states in paragraph 2.2.2. that "the detection limit for visual estimation is a function of the quantity of the sample analyzed, the nature of matrix interference, sample preparation, and fiber size and distribution. Asbestos may be detected in concentrations of less than one percent by area if sufficient material is analyzed. Samples may contain fibers too small to be resolved by PLM (<0.25 micrometers in diameter) so detection of those fibers by this method may not be possible."
Materials containing >1% asbestos are considered by the EPA to be asbestos containing materials, and must be handled as such.
Page 4 of 4 33547Lab Request No
I
Date: 8" jq J 2-Z- Laborator-V:
Qv~T
Specialty Construction & Environmental Remediation. Services
P.O. Box 8747 Missou la, Montana 59807 Office: (406) 549-8489 Fax: (406) 728-9416
CHAIN OF CUSTODY
Project Number: . f+ 22- ~ I - - o -g I Project Name:
,,5rv1 Ol4S .JuµPLJil- v"l517l>{L C-6N~
Report Results to: jim.parker@acm-contracting.com chelsea.sievers@acm-contracting.com mike.foust@acm-contracting.com brian.betts@acm-contracting.com desiree.bain@acm-contracting.com tatiana.salimova@acm-contracting.com chris.rinehart@acm-contracting.com
~PLM ( ) TEM Ai r ( ) Lead Air ( ) Air-0 -Cell Positive St op
( ) PCM ( ) Lead Bulk ( ) Mold Swab t>d ( ) Point Count ( ) Lead Wipe ( ) Mold Tape
TURN AROUND: ( ) RUSH {)<[24 HOUR ( ) 3 DAY ( ) 5 DAY ( ) 7 DAY
SAMPLE NUMBER SAMPLE TYPE/ DESCRIPTION
315-12 ~ FiELD UY/ s~ t a ~ ?Pc:A-1 ~1 ·- 71r1~ gj;J;~ I bm:>
Received b~ ~V/VJ Dafj/,6iz Z--trennqu ished by: Date/ Time: Received by:----' L/ Date/Time:
A S
B E
S T
O S
B U
L K
S A
M P
L
IN
G
C lie n t:
U n it e d S ta te s F o re st S e ri ce
Jo b
N am e
S m o ke ju m p e r V is it o r
C e n te r A dd re ss
U S
H ig h w a y
W e st
M is so u la
M o n ta n a a m p le
N o.
B D
I A
B
2.
A B
D
O fo
A B
H
M
A B
- DC
A
- [O
M f
A
- \ 2
M a te ri a l D e sc ri p ti o n I
L o ca ti o n
C( b
IH
2-at e
9-
S' -z
.z
In sp e ct or
J im
P a rk e r
.E C o n d
F t-.
t-F f=
Q u a n ti ty
EA
F LF
LF
SF
B E
S T
O S
B U
L K
S A
M P
L nt
U n it e d S ta te s F o re st S e
IH
2-
Jo b N am e:
m o ke ju m p e r
V is it o r C e n te r
D g_ g.
_2 z.
A dd re ss
U S
H ig h w a y
W e st
M is so u la
M o n ta n a
In sp ec to r:
Ji
P a rk e r
S a m te ri a l D e sc ri p ti o n I
L o ca ti n d
Q u a n f ~ U4 1" l W t'
Ji l3
IJ
v" -1
1) l "
-1
IL
ft"
-fL lr'
7m d
'5 f
Lt+ v o c
J
L t r i s
6/ lf.P S0
W
C8 Cu r..
tc, l Wt n~ J-
'l 'T
(w
1h m f f l
--L
[ l
IJ
l~
~A l.
\1 1\
I a( \i \l ft .i R l1 c l ~
I '(V bJ
1.1 o..
1t 1:-t
.t
F~ .P
,v \f
\S I\
(0
M
M
,0 J
I V
E
:i
U
4-1 bO l.
(4 ~M zn
Z
E;
A_
A B
M n:
vl lc l cg:
i-
T fu (L t
2- :3
B E
S T
O S
B U
L K
S A
M P
L nt
U n it e d S ta te s F o re st S e b
IH
2-
Jo b
N am e
S m o ke ju m p e r V is it o r
C e n te r D at e
2- Z
A dd re ss
U S
H ig h w a y
1 O W e st
M is so u la
M o n ta n a
In sp ec to r:
J im P a rk e r
S a m te ri a l D e s c ri p ti o n
I L o ca ti n d
Q u a n
.S
~A ,R o J f
VV
,o z_ f;
tJ
P
-4.
\N J
IL
J i?
U i i l T I
S F r
A B q" xC i" Ft c-o/
L -rr
LE
~T ie f u
2.8 lO
I L l>
P f6 l.
A f' lo
/f z q
I ~
°l lJP rA t 0 i
=j
I.
q" rx .q
'P
.o d
L
T c& f L ::r ft
AA
7l rl t_ (j cw
Gt it
:1
A r
A l\ lf
;N
L
P-t t r i b
T
-3
S
F
-3 j
A B t0 c;
'x q
P
-O D
IL
n t-r 8 ff t;
t G flA 4.
T l c.
r 8
.A q L
-L
'f fJ.
J
'D iS P
LA
l-
-1 l7
S
F 1, J& -e f"f t1" µ j tc
;B (o l G l t L
B E
S T
O S
B U
L K
S A
M P
L nt
U n it e d S ta te s F o re st S e b
IH
2-
Jo b
N o ke ju m p e r V is it o r
C e n te r D g
A d d re ss
U S
H ig h w a y
W e st
M is so u la
M o n ta na ec
Ji
P a rk e r
S a m te ri a l D e sc ri p ti o n I lo c a ti n d
Q u a n
B
L G i L tN .S
U L
.A -T
Z v-t t5
M
Z L l
D
8D i3
3'1
I, ..E
A
B
-4-lfo fr l, t( tf
$1
1' ! l
L b y lf r-
-M h t M J t c A
X Z
C
E fu
A Y
'I
T Lt f- ( W f-h
F i.V rt-
W
P tt lf3 f q l::> l{.
cA -t.
t s l5
'Lf
4- '5
B t , l /
C 8D
J,J t;
T I L fi Wi tt
J
IJ
D ,.J c, P z M r-i L
4.
LL
lY M
D A f) k l
~o c.
:n -i t i
M .J
-P l>
.J< i i
I lp tfC ii
B E
S T
O S
B U
L K
S A
M P
L nt
U n it e d S ta te s F o re st S e
N o ke
"u e r V is it o r
C e n te r
S a m te ri a l D e sc ri p ti o n I
L o ca ti
A B
/J1 rlf5
{N ~u c.
p;
fU r!
!F
L~ J1 hU I 6C ia.t lf .q
-<i
.J~
JA
A~
-~t r..
..k "'L
~f v\ :S
-1 $r
S-
D A
- 51
A B
- 5
A B
S lf-
A B t;
;7
- 6
- 5
D r~ r o
N O
I w
I•
RM
~A L~
-T
T~
1, v_
~c
~:t t J D v -a l l N t r L A
~A J'
J( Sc
Ll fG
?l
-P
~F tv ~f l tf lo o~ s
Jo
IH
2-
F N n d
I Q u a n
B E
S T
O S
B U
L K
S A
M P
L nt
U n it e d S ta te s F o re st S e
IH
-0
N o k e ju m p e r V is it o r
C e n te r D
~2 dd re ss
U S
H ig h w a y
W e st
M is so u la
M o n ta n a ec im
P a rk e r
S a m
HA
te ri a l
D e sc ri p ti o n
I L o ca ti n d
Q u a n
F
A B
H
.P rM f'
F U l?
LA
C~ t .A rl
( l tJ n
JJ
P fe
D tS P tA .u u, A-
"z
G, National Voluntary Laboratory Accreditation Program
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2017
For the National Voluntary Laboratory Accreditation Program
Effective 2021-07-01 through 2022-06-30
Quest MicroAnalytics 11052 Shady Trail
Suite 217 Dallas, TX 75229 Ms. Jennifer Jaber
Phone: 214-351-4441 Email: questmicro@gmail.com
ASBESTOS FIBER ANALYSIS NVLAP LAB CODE 200249-0
Bulk Asbestos Analysis
Code Description 18/A01 EPA -- 40 CFR Appendix E to Subpart E of Part 763, Interim Method of the Determination of
Asbestos in Bulk Insulation Samples
18/A03 EPA 600/R-93/116: Method for the Determination of Asbestos in Bulk Building Materials
U ni te d
St at es D ep ar tm en t o f C om m er io na l I ns tit ut e of S ta nd ar ds a nd
T ec hn ol og y
C er tif ic at e of A cc re di ta tio n to
IS
O
/IE
C
:2
N V
LA
P
LA
B
C O
D E:
9-
Q ue st M ic ro
A na ly tic s D al la s, TX is a cc re di te d by th e
N at io na l V ol un ta ry L ab or at or y A cc re di ta tio n
P ro gr am fo r s pe ci fic s er vi s, lis te d on th e S co pe o f A cc re di ta tio n, fo r:
A sb es to s F ib er A na ly sis
-0 7-th ro ug h
-0
6-
E ffe ct iv e D at es
Fo r t he N at io na l V ol un ta ry
L ab or at or y
A cc re di ta tio n P ro gr am
Th is la bo ra to ry is a cc re di te d in a cc or da nc e w ith th e re co gn iz ed
In te rn at io na l S ta nd ar d
IS
O
/IE
C
:2
7.
Th is a cc re di ta tio n de m on st ra te s te ch ni ca l c om pe te nc e fo r a d ef in ed s co pe a nd th e op er at io n of a la bo ra to ry q ua lit y m an ag em en t s ys te m
(r ef er to jo in t I S
O
-IL
A C
-IA
F
C om m un iq ue d at ed J an ua ry
9)
APPENDIX III
DRAWINGS OF SAMPLE
LOCATIONS
APPENDIX IV
PHOTOGRAPHS
Smokejumper Visitor Center 5765 US Highway 10 West, Missoula, Montana 59808
IH 22-088 August 25, 2022
Carpet Mastic (Yellow) Over Floor Tile (Tan) & Mastic (Black)
4” Cove Base (Dark Brown) & Mastic (Yellow)
Gypsum Walls (White) Joint Compound (White) Texture (Smooth)
** Positive for Asbestos **
CMU Block (Gray) & Mortar (Gray)
Caulking (White)
Gypsum Ceiling (White) Joint Compound (White) Texture (Light Splatter)
Stair Tread Mastic (Brown/Yellow)
9”x9” Floor Tile (Brown) & Mastic (Black)
9”x9” Floor Tile (Light Brown) & Mastic (Black)
9”x9” Floor Tile (Beige/Gray) & Mastic (Black)
Boiler Insulation (Gray)
2’x2’ Ceiling Tile (White with Lumpy Texture)
Sound Proofing Tiles (White with Long Fissures and Medium Holes)
2” Pipe Insulation (Yellow) & Wrap (Beige)
2” Pipe Insulation (Yellow) & Wrap (White)
Spray Applied Sound Proofing (White)
HVAC Duct Insulation (Brown) & Wrap (Silver)
Fireplace Flue Insulation (White)
APPENDIX V
CITY LETTER
City of Missoula Building Department 435 Ryman
Missoula, MT 59802 Phone: (406) 552-6040
FAX: (406) 552-6053
Date: _______________
City of Missoula Building Inspection Division 435 Ryman Street Missoula, MT 59802
Address and/or Project Name:
Asbestos Inspector/Company:
I, ___________________________________________________, an accredited asbestos inspector, have completed the asbestos survey at the above address and the Montana Department of Environmental Quality has been notified of the contents.
Signature
State of Montana Department of Environmental Quality Asbestos Control Program
(406) 444 5300
August 25, 2022
Smokejumper Visitor Center, 5765 US Highway 10 West, Missoula, MT 59808
Abatement Contractors of Montana
P.O. Box 8747
Missoula, Montana 59807
James Parker, MTA-5024
James Parker Digitally signed by James Parker Date: 2022.08.25 10:11:29 -06'00'
| Limited Inspection Report For |
| 2) 22-088 - Limited Sampling Report.pdf |
| 2880 Skyway Drive Phone: (406) 390-1701 |
| Helena, Montana 59602 E-Mail: reid.stovall@usda.gov |
File details come from the government source that posted it. Updated .