Amendment 5.pdf

PDF 333 KB Posted

Attached to
USFS Sisters Storage Building Federal contract opportunity
Solicitation number
1240BH22R0014
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This document contains an amendment to a solicitation for construction of a storage building on the Sisters Ranger District in Oregon, as well as responses to questions received. The amendment provides responses to all outstanding requests for information to date, and updates the applicable wage determination. It specifies that no further questions will be accepted after June 29, 2022, and that the proposal due date remains July 7, 2022. Relevant details include the location and scope of the construction project, applicable wage rates, and deadlines for questions and proposals.

View the file

Other files for this federal contract opportunity

Other files attached to USFS Sisters Storage Building, newest first.
File Type Posted
Amendment 4.pdf PDF
Amend4 - Equipment Removal List for Sisters Ranger District.pdf PDF
Amendment 3.pdf PDF
Amend3 - 07 25 00-RIB-Weather Barriers-06-20-2022.pdf PDF
Amend2 - P002 - SCHEDULES - PLUMBING.pdf PDF
Amendment 2.pdf PDF
Amendment 1.pdf PDF
Amend1 - E100 - SITE PLAN - ELECTRICAL.pdf PDF
Amend1 - T100 - SITE PLAN - TECHNOLOGY.pdf PDF
Amend1 - Exhibit 01.pdf PDF
Amend1 - E501 - SINGLE LINE DIAGRAMS - ELECTRICAL.pdf PDF
Amend1 - C3.1.Util Plan PH I.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
CompleteSolicitation.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240BH22R0014

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BH

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 6

06/29/20220005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/18/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See attached.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

DARCY J. RAPOZA

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

/s/ Darcy J. Rapoza 29 June 2022

Amendment 5 to RFP 1240BH22R0014

This Amendment provides the following information:

• Provides responses to all unanswered RFI’s received to date

• Updates the Wage Determination to OR 20220025 with 5 modifications, dated 24

June 2022.

No RFI’s will be accepted beyond COB Wednesday 6/29/2022.

The proposal due date remains 7/7/2022.

RFI’s

RFI-054

Keynotes 2,4&5 on sheet T400 refer to running conduits & cable to IT room in admin building, but Site plan T100 does not show any conduit runs going to the admin building. Please clarify these requirements, including where the IT room is located in the admin building, and what demo may be required to get conduits to the IT room.

Response: Notes 2,4 and 5 on Sheet T400 are incorrect. Conduit that leads to the Admin Building will only be installed from the new Storage Building to the telecommunications vault shown on T100 (see note 5 on T100) under this contract. Future conduit will be installed from that vault to the Admin Building under a separate contract. All telecommunications wiring that is supposed to be ran to the Admin Building IT room will be installed under a future contract.

6/29/22, 11:51 AM SAM.gov https://sam.gov/wage-determination/OR20220025/5 1/8

"General Decision Number: OR20220025 06/24/2022

Superseded General Decision Number: OR20210025

State: Oregon

Construction Type: Building

County: Deschutes County in Oregon.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).

|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.

Modification Number Publication Date 0 01/07/2022 1 02/18/2022 https://sam.gov/wage-determination/OR20220025/5 2/8

2 02/25/2022 3 04/01/2022 4 05/20/2022 5 06/24/2022

BROR0001-017 06/01/2020

Rates Fringes

BRICK FINISHER...................$ 26.94 14.94

BRICKLAYER.......................$ 41.20 22.39

TILE FINISHER....................$ 26.94 14.81

TILE SETTER......................$ 35.35 20.42

CARP1503-007 06/01/2021

Rates Fringes

Carpenters:

Hardwood floors and batt insulation..................$ 43.97 18.56 Including metal stud installation, from work and scaffold building.......$ 43.80 18.56

CARP9001-004 06/01/2020

Rates Fringes

Acoustical Ceiling Installer & Drywall Hanger.................$ 42.04 18.01

ELEC0280-010 01/01/2022

Rates Fringes

ELECTRICIAN......................$ 49.36 20.20

ELEC0280-012 01/01/2021

Rates Fringes

ELECTRICIAN (Alarm Installation, Computer Installation and Low Voltage wiring for Alarms)...............$ 34.93 16.00

ENGI0701-023 01/01/2020

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 45.90 15.35

GROUP 1A....................$ 48.06 15.35

GROUP 1B....................$ 50.22 15.35

GROUP 2.....................$ 43.99 15.35

GROUP 3.....................$ 42.84 15.35

GROUP 4.....................$ 41.01 15.35

GROUP 5.....................$ 39.77 15.35

GROUP 6.....................$ 36.55 15.35

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM https://sam.gov/wage-determination/OR20220025/5 3/8

CRANE: Operator 200 tons through 299 tons, and/or over 200 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments

GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;

GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over

GROUP 2: CRANE: Cableway Operator, 25 tons and over;

HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);

TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:

Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade Operator-Robotic; Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator;

Excavator over 130,000 lbs

GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);

LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Excavator over 80,000 through 130,000 lbs

GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;

LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/EXCAVATOR-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments;

Excavator Operator over 20,000 lbs through 80,000 lbs.;

BLADE: Blade operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; HYDRAULIC HOES:

Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments;

Asphalt Paver; Screed Operator; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled;

Trenching Machine, digging capacity over 3 ft Depth;

Excavator over 20,000 lbs through 80,000 lbs.

GROUP 5: TRACKHOE/EXCAVATOR-HYDRAULIC: up to and including 20,000 lbs.; Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; HYDRAULIC HOES: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type);

Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; Concrete Pumper; Concrete Paver: Compactor

GROUP 6: LOADERS: (less than 1 cu yd.); Roller (Non-Asphalt); Oiler; Bobcat/Skid Loader; Grade Checker;

Crane oiler

Zone Differential (add to Zone 1 rates):

Zone 2 - $3.00 Zone 3 - $6.00 https://sam.gov/wage-determination/OR20220025/5 4/8

For the following metropolitan counties: MULTNOMAH;

CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;

CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS

INDICATED:

All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.

St. Helens ""Blast Zone"" shall receive Zone I pay for all classifications.

All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications.

All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications.

For the following cities: ALBANY; BEND; COOS BAY; EUGENE;

GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG

All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications.

All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications.

All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications.

IRON0029-011 01/03/2022

Rates Fringes

IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 41.13 30.72

* LABO0737-005 06/01/2022

Rates Fringes

Laborers: (Mason Tender-Cement/Concrete)..........$ 38.79 16.85

* LABO0737-006 06/01/2022

Rates Fringes

Laborers: (Mason Tender-Brick)...$ 38.79 16.85

* LABO0737-007 06/01/2022

Rates Fringes https://sam.gov/wage-determination/OR20220025/5 5/8

Laborers: (Mason Tender-Stone)...$ 38.79 16.85

* LABO0737-013 06/01/2022

Rates Fringes

Laborers:

GROUP 1.....................$ 34.98 16.85

GROUP 2.....................$ 36.25 16.85

LABORER CLASSIFICATIONS

GROUP 1: Form-Stripping, Power Tool Operator

GROUP 2: Vibrating Plate, Grade Checker, Pipelayer

PAIN0055-021 07/01/2019

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 38.48 16.71

PLAS0082-003 07/01/2021

Rates Fringes

PLASTERER........................$ 39.65 18.98

PLAS0555-006 07/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 35.52 19.42

PLUM0290-008 04/01/2022

Rates Fringes

Plumbers and Pipefitters.........$ 50.68 31.16

* SUOR2009-023 11/09/2009

Rates Fringes

ELECTRICIAN (Low Voltage Wiring)..........................$ 20.75 9.30

GLAZIER..........................$ 22.25 11.21

LABORER: Common or General......$ 18.71 7.27

LABORER: Landscape..............$ 14.02 ** 2.63

OPERATOR: Forklift..............$ 19.09 7.89

PAINTER: Brush Only.............$ 13.70 ** 3.16

PAINTER: Roller.................$ 13.70 ** 3.16

PAINTER: Spray..................$ 12.00 ** 2.36

ROOFER, Excludes Installation of Metal Roofs...................$ 16.31 5.38 https://sam.gov/wage-determination/OR20220025/5 6/8

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 30.92 8.61

TRUCK DRIVER: Dump Truck........$ 15.50 9.05

TRUCK DRIVER: Water Truck.......$ 18.40 5.33

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 https://sam.gov/wage-determination/OR20220025/5 7/8 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour https://sam.gov/wage-determination/OR20220025/5 8/8

National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISIO"