This document provides an amendment to solicitation number 1240BH22R0014 for the USFS Sisters Storage Building project. The amendment revises the plumbing schedule, provides responses to contractor questions, and extends the proposal due date to July 7, 2022 at 4:00 PM local time. Revisions remove requirements for green building certification and related contractor qualifications from the evaluation criteria. Responses to questions clarify that no roof truss drag loads, solar panel loads, or asphalt paving are required for the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 5.pdf | ||
| Amendment 4.pdf | ||
| Amend4 - Equipment Removal List for Sisters Ranger District.pdf | ||
| Amendment 3.pdf | ||
| Amend3 - 07 25 00-RIB-Weather Barriers-06-20-2022.pdf | ||
| Amend2 - P002 - SCHEDULES - PLUMBING.pdf | ||
| Amendment 1.pdf | ||
| Amend1 - E100 - SITE PLAN - ELECTRICAL.pdf | ||
| Amend1 - T100 - SITE PLAN - TECHNOLOGY.pdf | ||
| Amend1 - Exhibit 01.pdf | ||
| Amend1 - E501 - SINGLE LINE DIAGRAMS - ELECTRICAL.pdf | ||
| Amend1 - C3.1.Util Plan PH I.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| CompleteSolicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BH22R0014
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
06/17/20220002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/18/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attached.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DARCY J. RAPOZA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
/s/ Darcy J. Rapoza 17 June 2022
Amendment 2 to RFP 1240BH22R0014
This Amendment provides the following information:
• Provides a list of Revisions to the Contract Documents
• Provides responses to RFI’s received since the last Amendment. If RFI’s have been submitted that are not addressed in this Amendment, a follow up Amendment will be issued at a later date that addresses those RFI’s
This amendment also extends the proposal date. Offers are now due 7/7/2022, at 1600 hours local time.
REVISIONS
REV-006
This Revision addresses the requirement for Green Globes certification including Contractor responsibilities under this contract. This contract DOES NOT REQUIRE ANY GREEN BUILDING CERTIFICATION OR CONTRACTOR REQUIREMENTS TO MEET SAID CERTIFICATION. This revision corrects the response given in RFI-023 of Amendment 1. References to a Green Building Certification in Sections C-1, F-4 and M-1 Factor 3 (d) of the RFP are removed. Offerors’ past experience with Green Globes and/or other sustainable building certifications is no longer an evaluation factor for award and offerors are not required to submit experience pertaining to Green Globes and/or other sustainable building certifications with their technical proposal.
REV-007
See attached Revised Plumbing Sheet P002. Adds TP-1 to Miscellaneous Equipment Schedule on plumbing Sheet P002. See RFI -027 Below.
RFI’s
RFI-026
Truss Questions:
What is the required heel height at the wall line? Response: Heel Height to be 1’-6” What are the actual drag loads? Response: There are no specific roof truss drag loads on the Storage Building What are the locations for the drag trusses? Response: As mentioned in #2 above, there are no drag trusses on the Storage Building Are there any sprinkler loads applied to the bottom chord of the trusses? Response: A uniform load of 1psf has been included in the design truss loads for the truss bottom chords for sprinklers. Please note the text in the General Structural Notes Sheet S002 under “PREMANUFACTURED WOOD TRUSSES” #6 that talks about needing to design for a concentrated load of 100-lb at any location. This is intended to account for main sprinkler lines.
Will there be any solar panel loads applied to the trusses? Response: There were no allowances or loads added for solar panels on the Storage Building trusses.
1240BH22R0014
Amendment 2
RFI-027
We noticed that a TP-1 is called out in the mechanical room, but it’s not in the fixture/equip schedule.
We didn’t see it in the mech/elec schedules either. Our guess is that it’s an electronic trap primer servicing the floor drains. Can you please clarify?
Response: TP-1 is an electronic trap primer and has been added to the plumbing schedule. See revised drawing sheet P002
RFI-028
Need to know depth of Asphalt and area on what will be paved.
Response: The is no proposed Asphalt Paving in the contract. Finished surface to be gravel. Remove Specification 32 12 16.
1240BH22R0014