This document is an amendment to a solicitation providing responses to contractor questions and revising specifications. The solicitation is for construction of a new storage building for the US Forest Service Sisters Ranger District in Oregon. The amendment responds to contractor questions on interior wall heights, use of waterguard trim, and specifications for 4-inch CMU veneer. It also confirms old equipment will be removed and provides an itemized list and photos of equipment to be removed and hauled off by the contractor. The proposal due date for the solicitation remains July 7, 2022.

View the file

Other files for this federal contract opportunity

Other files attached to USFS Sisters Storage Building, newest first.
File Type Posted
Amendment 5.pdf PDF
Amend4 - Equipment Removal List for Sisters Ranger District.pdf PDF
Amend3 - 07 25 00-RIB-Weather Barriers-06-20-2022.pdf PDF
Amendment 3.pdf PDF
Amendment 2.pdf PDF
Amend2 - P002 - SCHEDULES - PLUMBING.pdf PDF
Amendment 1.pdf PDF
Amend1 - E100 - SITE PLAN - ELECTRICAL.pdf PDF
Amend1 - T100 - SITE PLAN - TECHNOLOGY.pdf PDF
Amend1 - C3.1.Util Plan PH I.pdf PDF
Amend1 - Exhibit 01.pdf PDF
Amend1 - E501 - SINGLE LINE DIAGRAMS - ELECTRICAL.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
CompleteSolicitation.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

1240BH22R0014

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

40BH

PORTLAND OR 97204-2829

STE 310

1220 SW 3RD AVE

USDA-FS CSA NORTHWEST 6

06/28/20220004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/18/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See attached.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

DARCY J. RAPOZA

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

/s/ Darcy J. Rapoza 28 June 2022

Amendment 4 to RFP 1240BH22R0014

This Amendment provides the following information:

• Provides responses to all unanswered RFI’s received to date

No RFI’s will be accepted beyond COB Wednesday 6/29/2022.

The proposal due date remains 7/7/2022.

RFI’s

RFI-050

Drywall subcontractor is looking for confirmation of the interior wall heights of the walls that separate the group of rooms such as showrooms, janitor rooms, etc. Those rooms have a lower ceiling height of 9' and unsure if the intent is still to run the framing to 16' to underside if trusses.

Response: Framing and Drywall will go to 16’ to underside of trusses.

RFI-051

Waterguard trim at base of drywall is specified but unclear to the extent of use. Can you confirm that this product is limited to the “wet areas” such as the restroom/shower rooms, laundry room, janitor room and mechanical room?

Response: Waterguard is only to be used in rooms that have wet areas Is waterguard also to be used at backerboard locations as well?

Response: It is not necessary at the areas that have backerboard in the open shop area

RFI-052

Please clarify the color, texture and manufacturer of the 4” CMU Veneer;

Response:

The revised basis of design for the 4” CMU Veneer shall be:

Manufacturer: Willamette Greystone Texture: Split Face Color: Natural 211, Pewter 234, or Midnight 225. Physical samples will be required for review and color selection.

RFI-053

During the pre-proposal site visit on 6/1/2022, USFS indicated a desire to have some “old equipment” removed by the contractor and that USFS would provide an itemized list of that equipment. Please confirm if Gov’t equipment is to be removed by the Contractor under this contract, and could you provide a list the exact equipment to be removed/hauled off by contractor.

Response: Confirmed, old equipment shall be removed as part of this contract. See attached itemized list with photos.