This document includes an amendment to a solicitation for construction services. Key details include:
The amendment provides revisions to drawings and specifications, answers questions from a pre-proposal meeting, responses to requests for information received, a list of pre-proposal meeting attendees, and an updated wage determination. Revisions include changes to water and electrical connections. The opportunity involves construction of a storage building and relocation of existing structures at a US Forest Service location in Sisters, Oregon. Proposals are now due on June 30, 2022 at 4:00 PM local time due to the extension provided in this amendment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 5.pdf | ||
| Amendment 4.pdf | ||
| Amend4 - Equipment Removal List for Sisters Ranger District.pdf | ||
| Amend3 - 07 25 00-RIB-Weather Barriers-06-20-2022.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2.pdf | ||
| Amend2 - P002 - SCHEDULES - PLUMBING.pdf | ||
| Amend1 - C3.1.Util Plan PH I.pdf | ||
| Amend1 - E100 - SITE PLAN - ELECTRICAL.pdf | ||
| Amend1 - T100 - SITE PLAN - TECHNOLOGY.pdf | ||
| Amend1 - Exhibit 01.pdf | ||
| Amend1 - E501 - SINGLE LINE DIAGRAMS - ELECTRICAL.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| CompleteSolicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
1240BH22R0014
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
40BH
PORTLAND OR 97204-2829
STE 310
1220 SW 3RD AVE
USDA-FS CSA NORTHWEST 6
06/10/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/18/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See attached.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
DARCY J. RAPOZA
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
/s/ Darcy J. Rapoza 10 June 2022
Amendment 1 to RFP 1240BH22R0014
This Amendment provides the following information:
• Provides a list of Revisions to drawings and specifications
• Provides information on questions and items discussed at the Pre-Proposal meeting held on June 1st, 2022
• Provides responses to RFI’s received to date.
• Provides a list of attendees from the Pre-Proposal Meeting held on June 1st, 2022
• Updates the Wage Determination to OR 20220025 with 4 modifications, dated 20
May 2022.
This amendment also extends the proposal date. Offers are now due 6/30/2022, at 1600 hours local time.
REVISIONS
REV-001
See Revised Civil Drawing C3.1. Connection of water services to existing water line has been consolidated from two services to one and connection is now to existing 10” C900 waterline instead of existing 2” as originally shown
REV-002
See Revised Electrical Drawing E100. Adds reference to Civil Drawings for UT pole #102552 and reference to providing conduit to future gate connection.
REV-003
See Revised Electrical Drawing E501. Addresses responsibility of conductor installation from transformer to cabinet as PUD responsibility.
REV-004
See Revised Technology Drawing T100. Removes reference to Sheet A103.
REV-005
Specifications 32 84 00, 32 91 00, 32 91 19, 32 92 00, and 32 93 00 have been removed from the contract. No irrigation or landscaping is included in the scope of this contract.
PRE-PROPOSAL MEETING QUESTIONS AND ITEMS DISCUSSED
PPM-001
Is the Forest Service project currently permitted?
Response: The Forest Service is currently working with Deschutes County on plan review. The Forest Service will pay for building permit fees. The Contractor will be responsible for scheduling required building inspections. The contractor will be responsible for paying for any reinspection fees due to failed inspections.
1240BH22R0014
Amendment 1
PPM-002
Is a NPDES permit required for this project?
Response: No, a NPDES permit is not required however Contractor will be required to develop and submit an Erosion Control and Sediment that meets EPA requirements. See specification 01 57 13.
PPM-003
What are the vaccine and mask requirements for workers onsite?
Response: USDA Forest Service is following CDC guidance regarding masking and testing requirements when the Contractor enters an occupied Federal facility. Currently, guidance from the Safer Federal Workforce Task Force requires that different protocols for masking and testing for individuals not fully vaccinated be implemented based on the level of COVID-19 in the county where the USDA facility is located. If the community level for Deschutes County is high or medium, Attachment 6, Contractor Certification of Vaccination, and proof of vaccination or negative COVID-19 test from within three days, would need to be presented to enter the occupied facility. If community level is high, everyone, regardless of vaccination status, must wear a mask in the occupied facility.
PPM-004
Will the Paint and Haz Mat shed remain permanently located on the pad the contractors are required to pour?
Response: Yes the Paint and Haz Mat sheds will remain permanently located on the pad the contractors are required to pour. A temporary location for these two buildings may be required if the contractor desires to move them prior to concrete pad completion. Power service will be required to be provided to these two buildings in the temporary location.
Could the meters be relocated to the sheds themselves?
Response: Yes, this can be considered, however, it will require coordination with the Power Company
PPM-005
Will safety fencing be required around the construction site?
Response: No. However, the construction site will be required to comply with all OSHA standards.
PPM-006
Will the FS keep all the logs from trees needing to be cut?
Response: Yes. The Contractor will be required to limb and buck all logs above 7” D.B.H. and transport them to the USFS Whychus Pit on Forest Service Road 16. Approximate travel distance is 10 miles. All stumps, tops, limbs and other tree debris generated from tree clearing will be the responsibility of the Contractor to dispose of off Forest Service Land.
PPM-007
Will the Forest Service be providing temporary power and water for contractor use?
Response: No, Contractor will have to work with the electrical provider to establish a temporary power connection point and will have to work with the city of Sister Public Works Department to obtain a temporary meter to connect to one of the existing fire hydrants on the site.
1240BH22R0014
Amendment 1 https://www.saferfederalworkforce.gov/faq/contractors/ https://www.saferfederalworkforce.gov/faq/contractors/ https://www.cdc.gov/coronavirus/2019-ncov/science/community-levels.html
PPM-008
Who is the Electrical provider?
Response: Central Electric Coop (CEC).
PPM-009
Is there a Geo Tech report for the site?
Response: Yes. A copy can be obtained by requesting one from Contract COR Chad Houchin at (541) 408-2870
PPM-010
Will electricity and concrete pads be required for the Storage Containers and where are they being relocated to?
Response: No electricity or concrete pads will be necessary for the Storage Containers. See attached Exhibit 01 for new Storage Container location. Forest Service will be responsible for removing contents of Storage Containers prior to Contractor relocating them.
PPM-011
Will the trenching of asphalt require repaving?
Response: No, all asphalt in this contract area will be replaced in a future phase of construction. Where asphalt is being required to be removed under this contract, compacted gravel will be put in it’s place.
Where concrete is required to be removed a sawcut line with clean edge will be required. Contractors required to use plates or gravel on trenching across bunkhouse driveways so residents have access to parking.
PPM-012
Where will the construction staging area be located?
Response: Once the contract is awarded, discussion can be had about staging and how much room the contractor will need.
PPM-013
Where will construction access to the site be located?
Response: Construction access will be from the north entrance to the property from Pine Street.
PPM-014
What is expectation of electrical to existing Residents onsite?
Response: Underground service is expected to the OUTSIDE of the houses as shown on the drawings.
Setting of new electrical panel and any internal building electrical work are not currently under the scope of this contract.
PPM-015
For the two new water services, can the contractor hot tap the water line or do they need to shut it down for connection?
Response: Hot tap will be ok. See revised Civil Drawing Sheet C3.1 attached to this amendment. The two new water services will be consolidated into one connection and connection is now to existing 10” C-900 water line that runs through property instead of 2” existing water line.
1240BH22R0014
PPM-016
Is there Natural gas service on the site?
Response: No, there is no natural gas services to the site.
PPM-017
Occupancy of existing Residents onsite. Contractor to plan for occupancy of existing residences onsite.
Vehicle Access will be required to the residents with reasonable delays allowed due to required site and utility work.
PPM-018
Relocation of existing storage shed and car port (note #10 on Civil Drawing C1.2). Contractor will be responsible for disassembling covered car port and relocating car port to area identified on attached Exhibit 01. Re-assembly of car port will not be required. Other storage building identified by note #10 on Civil Drawing C1.2 will also be relocated by contractor to area identified on attached Exhibit 01.
RFI’s
RFI-001
K/A130 - Please verify if dry type sprinklers are required at canopies? No spec section provided.
Response: Fire Sprinkler are not required on this building, and therefore the canopies do not need to have fire sprinklers. The building is well under the maximum allowable area of 9000 sf which is the threshold where fire sprinklers would be required.
RFI-002
Will landscape/irrigation drawings be provided?
Response: Landscape is not in the scope of this project and will not be provided. Spec section have been removed from the spec book.
RFI-003
A101 - Will trash enclosure details be provided? Drawings note details on A101, none listed.
Response: The trash enclosure is not in the scope of this project and will not be provided.
RFI-004
C2/A210 - P-Lam wainscot @ Janitor. Please clarify is this is meant for FRP? If wainscot, please provide spec info.
Response: Yes, FRP
RFI-005
C2.1 & A100 - Will updated civil drawings be released to reflect architectural site plan?
Response: No, to the design team’s knowledge the architectural site plan and civil plans match.
RFI-006
A100 - Are fuel and paint storage building included in this phase? If so, will drawings be released.
Response: the fuel and paint storage are not buildings. However, these are existing conex type storage containers that will be relocated during this phase.
1240BH22R0014
RFI-007
A100 - Fence/gate details? Please include/clarify if included in this phase.
Response: All fencing and gates are not in the scope of this project and will not be provided.
RFI-008
A120 - Specs state for 4" CMU Veneer, however finish legend (A120) calls out for 8", 10", or 12".
Please clarify.
Response: 4” CMU Veneer.
RFI-009
2/E100 - Provide connection to future admin building. Admin building is not in scope, please clarify if meant for vault system connection. Civil drawing does not reflect this scope.
Response: The sheet keynote #2 should read “Provide conduit from storage building for future administration building connection to access door per manufacturer shop drawing requirements.
Coordinate with Civil drawings and Division 27.” Electrical drawing to be revised.
RFI-010
E100 - Primary Feed for utility shows the conduit going to UT Pole #102552. We can only figure what is shown on the drawings, please provide length or updated drawing.
Response: Refer to Civil drawing C3.1 for exact location of utility pole #102552.
RFI-011
1/E501 - Single Phase Service, the PUD booklet calls out a direct connect metering at the service entrance, are we to install this service as shown?
Response: Per CEC, a CT cabinet is required at services 400A (continuous) or larger.
RFI-012
E501 - Feeder from the X-frmr to the terminal cabinet (400A) is calling out conductors by PUD and installed by contractor, this is not standard procedure, is this note correct? Please clarify.
Response: Per discussion with CEC, secondary conductors furnished and installed by PUD.
Electrical drawing to be revised.
RFI-013
E702 - RV Meter Pedestal - What manufacturer and model is called for? Please clarify. Very few designs available.
Response: RV Meter Pedestal manufacturer and model noted on site plan E100, sheet keynote #6.
RFI-014
4/T100 - Note references sheet A103 for more information, no A103 sheet provided. Will this sheet be provided?
Response: The reference has been removed. There is not a sheet A103 in the set.
RFI-015
Page A100 states that the landscaping scope does not occur until Phase 3 construction. However, there is a spec for landscaping and irrigation in the spec book. Is there no landscaping scope during this phase?
Is gravel the finish material for the active construction area during this phase?
Response: No landscaping or irrigation is required in this contract and associated specs have been removed. Gravel is the finish material for this contract
1240BH22R0014
RFI-016
Page A100 calls out a gate and perimeter fence. However, there is no spec for these exterior improvements. Is the Gate and Fencing part of a later phase in this project?
Response: No gates or fences are part of this contract. They are part of a later phase of construction.
RFI-017
Do you want us to supply the Air compressor (AC-10) that appears on P002 under Misc Equipment Schedule, or will this be OFCI?
Response: Air Compressor to be CFCI
RFI-018
How long to you want to logs to be that we are moving off site to the forest pit?
Response: The Contractor will be required to limb and buck all logs above 7” D.B.H. and transport them to the USFS Whychus Pit on Forest Service Road 16. Approximate travel distance is 10 miles. All stumps, tops, limbs and other tree debris generated from tree clearing will be the responsibility of the Contractor to dispose of off Forest Service land.
RFI-019
Regarding 01 57 19 The Indoor Air Quality Controls “Will test reports be required during course of construction. Do the 1.06F Air Contaminant Test Plan and the 1.06G Air Contaminant Test Report refer to the completed/post construction HVAC system and the air quality for the Forest Service Staff occupying the structure. Or will testing be required during the construction period as well?
Response: Test Reports and Testing refer to completed/post construction HVAC system and air quality.
RFI-020
There is no reference to an Environmental Protection Plan (EPP). Will an EPP be required for this project?
Response: A NPDES permit is not required however Contractor will be required to develop and submit an Erosion Control and Sediment that meets EPA requirements. See specification 01 57 13.
RFI-021
We noticed that a TP-1 is called out in the mechanical room, but it’s not in the fixture/equip schedule. We didn’t see it in the mech/elec schedules either. Our guess is that it’s an electronic trap primer servicing the floor drains. Can you please clarify?
Response: Response will be provided in a follow up amendment
RFI-022
Per finish legend. Manufacturer to be Beuner Block which is located in Salt Lake City Utah. Please confirm local supplier Willamette Graystone or Mutual Material to be approved supplier.
Response: No substitutions are allowed prior to bidding. Substitutions of materials that meet the salient characteristics of the basis of design in the contract will be considered and likely approved after contract award.
Color to be Natural Gray. Please provide texture and confirm 4” thickness, not 8”,10” & 12” as noted Response: thickness to be 4”. Texture to be Split Face
1240BH22R0014
RFI-023
The solicitation mentions the requirement for the contractor to “perform construction practices and reporting that help obtain a Green Building certification.” Will the contractor be required to provide a certification (to include a Green Globes Assessor), or simply to use biobased and recovered materials and report those to the Forest Service?
Response: The Owner and Designer have already engaged and paid the Green Globes fee and an Assessor has already been assigned to the project. Contractor will be responsible for following the Contractor requirements identified in the Specifications.
RFI-024
There is fencing shown on the civil plans but no spec section or drawing details. Can the USFS provide these?
Response: No gates or fences are part of this contract. They are part of a later phase of construction.
RFI-025
The finish schedule on the drawings details out wall paint but makes no mention of the paint for the ceilings. Please clarify.
Response: A120 Finish Plan - the room finish schedule is for walls only. However, our Finish Legend calls ceiling paint out as PT5. A130 Reflected Ceiling Plan – Calls out PT5 on the legend
USFS Sisters Storage Building Pre-Proposal Meeting Attendance Sheet
6/1/2022
Name Company Contact Info
Robin Davis Griffin Construction 971-940-5960 robind@griffinconstructionllc.com
Daniel Weiner Seabee Construction 541-684-4002 d.weiner@builtbyseabee.com
Tim Perdue RJS Construction 503-910-9964 tim.perdue@rjsconst.com
Charlie Daniels Doyan Management Services 253-350-6758 Charles.Daniels@Doyongovgrp.com
Denny Watts Glen/Mar Construction 808-482-1361 dennywatts@gmail.com
Andy Brown Glan/Mar Construction 503-650-1720 andy@glenmarconstruction.com
Will Turner Cedar Mill Construction 503-332-6458 will@cedarmillcc.com
Dennis Williams Deluge Electric 541-280-7384 deluge@bendbroadband.com
Vic Andermatt DSL Builders 503-302-3124 vica@dsl-builders.com
Andrew Johnson Einstein Pros 541-420-8888 andrew@einsteinpros.com
Matt Freeman CS Construction 541-517-5912 mattf@csconstruction.com
1240BH22R0014
Amendment 1 mailto:robind@griffinconstructionllc.com mailto:d.weiner@builtbyseabee.com mailto:tim.perdue@rjsconst.com mailto:Charles.Daniels@Doyongovgrp.com mailto:dennywatts@gmail.com mailto:andy@glenmarconstruction.com mailto:will@cedarmillcc.com mailto:deluge@bendbroadband.com mailto:vica@dsl-builders.com mailto:andrew@einsteinpros.com mailto:mattf@csconstruction.com
6/10/22, 3:00 PM SAM.gov https://sam.gov/wage-determination/OR20220025/4 1/8
"General Decision Number: OR20220025 05/20/2022
Superseded General Decision Number: OR20210025
State: Oregon
Construction Type: Building
County: Deschutes County in Oregon.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/18/2022
1240BH22R0014
https://sam.gov/wage-determination/OR20220025/4 2/8
2 02/25/2022 3 04/01/2022 4 05/20/2022
BROR0001-017 06/01/2020
Rates Fringes
BRICK FINISHER...................$ 26.94 14.94
BRICKLAYER.......................$ 41.20 22.39
TILE FINISHER....................$ 26.94 14.81
TILE SETTER......................$ 35.35 20.42
* CARP1503-007 06/01/2021
Rates Fringes
Carpenters:
Hardwood floors and batt insulation..................$ 43.97 18.56 Including metal stud installation, from work and scaffold building.......$ 43.80 18.56
CARP9001-004 06/01/2020
Rates Fringes
Acoustical Ceiling Installer & Drywall Hanger.................$ 42.04 18.01
ELEC0280-010 01/01/2022
Rates Fringes
ELECTRICIAN......................$ 49.36 20.20
ELEC0280-012 01/01/2021
Rates Fringes
ELECTRICIAN (Alarm Installation, Computer Installation and Low Voltage wiring for Alarms)...............$ 34.93 16.00
ENGI0701-023 01/01/2020
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 45.90 15.35
GROUP 1A....................$ 48.06 15.35
GROUP 1B....................$ 50.22 15.35
GROUP 2.....................$ 43.99 15.35
GROUP 3.....................$ 42.84 15.35
GROUP 4.....................$ 41.01 15.35
GROUP 5.....................$ 39.77 15.35
GROUP 6.....................$ 36.55 15.35
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: CRANE: Helicopter Operator, when used in erecting work; Whirley Operator, 90 ton and over; LATTICE BOOM CRANE: Operator 200 tons through 299 tons, and/or over 200
1240BH22R0014
https://sam.gov/wage-determination/OR20220025/4 3/8 feet boom; HYDRAULIC CRANE: Hydraulic Crane Operator 90 tons through 199 tons with luffing or tower attachments
GROUP 1A: HYDRAULIC CRANE: Hydraulic Operator, 200 tons and over (with luffing or tower attachment); LATTICE BOOM CRANE: Operator, 200 tons through 299 tons, with over 200 feet boom;
GROUP 1B: LATTICE BOOM CRANE: Operator, 300 tons through 399 tons with over 200 feet boom; Operator 400 tons and over
GROUP 2: CRANE: Cableway Operator, 25 tons and over;
HYDRAULIC CRANE: Hydraulic crane operator 90 tons through 199 tons (without luffing or tower attachment);
TOWER/WHIRLEY OPERATOR: Tower Crane Operator; Whirley Operator, under 90 tons; LATTICE BOOM CRANE: 90 through 199 tons and/or 150 to 200 feet boom; HYDRAULIC CRANE:
Hydraulic crane operator, 50 tons through 89 tons (with luffing or tower attachment); BLADE: Auto Grader;Blade Operator-Robotic; Rubber tired scraper with tandom scrapers, multi-engineTrenching Machine-Wheel Operator;
Excavator over 130,000 lbs
GROUP 3: HYDRAULIC CRANE: Hydraulic crane operator, 50 tons through 89 tons (without luffing or tower attachment);
LATTICE BOOM CRANES: Lattice Boom Crane-50 through 89 tons (and less than 150 feet boom); Rubber Tired Scraper: with tandom scrapers; self loading, paddle wheel, auger type, finish and/or 2 or more units; Excavator over 80,000 through 130,000 lbs
GROUP 4: CRANE: Hydraulic Crane Operator, under 50 tons;
LATTICE BOOM CRANE OPERATOR: Lattice Boom Crane Operator, under 50 tons; TRACKHOE/EXCAVATOR-ROBOTIC: up to and including 20,0000 lbs. with any or all attachments;
Excavator Operator over 20,000 lbs through 80,000 lbs.;
BLADE: Blade operator; Tractor operator with boom attachment; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator over 20,000 lbs pullback; CRANE: Chicago boom and similar types; Boom type lifting device, 5 ton capacity or less; HYDRAULIC HOES:
Robotic Hydraulic backhoe operator, track and wheel type up to and including 20,0000 lbs. with any or all attachments;
Asphalt Paver; Screed Operator; Rubber-Tired Scraper, single engine, single scraper; Compactor-Self Propelled;
Trenching Machine, digging capacity over 3 ft Depth;
Excavator over 20,000 lbs through 80,000 lbs.
GROUP 5: TRACKHOE/EXCAVATOR-HYDRAULIC: up to and including 20,000 lbs.; Boom truck operator; DRILLING: Churm Drill and Earth Boring Machine Operator; Directional Drill Operator less than 20,000 lbs pullback; HYDRAULIC HOES: Hydraulic Backhoe Operator, wheel type (Ford, John Deere, Case type);
Hydraulic Backhoe Operator track type up to and including 20,000 lbs.; Concrete Pumper; Concrete Paver: Compactor
GROUP 6: LOADERS: (less than 1 cu yd.); Roller (Non-Asphalt); Oiler; Bobcat/Skid Loader; Grade Checker;
Crane oiler
Zone Differential (add to Zone 1 rates):
Zone 2 - $3.00 Zone 3 - $6.00
For the following metropolitan counties: MULTNOMAH;
1240BH22R0014
https://sam.gov/wage-determination/OR20220025/4 4/8
CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA;
CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS
INDICATED:
All jobs or projects located in Multnomah, Clackamas and Marion Counties, West of the western boundary of Mt. Hood National Forest and West of Mile Post 30 on Interstate 84 and West of Mile Post 30 on State Highway 26 and West of Mile Post 30 on Highway 22 and all jobs or projects located in Yamhill County, Washington County and Columbia County and all jobs or porjects located in Clark & Cowlitz County, Washington except that portion of Cowlitz County in the Mt.
St. Helens ""Blast Zone"" shall receive Zone I pay for all classifications.
All jobs or projects located in the area outside the identified boundary above, but less than 50 miles from the Portland City Hall shall receive Zone II pay for all classifications.
All jobs or projects located more than 50 miles from the Portland City Hall, but outside the identified border above, shall receive Zone III pay for all classifications.
For the following cities: ALBANY; BEND; COOS BAY; EUGENE;
GRANTS PASS; KLAMATH FALLS; MEDFORD; ROSEBURG
All jobs or projects located within 30 miles of the respective city hall of the above mentioned cities shall receive Zone I pay for all classifications.
All jobs or projects located more than 30 miles and less than 50 miles from the respective city hall of the above mentioned cities shall receive Zone II pay for all classifications.
All jobs or projects located more than 50 miles from the respective city hall of the above mentioned cities shall receive Zone III pay for all classifications.
IRON0029-011 01/03/2022
Rates Fringes
IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 41.13 30.72
LABO0737-005 06/01/2020
Rates Fringes
Laborers: (Mason Tender-Cement/Concrete)..........$ 32.71 15.40
LABO0737-006 06/01/2020
Rates Fringes
Laborers: (Mason Tender-Brick)...$ 32.71 15.40
LABO0737-007 06/01/2020
Rates Fringes
1240BH22R0014
https://sam.gov/wage-determination/OR20220025/4 5/8
Laborers: (Mason Tender-Stone)...$ 32.71 15.40
LABO0737-013 06/01/2021
Rates Fringes
Laborers:
GROUP 1.....................$ 33.48 16.23
GROUP 2.....................$ 34.71 16.23
LABORER CLASSIFICATIONS
GROUP 1: Form-Stripping, Power Tool Operator
GROUP 2: Vibrating Plate, Grade Checker, Pipelayer
PAIN0055-021 07/01/2019
Rates Fringes
DRYWALL FINISHER/TAPER...........$ 38.48 16.71
PLAS0082-003 07/01/2021
Rates Fringes
PLASTERER........................$ 39.65 18.98
PLAS0555-006 07/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 35.52 19.42
PLUM0290-008 04/01/2022
Rates Fringes
Plumbers and Pipefitters.........$ 50.68 31.16
* SUOR2009-023 11/09/2009
Rates Fringes
ELECTRICIAN (Low Voltage Wiring)..........................$ 20.75 9.30
GLAZIER..........................$ 22.25 11.21
LABORER: Common or General......$ 18.71 7.27
LABORER: Landscape..............$ 14.02 ** 2.63
OPERATOR: Forklift..............$ 19.09 7.89
PAINTER: Brush Only.............$ 13.70 ** 3.16
PAINTER: Roller.................$ 13.70 ** 3.16
PAINTER: Spray..................$ 12.00 ** 2.36
ROOFER, Excludes Installation of Metal Roofs...................$ 16.31 5.38 https://sam.gov/wage-determination/OR20220025/4 6/8
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 30.92 8.61
TRUCK DRIVER: Dump Truck........$ 15.50 9.05
TRUCK DRIVER: Water Truck.......$ 18.40 5.33
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number
1240BH22R0014
https://sam.gov/wage-determination/OR20220025/4 7/8 where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for
1240BH22R0014
https://sam.gov/wage-determination/OR20220025/4 8/8 the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.