Amend1 - E100 - SITE PLAN - ELECTRICAL.pdf

PDF 365 KB Posted

Attached to
USFS Sisters Storage Building Federal contract opportunity
Solicitation number
1240BH22R0014
Issued by
Department of Agriculture Forest Service R6-Pacific Northwest Region

About this file

This document includes an electrical site plan and details for a federal solicitation. The site plan shows the layout for electrical infrastructure at a new storage building for the US Forest Service Sisters Ranger District. It specifies connections from the storage building to other structures, locations for utility transformers and secondary vaults, and conduit routing. The solicitation is for construction of the storage building and seeks bids by 1 June 2022. A pre-proposal conference will be held on that date at 10:00 AM at the Sisters Ranger District office. Attendees must show proof of Covid vaccination or a negative test to enter the building if community transmission levels are high or medium on that date in Dechutes County, Oregon. The solicitation was issued on 18 May 2022 by the USDA Forest Service Pacific Northwest Region for contract number 1240BH22R0014.

View the file

Other files for this federal contract opportunity

Other files attached to USFS Sisters Storage Building, newest first.
File Type Posted
Amendment 5.pdf PDF
Amendment 4.pdf PDF
Amend4 - Equipment Removal List for Sisters Ranger District.pdf PDF
Amend3 - 07 25 00-RIB-Weather Barriers-06-20-2022.pdf PDF
Amendment 3.pdf PDF
Amendment 2.pdf PDF
Amend2 - P002 - SCHEDULES - PLUMBING.pdf PDF
Amend1 - C3.1.Util Plan PH I.pdf PDF
Amendment 1.pdf PDF
Amend1 - T100 - SITE PLAN - TECHNOLOGY.pdf PDF
Amend1 - Exhibit 01.pdf PDF
Amend1 - E501 - SINGLE LINE DIAGRAMS - ELECTRICAL.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
CompleteSolicitation.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WM

WS

WS

WM

M M

(E) BLDG

#1037

(10K AIC)

(E) BLDG

#1011

(22K AIC)

(E) BLDG

#1025

(10K AIC)

(E) BLDG

#1041

(10K AIC)

(E) BLDG

#1038

(10K AIC)

NEW OLDCASTLE

PRECAST 575 VAULT,

PAD MOUNT UTILITY

1-PH TRANSFORMER

NEW SECONDARY

FEEDER TO NEW

STORAGE BUILDING,

(2) 4"C.

S

S

S

NEW STORAGE BUILDING

T

S

S

S

S

'SA1'

'SA1'

'SA1'

'SB2'

'SB1'

'SA1'

'SA1''SA2'

RELOCATED

HAZARD

STORAGE

1"C.

1"C.

1"C.

1"C.

1"C.

43.

43.

43.

43.

43.

43.

43.

43.

S

P

S

P

S

S

S

P

P

P

P

TO UT POLE #102552,

REFER TO CIVIL PLANS

S

S

S

S

S

S

S

S

1 2

E701

E701

E701

E701

TYP.

72,74.

S

S

S

S

CAP CONDUIT FOR

FUTURE EXTENSION

TO NEW SITE POLE

CAP CONDUIT FOR

FUTURE EXTENSION

TO NEW SITE POLE.

(2) 4"C.

(1) 3"C.

(1) 3"C.

(1) 3"C.

(1) 3"C.

(1) 3"C.

SECONDARY

FLUSH WITH GRADE

VAULT, UTILITY

FURNISHED /

INSTALLED

P

P

P

(2) 4"C.

CAP CONDUIT FOR

FUTURE UTILITY

CONDUIT ROUTING.

CAP CONDUIT FOR

FUTURE UTILITY

CONDUIT ROUTING.

(2) 4"C.

(2) 4"C.

(1) 3"C.

E703

E703

#10 CU

S

S

(1) 3"C.

RV PARKING

STALL PEDESTAL

UTILITY METERS

E702

E501

SECONDARY FLUSH

WITH GRADE VAULT,

UTILITY FURNISHED /

INSTALLED

COPYRIGHT 2021

STEELE ASSOCIATES

ARCHITECTS

All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.

A S

S O

C

IA

T E

S A

R C

H

IT

E C

T S

L L C

N W

Y O

R K

D R

IV

E

S U

IT

E

B

E N

D O

R

.3

.9

F

A X

.3

.8 w w w

.s te e le

-a rc h .c o m

JOB NO.

DATE

DRAWN BY CHECKED BY

SHEET NO.

5 4 3 2 1

D

C

B

A

D

C

B

A

5 4 3 2 1

EXPIRES: 12/31/22

/8

/2

:3

:5

A

M

E100

MOKL

20145.01

C D

S U

B M

IT

T

A L

J A

N U

A R

Y

S

IT

E P

L A

N

E L E

C T

R

IC

A L

SITE PLAN - ELECTRICAL

01/28/2022

S

IS

T E

R S

O R

E G

O N

U S

F S

S

IS

T E

R S

R A

N G

E R

D

IS

T R

IC

T

S T

O R

A G

E B

L D

G

PROJECT

CONTACT

www.interfaceengineering.com

KRISTINE LEAVENS

2020-0398

100 SW Main Street, Suite 1600 Portland, OR 97204

TEL 503.382.2266

0' 40' 80'

1" = 40'-0"

1 SITE PLAN - ELECTRICAL N

O R T H

SHEET KEYNOTES

1 PROVIDE CONNECTION FROM STORAGE BUILDING TO MOTORIZED

VEHICLE ACCESS DOOR PER MANUFACTURER SHOP DRAWING

REQUIREMENTS. COORDINATE WITH CIVIL DRAWINGS AND DIVISION 27.

2 PROVIDE CONDUIT FROM STORAGE BUILDING FOR FUTURE

ADMINISTRATION BUILDING CONNECTION TO ACCESS DOOR PER

MANUFACTURER SHOP DRAWING REQUIREMENTS. COORDINATE WITH

CIVIL DRAWINGS AND DIVISION 27.

3 PROVIDE CONDUIT WITH PULL-STRING FOR FUTURE RECONNECTION TO

EXISTING UTILITY METER.

4 UTILITY TRANSFORMER, EXACT LOCATION TO BE CONFIRMED WITH

CENTRAL ELECTRIC COOP.

5 CONFIRM SECONDARY FLUSH VAULT LOCATIONS / REQUIREMENTS WITH

UTILITY PRIOR TO BID.

#10 CU ENTIRE

CIRCUIT

#10 CU ENTIRE

CIRCUIT

#10 CU ENTIRE

CIRCUIT

#10 CU ENTIRE

CIRCUIT

REV. DATE DESCRIPTION

1 06/08/22 Addendum - 01

GENERAL SHEET NOTES

A CONFIRM SECONDARY CONDUIT QUANTITY FOR WITH CENTRAL

ELECTRIC COOP PRIOR TO ROUGH-IN.

6 PROVIDE TWO (2) 100A, 120/240V RV PARKING STALL UTILITY METER

PEDESTAL WITH INTEGRAL 50A / 30A / 20A BREAKERS AND NEMA 14-15 /

TT-30 / 5-20 RECEPTACLES; EATON PEDESTAL CHM1N7N4NPTZ OR

APPROVED EQUIVALENT.

Sheets
E100 - SITE PLAN - ELECTRICAL

File details come from the government source that posted it. Updated .