Amend1 - E100 - SITE PLAN - ELECTRICAL.pdf
PDF 365 KB Posted
- Attached to
- USFS Sisters Storage Building Federal contract opportunity
- Solicitation number
- 1240BH22R0014
About this file
This document includes an electrical site plan and details for a federal solicitation. The site plan shows the layout for electrical infrastructure at a new storage building for the US Forest Service Sisters Ranger District. It specifies connections from the storage building to other structures, locations for utility transformers and secondary vaults, and conduit routing. The solicitation is for construction of the storage building and seeks bids by 1 June 2022. A pre-proposal conference will be held on that date at 10:00 AM at the Sisters Ranger District office. Attendees must show proof of Covid vaccination or a negative test to enter the building if community transmission levels are high or medium on that date in Dechutes County, Oregon. The solicitation was issued on 18 May 2022 by the USDA Forest Service Pacific Northwest Region for contract number 1240BH22R0014.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 5.pdf | ||
| Amendment 4.pdf | ||
| Amend4 - Equipment Removal List for Sisters Ranger District.pdf | ||
| Amend3 - 07 25 00-RIB-Weather Barriers-06-20-2022.pdf | ||
| Amendment 3.pdf | ||
| Amendment 2.pdf | ||
| Amend2 - P002 - SCHEDULES - PLUMBING.pdf | ||
| Amend1 - C3.1.Util Plan PH I.pdf | ||
| Amendment 1.pdf | ||
| Amend1 - T100 - SITE PLAN - TECHNOLOGY.pdf | ||
| Amend1 - Exhibit 01.pdf | ||
| Amend1 - E501 - SINGLE LINE DIAGRAMS - ELECTRICAL.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| CompleteSolicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WM
WS
WS
WM
M M
(E) BLDG
#1037
(10K AIC)
(E) BLDG
#1011
(22K AIC)
(E) BLDG
#1025
(10K AIC)
(E) BLDG
#1041
(10K AIC)
(E) BLDG
#1038
(10K AIC)
NEW OLDCASTLE
PRECAST 575 VAULT,
PAD MOUNT UTILITY
1-PH TRANSFORMER
NEW SECONDARY
FEEDER TO NEW
STORAGE BUILDING,
(2) 4"C.
S
S
S
NEW STORAGE BUILDING
T
S
S
S
S
'SA1'
'SA1'
'SA1'
'SB2'
'SB1'
'SA1'
'SA1''SA2'
RELOCATED
HAZARD
STORAGE
1"C.
1"C.
1"C.
1"C.
1"C.
43.
43.
43.
43.
43.
43.
43.
43.
S
P
S
P
S
S
S
P
P
P
P
TO UT POLE #102552,
REFER TO CIVIL PLANS
S
S
S
S
S
S
S
S
1 2
E701
E701
E701
E701
TYP.
72,74.
S
S
S
S
CAP CONDUIT FOR
FUTURE EXTENSION
TO NEW SITE POLE
CAP CONDUIT FOR
FUTURE EXTENSION
TO NEW SITE POLE.
(2) 4"C.
(1) 3"C.
(1) 3"C.
(1) 3"C.
(1) 3"C.
(1) 3"C.
SECONDARY
FLUSH WITH GRADE
VAULT, UTILITY
FURNISHED /
INSTALLED
P
P
P
(2) 4"C.
CAP CONDUIT FOR
FUTURE UTILITY
CONDUIT ROUTING.
CAP CONDUIT FOR
FUTURE UTILITY
CONDUIT ROUTING.
(2) 4"C.
(2) 4"C.
(1) 3"C.
E703
E703
#10 CU
S
S
(1) 3"C.
RV PARKING
STALL PEDESTAL
UTILITY METERS
E702
E501
SECONDARY FLUSH
WITH GRADE VAULT,
UTILITY FURNISHED /
INSTALLED
COPYRIGHT 2021
STEELE ASSOCIATES
ARCHITECTS
All rights reserved. Reproduction or use in any form or by any means- graphic, electronic, mechanical, etc.- without written permission of STEELE ASSOCIATES ARCHITECTS is unlawful and subject to criminal prosecution.
A S
S O
C
IA
T E
S A
R C
H
IT
E C
T S
L L C
N W
Y O
R K
D R
IV
E
S U
IT
E
B
E N
D O
R
.3
.9
F
A X
.3
.8 w w w
.s te e le
-a rc h .c o m
JOB NO.
DATE
DRAWN BY CHECKED BY
SHEET NO.
5 4 3 2 1
D
C
B
A
D
C
B
A
5 4 3 2 1
EXPIRES: 12/31/22
/8
/2
:3
:5
A
M
E100
MOKL
20145.01
C D
S U
B M
IT
T
A L
J A
N U
A R
Y
S
IT
E P
L A
N
E L E
C T
R
IC
A L
SITE PLAN - ELECTRICAL
01/28/2022
S
IS
T E
R S
O R
E G
O N
U S
F S
S
IS
T E
R S
R A
N G
E R
D
IS
T R
IC
T
S T
O R
A G
E B
L D
G
PROJECT
CONTACT
www.interfaceengineering.com
KRISTINE LEAVENS
2020-0398
100 SW Main Street, Suite 1600 Portland, OR 97204
TEL 503.382.2266
0' 40' 80'
1" = 40'-0"
1 SITE PLAN - ELECTRICAL N
O R T H
SHEET KEYNOTES
1 PROVIDE CONNECTION FROM STORAGE BUILDING TO MOTORIZED
VEHICLE ACCESS DOOR PER MANUFACTURER SHOP DRAWING
REQUIREMENTS. COORDINATE WITH CIVIL DRAWINGS AND DIVISION 27.
2 PROVIDE CONDUIT FROM STORAGE BUILDING FOR FUTURE
ADMINISTRATION BUILDING CONNECTION TO ACCESS DOOR PER
MANUFACTURER SHOP DRAWING REQUIREMENTS. COORDINATE WITH
CIVIL DRAWINGS AND DIVISION 27.
3 PROVIDE CONDUIT WITH PULL-STRING FOR FUTURE RECONNECTION TO
EXISTING UTILITY METER.
4 UTILITY TRANSFORMER, EXACT LOCATION TO BE CONFIRMED WITH
CENTRAL ELECTRIC COOP.
5 CONFIRM SECONDARY FLUSH VAULT LOCATIONS / REQUIREMENTS WITH
UTILITY PRIOR TO BID.
#10 CU ENTIRE
CIRCUIT
#10 CU ENTIRE
CIRCUIT
#10 CU ENTIRE
CIRCUIT
#10 CU ENTIRE
CIRCUIT
REV. DATE DESCRIPTION
1 06/08/22 Addendum - 01
GENERAL SHEET NOTES
A CONFIRM SECONDARY CONDUIT QUANTITY FOR WITH CENTRAL
ELECTRIC COOP PRIOR TO ROUGH-IN.
6 PROVIDE TWO (2) 100A, 120/240V RV PARKING STALL UTILITY METER
PEDESTAL WITH INTEGRAL 50A / 30A / 20A BREAKERS AND NEMA 14-15 /
TT-30 / 5-20 RECEPTACLES; EATON PEDESTAL CHM1N7N4NPTZ OR
APPROVED EQUIVALENT.
| Sheets |
| E100 - SITE PLAN - ELECTRICAL |
File details come from the government source that posted it. Updated .