This is a bid tabulation spreadsheet from the Nebraska Department of Administrative Services (DAS) for 1.5" Crusher Run Rock and optional 3/8" Washed, 1" Crusher Run Rock and Crushed Rock for Surfacing Aggregate. The document shows bids from six vendors (Armstrong Rentals LLC, CenCon of Kansas LLC, Gana Trucking & Excavating, Jeffres Sand and Gravel Inc, Koch Excavating Co Inc, and Westover Rock & Sand Inc) for deliveries to multiple locations across Nebraska Department of Transportation (NDOT) districts. The contract opening date is listed as February 21, 2025, and includes 23 primary line items for 1.5" crusher run rock deliveries ranging from 100 to 2,000 tons per location, plus 32 alternate optional locations for various rock types in 25-ton quantities.
The bid amounts range significantly based on delivery location, with prices varying from approximately $29.80 to $88.60 per ton for the main line items. Total bid amounts from the vendors ranged from $76,950 to $628,541. CenCon of Kansas LLC submitted the lowest total bid at $76,950, though they only bid on one line item. Several vendors submitted "no bid" responses for certain locations, particularly in the alternate optional locations section. The pricing structure is based on per-ton unit prices with extended prices calculated for the total quantity at each delivery point.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| 1.5" CRUSHER RUN ROCK AND OPTIONAL 3/8 " WASHED, 1" CRUSHER RUN ROCK AND CRUSHED ROCK FOR SURFACING AGGREGATE | Armstrong Rentals, LLC | CenCon of KANSAS LLC | Gana Trucking & Excavating | Jeffres Sand and Gravel Inc | Koch Excavating Co, Inc. | Westover Rock & Sand, Inc. | ||||||||||
| Description | Qty | UOM | UNIT PRICE | EXTENDED PRICE | UNIT PRICE | EXTENDED PRICE | UNIT PRICE | EXTENDED PRICE | UNIT PRICE | EXTENDED PRICE | UNIT PRICE | EXTENDED PRICE | UNIT PRICE | EXTENDED PRICE | ||
| 1 | 1-1/2" CRUSHER RUN ROCK - D1 | |||||||||||||||
| GREENWOOD YARD | 500 | TN | $ 30.55 | $ 15,275.00 | $ 32.57 | $ 16,285.00 | $ 31.25 | $ 15,625.00 | $ 36.65 | $ 18,325.00 | $ 29.80 | $ 14,900.00 | ||||
| 2 | 1-1/2" CRUSHER RUN ROCK - D1 | |||||||||||||||
| SUPERIOR STREET YARD | 300 | TN | $ 33.15 | $ 9,945.00 | $ 35.63 | $ 10,689.00 | $ 32.85 | $ 9,855.00 | $ 40.45 | $ 12,135.00 | $ 34.40 | $ 10,320.00 | ||||
| 3 | 1-1/2" CRUSHER RUN ROCK - D1 | |||||||||||||||
| WAHOO YARD | 300 | TN | $ 34.15 | $ 10,245.00 | $ 37.08 | $ 11,124.00 | $ 34.25 | $ 10,275.00 | $ 39.65 | $ 11,895.00 | $ 35.35 | $ 10,605.00 | ||||
| 4 | 1-1/2" CRUSHER RUN ROCK - D1 | |||||||||||||||
| DAVID CITY YARD | 300 | TN | $ 37.93 | $ 11,379.00 | $ 41.90 | $ 12,570.00 | $ 37.20 | $ 11,160.00 | $ 43.43 | $ 13,029.00 | $ 38.95 | $ 11,685.00 | ||||
| 5 | 1-1/2" CRUSHER RUN ROCK - D1 |
HWY 136
| MM 172 2.5 MI South West of BEATRICE | 1500 | TN | $ 36.10 | $ 54,150.00 | $ 41.26 | $ 61,890.00 | $ 38.45 | $ 57,675.00 | $ 29.75 | $ 44,625.00 | $ 36.00 | $ 54,000.00 |
| 6 | 1-1/2" CRUSHER RUN ROCK - D1 |
HWY 50, MM14
| NORTH SIDE OF PAWNEE CITY | 2000 | TN | $ 34.65 | $ 69,300.00 | $ 41.26 | $ 82,520.00 | $ 35.85 | $ 71,700.00 | $ 32.20 | $ 64,400.00 | $ 34.50 | $ 69,000.00 | |||
| 7 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| HWY 33, 0.5 MI EAST OF DORCHESTER | 500 | TN | $ 36.00 | $ 18,000.00 | $ 39.49 | $ 19,745.00 | $ 38.40 | $ 19,200.00 | $ 32.95 | $ 16,475.00 | $ 36.00 | $ 18,000.00 | |||
| 8 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| HWY 15, MM 24 13 MI North of FAIRBURY | 1500 | TN | $ 38.49 | $ 57,735.00 | $ 43.35 | $ 65,025.00 | $ 42.50 | $ 63,750.00 | $ 33.25 | $ 49,875.00 | $ 39.30 | $ 58,950.00 | |||
| 9 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| SALT VALLEY YARD | 800 | TN | $ 31.75 | $ 25,400.00 | $ 43.35 | $ 34,680.00 | $ 34.00 | $ 27,200.00 | $ 37.34 | $ 29,872.00 | $ 34.40 | $ 27,520.00 | |||
| 10 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| NEBRASKA CITY YARD | 1500 | TN | $ 30.78 | $ 46,170.00 | $ 33.37 | $ 50,055.00 | $ 31.85 | $ 47,775.00 | $ 35.00 | $ 52,500.00 | $ 30.75 | $ 46,125.00 | |||
| 11 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| DUNBAR YARD | 1500 | TN | $ 30.55 | $ 45,825.00 | $ 31.93 | $ 47,895.00 | $ 31.65 | $ 47,475.00 | $ 33.00 | $ 49,500.00 | $ 30.45 | $ 45,675.00 | |||
| 12 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| FALLS CITY YARD | 1000 | TN | $ 38.60 | $ 38,600.00 | $ 43.51 | $ 43,510.00 | $ 41.65 | $ 41,650.00 | $ 49.72 | $ 49,720.00 | $ 37.50 | $ 37,500.00 | |||
| 13 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| HWY 136 MM 209 | 1500 | TN | $ 31.74 | $ 47,610.00 | $ 34.34 | $ 51,510.00 | $ 34.85 | $ 52,275.00 | $ 31.98 | $ 47,970.00 | $ 31.55 | $ 47,325.00 | |||
| 14 | 1-1/2" CRUSHER RUN ROCK - D1 | ||||||||||||||
| HWY 4, MM 204 | 1500 | TN | $ 35.35 | $ 53,025.00 | $ 28.00 | $ 42,000.00 | $ 36.90 | $ 55,350.00 | $ 37.53 | $ 56,295.00 | $ 34.35 | $ 51,525.00 | |||
| 15 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| FREMONT YARD | 100 | TN | $ 36.65 | $ 3,665.00 | $ 38.84 | $ 3,884.00 | no bid | $ 34.35 | $ 3,435.00 | $ 35.00 | $ 3,500.00 | ||||
| 16 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| BLAIR YARD | 100 | TN | $ 35.15 | $ 3,515.00 | $ 37.88 | $ 3,788.00 | no bid | $ 32.40 | $ 3,240.00 | $ 30.75 | $ 3,075.00 | ||||
| 17 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| 108TH Street Yard, OMAHA | 100 | TN | $ 34.15 | $ 3,415.00 | $ 33.70 | $ 3,370.00 | no bid | $ 38.15 | $ 3,815.00 | $ 34.00 | $ 3,400.00 | ||||
| 18 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| MORMON BRIDGE YARD | 100 | TN | $ 34.15 | $ 3,415.00 | $ 35.63 | $ 3,563.00 | no bid | $ 32.80 | $ 3,280.00 | $ 31.00 | $ 3,100.00 | ||||
| 19 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| SOUTH OMAHA YARD | 100 | TN | $ 34.15 | $ 3,415.00 | $ 34.82 | $ 3,482.00 | no bid | $ 39.40 | $ 3,940.00 | $ 34.00 | $ 3,400.00 | ||||
| 20 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| MELIA HILL YARD | 100 | TN | $ 32.65 | $ 3,265.00 | $ 33.37 | $ 3,337.00 | no bid | $ 32.65 | $ 3,265.00 | $ 31.25 | $ 3,125.00 | ||||
| 21 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| ELKHORN YARD | 100 | TN | $ 33.00 | $ 3,300.00 | $ 36.11 | $ 3,611.00 | no bid | $ 39.75 | $ 3,975.00 | $ 34.00 | $ 3,400.00 | ||||
| 22 | 1-1/2" CRUSHER RUN ROCK - D2 | ||||||||||||||
| PLATTSMOUTH YARD | 100 | TN | $ 34.00 | $ 3,400.00 | $ 34.02 | $ 3,402.00 | no bid | $ 33.65 | $ 3,365.00 | $ 33.00 | $ 3,300.00 | ||||
| 23 | 1-1/2" CRUSHER RUN ROCK - D7 | ||||||||||||||
| HWY N-23, MM 13, NEAR GRANT | 1000 | TN | $ 88.60 | $ 88,600.00 | $ 76.95 | $ 76,950.00 | No Bid | $ 80.085 | $ 80,085.00 | $ 83.61 | $ 83,610.00 | $ 75.95 | $ 75,950.00 | ||
| ALTERNATE OPTIONAL LOCATIONS AND MATERIALS | i | ||||||||||||||
| 24 | 3/8" WASHED CRUSHED ROCK - D1 |
ALTERNATE OPTIONAL LOCATIONS
1400 HICKMAN ROAD
| ROCO, NE 68430 | 25 | TN | $ 45.40 | $ 45.64 | $ 0.22 | $ 53.19 |
| 25 | 1.0" CURSHER RUN ROCK -D1 |
ALTERNATE OPTIONAL LOCATIONS
1400 HICKMAN ROAD
| ROCO, NE 68430 | 25 | TN | $ 32.65 | $ 35.79 | $ 0.22 | $ 42.41 |
| 26 | 1.5" CURSHER RUN ROCK -D1 |
ALTERNATE OPTIONAL LOCATIONS
1400 HICKMAN ROAD
| ROCO, NE 68430 | 25 | TN | $ 32.65 | $ 35.79 | $ 0.22 | $ 42.41 |
| 27 | CRUSHED ROCK - SURFACING -D1 |
ALTERNATE OPTIONAL LOCATIONS
1400 HICKMAN ROAD
| ROCO, NE 68430 | 25 | TN | $ 32.65 | $ 35.79 | $ 0.22 | $ 42.41 |
| 28 | 3/8" WASHED CRUSHED ROCK - D2 |
ALTERNATE OPTIONAL LOCATIONS
4425 S. 108TH STREET
| OMAHA, NE 68137 | 25 | TN | $ 43.40 | $ 44.45 | $ 0.22 | $ 45.93 |
| 29 | 1.0" CRUSHER RUN ROCK - D2 |
ALTERNATE OPTIONAL LOCATIONS
4425 S. 108TH STREET
| OMAHA, NE 68137 | 25 | TN | $ 31.65 | $ 33.70 | $ 0.22 | $ 35.65 |
| 30 | 1.5" CRUSHER RUN ROCK - D2 |
ALTERNATE OPTIONAL LOCATIONS
4425 S. 108TH STREET
| OMAHA, NE 68137 | 25 | TN | $ 31.65 | $ 33.70 | $ 0.22 | $ 35.65 |
| 31 | CRUSHED ROCK - SURFACING - D2 |
ALTERNATE OPTIONAL LOCATIONS
4425 S. 108TH STREET
| OMAHA, NE 68137 | 25 | TN | $ 31.66 | $ 33.70 | $ 0.22 | $ 35.65 |
| 32 | 3/8" WASHED CRUSHED ROCK - D3 |
ALTERNATE OPTIONAL LOCATIONS
HWY 32, MM 33.27
| 1 MI WEST OF MADISON | 25 | TN | $ 61.55 | No Bid | $ 0.19 | $ 58.73 |
| 33 | 1.0" CRUSHER RUN ROCK - D3 |
ALTERNATE OPTIONAL LOCATIONS
HWY 32, MM 33.27
| 1 MI WEST OF MADISON | 25 | TN | $ 49.80 | No Bid | $ 0.19 | $ 47.98 |
| 34 | 1.5" CRUSHER RUN ROCK - D3 |
ALTERNATE OPTIONAL LOCATIONS
HWY 32, MM 33.27
| 1 MI WEST OF MADISON | 25 | TN | $ 49.80 | No Bid | $ 0.19 | $ 47.98 |
| 35 | CRUSHED ROCK- SURFACING - D3 |
ALTERNATE OPTIONAL LOCATIONS
HWY 32, MM 33.27
| 1 MI WEST OF MADISON | 25 | TN | $ 49.80 | No Bid | $ 0.19 | $ 47.98 |
| 36 | 3/8" WASHED CRUSHED ROCK - D4 |
ALTERNATE OPTIONAL LOCATIONS
I-80/L40C ALDA INTERCHANGE
| NORTHEAST CORNER | 25 | TN | $ 64.55 | $ 62.95 | No Bid | $ 0.19 | $ 62.05 |
| 37 | 1.0" CRUSHER RUN ROCK - D4 |
ALTERNATE OPTIONAL LOCATIONS
I-80/L40C ALDA INTERCHANGE
| NORTHEAST CORNER | 25 | TN | $ 53.80 | $ 58.95 | No Bid | $ 0.19 | $ 51.30 |
| 38 | 1.5" CRUSHER RUN ROCK - D4 |
ALTERNATE OPTIONAL LOCATIONS
I-80/L40C ALDA INTERCHANGE
| NORTHEAST CORNER | 25 | TN | $ 53.80 | $ 58.95 | No Bid | $ 0.19 | $ 51.30 |
| 39 | CRUSHED ROCK-SURFACING - D4 |
ALTERNATE OPTIONAL LOCATIONS
I-80/L40C ALDA INTERCHANGE
| NORTHEAST CORNER | 25 | TN | $ 53.80 | $ 58.95 | No Bid | $ 0.19 | $ 51.30 |
| 40 | 3/8" WASHED CRUSHED ROCK - D5 |
ALTERNATE OPTIONAL LOCATIONS
140375 RUNDELL ROAD
| GERING, NE 69341 | 25 | TN | No bid | No Bid | $ 0.18 | $ 114.52 |
| 41 | 1.0" CRUSHER RUN ROCK - D5 |
ALTERNATE OPTIONAL LOCATIONS
140375 RUNDELL ROAD
| GERING, NE 69341 | 25 | TN | No Bid | No Bid | $ 0.18 | $ 103.77 |
| 42 | 1.5" CRUSHER RUN ROCK - D5 |
ALTERNATE OPTIONAL LOCATIONS
140375 RUNDELL ROAD
| GERING, NE 69341 | 25 | TN | No Bid | No Bid | $ 0.18 | $ 103.77 |
| 43 | CRUSHED ROCK - SURFACING - D5 |
ALTERNATE OPTIONAL LOCATIONS
140375 RUNDELL ROAD
| GERING, NE 69341 | 25 | TN | No Bid | No Bid | $ 0.18 | $ 103.77 |
| 44 | 3/8" WASHED CRUSHED ROCK- D6 |
ALTERNATE OPTIONAL LOCATIONS
123 LAKE AVE, PO BOX 394
| GOTHENBURG, NE 69138 | 25 | TN | $ 79.40 | $ 60.95 | No Bid | $ 0.18 | $ 81.05 |
| 45 | 1.0 CRUSHER RUN ROCK - D6 |
ALTERNATE OPTIONAL LOCATIONS
123 LAKE AVE, PO BOX 394
| GOTHENBURG, NE 69138 | 25 | TN | $ 67.65 | $ 56.95 | No Bid | $ 0.18 | $ 70.31 |
| 46 | 1.5 CRUSHER RUN ROCK - D6 |
ALTERNATE OPTIONAL LOCATIONS
123 LAKE AVE, PO BOX 394
| GOTHENBURG, NE 69138 | 25 | TN | $ 67.65 | $ 56.95 | No Bid | $ 0.18 | $ 70.31 |
| 47 | CRUSHED ROCK - SURFACING - D6 |
ALTERNATE OPTIONAL LOCATIONS
123 LAKE AVE, PO BOX 394
| GOTHENBURG, NE 69138 | 25 | TN | $ 67.65 | $ 56.95 | No Bid | $ 0.18 | $ 70.31 |
| 48 | 3/8" WASHED CRUSHED ROCK - D7 |
ALTERNATE OPTIONAL LOCATIONS
38764 US HIGHWAY 6
| 2 MI EAST OF MCCOOK | 25 | TN | $ 84.49 | $ 64.75 | No Bid | $ 0.18 | $ 86.52 |
| 49 | 1.0" CRUSHER RUN ROCK - D7 |
ALTERNATE OPTIONAL LOCATIONS
38764 US HIGHWAY 6
| 2 MI EAST OF MCCOOK | 25 | TN | $ 72.74 | $ 60.75 | No Bid | $ 0.18 | $ 75.77 |
| 50 | 1.5" CRUSHER RUN ROCK - D7 |
ALTERNATE OPTIONAL LOCATIONS
38764 US HIGHWAY 6
| 2 MI EAST OF MCCOOK | 25 | TN | $ 72.74 | $ 60.75 | No Bid | $ 0.18 | $ 75.77 |
| 51 | CRUSHED ROCK - SURFACING - D7 |
ALTERNATE OPTIONAL LOCATIONS
38764 US HIGHWAY 6
| 2 MI EAST OF MCCOOK | 25 | TN | $ 72.74 | $ 60.75 | No Bid | $ 0.18 | $ 75.77 |
| 52 | 3/8" WASHED CRUSHED ROCK - D8 |
ALTERNATE OPTIONAL LOCATIONS
HWY 12, MM 80.6
| SPRING VIEW, NE 68778 | 25 | TN | $ 94.00 | No Bid | $ 0.18 | $ 85.80 |
| 53 | 1.0" CRUSHER RUN ROCK - D8 |
ALTERNATE OPTIONAL LOCATIONS
HWY 12, MM 80.6
| SPRING VIEW, NE 68778 | 25 | TN | $ 82.00 | No Bid | $ 0.18 | $ 75.05 |
| 54 | 1.5" CRUSHER RUN ROCK - D8 |
ALTERNATE OPTIONAL LOCATIONS
HWY 12, MM 80.6
| SPRING VIEW, NE 68778 | 25 | TN | $ 82.00 | No Bid | $ 0.18 | $ 75.05 |
| 55 | CRUSHED ROCK - SURFACING - D8 |
ALTERNATE OPTIONAL LOCATIONS
HWY 12, MM 80.6
| SPRING VIEW, NE 68778 | 25 | TN | $ 82.00 | No Bid | $ 0.18 | $ 75.05 | ||||||
| TOTAL | $ 618,649.00 | $ 76,950.00 | $ 577,935.00 | $ 611,050.00 | $ 628,541.00 | $ 605,380.00 | ||||||
| Payment Terms | ||||||||||||
| Delivery Days ARO | ||||||||||||
| COMMENTS |
PROCUREMENT CONTRACTS OFFICER
BRENDA SENSIBAUGH 121021 OR
&9 1.5" CRUSHER RUNN ROCK AND OPTIONAL 3/8 " WASHED, 1" CRUSHER RUN ROCK AND CURSHED ROCK FOR SURFACING AGGREGATE &10
NDOT OPENING DATE: FEBRUARY 21, 2025
Page &P of &N
File details come from the government source that posted it. Updated .