12_PART_B_-_General_Conditions_(final_8-28-25).pdf

PDF 257 KB Posted

Attached to
Payne Avenue Improvements
Solicitation number
AR2612
Issued by
Cuyahoga County, Ohio

About this file

This document is the General Conditions (Part B) for public improvement contracts issued by the City of Cleveland, Ohio, establishing the standard contractual framework and obligations for construction and service projects undertaken by the municipality. The General Conditions apply to all contractors performing work for the City and establish foundational requirements including project commencement within five days of contract execution, completion timelines as specified in individual bids, and performance standards for all contracted work. The document does not address specific project details, quantities, response dates, or award information, as it functions as a template of standard terms applicable across multiple City projects rather than specifications for a particular solicitation.

The General Conditions establish comprehensive financial, insurance, and compliance requirements for all contractors. Contractors must maintain public liability insurance of at least $500,000 per person and $1,000,000 per occurrence, property damage insurance of at least $200,000, and automobile liability coverage as specified. Payment terms include retainage of three percent until fifty percent completion, then 1.5 percent until final acceptance, with contracts under $500,000 exempt from retainage requirements. The document mandates compliance with prevailing wage requirements as determined by the Ohio Department of Industrial Relations, adherence to the Cleveland Area Business Code regarding Certified Small Business (CSB), Minority Business Enterprise (MBE), and Female Business Enterprise (FBE) participation, and comprehensive indemnification protecting the City from claims arising from contractor performance. Liquidated damages are set at $25 per calendar day for project delays unless otherwise specified in supplemental conditions, and the contractor bears all costs for materials, equipment, labor, permits, licenses, workers' compensation, and project insurance throughout the contract term.

View the file

Other files

File Type Posted
Payne_Avenue_Improvements_(Addendum_#2_Revision).pdf PDF
Payne_RFP_MAILING_LIST_-_DB.pdf PDF
2023_Payne_Avenue_Condition_Assessment_Report.pdf PDF
Payne_Avenue_Criteria_Documents.pdf PDF
22_PW_RATES_-_COVER_LETTER_(2024.12.27).pdf PDF
23_Wage_Theft_PDF_Version.pdf PDF
21_PW_CERTIFIED_PAYROLL_REPORT_-_OHIO_(2024.12.27).pdf PDF
18_PW_INSTRUCTIONS_FOR_PREPARING_CERTIFIED_REPORTS_-_OHIO_(2024.12.27).pdf PDF
16_PW_CONTRACTOR_RESPONSIBILITY_-_OHIO_(2024.12.27).pdf PDF
17_PW_NOTIFICATION_TO_EMPLOYEE_-_OHIO_(2024.12.27).pdf PDF
18_PW_AFFIDAVIT_OF_COMPLIANCE_-_OHIO_(2024.12.27).pdf PDF
19_PW_THRESHOLD_LEVELS_-_OHIO_(2024.01.01).pdf PDF
15_Prev_Wage_Notification_(2024.12.27).pdf PDF
13_PART_C_-_SUPPLEMENTAL_GENERAL_CONDITIONS__2025_09_16.pdf PDF
14_PW_NOTICE_-Valerie_Harvey_(2024.12.27).pdf PDF
08_City_of_Cleveland_Sustainable_Building_Policy_2013-04.pdf PDF
11_FORM_CWM-8_CONSTRUCTION_WASTE.pdf PDF
03_Subcontractor_Addition_and_Subtraction_Policy.pdf PDF
06_2023_Reimbursables_Policy.pdf PDF
10_FORM_CWM-7_DEMOLITION_WASTE.pdf PDF
01_NORTHERN_IRELAND_DISCLOSURE.pdf PDF
02_CCO_187-22.pdf PDF
04_DASD_Minimum_Deliverables_(2026.03.11).pdf PDF
05B_Design-Build_Agreement_Sample_for_MOCAP.pdf PDF
07_Cleveland_City-Wide_Asbestos_Policy_(2017.05.19).pdf PDF
09_017419_CONSTRUCTION_WASTE_MANAGEMENT_AND_DISPOSAL.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART B - GENERAL CONDITIONS

(Revised August 28,2025)

Contents

B-1. CONTRACT DOCUMENTS

B-2. DEFINITIONS

B-3. TIME OF ESSENCE

B-4. TIME OF COMMENCEMENT AND COMPLETION OF WORK

B-5. LIQUIDATED DAMAGES FOR DELAY

B-6. DELAY FOR CAUSES BEYOND CONTROL

B-7. STORAGE OF MATERIALS

B-8. RESPONSIBILITY OF CONTRACTOR

B-9. DUTY AND RESPONSIBILITY OF CONTRACTOR FOR PLANT AND METHODS

B-10. STRUCTURES ENCOUNTERED AND PROTECTION OF PROPERTY

B-11. PROTECTION OF WORK, LIFE AND PROPERTY

B-12. WATCHMEN

B-13. SANITARY PROVISIONS

B-14. AID TO THE INJURED

B-15. WATER SUPPLY

B-16. ACCESSIBILITY OF FIRE HYDRANTS AND STOP VALVES

B-17. REMOVAL OF RUBBISH

B-18. PUBLIC LIABILITY, PROPERTY DAMAGE AND AUTOMOBILE INSURANCE

B-19. ACCESS TO WORK AND PLACE OF MANUFACTURE

B-20. EXPERIMENTAL METHODS, EQUIPMENT AND MATERIAL PROHIBITED

B-21. STATUS OF CITY INSPECTOR

B-22. LAWS, PERMITS AND REGULATIONS

B-23. BLASTING

B-24. OTHER CONTRACTS

B-25. PATENTS

B-26. STATE INDUSTRIAL COMPENSATION

B-27. SOCIAL SECURITIES ACT

B-28. EIGHT HOUR DAY-MINIMUM WAGE AND NON-DISCRIMINATION

B-29. PREVAILING RATES OF WAGES

B-30. STATE OR FEDERAL TAXES

B-31. LABOR AND MATERIALMEN

B-32. ASSIGNMENT

B-33. SUBCONTRACTING

B-34. ALTERATIONS OR MODIFICATIONS OF CONTRACT. (Section 168, Charter of the

City of Cleveland)

B-35. FAILURE TO MEET PERFORMANCE REQUIREMENTS

B-36. ANNULMENT OF CONTRACT

B-37. ACCEPTANCE OF PERFORMANCE

B-38. GUARANTEE

B-39. TERMS OF PAYMENT

B-40. NO WAIVER OF LEGAL RIGHTS

B-41. INDEMNIFICATION

B-42. FIRE AND EXTENDED COVERAGE INSURANCE

B-43. COMPLIANCE WITH THE CLEVELAND AREA BUSINESS CODE (Chapter 187, Codified Ordinances)

B-44. CITY’S REMEDIES

, 2025)

B-1. CONTRACT DOCUMENTS.

A. The following shall constitute the Contract Documents and shall be deemed the Contract made pursuant to this Invitation to Bid:

(1). The Ordinance or Ordinance authorizing the making of the public improvement.

(2). The Invitation to Bid, General Conditions, Supplemental General Conditions and Detail Specifications.

(3). The Contract Drawings.

(4). All Addenda issued by the City prior to the receipt of bids.

(5). The Affidavit of Non-Collusion.

(6). The Bid.

(7). The Resolution of the Board of Control awarding the Contract.

(8). The Agreement.

(9). All required Bonds and Policies of Insurance.

(10). All provisions required by law, charter or ordinance to be inserted in the Contract, whether actually inserted or not.

B-2. DEFINITIONS.

A. The following words and expressions, or pronouns used in their stead, shall, wherever they appear herein, be construed as follows, unless a different meaning is clear from the context:

(1). “Addendum” or “Addenda” shall mean the additional contract requirements prepared by the Director and issued in writing, by means of drawings, or both, by the Commissioner of Purchases and Supplies prior to the receipt of bids.

(2). “City” shall mean the City of Cleveland, Ohio.

(3). “Contract” or “Contract Documents” shall mean each of the various parts of the contract referred to in

Part B-1 hereof, both as a whole and severally and shall include subsidiary agreements, if any.

(4). “Contractor” shall mean the corporation, firm or individual, or any combination thereof, and its, their or his successors, personal representatives, executors, administrators and assigns, and any person, firm or corporation who or which shall at any time be substituted therefore under this contract, and shall include in their respective capacities, the President, Manager, or other officer or agent for the time being, representing or locally managing the work of any corporation contracting herein.

(5). “Contract Drawings” shall mean those identified as such in the contract documents and shall include those issued in connection with any addendum, or issued in connection with any proper subsidiary agreement and shall also include any other detail or explanatory drawings issued during the progress of the work which are consistent with the contract documents, true developments thereof or reasonably inferable therefrom.

(6). “Specifications” shall mean all of the directions, requirements and standards of performance applying to the work as hereinafter detailed an designated under specifications.

(7). “Contract Work” or “Work” shall include the furnishing of all labor, materials, tools, equipment, incidentals, and any other thing necessary or required for the full performance of the contract by the Contractor, including all such required or necessary as called for in any proper subsidiary agreement.

(8). “Director” shall mean the director of the department for which the improvement is being made.

(9). “Final Acceptance” shall mean final acceptance of the work by the Director, as evidenced by his signature upon his certificate of completion and acceptance filed in the Office of Commissioner of Accounts of the City, copy of which shall be sent to the Contractor. Such acceptance shall be deemed to have taken place as of the date so stated in such certificate.

(10). “Law” or “Laws” shall mean the Constitution of the State of Ohio, the Cleveland City Charter, a statue of the United States or of the State of Ohio, The Codified Ordinances of the City of Cleveland, and any municipal ordinance, rule or regulation having the force of law which is applicable to this contract.

(11). “Materialman” or “Material Supplier” shall mean any person, firm or corporation, other than employees of the contractor, who or which contracts with the Contractor, or any sub-contractor to fabricate or deliver, or who actually fabricates or delivers, materials, plant, or equipment to be incorporated in the work.

(12). “Subcontractor” shall mean anyone (other than the contractor and his employees) who performs work (other than or in addition to the furnishing of materials, plant or equipment) at or about the construction site, directly or indirectly for or on behalf of the contractor (and whether or not in privity of contract with the contractor), but shall not include any person who furnished merely his own personal labor or his own personal services.

(13). “Workman”, “Worker”, or “Laborer” shall mean any employee of the Contractor or of a Subcontractor, who performs personal labor or personal services at the construction site.

(14). “Directed”, “Required”, “Approved”, and words of like import whenever they refer to the work or its performance; and the words “directed”, “required”, “permitted”, “ordered”, “designated”, “established”, “prescribed”, and words or like import used in the specifications, the contract, or upon the drawings, shall imply the direction, requirement, permission, order, designation or prescription of the

Director; and “approved” - “acceptable” - “satisfactory”, and words of like import shall mean approved by or acceptable or satisfactory to the Director.

(15). “Site” shall mean the area upon or in which the Contractor’s operations are carried on, and such other areas adjacent thereto as may be designated as such by the Director.

B-3. TIME OF ESSENCE.

Since this Contract is for a needed improvement, the provisions relating to the time of performance and time of completion of the work included in this Contract are of the essence of this Contract. The Contractor shall begin work on the day specified in paragraph B-4 and shall prosecute the work diligently so as to assure completion of the work not later than the time specified therefor, or the time of completion extended, pursuant to paragraph B-6 hereof.

B-4. TIME OF COMMENCEMENT AND COMPLETION OF WORK.

A. The work to be performed herein shall start within five (5) days after the execution of the Contract and without further notices from the Director, except as otherwise provided in the Supplemental General Conditions;

provided in case of special conditions arising after the execution of the Contract the Director and the Contractor may agree in writing to postpone the commencement of the work hereunder.

B. This Contract shall be deemed executed when signed by the parties thereto, certified by the Director of Finance as required by law, secured by the required bond, approved by the Director of Law, and when the original contract is filed with the Commissioner of Accounts of the City and a copy delivered to the Contractor. Under normal conditions a contract will be executed within approximately 6 (six) weeks after approval of the contract.

C. Unless fixed by the Director, or otherwise provided in the Supplemental General Conditions, the bidder shall state in its bid the date on or before which the work herein contemplated will be completed and ready for Final Acceptance. (Where equal bids are received, the date of completion will be used in determining the lowest responsible bid.)

B-5. LIQUIDATED DAMAGES FOR DELAY.

The Contractor guarantees that it can and will complete the work on or before the time fixed in its bid, or on or before the extended time as provided under Section B-6 below. For the reason that the damage and loss to the City which will result from the failure of the Contractor to complete the work at the time fixed will be most difficult or impossible of accurate assessment, the damages to the City for such delay and failure on the part of the Contractor shall be liquidated in the amount of Twenty-Five Dollars ($25.00), or in the amount fixed in the Supplemental General Conditions, for each calendar day which the Contractor shall fail to complete the work, or any part thereof, in accordance with the provisions of this Contract and such liquidated damages shall not be considered as a penalty. The City will deduct and retain out of any money due or to become due under this Contract the amount of the liquidated damages and, in case those amounts are less than the amount of the liquidated damages, the Contractor shall be liable for the payment of the difference upon demand of the City.

B-6. DELAY FOR CAUSES BEYOND CONTROL.

A. If the Contractor is delayed in the completion of the work by any act or neglect of the City, or by any other contractor employed by the City, or by changes ordered in the work; or by strikes, lockouts, fire, unusual delay by common carriers, unavoidable casualties, or any cause beyond the Contractor’s control, including orders, limitations, or restrictions of any Governmental agency having jurisdiction over the subject matter of this Contract, or by delay authorized by the City, or by any cause which the Director shall decide to justify the delay; then, for all such delays and suspensions, the Contractor shall be allowed one calendar day extension beyond the time herein stated for completion of the work for each and every calendar day of such delay so caused in the completion of the work, the same to be ascertained by the Director.

B. No such extension shall be made for any one or more of such delays unless within ten (10) days after the beginning of such delay a written request for additional time shall be filed with the Director. In case of a continuing cause of delay, only one request will be necessary.

C. [Reserved] D. When by reason of any of the causes stated herein an extension of time has been allowed the Contractor for the completion of his or her work, he or she shall not be entitled to a bonus for completion prior to the date so extended, anything in the Contract Documents to the contrary notwithstanding.

B-7. STORAGE OF MATERIALS.

A. The Contractor shall make all necessary arrangements and provisions for the storage of materials and equipment to be used on this Contract.

B. Materials and equipment which are to become the property of the City, shall be so stored as to facilitate their prompt inspection and insure preservation of the quality and fitness of the work, including proper protection against damage by freezing and wet weather; and they shall be placed under cover on wooden platforms or other hard, clean surfaces, and not on the ground, when so directed. Whenever the best interest of the City so requires, upon order of the Director, the Contractor shall promptly provide improved storage facilities and methods.

C. Lawns, grass plots or other private property shall not be used for storage purposes without written permission of the owner, his agent or other person in possession or control of such premises.

D. The City disclaims all responsibility for loss or damage to stored materials or equipment, or both.

B-8. RESPONSIBILITY OF CONTRACTOR.

A. The City will not insure the work under construction, nor against claims for injury to person or property arising during the prosecution of such work.

B. The Contractor will be held responsible for all damage to the work under construction, whether from fire, water, high winds, or other causes until Final completion and Acceptance, even though partial payments have been made under this Contract. He or she will be held answerable for all damages that may occur to persons, property, animals, or vehicles from want of proper shoring, bracing, lighting, watching, boarding or enclosing, and for any accident arising from defective scaffolding or apparatus, or from any negligence on the part of himself or his employees.

B-9. DUTY AND RESPONSIBILITY OF CONTRACTOR FOR PLANT AND METHODS.

The Contractor shall provide and install such construction plants and shall use such methods and appliances for the performance of all the operations connected with the work to be done under this Contract as will secure the safety of the work and those working on it, a satisfactory quality of the work and a rate of progress which will insure the completion of the work within the time specified. If at any time before the commencement or during the progress of the work, or any part of it, such methods and appliances appear to be unsafe, inefficient or inadequate for securing the safety of the workers, the quality of the work or the rate of progress required, the Director may order the Contractor to increase safety measures or to improve their character, and the Contractor shall comply with such orders; but the failure of the Director to make such a demand shall not release the Contractor from his obligation to secure the safe conduct and the quality of the work, and the rate of progress required, and the Contractor alone shall be responsible for the safety, efficiency and adequacy of his or her plant, appliances and methods.

B-10. STRUCTURES ENCOUNTERED AND PROTECTION OF PROPERTY.

A. The Contractor shall, at its own expense, support and protect all buildings, bridges, conduits, wires, water pipes, gas pipes, sewers, pavements, curbing, sidewalks, equipment and fixtures of all kinds and all other public or private property, whether of this or another Contract, that may be encountered or endangered in the prosecution of the work herein contemplated and that are not otherwise provided for in the Charter or franchise relating to same. The Contractor shall repair and make good any damage caused to any such property by reason of its operations leaving all work in approved condition at the completion of the contract.

B. The City reserves the right to repair any damage to public utilities or other facilities of the City caused by the work of the Contractor and the cost of such repair shall be borne by the Contractor. In the event the Contractor refuses or fails to pay bills for such repair work upon presentation, without prejudice to any other remedies available to the City, the cost of the same shall be deducted from any money that may be due to him on partial or final estimates as herein provided.

B-11. PROTECTION OF WORK, LIFE AND PROPERTY.

The Contractor shall provide proper facilities, take all necessary precautions and assume the entire cost for protecting the work against adverse weather conditions and for handling all storm and flood water, sewage, seepage, ice or snow that may be encountered during the performance of this Contract and the manner of providing for such contingencies and for carrying on the work in freezing weather shall meet with the approval of the City.

B-12. WATCHMEN.

A. The Contractor shall provide the necessary watchmen and sufficient warning lights and barricades at its own expense and shall take such other precautions as are necessary to protect life and property.

B. The Director may at any time order the Contractor to provide watchmen or additional watchmen at any point where, in the Director’s opinion, they are required, or where they may be requested by the proper official of any municipality affected.

C. Nothing in this section shall be construed as requiring the Contractor to provide a road patrol.

B-13. SANITARY PROVISIONS.

The Contractor shall provide and maintain in a neat and sanitary condition such accommodations for the use of its employees as may be necessary to comply with the sanitary requirements of law and ordinance.

B-14. AID TO THE INJURED.

The Contractor shall have standing arrangements for the immediate removal and hospital treatment, if necessary, of any employee who may be injured on the work. The Contractor shall keep on the work, ready for immediate use, all articles necessary for giving “First Aid to the Injured”.

B-15. WATER SUPPLY.

A. The Contractor may obtain water from the City water supply by obtaining the necessary fire hydrant permit from the Department of Public Utilities and shall pay all charges for the service. No improper, wasteful or undue use of water will be permitted.

B. When the water supply to be used is in a Master Meter Municipality, permission shall be obtained by the Contractor from that municipality before any water is used, and the cost of such water supply shall be paid by the Contractor to said municipality.

B-16. ACCESSIBILITY OF FIRE HYDRANTS AND STOP VALVES.

Fire hydrants and stop valves adjacent to the work shall be kept readily accessible to fire apparatus and no material or other obstruction shall be placed within five (5) feet of any hydrant or stop valve unless by special permission of the proper authorities.

B-17. REMOVAL OF RUBBISH.

The Contractor shall, at its own expense keep the site of its operation, building or structure being worked on clean during the construction and remove all rubbish as it accumulates. Upon the completion of the work, the Contractor shall tear down and remove all temporary structures it built; shall remove all rubbish of all kinds from any grounds which it occupied and shall leave the site and the work in a clean and neat condition.

B-18. PUBLIC LIABILITY, PROPERTY DAMAGE AND AUTOMOBILE INSURANCE.

A. The Contractor shall take out and maintain during the life of this Contract such public liability and property damage insurance, wherein the City of Cleveland is included as an additional insured, as shall protect himself or herself, the City and any Subcontractor performing work covered by this Contract from claims for damage for personal injury, including accidental death, as well as from claims for property damages which may arise from operations under this Contract, whether such operations be by himself or herself or by any Subcontractor or by anyone directly or indirectly employed by either of them. An exact copy of such policy or policies shall be deposited with the City of Cleveland before the commencement of any work under the contract. The amounts of such insurance shall be as follows:

B. Public Liability Insurance: In an amount not less than $500,000.00 for injuries, including accidental death to any one person, and subject to the same limit for each person, in an amount not less than $1,000,000.00 on account of one occurrence involving injury to more than one person, and property damage insurance in an amount not less than $200,000.00.

C. The following special hazards shall be covered during the life of this Contract by rider or riders to the policy or policies above required, or by separate policies of insurance in amounts as follows:

(1). Public Liability insurance to cover each automobile, truck or other vehicle used in the performance of the Contract in an amount not less than $500,000.00 on account of injury or death of one person and not less than $1,000,000.00 on account of injury or death of two or more persons.

(2). Property Damage liability insurance to cover each automobile, truck, or other vehicle used in the performance of the Contract in an amount not less than $200,000.00 in any occurrence.

(3). Public Liability and property damage insurance to cover the use of explosives used in the performance of this Contract, in the same limits as set forth in the preceding sub-sections.

The policy shall contain the following special provision: “The Company agrees that ten (10) days prior to cancellation or reduction of the insurance afforded by this policy, with respect to the contract involved, written notice will be mailed to the City of Cleveland”.

B-19. ACCESS TO WORK AND PLACE OF MANUFACTURE.

The Director or his authorized representative and such representative’s staff shall at all times have access to inspect the work wherever it is in preparation, progress, being manufactured or fabricated and the Contractor shall arrange and provide proper facilities for such access and inspection to determine whether such work is being done in accordance with the contract requirements.

B-20. EXPERIMENTAL METHODS, EQUIPMENT AND MATERIAL PROHIBITED.

The use of any experimental or untried methods, or the use or installation of any experimental or untried materials or equipment or any combination of either or both, shall not be allowed. Each bidder shall, if so required by the Director, submit ample proof that the method of doing any of the work contemplated under these specifications has been successfully used for like work for a period of at least one year; or that the materials or equipment or any combination of either or both proposed to be used on, or furnished for such contemplated work, is of a reliable make and is of a type that has been successfully used in practical service outside of the builder’s works, for a period of not less than one year.

B-21. STATUS OF CITY INSPECTOR.

A. Inspectors as designated by the Director are authorized to inspect all work done and materials furnished. Such inspection may extend to all or any part of the work, and to the preparation or manufacture of the materials to be used. In case of any dispute arising between the Contractor and the Inspector as to materials furnished or the manner of performing the work, the Inspector shall have the authority to stop the use of material or suspend the work until the question at issue can be referred to and decided by the Director. The Inspector shall not be authorized to revoke, alter, enlarge, relax or release any requirements of these specifications, nor to approve or accept any portion of the work or to issue instructions contrary to the plans and specifications.

The Inspector shall in no case act as foreman or perform other duties for the Contractor or interfere with the management of the work by the latter. Any advice which the Inspector may give the Contractor shall in no wise be construed as binding the Director in any way or releasing the Contractor from the fulfillment of the terms of the contract.

B. The Contractor is not entitled to any claims for loss of time, damages or anticipated profit due to any time lost from suspension of work and from the referral of the questions at issue to said Director or his representative.

B-22. LAWS, PERMITS AND REGULATIONS.

The Contractor shall comply with all applicable laws of the Federal Government, State of Ohio and Ordinances of the City of Cleveland or other municipality in which the work is being done, and all applicable regulations and any authorized regulations, and shall be responsible for securing at his own expense any and all licenses, permits and certificates of inspection required by law, or by the Contract Documents.

B-23. BLASTING

A. The use, storage and transportation of explosives in and about the work or in the vicinity of the same shall be in accordance with the provisions of Sections 387.01 to 387.99, both inclusive, of the Codified Ordinances of Cleveland, Ohio 1976.

B. In addition, all laws, rules and regulations of the State and the municipalities or townships through which the explosives are to be transported or in which the explosives are to be stored or used shall be complied with.

C. The Contractor shall assume all responsibility for any damage that may be done by the use of any explosives, by it or its agent, in any way, in connection with this Contract, or damage that may be done by explosives that are being stored for, or transported to or from the work.

D. In blasting, great care must be taken not to injure any existing gas or water pipes, sewer drain, conduit or other structures on the site of the work or in adjacent premises, and the Contractor will be responsible for any damage done to these structures.

B-24. OTHER CONTRACTS.

It is understood and agreed that the Contractor shall execute his or her work in such a manner and in such order as will not interfere with work in progress and will permit the City to perform other work or to enter into other contracts for work and materials to be constructed or placed in, on or about the work herein described, with the least interference possible and with complete cooperation whenever it is desirable to prosecute such other work, either simultaneously with the work under this Contract or otherwise. The Director shall decide all questions of priority among separate Contractors.

B-25. PATENTS.

The Contractor shall pay all royalties and license fees and shall hold and save the City and its officers, agents, servants and employees harmless from liability of any nature or kind, including cost and expenses, for or on account of, any patented or unpatented invention, process, article, or appliance manufactured or used in the performance of the contract, including its use by the City unless otherwise specifically stipulated in the Contract

Documents. In this respect the Contractor shall defend all suits or claims for infringement of any patent or license rights.

B-26. STATE INDUSTRIAL COMPENSATION.

The Contractor shall at all times during the term of this Contract subscribe to and comply with the Workmen’s Compensation Laws of the State of Ohio and pay such premiums as may be required thereunder and to save the City harmless from any and all liability arising from or under the act. It shall also furnish at the time of delivery of this Contract and at such other times as may be requested, a copy of the official certificate or receipt showing the payments hereinbefore referred to.

B-27. SOCIAL SECURITIES ACT.

The Contractor shall be and remain an independent contractor with respect to all services performed hereunder and agrees to and does hereby accept full and exclusive liability for the payment of any and all contributions or taxes for social security, unemployment insurance, or old age retirement benefits, pensions, or annuities now or hereafter imposed under any State or Federal Law which are measured by the wages, salaries, or other remuneration paid to persons employed by the Contractor on work performed under the terms of this Contract and further agrees to obey all lawful rules and regulations and to meet all lawful requirements which are now or hereafter may be issued or promulgated under said respective laws by any duly authorized State or Federal officials; and the Contractor also agrees to indemnify and save harmless the City of Cleveland from any such contributions or taxes or liability therefor.

B-28. EIGHT HOUR DAY-MINIMUM WAGE AND NON-DISCRIMINATION.

The Contractor agrees that it will comply with the following provisions of the Charter of the City of Cleveland, which read respectively, as follows:

Section 196. Except in case of extraordinary emergencies, not to exceed eight hours shall constitute a day’s work and not to exceed forty-eight (48) hours a week’s work, for any City employee of the City of Cleveland in the classified service thereof, and for any workmen engaged in any public work carried on or aided by the municipality whether done by contract or otherwise. The Council shall, by ordinance, provide for the enforcement of the provisions of this section.

Section 197. Every contract for public work entered into by the City of Cleveland shall contain, and no contract shall be entered into unless it contains the following stipulations:

The Contractor hereby agrees that all persons employed by him shall be paid wages which are not less than are paid by the City of Cleveland for similar or like work; but if said City has not established a rate of wages for any particular class of work to be performed under the terms of this Contract, then said employees shall be paid wages not less than are generally paid therefor by others employing union labor in said city; but in no event shall any employee be paid less than four dollars and fifty cents ($4.50) per day for eight hours.

The Contractor hereby further agrees that in the employment of labor, skilled or unskilled, under the contract there shall be no discrimination exercised against any citizen because of race, color, religion or national origin; and that any violation hereof shall be deemed a material breach of said contract.

B-29. PREVAILING RATES OF WAGES.

A. Each laborer, workman or mechanic employed by the Contractor for the work herein specified or by the Subcontractor, or by other persons upon such work, shall be paid the prevailing rates of wages as determined by the Department of Industrial Relations, Division of Building and Factory Inspection, of the State of Ohio, the published and approved schedule of which may be obtained at the office of the Director.

B. In the event the wage scale for any labor classification is changed between the time the schedule was approved and the time the work required by this Contract is performed, or in the event any class of labor employed under this Contract, is not included in the published schedule of prevailing wages, then the rate prevailing at the time the work is actually performed as ascertained and determined by the Department of Industrial Relations of the State of Ohio shall govern the work done under this Contract.

C. Every contractor and Subcontractor who is subject to Chapter 4115. of the Revised Code shall, as soon as it begins performance under its contract with any contracting public authority, supply to the prevailing wage coordinator of the contracting public authority a schedule of the dates during the life of his contract with the authority on which it is required to pay wages to employees. It shall also deliver to the prevailing wage coordinator a certified copy of his payroll, within two weeks after the initial pay date, and supplemental report for each month thereafter which shall exhibit for each employee paid any wages, his name, current address, social security number, number of hours worked during each day of the pay periods covered and the total for each week, his hourly rate of pay, his job classification, fringe payments, and deductions from his wages. If the life of the contract is expected to be no more than four months from the beginning of performance by the contractor or subcontractor, such supplemental reports shall be filed each week after the initial report. The certification of each payroll shall be executed by the contractor, subcontractor, or duly appointed agent thereof and shall recite that the payroll is correct and complete and that the wage rates shown are not less than those required by the contract.

D. Each contractor or subcontractor shall file with the contracting public authority upon completion of the public improvement and prior to final payment thereof an affidavit stating that he has fully complied with Chapter 4115. of the Revised Code. The affidavit is to be filed with the City Commissioner of Accounts.

B-30. STATE OR FEDERAL TAXES.

A. The Contract Price or Prices for the materials contained in this Contract are subject to increase or decrease by the amount of any additional tax or taxes or reduction of such tax or taxes, as the case may be, affecting such commodity imposed by or under authority of the Federal Government or the State of Ohio, which may be enacted after receipt of bids for this Contract and such changes shall continue in effect during the existence of such change in the taxes, provided, however, that in the event of any increase in cost, a claim shall be presented by the Contractor within thirty (30) days and provided that such claim is supported by evidence showing such additional tax, satisfactory to the Director of Law. Reductions in taxes will be deducted from the contract price.

B. The City is exempt from all sales, excise and transportation taxes, except State of Ohio gasoline tax. The price or prices bid, whether a unit price, lump sum price, lot price, or a trade discount from catalogue list prices, shall be exclusive of all such taxes and will be so construed.

B-31. LABOR AND MATERIALMEN.

A. The Contractor shall well, truly, and promptly pay or satisfy the just and equitable claims of all persons who have performed labor or furnished material for the Contractor in the execution of this Contract, including those who have previously filed attested account of such claims with the Director of Finance of the City, and all bills, costs or claims of whatever kind which might in law or equity become a lien upon said work or against the fund from which the same is to be paid or a charge against the City. In case the attested accounts, claims, bills or costs are not paid or adjusted to the satisfaction of the Director of Finance, then it is agreed that the City may proceed as stated in paragraph B of this section.

B. The City may retain out of any monies at any time due to the Contractor a sum sufficient to pay all persons who have done work or furnished labor or materials for the work herein contracted for, and who shall have filed an attested account of such claim with the Director of Finance within four months from the performance of labor or the delivery of materials, stating that any balance for said work or materials is still due and unpaid, which amount may be retained by the City until satisfactory evidence is furnished to the Director of Finance that the balance has been fully paid, and if the evidence is not furnished before the next estimate becoming due to the contractor under the contract, said Director of Finance may pay said balance to the person claiming it and charge such payment to the Contractor as payment under the contract, unless the Contractor shall have previously filed with the Director of Finance written notice that such claim is in dispute. In the event of such dispute, the City will retain the amount until the claim has been adjusted or the money paid into court on proceedings in the nature of an interpleader.

B-32. ASSIGNMENT.

The Contractor shall not assign, transfer, convey or otherwise dispose of this Contract, or his right to execute it, or his right, title or interest in or to it or any part thereof, or assign, by power of attorney or otherwise, any of the moneys due or to become due under this Contract, except by consent of the Board of Control. The giving of any such consent to a particular assignment shall not dispense with the necessity of such consent to any further or other assignments. Such an assignment, transfer or conveyance shall not be valid until filed in the office of the Commissioner of Accounts.

B-33. SUBCONTRACTING.

A. This Contract is made pursuant to the bid submitted by the Contractor and in reliance upon the Contractor’s represented qualifications and responsibility. Therefore:

(1). The Contractor shall not subcontract, sublet, assign, transfer, convey or otherwise dispose of the

Contract, its duties, rights, title or interest in it or in any part thereof, nor shall any subcontractor commence performance of any part of the work included or any materialman deliver or fabricate materials, plant or equipment to be incorporated in the contract, nor shall the Contractor assign, by power of attorney or otherwise, any of the monies due or to become due under the Contract, except, in each instance, with the previous written consent of the Board of Control of the City, expressed through its resolution, and then only upon such terms and conditions as may be agreed to by the Board. No such subcontracting, subletting, assignment, transfer, conveyance or other disposal of the contract shall be valid and effective until the written consent of the Board of Control is attached or endorsed hereto and filed in the Office of the Commissioner of Accounts. Subletting, if permitted, shall not relieve the Contractor or his or her surety of any of his, her or its obligations under the Contract.

(2). Prior written Board of Control consent is required for the Contractor to add a subcontractor or to substitute one subcontractor for another subcontractor, under this Contract. Failure by the Contractor to obtain consent of the Board of Control for any Subcontractor or Materialman shall be a breach of the Contract for which the Contractor may incur a penalty.

(3). The City assumes no obligation to pay, and will not pay, a contractor for any work and or services performed by a sub-contractor on the contract prior to Board of Control approval of that sub-contractor.

(4). The Director will not grant the Contractor additional time to meet project deadlines, and will not authorize or pay additional compensation or delay damages of any kind arising from the contractor’s inability to add or substitute a Subcontractor because the Contractor failed to submit the approval request and supporting documentation at least 3 (three) weeks in advance of the date the additional or substitute Sub-contractor is needed.

(5). The City Office of Equal Opportunity shall evaluate each Subcontractor addition and substitution for increased or decreased CSB, MBE, or FBE participation even if the Contract originally had no certified Sub-contractor participation.

(6). The City's Sub-contractor Addition and Substitution Policy and Procedure is hereby incorporated by reference in its entirety. The complete document is available online at the City of Cleveland website:

http://www.clevelandohio.gov.

(7). In its request for consent to subcontract or sublet any portion of the work, the Contractor shall state in writing the portion of the work which each Subcontractor is to do or the material which it is to furnish, its place of business, and such other information as may be required in order to ascertain whether such Subcontractor is responsible, reliable and able to perform the work or to furnish the materials as called for in the specifications. Subletting, if permitted, shall not relieve the Contractor, or its surety of any of the Contractor’s or its obligations under this Contract

B. Any subcontract for work covered by this Contract must conform to the requirements of the general and detailed provisions of this Contract.

C. The Contractor shall be and remain solely responsible to the City for the acts or faults of his or her Subcontractor and of such Subcontractor’s officers, agents and employees, each of whom shall, for this purpose, be deemed to be the agent or employee of the Contractor to the extent of his subcontract. The Contractor shall promptly, upon request of the Director, file a confirmed copy of the subcontract with prices and terms of payment deleted, as a condition precedent to the approval of a Subcontractor. The Contractor and Subcontractor shall jointly and severally agree that subcontracting does not obligate the City to pay, or see to the payment of any sums to any Subcontractor.

B-34. ALTERATIONS OR MODIFICATIONS OF CONTRACT. (Section 168, Charter of the City of

Cleveland)

Charter Section 168. When in the prosecution of any work or improvement under contract it becomes necessary, in the opinion of the Director of the appropriate department, to make alterations or modifications in such contracts, such alterations or modifications shall be made only when authorized by the Council upon the written recommendations of such director, countersigned by the Mayor. No such alterations shall be valid unless the price to be paid for the work or material, or both, under the altered or modified contract, shall have been agreed upon in writing and signed by the Contractor and such Director prior to authorization by Council.

Consistent with Charter Section 168, for alterations or modifications in the Contract, the Contractor acknowledges and agrees to the following:

A. Changes in the Work - Without invalidating the Contract and without notice to the Contractor’s surety, the City may, at any time, or from time to time, order additions, deletions or revisions in the work, which shall be authorized by a Change Order. Upon receipt of a Change Order, the Contractor shall promptly proceed with the work as altered, the same as if it had been part of the original Contract, whether or not agreement has been reached as to any price adjustment for such work.

B. Change of Contract Price - The Contract Price shall mean the moneys payable by the City to the Contractor under the Contract Documents less the Contingency Allowance. No change in the Contract Price shall be authorized for work required by or reasonably implied as a requirement of the Contract Documents or for work foreseeable at the time of the bid as necessary to complete the project as originally contemplated.

In the event the Contractor is requested or required to perform work neither required by nor reasonably implied as a requirement of the Contract Documents and not foreseeable at the time of the bid as necessary to complete the project as originally contemplated, the Contract Price may be changed for work so performed by Contingency Allowance or by Subsidiary Agreement, provided that:

(1.) Within ten (10) days after the occurrence or non-occurrence of any event giving rise to Contractor’s claim for an adjustment in the Contract Price based on changes in the work, Contractor shall notify the City, in writing, of the general nature of the claim.

(2.) The Contractor shall provide to the Architect or Engineer, within thirty (30) days after such event, the following supporting documentation:

(i) statement of the date, nature and specific circumstances of such event;

(ii) copies of all correspondence regarding such event;

(iii) identification of all work which has been or may be affected by such event;

(iv) itemization of all labor, materials and equipment for which a price adjustment is claimed;

(v) copies of all invoices for materials delivered for which a price adjustment is claimed.

The Contractor’s supporting documentation shall be accompanied by the Contractor’s written statement that the amount claimed covers all known amounts to which Contractor is entitled as a result of the occurrence of the event.

No claim by Contractor for an adjustment in the Contract Price shall be valid if not submitted in accordance with this Section B-34.

(3.) The price adjustment for any work for which Contractor claims an increase in the Contract Price shall not exceed the actual cost of additional on-site labor, materials and equipment plus ten percent (10%) of such cost for profit and overhead.

All trade discounts, rebates and refunds and all returns from sale of surplus materials and equipment shall accrue to the City, and the Contractor shall make provisions so that they may be obtained.

(4.) In the event changes in the work result in a net decrease in the Contractor’s costs, the Contract Price shall be decreased by an amount equal to the actual net decrease in the cost of on-site labor, materials and equipment plus ten percent (10%) of such net decrease.

(5.) Where the work involved is covered by unit prices contained in the Contract Documents, the value of the work for which Contractor claims an increase in the Contract Price or the credit to which the City is entitled shall be determined by application of such unit prices.

(6.) Changes in the Contract Price made pursuant to the Contingency Allowance shall not exceed the amount of the Contingency Allowance listed on the Contractor’s bid.

(7.) In the event that the Contingency Allowance is exhausted, changes in the Contract Price may only be made by Subsidiary Agreement, pursuant to this Section B-34; the Contractor shall proceed with the work while any such Subsidiary Agreement is being processed.

B-35. FAILURE TO MEET PERFORMANCE REQUIREMENTS.

The delivery of any material, equipment or the performance of any labor hereunder which does not in all respects conform to this Contract’s requirements, will be rejected and the Contractor shall be notified promptly by the Director of such rejection and the reason therefor, which notice shall be confirmed in writing. If the Contractor fails to effect immediate replacement of such rejected materials, equipment and labor with material, equipment and labor meeting the requirements of the order and of the Contract, the City will purchase in the open market, material, equipment and hire labor of the character required under the order up to the amount rejected and the Contractor and his or her surety shall be liable to the City for any excess cost and expense occasioned the City thereby. The Director shall have the right to suspend the whole or any part of the work to be done hereunder, when the Contractor is not doing the work in accordance with the provisions of the Contract. No extension of time for completion of the contract work or claim for damages will be allowed by reason of such suspension.

B-36. ANNULMENT OF CONTRACT.

The Director shall have the right to annul the Contract upon the failure of the Contractor to comply within three (3) days after receipt of written notice to proceed with the performance of any work unreasonably delayed as to indicate failure of completion within the time specified or to replace any work, material or equipment not meeting the Contract.

B-37. ACCEPTANCE OF PERFORMANCE.

The Director shall determine finally, the satisfactory quality of the work, material and equipment furnished under the Contract.

B-38. GUARANTEE.

A. The Contractor for the work called for in the Contract Documents, in consideration of the price bid and the payments received or to be received, guarantees that all work done and all material used in the project under this Contract are in all respects first-class, of the proper kind and quality and has been done and is being done in accordance with the requirements of the Contract Documents, and also guarantees that the improvement will remain in good condition for and during the entire period of guarantee.

B. The guarantee period shall begin upon the date of Final Acceptance by the Director in writing, of the construction work, and shall continue for a period of twelve (12) months thereafter or as otherwise provided in the Supplemental General Conditions.

C. If at any time before or during the guarantee period, any defects or omissions become apparent in the work, or if the work, or if it becomes apparent that any of the work is not in accordance with the requirements of the Contract Documents, or if any of the work constructed under this Contract requires repairs due to defects in materials or workmanship, or for any other cause which may be attributed to the work which is being done or has been done by the Contractor, all as determined by the Director or his authorized representative, the Director or representative will notify the Contractor to rectify such defects or omissions, or to make the repairs so required.

D. If the Contractor shall fail to begin to rectify such defects or omissions or to start the repairs within five (5) days from the date of such notification, or if such rectification or repair work is not made in a manner satisfactory to the Director or to his representatives, the Director shall have the right to purchase any necessary materials, rent any necessary tools and equipment and to employ any other person or persons as the Director may deem proper to make the repairs, and to pay the expense thereof out of moneys then due, or which may thereafter become due to the Contractor, or out of any amount retained for that purpose by the City.

E. In case of an emergency the Director shall have the right to purchase any necessary materials, rent any necessary tools and equipment and to employ any other person or persons as the Director may deem proper to make such repairs, and to pay the expense thereof out of the moneys then due, or which may thereafter become due to the Contractor, or out of any amount retained for that purpose by the City.

F. If such moneys are not sufficient to meet such expense, the additional moneys shall be furnished by the

Contractor, and if it refuses or neglects to provide the necessary moneys, they shall be provided by the Contractor’s surety(ies).

G. If it is necessary to remove any part of the work to rectify defects or omissions or to repair defects in materials or workmanship, or if any part of the work becomes damaged due to such rectification or repairing, all the removed or damaged work shall be replaced or repaired, all to the satisfaction of the Director or representative. The guarantee provisions of this Contract shall also apply to all rectified or repaired work.

B-39. TERMS OF PAYMENT.

A. The Contractor shall make current requests for payment in writing, not more than one (1) each month, and submit them to the Director who executed the contract on behalf of the City (“Director”) for approval. The request shall be dated the last working day of the month and be submitted to the Director by the fifth day of the following month. The request for payment shall cover the materials in place complete, and the amount of work performed in accordance with the contract during the preceding payment period and the value thereof. At the discretion of the Director, allowances may be made for nonperishable materials which are to be incorporated into the work, when delivered and properly stored upon the site.