About this file

This is a project drawings and specifications document for the Salt Lake City School District (SLCSD) in conjunction with McKinstry, the design-build partner, for the Whittier Elementary HVAC Electrification project located at 1600 S 300 E, Salt Lake City, Utah. The scope of work encompasses mechanical retrofit work inside the building and installation of a ground loop bore field outside the building. Subcontractors must provide all required trades for ground heat exchanger installation, including drilling, earthwork, and ground loop system piping installation. All mechanical work inside the building will be priced and selected through a separate RFP. The document incorporates industry codes and standards adopted by the State of Utah and Salt Lake City, including the 2021 International Building Code, 2021 International Existing Building Code, 2021 International Plumbing Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2021 International Energy Conservation Code, and the 2023 National Electric Code. Industry standards referenced include NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems, SMACNA HVAC Duct Construction Standards, and National Fire Protection Association Standards.

The document specifies that detailed equipment and material installation requirements are contained in the construction documents and project specifications, which are accessible via a Google Drive link provided in the RFP. SLCSD standards and specifications, along with McKinstry standards and specifications, are incorporated by reference and include prequalification applications, sample subcontracts, insurance requirements, construction standard scope requirements, TAB provider performance standards, controls provider performance standards, commissioning roles and responsibilities, and concrete imaging policies. All questions concerning the solicitation must be submitted through the Bonfire system, with official answers provided only through that system or via authorized addenda issued by the SLCSD Purchasing Department. Bidders are cautioned that any modifications to the procurement must be made by official addendum, and responses based on information from sources other than official addenda may result in non-responsiveness determinations and rejection.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SLCSD – WHITTIER ELEMENTARY HVAC ELECTRIFICATION

PROJECT DRAWINGS AND SPECIFICATIONS

Attachment D – Drawings & Specifications The following documents and standards are hereby included in this RFP and will be included in the winning bidder contract by reference. All documents that are not an industry standard are included in the Dropbox link below.

Industry Codes & Standards

1) Codes

(i) Codes as adopted by the State of Utah and Salt Lake City

(a) 2021 International Building Code

(b) 2021 International Existing Building Code

(c) 2021 International Plumbing Code

(d) 2021 International Mechanical Code

(e) 2021 International Fuel Gas Code

(f) 2021 International Energy Conservation Code

(g) 2023 National Electric Code

2) Industry Standards (Latest edition, unless noted otherwise)

(i) NEBB Procedural Standards for Testing, Adjusting, and Balancing of Environmental Systems

(ii) SMACNA HVAC Duct Construction Standards, Metal and Flexible

(iii) National Fire Protection Association Standards (NFPA)

SLCSD Standards & Specifications

1) Salt Lake City School District Standard Terms and Conditions for Goods and Services (Attachment A)

McKinstry Standards & Specifications

1) McKinstry Prequalification Application (Attachment B)

2) McKinstry Sample Subcontract (Attachment E)

3) Contractor Insurance Requirements (Attachment F)

4) Construction Standard Scope Requirements (Attachment G)

5) McKinstry TAB Provider Performance Standards (Attachment H)

6) McKinstry Controls Provider Performance Standards (Attachment I)

7) McKinstry Controls Commissioning Roles and Responsibilities (Attachment J)

8) McKinstry Concrete Imaging Policy (Attachment K)

MCKINSTRY STANDARDS, SPECIFICATIONS & DRAWINGS ACCESS

Copy and paste the below address into Chrome (preferred) for the most up to date SLCSD and McKinstry standards, Project Specifications, and Drawings:

https://drive.google.com/drive/folders/1zwZ2esKiR96fCUxv0Ywx6PGv_vaBulFO?usp=sharing

File details come from the government source that posted it. Updated .