11-Appendix H Draft Contract.pdf
PDF 1 MB Posted
- Attached to
- Mora County Complex Tenant Improvements (TI)
- Solicitation number
- 60-35000-26-08796
- Issued by
- Luna County, New Mexico
About this file
This is a Draft Contract (Appendix H) for the Mora County Complex Tenant Improvements project involving Mora County, New Mexico, and the selected contractor Architectural Research Consultants, Incorporated, with John Petronis as the signatory representative. The project encompasses construction of interior tenant improvements to the Mora County Courthouse, a two-story structure of approximately 44,000 square feet located in Mora, New Mexico, to accommodate County Administrative Offices in the South Wing and a Fourth Judicial District courtroom on the first floor. The scope of work is divided into two phases: Phase I involves construction of interior walls, finishes, mechanical systems, electrical systems, technology infrastructure, exterior windows, stucco patchwork, and elevator installation in the south wing, with substantial completion required 334 calendar days from notice to proceed; Phase II includes demolition and reconfiguration of work areas, construction of secure courtroom facilities with Level 2 ballistic resistance, entry and exit vestibules with security screening and metal detection equipment, and reconfiguration of HVAC and fire protection systems, with substantial completion required 124 calendar days from its notice to proceed. An additive alternate is included for complete exterior stucco color coating of the entire building exterior. The contract includes detailed requirements for CPM scheduling using approved software, with baseline schedules due within 10 days of contract award and monthly progress schedules required prior to each pay application submission.
The contract establishes pricing methodology through fixed-price cost proposals with itemized breakdowns of labor, equipment, materials, permits, insurance, bonds, and gross receipts tax. Contractor overhead and profit markups are tiered based on change order amounts and whether work is self-performed or subcontracted, ranging from 5% to 10% for changes less than 5% of contract value and negotiable but not exceeding 5% for changes at or above 5% of contract value. Time extension costs are calculated separately based on daily general conditions allowable direct site and project costs including project management, site superintendence, temporary facilities, and project-specific costs, with a 5% overhead and profit markup applied to inactivity periods. The contract requires contractor audit provisions allowing the Owner to review books and records for three years from final payment. Civil and site work are excluded from the general contractor's scope, and Furniture, Fixtures, and Equipment (FF&E) are not included. The contract document references attached exhibits including CPM Schedule Standards (Exhibit D), Schedule of Values (Exhibit C), and Project Phasing details (Exhibit E) for comprehensive scope and scheduling requirements.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX H
Draft Contract
Revised: 19 Mar 2025 8 of 73
Enter Contract Number
Enter Contract Number
Enter or "Pending"
Funding Contract ID
Complete Name of Contractor Legal Entity
Name of Individual Signing Contract (See Note below
Title of Individual Signing Contract
Physical Address of Contractor
Mailing Address of Contractor
City, State. Zip of Contractor
Carlos Marquez Telephone of Contractor carlos.marquez@gsd.nm.gov Email Address of Contractor for Notice; Article 5.6 Notices, Part A
Mora County Complex TI
Architectural Research Consultants, Incorporated
John Petronis
4906 Alameda Blvd. NE Suite A, Albuquerque NM 87113
PO Box 1158, Albuquerque NM 87103 jppetronis@arcplanning.com
505-842-1254
Revised: 19 Mar 2025 9 of 73
The Work under this Contract includes all demolition, construction, materials, labor, transportation, security, temporary facilities, equipment, testing, and all other items identified in, or reasonably inferable from, the Construction Drawings and Project Manual for Tenant Improvements within the existing building shell of the Mora County Complex Tenant Improvement (TI).
Work includes, but is not limited to:
Phase I
1. Construction of new interior walls, partitions, and ceilings per the Construction Drawings, including framing, drywall, insulation, and all associated fire-rated assemblies.
2. Installation of new interior finishes and casework, including flooring, wall finishes, ceiling finishes, millworker, and counter tops as specified in the Project Manual
3. Installation of new plumbing systems and fixtures, including domestic water and hot water, waste, and vent piping, and all associated connections to existing building systems.
4. Installation of new HVAC system and fire protection system in the south wing, including all ductwork, piping, controls, equipment, and connections to the new mechanical equipment. Refer to the Mechanical Drawings for equipment schedules and specifications.
5. Installation of new electrical systems, including power distribution, lighting, panels, circuitry, and all associated connections to existing building electrical service.
6. Installation of new technology and security infrastructure, including but not limited to: structured cabling (voice and data), access control systems (card readers, electric strikes, controllers). Refer to Technology Drawings and Specifications for complete requirements. Contractor will coordinate with AOC on some of this work.
7. Installation of new exterior windows, including selective demolition of exterior walls, framing modifications as required, new window units, flashing, sealant, and interior and exterior trim.
8. Exterior stucco patchwork at new window locations and at the south entrance soffit. Patchwork scope is limited to areas within twelve (12) inches of new window frames and the soffit area identified on Drawing A-201. All patchwork shall match the existing stucco profile, texture an base coat color.
9. Installation of a new elevator in the existing shaft, including all cab finishes, door assemblies, guide rails, controls, electrical connections, pit equipment, and machine room equipment.
Phase II work:
10. Demolition and reconfiguration of Phase 2 work areas, including selective demolition of existing interior partitions, demolition and relocation of multi-stall restrooms on the first floor, ceilings, flooring, MEP systems, and preparation of the space for new construction.
11. Phase 2 work will include the construction of separate entry and exit vestibules and a security office, courtroom and support spaces for the Fourth Judicial District Court. All walls, ceiling, doors, and glazing, as indicated in the construction documents, will be designed to level 2 ballistic resistance. The entry vestibule will feature a queuing area, an security screening room equipped with a metal detector and x-ray machine, and access-controlled doors. The exit vestibule will serve as a sally port with interlocking doors that can only be opened simultaneously, with a fail-safe override in case of a fire alarm. The security office will have direct visual observation of the entry and exit vestibules, supplemented by CCTV. The metal detector, x-ray machine, and all surveillance equipment will be provided and install by the Courts.
Contractor will coordinate with AOC on some of this work.
12. Reconfiguration of exiting HVAC systems and fire protection system in Phase 2 work areas (north Judicial section), including demolition of existing ductwork and piping, rerouting and connection to new equipment, and balancing of all modified systems.
13. Cladding of exterior columns at the main entry to the south wing, including CMU and metal panel materials to match the existing north wing entrance. Refer to Drawings A-301 and A-302 for dimensions, profiles, and material specifications.
14. Painting of columns and exposed structural components at the secondary building entrances at the south and west entrances, including surface preparation, primer, and two (2) coats of exterior-grade acrylic latex paint. Color to be selected by Architect.
Additive Alternate No. 1: Complete exterior stucco color coat of the entire building exterior. This alternate is in addition to the base bid stucco patchwork in Item 11.
Refer to the Bid Form for pricing of this alternate. The Owner reserves the right to accept or reject the alternate at any time prior to execution of the Contract.
The Construction Drawings and Project Manual are intended to provide the basis for proper completion of the Work suitable for the Owner's intended use.
Refer to attached PDF tiltel "Mora_Coounty_Complex_Phasing.pdf" for project phasing requirements.
It is the intent of the project to award Phase I and Phase II. If appropriations are not appropriated at time of award to fully fund phase I & II, phase II may be postponed until funding is available.
Revised: 19 Mar 2025 10 of 73
Five Hundred
$ 500.00
Enter the full amount of the Contract Sum written out in words
$ 0.00
$ 0.00
Enter Brief Alt Description or N/A $ 0.00
Enter Brief Alt Description or N/A $ 0.00
Enter Brief Alt Description or N/A $ 0.00
Enter Brief Alt Description or N/A $ 0.00
Enter Brief Alt Description or N/A $ 0.00
Enter Brief Alt Description or N/A $ 0.00
$ 0.00
0.0000% $ 0.00
$ 0.00
$ 0.00
$ 0.00
Revised: 19 Mar 2025 11 of 73
Revised: 19 Mar 2025 12 of 73
Unique ID (Date/ Author/ Version...) - Upload Below - Must have a minimum of a Vicinity Map Map
Unique ID (Date/ Author/ Version...) - Upload below
Unique ID (Date/ Author/ Version...) - Upload & Requirements below
Revision Dated 24 Jan 2024
Revised: 19 Mar 2025 13 of 73
Obtain from Contractor
Obtain from Contractor Obtain from Capital Outlay/ Pl
Signature: _________________________________________________________
Printed Name: ________________________________________________________
Title: ______________________________________________________________
Date: _______________________________________________________________
Signature: ___________________________________________________________
Printed : ________________________________________________________
Title: _______________________________________________________________
Date: _______________________________________________________________
Signature: _________________________________________________________
Printed Name: ______________________________________________________
Title: _____________________________________________________________
Date: _____________________________________________________________
END OF SIGNATURE PAGE FOR PART A
Revised: 19 Mar 2025 14 of 73
Contents
Revised: 19 Mar 2025 15 of 73
Revised: 19 Mar 2025 16 of 73
Revised: 19 Mar 2025 17 of 73
Revised: 19 Mar 2025 18 of 73
Revised: 19 Mar 2025 19 of 73
Revised: 19 Mar 2025 20 of 73
Revised: 19 Mar 2025 21 of 73
Revised: 19 Mar 2025 22 of 73
Revised: 19 Mar 2025 23 of 73
Revised: 19 Mar 2025 24 of 73
25 of 71Revised: 19 Mar 2025 25 of 73
Revised: 19 Mar 2025 26 of 73
CPM output and ancillary requirements shall substantially conform to Exhibit D – CPM Schedule Standards.
: Contractor shall use the following CPM Software to create and maintain the Project CPM Construction Schedule:
MS Project or Primavera P6 or Other CPM software approved by Owner and the Design Professional
(Only required for Projects with a Contract Sum greater than $2,000,000)
The Contractor shall provide a Scheduler who has verifiable training and credentials in preparing and maintaining a computerized CPM Construction Schedule using the latest version of Primavera scheduling software (or other software approved by the State).
Within 5 days of being awarded the Contract and before the first payment application the Contractor shall submit the Project Scheduler’s showing the Project Scheduler’s work on previous similar types of projects. The Owner reserves the right to reject the proposed cheduler based on the lack of qualifications as defined in this Section.
The Owner, at its sole discretion, may retain a Scheduler to review all submitted schedule related contract documents. The Contractor shall respond to all issues raised by the Scheduler in writing to the Design Professional and Owner’s satisfaction.
Initial Project Plan Within 10 days of being awarded the Contract, Contractor shall furnish an electronic copy of the Baseline CPM Schedule and Summary Schedule for review and approval by the Design Professional and Owner.
The Contractor shall provide any and all reports in electronic form, including the native CPM Schedule Software files.
A Baseline CPM Schedule showing a completion date after the Substantial Completion Date is cause for rejection.
The Baseline CPM Schedule shall show a single critical path.
Each Baseline CPM Schedule activity shall include (in detail) all activities’ ID numbers, WBS breakdowns, descriptions, predecessors, successors, start/finish dates, calendars, duration, remaining duration, physical percent complete, actual dates, constraints, and other grouping codes such as location and responsibility.
No progress shall be shown in the initial Baseline Schedule.
The Baseline CPM Schedule shall not show any negative float.
Each electronic schedule file submission shall be given a file name that will enable it to be uniquely and readily identified.
The Contractor shall prepare and submit a narrative along with the Baseline CPM Schedule. The baseline narrative shall include the schedule methodology, rain day calculation, productivity considerations, high risk activities, critical path and nearly critical path description, and other general comments.
Total float or slack is defined as the minimum amount of time between the early start date and the late start date, or the early finish date and the late finish date, for any activity in the Schedule. Float or slack is not time for the exclusive use of or benefit of either the Owner or the Contractor but is a resource available to both parties on a first-needed basis and at no change in contract price. Extensions of time will not be granted unless the excusable delays affect the critical path in the Schedule as required by the Contract Terms and after all available float or slack has been used.
Use of Project float suppression techniques shall be cause for rejection of any schedule submittal. Float suppression techniques include, but are not limited to, Preferential sequencing (arranging critical path through activities more susceptible to Owner-caused delay), Special lead/lag logic restraints, Zero total or free float constraints, Extended activity durations, Imposing of constraint dates other than required by Contract, and Modifying the work calendar in a way that does not reflect when the work will take place.
Revised: 19 Mar 2025 27 of 73
1. The schedule shall include proper logic and adequate durations for all activities including but not limited to mobilization, submittals, review/approval, fabrication/delivery, installation, system shutdowns, key milestones, cleanup, remedial and restoration work, testing and start-up, submittal of closeout documentation, and demobilization.
2. Activities should be assigned clear descriptions that reflect the work being performed and substantially correspond to an item in Exhibit C - Schedule of Values. Each activity may be subdivided into sub-activities as required for planning and monitoring progress.
3. As a minimum, each Baseline CPM Schedule activity shall include (in detail) all activities’:
a. ID numbers,
b. WBS breakdowns,
c. Descriptions,
d. Predecessors,
e. Successors,
f. Start/finish dates,
g. Calendars,
h. Duration,
i. Remaining duration,
j. Physical percent complete,
k. Actual dates,
l. Constraints, and
m. Other grouping codes as required such as location and responsibility.
4. Activity durations shall not exceed 28 calendar days unless it is approved by the Owner.
5. Long Lead Items – Material, equipment other such items of the Work where an acquisition delay impacts the performance of the work must be included.
6. A Schedule Activity hierarchy that substantially reflects Exhibit C - Schedule of Values hierarchy facilitating the generation of summary schedules and cost checking Pay Applications.
7. Milestones indicators that represent significant Project Milestones such as:
a. Project Start,
b. Project Complete,
c. Substantial Completion, Revised: 19 Mar 2025 28 of 73
d. Final Payment, and
e. Must include any Critical Inspection Points identified by the Design Professional.
8. Activities are to be delineated by individual parties and specific work areas. No activity should be assigned more than one responsible party or one specific area.
9. Unless required by the Owner or Design Professional, Resource Loading will not be required.
10. Unless required by the Owner or Design Professional, Budget Tracking or Cost Loading will not be required.
11. No lags on finish-to-start relationships shall be used. Also, no lags that exceed the predecessor’s duration shall be used. Both circumstances create gaps between the activities. Instead, these lags need to be either removed, or converted into the activities that they are intended to represent.
12. Negative lags shall not be used.
g. CPM Periodic Progress Schedule:
1. The Contractor shall prepare a Periodic Progress Schedule prior to processing of a corresponding Pay Application that updates the Baseline CPM Schedule during the Work.
The Periodic Progress Schedule must reflect progress up to the payment application period, forecast finish for in-progress activities and re-forecast early dates for activities planned in the next update period.
2. Data dates for schedule updates must be the day after the progress period closes. Failure to make corrections to the schedule update is cause for rejection of the schedule update and will delay processing of the Pay Application. The Monthly Progress Schedule must include the following:
a. Actual start and finish dates for completed activities;
b. Actual start dates, percentage complete, actual and remaining quantities, and remaining duration for activities in progress;
c. Projected sequences of activities for future Work;
d. Planned start and finish dates for future activities; and
e. Progress for the current invoice submittal for Project activities
f. Any other output as defined in Exhibit D – CPM Schedule Standards.
3. Pending change orders shall not be incorporated into the Project Schedule unless pre-approved by the Owner. Only after a Change Order has been approved can the changes to the schedule be made and coded as such.
4. If, at any point, a schedule update shows a late Project completion by more than 15 calendar days of the contract completion date, the Contractor shall provide a separate schedule file consisting of either:
a. A recovery schedule that shows how the Contractor will complete the project within the contract duration, at no additional cost to the Owner, or;
b. Justification for granting a Time extension as defined in Contract Terms
h. Recovery Schedule:
1. Unless otherwise directed in writing by the Owner, if the Owner’s review of the Monthly
Progress Schedule indicates a late completion of the Work, or should Critical Path items shown on the Monthly Progress Schedule Submittal slip by fifteen (15) or more calendar days beyond any milestone, Contractor shall prepare a Recovery Schedule that demonstrates how Contractor intends to reschedule those activities to regain compliance with the milestones and the Contract at no additional cost to the Owner.
2. Whenever a Recovery Schedule is required, Contractor shall prepare and include the following information with the Recovery Schedule:
a. Transmittal letter;
b. Electronic copy of the file used for the proposed Recovery Schedule; and
Revised: 19 Mar 2025 29 of 73
c. Narrative describing any proposed changes to the Project Schedule, in detail, with justification for the changes, including the following:
• Changes to activity original durations;
• Changes to activity relationships and/or schedule logic;
• Cause of schedule slippage and actions taken to recover schedule within the shortest reasonable time (e.g., hiring of additional labor, use of additional construction equipment, and expediting of deliveries);
• Identification of activities that have been added, deleted, or modified; and/or
• Changes to the Project Schedule’s Critical Path.
3. Contractor is not required to prepare a Recovery Schedule if Contractor is awarded a Time Extension under the terms of Paragraph 8.3 Delays and Extension of Time a Recovery Schedule is not required at that time.
4. If the Owner or Design Professional rejects a Recovery Schedule, Contractor shall prepare a revised Recovery Schedule that incorporates the Owner’s and Design Professional’s comments.
5. When the Owner accepts Contractor’s Recovery Schedule, Contractor shall prepare an updated Project Schedule that incorporates such Recovery Schedule and becomes the Revised Baseline Schedule. Contractor must proceed in accordance with the approved Recovery Schedule.
i. Revised Baseline Schedule:
1. If Contractor is awarded a Time Extension under the terms of Article 8 – Time a Revised
Baseline Schedule is required at that time.
2. When the Owner accepts Contractor’s time extension, Contractor shall prepare an updated Project Schedule that incorporates authorized time extension and becomes the Revised Baseline Schedule.
Revised: 19 Mar 2025 30 of 73
Revised: 19 Mar 2025 31 of 73
32 of 71Revised: 19 Mar 2025 32 of 73
33 of 71Revised: 19 Mar 2025 33 of 73
Revised: 19 Mar 2025 34 of 73
Revised: 19 Mar 2025 35 of 73 a) b) c)
Revised: 19 Mar 2025 36 of 73
Revised: 19 Mar 2025 37 of 73
Revised: 19 Mar 2025 38 of 73
Revised: 19 Mar 2025 39 of 73
Revised: 19 Mar 2025 40 of 73
Revised: 19 Mar 2025 41 of 73
Revised: 19 Mar 2025 42 of 73
Revised: 19 Mar 2025 43 of 73
Revised: 19 Mar 2025 44 of 73
METHODS FOR CHANGES IN THE WORK PRICING
7.3.1 Fixed Price- Allowable Costs and Fees: Unless specifically authorized by additional terms and conditions of this Agreement, the Parties agree and bind themselves to the following method of calculating Change Order costs by Fixed Price or by utilizing the terms and conditions of the original funding Contract.
Time extension cost proposals will be submitted separately per 7.3.4 after the time extension has been approved per the contract terms and conditions. With each Proposal for a cost Change Order, the Contractor shall submit an itemized breakdown of any change in the Cost that shall include at least the following itemized accounting detail in the general order listed unless otherwise provided in the terms and conditions of this Agreement. For Contractor’s Direct Costs of Work, use the following:
7.3.1.1 Contractor’s Direct Costs of Work
A list of Tasks (Cost Codes) required to complete the proposed Work that shall detail the Direct Costs for the proposed Work.
Each Task shall be subdivided into the typical Cost Types required to perform the proposed Work.
Typical Cost Types may include the following or any other requisite Cost Types:
Worked performed by forces directly employed, owned or rented by Contractor
Labor: Hours and burdened rates for employees directly employed in the Change in the Work (identified with related items of material to be placed or operation to be performed) and labor burden (FICA, FUTA, SUTA, Pension, Workman’s Compensation Insurance, General Liability & Group Insurance, if any). Burdens shall not include retirement plans qualified by minimum employment time, organizational fees or dues, legal or related expenses, information technology training and the like.
Equipment: Quantities and unit utilization or rental costs of machinery and equipment, exclusive of hand tools, whether rented from the Contractor, Subcontractor or others;
Utilization costs shall be based on the life expectancy of the equipment and the purchase price of the equipment.
Materials: List of materials to be installed.
required to complete the proposed work.
This would include Subcontractors and Vendor’s quotes. Those quotes shall be itemized by labor, materials, equipment as well as allowable overhead and profit markup shown in the schedule below.
7.3.1.2 Contractor, Subcontractor and Subsubcontractors’s Allowable Markups for Overhead and Profit on the Work (See Allowable Overhead and Profit Schedule ) The costs for each category below shall be subtotaled and the markup applied.
Indirect Overhead and Profit may include, but is not limited to, project management costs including software, timekeeping, project accounting, main office expenses, processing of documents, computers, cell phones, and incidentals. These are not to be included in the ‘cost of Work’ because they are part of the markup agreed to and indicated in the schedule below.
Overhead and profit for both additive and deductive changes in the Work (other than changes covered by unit prices) shall be paid by applying the specified percentage markups only on the net cost of the changed Work (i.e. difference in cost between original and changed Work excluding overhead and profit) Said percentages for overhead and profit shall reasonably approximate the Contractor’s overhead and profit, but shall not exceed the percentages on the below schedule.
7.3.1.3 Other Allowable Costs
Revised: 19 Mar 2025 45 of 73
Permits: Quantities and unit premiums for any permit fees requited for the proposed Work.
Insurance: Maximum of 1% mark-up for Insurances applied to the sum of Contractor’s Direct Cost and Allowable Markups.
Charges: Quantities and unit costs of any “use charges” or similar fees related to proposed Work.
Bonds: Maximum of 2% mark-up for Bonds applied to the sum of Contractor’s Direct Cost and Allowable Markups. At the Owner's request, the Contractor shall provide proof of his notification to the Surety of the proposed Work and of the Surety's agreement to include such change in its coverage.
Gross Receipts Tax: New Mexico Gross Receipts Tax (GRT) as required by statute for Contractor only.
Allowable Overhead and Profit Schedule for Direct Work Costs Amount of Change in The Work
Category of Work < 5% 0f Contract
5% of Contract
1 Contractor for Self Performed Work by forces directly employed by Contractor
10% Negotiable but < 5%
2 Contractor for Work performed by Subcontractor or Vendor
5% Negotiable but < 5%
3 Subcontractor For Self Performed Work 10% Negotiable but < 5% 4 Subcontractor for Work performed by
Subsubcontractor 5% Negotiable but < 5%
7.3.2 Time and Material: Only if specifically provided in the terms and conditions of this Agreement, the following Time and Material method of pricing may be used to price a Change in the Work subjects to the terms and conditions authorizing such pricing.
7.3.3 Unit Price: Only if specifically provided in the terms and conditions of this Agreement, the following Time and Material method of pricing may be used to price a Change in the Work subjects to the terms and conditions authorizing such pricing.
7.3.4 Time Extension Costs: Changes in the Work that extend the Contract Duration must be approved, as specifically provided in the terms and conditions of this Agreement. The costs below shall not be marked up for indirect overhead and profit unless there is no additional Work involved. Labor costs below have a definition the same as in 7.3.1.1.2(a)i above. The Contractor shall submit a separate Proposal for Change Order providing a detailed accounting of General Conditions which are Allowable Direct Site and Project Costs including the following:
Project Management Fully Burdened Labor Costs- prorated time of Project Manager(s), Project Engineer(s) and Project Scheduler Site Superintendence- Fully Burdened Labor Costs Project General Labor- Fully Burdened Labor Hourly Costs Project Company Vehicle(s) for Superintendent(s) Project Temporary Office, Supplies and Equipment Project Temporary Fencing Project Site Storage Project Temporary Utilities Project Temporary Waste Control
Revised: 19 Mar 2025 46 of 73
7.3.5 Audit: The Owner shall be entitled to audit the books and records of a Contractor or Subcontractor for any time-and-material or negotiated cost to the extent that such books and records relate to the proposal or performance of such Work. Such books and records shall be maintained by the Contractor and Subcontractor for a period of three years from the date of final payment under their respective Contracts, unless a shorter period is otherwise authorized in writing (13-1-16 , NMSA 1978).
7.3.6 Change Orders
10. Project Sanitation Requirements
11. Project Safety Requirements
12. Project SWPPP Requirements
13. Other Project Specific Direct Site Temporary Costs
These costs shall be subtotaled and calculated to a daily rate and multiplied by the number of days of the approved Time Extension. If there is no Work involved for a period of time, then overhead and profit in the amount of 5% may be added to the inactivity period. Finally, insurance, bond and NMGRT costs may be added to reach the total value of the Time Extension cost.
Revised: 19 Mar 2025 47 of 73
Revised: 19 Mar 2025 48 of 73
8.3.2 Time Impact Analysis (TIA): Contractor shall submit a Time Impact Analysis (TIA) for any change that effects overall cost and schedule within 14 calendar days of when the delay event began. The TIA shall illustrate the impact of each change or delay on the Contract Substantial Completion Date or milestones. In addition to the limitation of delay damages provided in the Contract, the Contractor shall not be granted any time extensions or delay damages paid unless a delay occurs which consumes all available Project float, extending the projected finish beyond the Contract Completion Date. Each time impact analysis must include a fragnet demonstrating the following information:
a. How Contractor proposes to incorporate the extension of time;
b. How the change impacts the Project Schedule;
c. The sequence of new and/or existing activity revisions that are proposed to be added to the Project Schedule that is in effect when the change or delay is encountered; and
d. The proposed method for incorporating the delay and its impact to the Project Schedule.
e.
The TIA shall be a separate schedule file to be reviewed separately from the Pay Application that the Contractor must follow for providing a TIA schedule are as follows:
The modeled delay event shall be inserted into the appropriate pre-impacted schedule.
The pre-impacted schedule shall be the approved schedule of record immediately preceding the start of the delay event.
No time extension request will be considered unless all available float has been used and the impact event delayed the completion date beyond the contract date.
Revised: 19 Mar 2025 49 of 73
Revised: 19 Mar 2025 50 of 73
Revised: 19 Mar 2025 51 of 73
Revised: 19 Mar 2025 52 of 73
Revised: 19 Mar 2025 53 of 73
Revised: 19 Mar 2025 54 of 73
Revised: 19 Mar 2025 55 of 73
Revised: 19 Mar 2025 56 of 73
Revised: 19 Mar 2025 57 of 73
Revised: 19 Mar 2025 58 of 73
Revised: 19 Mar 2025 59 of 73
Revised: 19 Mar 2025 60 of 73
Revised: 19 Mar 2025 61 of 73
Revised: 19 Mar 2025 62 of 73
Revised: 19 Mar 2025 63 of 73
Revised: 19 Mar 2025 64 of 73
Revised: 19 Mar 2025 65 of 73
Revised: 19 Mar 2025 66 of 73
Revised: 19 Mar 2025 67 of 73
Revised: 19 Mar 2025 68 of 73
Revised: 19 Mar 2025 69 of 73
The project is divided into two phases as follows:
Phase 1: County Offices in the south wing and associated work in the north wing as specifically identified in this Section. Phase 1 includes all work in the south wing, plus limited HVAC piping installation in the north wing. Substantial completion to be achieved 334 calendar days from notice to proceed.
Phase 2: District Court renovation and construction of select County Offices in the north wing, including all demolition, construction and systems work identified on the Phasing Plan. Substantial completion to be achieved 124 calendar days from its notice to proceed.
Refer to attached PDF titled "Mora_County_Complex_Phasing.pdf" for addtioinal Phasing details.
Revised: 19 Mar 2025 70 of 73
Civil and site work is not part of the Mora County Complex TI scope of work.
FF&E not included in GC's Scope of Work.
Revised: 19 Mar 2025 71 of 73
Revised: 19 Mar 2025 72 of 73
60-35000-26-08796
Email Address of Contractor for Notice; Article 5.6 Notices, Part A
Complete Name of Contractor Legal Entity
Name of Individual Signing Contract (See Note below
Title of Individual Signing Contract
Enter or "Pending" Physical Address of Contractor
Mailing Address of Contractor
City, State. Zip of Contractor
Telephone of Contractor
Mora County Complex TI
CP2600416
Enter Contract Number
Obtain from Capital Outlay/ Planning
$ 0.00
Name of Individual Signing Contract (See Note below
334 08/18/2027
Revised: 19 Mar 2025 73 of 73
Exhibit E - Project Phasing