About this file

This document is a Contract Data Requirements List (CDRL) for a Static Transfer Switch (STS) contract with the Federal Aviation Administration. The CDRL contains 32 detailed data item descriptions covering various aspects of the contract, including technical documentation, logistics support, training requirements, and quality assurance.

Key requirements include submission of multiple documents such as Monitoring Software Interface documents, Equipment Data Sheets, Equipment Drawings, Bill of Materials, Integrated Support Plan, Spare Parts Lists, Configuration Management Plan, Training Materials, Personnel Qualifications, Course Development Documents, and Post-Award Training Conference Reports. The documents have specific submission timelines, typically ranging from 10-90 calendar days after contract award or delivery order, with most requiring electronic soft copy submissions to multiple FAA offices including the Contracting Officer, Logistics Team, Power Services Group, and FAA Academy. The CDRLs are part of a solicitation (6973GH-25-R-00121) for acquiring Static Transfer Switches for National Airspace Systems facilities throughout the United States and its territories.

View the file

Other files

File Type Posted
Section M_Rev-A - Evaluation Factors for Award.pdf PDF
6973GH-25-R-00121-P0005.pdf PDF
10 STS Section J attachment J.19 Schedule B Pricing - Revised.xlsx XLSX spreadsheet
6973GH-25-R-00121-P0004.pdf PDF
FAA_Responses for SIR - 6973GH-25-R-00121 - Revised.xlsx XLSX spreadsheet
10 STS Section J attachment J.19 Schedule B Pricing - Revised.xlsx XLSX spreadsheet
6973GH-25-R-00121-P0003.pdf PDF
FAA_Responses for SIR - 6973GH-25-R-00121.xlsx XLSX spreadsheet
FAA-C-1217H Chg 2.pdf PDF
REV1_10 STS Section J attachment J.01 SOW.pdf PDF
6973GH-25-R-00121-P0002.pdf PDF
6973GH-25-R-00121-P00001.pdf PDF
10 STS Section J attachment J.19 Schedule B Pricing.xlsx XLSX spreadsheet
10 STS Section J Attachment J.02 STS Specifications.pdf PDF
10 STS Section J Attachment J.07 CDLS Vendor Users Guide.pdf PDF
10 STS Section J attachment J.08 Past Performance Questionnaire 24-06-04.pdf PDF
10 STS Section J Attachment J.04 DIDs.pdf PDF
10 STS Section J attachment J.01 SOW.pdf PDF
6973GH-25-R-00121.pdf PDF
10 STS Section J Attachment J.05 FAA-STD-028C - (DIDs).pdf PDF
10 STS Section J Attachment J.03 Labor Categories -24-06-04.pdf PDF
10 STS Section J Attachment J.11 Operational Characteristics 24-06-04.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages Adobe Professional 8.0

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E001

2. TITLE OF DATA ITEM

Monitoring Software/Firmware Interface Document

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.3.1.1

6. REQUIRING OFFICE

Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 10: One (1) time submission, unless STS Processor/Control and Monitoring Software is changed.

Block 12: The Contractor must provide Software Interface documents twenty (20) calendar days following contract award.

Block 13: If STS Processor/Control and Monitoring Software is changed and/or updated, the Contractor must update and submit the Revised Software Interface document within ten

(10) calendar days of update.

Contracting Officer 0 1 Power Services Group 0 1

15. TOTAL 0 0 2

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Base Award

D. SYSTEM/ITEM

STATIC TRANSFER SWITCH (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E002

2. TITLE OF DATA ITEM

EQUIPMENT DATA SHEETS

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., C.3.3.2

6. REQUIRING OFFICE

Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

As Changes Occur

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 10: Submit STS Data Sheets 30-Calendar Days following FAA Approval to purchase new configurations.

Block 12: Submit STS Data Sheets on all models 30-Calendar Days after contract award and all option periods.

Block 13: Submit STS Data Sheets on all models 30-Calendar Days following FAA Approval to purchase new configurations.

Power Services Group 0 1 Contracting Officer 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E003

2. TITLE OF DATA ITEM

EQUIPMENT DRAWINGS

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.3.3

6. REQUIRING OFFICE

Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 10: Submit STS Equipment Drawings 30-Calendar Days following FAA Approval to purchase new configurations.

Block 12: Submit STS Equipment Drawings 30-Calendar Days on all models after contract award and all option periods.

Block 13: Submit STS Equipment Drawings 30-Calendar Days following FAA Approval to purchase new configurations.

Power Services Group 0 1 Contracting Officer 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E004

2. TITLE OF DATA ITEM

EQUIPMENT BILL OF MATERIALS

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.3.4

6. REQUIRING OFFICE

FAA Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

BLOCK 10: Submit STS Equipment Bill of materials for each make and model of equipment, 30-calendar days following contract award. Then when changes are made to the equipment, the Bill of Materials must be updated within 30 Calendar Days of FAA Approval.

BLOCK 12: Submit STS Equipment Bill of materials for each make and model of equipment, 30-calendar days following contract award and option periods.

BLOCK 13: Submit STS Equipment Bill of materials for each make and model of equipment, 30-calendar days following contract award. Then when changes are made to the equipment, the Bill of Materials must be updated within 30 Calendar Days of FAA Approval.

Power Services Group 0 1 Contracting Officer 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

E005

2. TITLE OF DATA ITEM

EQUIPMENT ELECTRICAL WIRING / DIAGRAM

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.3.5

6. REQUIRING OFFICE

Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

Contracting Officer 0 1 Power Services Group 0 1

16. REMARKS

BLOCK 10: Submit STS Equipment Electrical Wiring/Diagram for each make and model of equipment listed in the contract 30-calendar days following contract award and then when changes are made to the equipment.

BLOCK 12: Submit STS Equipment Electrical Wiring/Diagram on all models in equipment CLINS and option periods, 30 Calendar days after contract award/option awards.

BLOCK 13: Submit STS Equipment Electrical Wiring/Diagram for each make and model of equipment listed in the contract 30-calendar days following contract award and then when changes are made to the equipment.

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection OMB control number. Please do not return your form to the above organization. Send completed form to the Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L001

2. TITLE OF DATA ITEM

Integrated Support Plan (ISP)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.4.1.1

6. REQUIRING OFFICE

FAA Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16

16. REMARKS

Block 10: The Contractor must submit an ISP upon award and when any changes or updates are made to the ISP.

Block 12: The Contractor must submit the ISP, or applicable portions of their ISO 9000 Series documentation or a copy of their Internal documentation that supports both the scope and intent of the ISP, not later than twenty (20) calendar days after contract award. The Government will review, and/or comment/approve the ISP, ISO 9000 Series, or Internal documentation within thirty (30) calendar days of receipt.

Block 13: The Contractor must submit updated/revised ISP, ISO 9000 Series, or Internal documentation within fifteen (15) calendar days of updates/revisions.

Contracting Officer 0 1 Logistics Team 0 1

DD FORM 1423-1, FEB 2001 Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L002

2. TITLE OF DATA ITEM

Recommended Spare Parts List (RSPL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.4.2.1

6. REQUIRING OFFICE

Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 12: The first (1st) RSPL must be submitted with the Contractor's proposal, as directed in Section L of the SIR. The Government will review, comment, approve/disapprove the RSPL and advise the Contractor (as appropriate) during the Post-Award Conference.

Block 13: The Contractor must update and resubmit the RSPL no less than 90 calendar days prior to revisions in equipment occurs, and when the Contractor/Vendor introduces a new product line of equipment.

Contracting Officer 0 1 Logistics Team 0 1

PREVIOUS EDITION MAY BE USED. Page 1 of 1 Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L003

2. TITLE OF DATA ITEM

Site Spare Parts List (SSPL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.4.2.2

6. REQUIRING OFFICE

Power Services Group, Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 12: The first (1st) SSPL must be submitted with the Contractor's proposal, as directed in Section L of the SIR. The Government will review, comment, approve/disapprove the SSPL and advise the Contractor (as appropriate) during the Post-Award Conference.

Block 13: The Contractor must update and resubmit the SSPL no less than 90 calendar days prior to revisions in equipment occurs, and when the Contractor/Vendor introduces a new product line of equipment.

Contracting Officer 0 1 Logistics Team 0 1

15. TOTAL 0 0 2

G. PREPARED BY

DD FORM 1423-1, FEB 2001

H. DATE I. APPROVED BY J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L004

2. TITLE OF DATA ITEM

Support Equipment Candidate List (SECL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.4.2.3

6. REQUIRING OFFICE

Power Services Group, Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 12: The first (1st) SECL must be submitted with the Contractor's proposal, as directed in Section L of the SIR. The Government will review, comment, approve/ disapprove the SECL and advise the Contractor (as appropriate) during the Post-Award Conference.

Block 13: The Contractor must update and resubmit the SECL no less than 90 calendar days prior to revisions in equipment occurs, and when the Contractor/Vendor introduces a new product line of equipment.

Contracting Officer 0 1 Logistics Team 0 1

15. TOTAL 0 0 2

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L005

2. TITLE OF DATA ITEM

Spare-Parts Peculiar List

(SPPL)

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.4.2.4

6. REQUIRING OFFICE

Power Services Group, Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

As Required

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 12: The first (1st) SPPL must be submitted with the Contractor's proposal, as directed in Section L of the SIR. The Government will review, comment, approve/disapprove the SSPL and advise the Contractor (as appropriate) during the Post-Award Conference.

Block 13: The Contractor must update and resubmit the SPPL no less than 90 calendar days prior to revisions in equipment occurs, and when the Contractor/Vendor introduces a new product line of equipment.

Contracting Officer 0 1 Logistics Team 0 1

15. TOTAL 0 0 2

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L006

2. TITLE OF DATA ITEM

Repair Status Report

3. SUBTITLE

LRU Repair Status Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.4.3.3

6. REQUIRING OFFICE

Power Services Group, FAA Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 10: Monthly, and as described in DID L006.

Block 12: The first (1st) submission of all reports must be no later than 90 calendar days from contract award.

Block 13: Subsequent submissions must be submitted monthly, 15 calendar days after the month the data was collected.

Contracting Officer 0 1 Logistics Team 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L007

2. TITLE OF DATA ITEM

CDLS Maintenance & Contract Cost Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.4.3.4

6. REQUIRING OFFICE

Power Services Group, Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

See 16

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 10: Quarterly, and Annually

Block 11: End of the Quarter/Annual Year

Block 12: Not later than ten (10) calendar days after the Quarter the first data is collected.

Block 13:

a. Quarterly - Not later than ten (10) calendar days after the Quarter.

b. Cumulative - Submitted with the Quarterly submission.

c. Annually - Not later than twenty (20) calendar days after the end of the contract year.

Contracting Officer 0 1 Logistics Team 0 1

15. TOTAL 0 0 2

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L008

2. TITLE OF DATA ITEM

Depot Level LRU & Associated Equipment Parts Usage List

3. SUBTITLE

Parts Usage List

4. AUTHORITY (Data Acquisition Document No.)

DI-SESS-81359B

5. CONTRACT REFERENCE

SOW Para., 3.5.4

6. REQUIRING OFFICE

Power Services Group, Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 10: Monthly, Quarterly, Bi-Yearly, and Annually; as directed in Block 8 of

DID-L007.

Block 12:

a. Monthly - Twelve (12) calendar days after the first month, following contract award.

b. Quarterly - Twelve (12) calendar days after the first quarter, following contract award.

c. Bi-Yearly - Twelve (12) calendar days after the first six-months, following contract award.

d. Annually - Twelve (12) calendar days after the end of the first contract year, following contract award.

Block 13:

a. Monthly - Twelve (12) calendar days following the month the data was collected for.

b. Quarterly - Twelve (12) calendar days following the quarter the data was collected for.

c. Bi-Yearly - Twelve (12) calendar days following the six-months the data was collected for.

d. Annually - Twelve (12) calendar days following the contract year the data was collected for.

Contracting Officer 0 1 Logistics Team 0 1

15. TOTAL 0 0 2

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

L009

2. TITLE OF DATA ITEM

Commercial Support Documentation (CSD)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.5.7.1

6. REQUIRING OFFICE

Power Services Group, Logistics Center

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 11: When directed by Delivery Order and the Contractor must deliver with each STS, and associated equipment ordered, one complete set of operations and installation manuals, which is included in the cost of applicable CLINS and option contract periods.

Block 12: The Contractor must submit the Commercial Support Documentation for all equipment purchased under this contract, in accordance with the Delivery Order.

Block 13: The Contract must update and re-submit all documentation previously submitted 90 calendar days prior to delivery of new equipment.

Logistics Team 0 1 Contracting Officer 0 1 Power Services Group 0 1

15. TOTAL 0 0 3

G. PREPARED BY

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

M001

2. TITLE OF DATA ITEM

Program Plan

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DID M001

5. CONTRACT REFERENCE

SOW Para., 3.1.1

6. REQUIRING OFFICE

POWER SERVICES GROUP

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

N/A

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 12: The Contractor must submit the Program Plan not later than 30 Calendar Days following the first Task or Delivery Order.

Block 13: The Contractor must update and submit the Program Plan at least once every quarter, unless otherwise directed by the Government.

Block 14b: REPRO means emailed soft copy.

Logistics Team 0 1 Contracting Officer 0 1 Power Services Group 0 1

15. TOTAL 0 0 3

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0014B

B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

M002

2. TITLE OF DATA ITEM

Program Management Report (PMR)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DID M002

5. CONTRACT REFERENCE

SOW Para., 3.1.2

6. REQUIRING OFFICE

POWER SERVICES GROUP

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

As Requested

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 12: The Contractor must submit the PMR not later than 30 Calendar Days following the first Task or Delivery Order.

Block 13: The Contractor must update and submit the PMR as any changes or revisions are made to the Contractor's program management structure.

Block 14b: REPRO means emailed soft copy.

Logistics Team 0 1 Contracting Officer 0 1 Power Services Group 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

M003

2. TITLE OF DATA ITEM

Start Up Report

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE

SOW Para., 3.1.3

6. REQUIRING OFFICE

POWER SERVICES GROUP

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft Final

Reg Repro

16. REMARKS

Block 10: A comprehensive Start Up report must be prepared and delivered 10 working days after Start Up completion.

Block 12: The Contractor must a comprehensive Start Up report 10 working days after contract award. .

Block 13: The Contract must update and re-submit all documentation previously submitted if any start up procedures are modified. Delivery must be within 10 working days after FAA approval of modifications.

Contracting Officer 0 1 Power Services Group 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

M004

2. TITLE OF DATA ITEM

MEETING AGENDA

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DID M004

5. CONTRACT REFERENCE

SOW Para. 3.1.4

6. REQUIRING OFFICE

POWER SERVICES GROUP

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

As Requested

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 12, and 13: The Contractor must submit a meeting agenda to the Government a minimum of five (5) Working Days prior to each scheduled conference, review, and/or meeting for which the Contractor has responsibility.

*The Government reserves the right to add or delete agenda items. The Government will respond to the Contractor within five (5) Working Days after receipt of the agenda, if required. The Government may respond via telephone, e-mail, or fax.

Block 14: Additional copies of the agenda must be distributed per the attendance list.

Logistics Team 0 1 Contracting Officer 0 1 Power Services Group 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

M005

2. TITLE OF DATA ITEM

Meeting Minutes

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DID M005

5. CONTRACT REFERENCE

SOW Para., 3.1.4, 3.4.1.3,

6. REQUIRING OFFICE

POWER SERVICES GROUP

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

As Requested

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 12 and 13: The Contractor must submit conference minutes, for which the Contractor has responsibility, to the Government for approval within five (5) Working Days after each conference, review, and/or meeting.

*The Government reserves the right to redline, clarify, or add/delete items from the minutes before granting approval. The Contractor must resubmit minutes, if required, to the Government for approval within five (5) Working Days after receipt of redlines.

Block 14b: REPRO means emailed soft copy. Additional copies of the minutes must be distributed per the attendance list.

Logistics Team 0 1 Contracting Officer 0 1 Power Services Group 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Base Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

Q001

2. TITLE OF DATA ITEM

Quality Assurance Plan (QAP)

3. SUBTITLE

N/A

4. AUTHORITY (Data Acquisition Document No.)

DID Q006,

5. CONTRACT REFERENCE

SOW Para. 3.1.5.

6. REQUIRING OFFICE

POWER SERVICES GROUP

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

As Changes Occur

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 12: The Contractor must submit to the Government the Contractor's QAP 10 Calendar Days following receipt of Delivery Order. If the Contractor is ISO 9000 certified, the Contractor will be required to submit his/her current ISO certification to the Government.

Block 13: The Contractor shall update and submit the QAP as any changes or revisions occur.

Block 14b: REPRO means emailed soft copy.

Logistics Team 0 1 Contracting Officer 0 1 Power Services Group 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Contract Base Award

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

Q002

2. TITLE OF DATA ITEM

Contractor's Configuration Management Plan

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DID Q002, DI-SESS-80858C

5. CONTRACT REFERENCE

SOW Para., 3.1.6.

6. REQUIRING OFFICE

POWER SERVICES GROUP

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

ONE TIME

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

N/A

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 12: The Contractor must deliver the Contractor's Configuration Management Plan ten

(10) Calendar Days after receipt of Delivery Order. If the Contractor is ISO 9000 certified, the Contractor will be required to provide his/her latest certification to the Government.

Block 13: The Contractor must update and submit the Contractor's Configuration Management Plan as revisions occur.

Block 14b: REPRO means emailed soft copy.

Logistics Team 0 1 Contracting Officer 0 1 Power Services Group 0 1

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Training

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

T001

2. TITLE OF DATA ITEM

Personnel Qualifcations Report

3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.)

DID T001

5. CONTRACT REFERENCE

SOW Para., 3.6.4.1.

6. REQUIRING OFFICE

Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

See 16

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 10: When intructors leave or new instructors are hired.

Block 12: Original submittal ten (10) calendar days from receipt of delivery order.

Block 13: Five (5) calendar days following receipts of Government review comments.

Block 14: Email any subsequent re-submission to each addressee.

Contracting Officer 0 0 1 Tech. Train. & Dev. Off 0 0 1 FAA Academy 0 0 1 Power Services Group 0 0 1 Logistics Team 0 0 1

15. TOTAL 0 0 5

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER Training

D. SYSTEM/ITEM

Static Transfer Switch (STS)

E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO.

T002

2. TITLE OF DATA ITEM

Task and Skills Analysis (TASA)

3. SUBTITLE

TASA for Second Level Engineering Training

Course (SLETC)

4. AUTHORITY (Data Acquisition Document No.)

DID T002

5. CONTRACT REFERENCE

SOW Para., 3.6.4.2.

6. REQUIRING OFFICE

Power Services Group

7. DD 250 REQ

N/A

9. DIST STATEMENT

REQUIRED

None

10. FREQUENCY

See 16

12. DATE OF FIRST SUBMISSION

See 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE 11. AS OF DATE

See 16

13. DATE OF SUBSEQUENT

SUBMISSION

See 16 Draft

Final

Reg Repro

16. REMARKS

Block 10: Original and two (2) re-submittals.

Block 12: Original submittal 45 calendar days from receipt of Delivery Order.

Block 13: Re-submittals ten (10) calendar days following receipt of FAA review comments and final version submitted prior to CDRL T013, DID-16 First Course Conduct.

Block 14: Email to each addressee one (1) softcopy of the original and re-submittal Task and Skills Analysis Report.

Contracting Officer 0 0 1

Tech. Train. & Dev. Off 0 0 1

FAA Academy 0 0 1

Power Services Group 0 0 1

Logistics Team

15. TOTAL 0 0 4

G. PREPARED BY H. DATE

10/31/2023

I. APPROVED BY

AJW-22

J. DATE

10/31/2023

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .