This is a set of mechanical drawings and specifications for a Parking Ramp Expansion project at a Veterans Affairs facility located at 3495 Bailey Ave., Buffalo, NY 14215 (Project 528-18-375). The drawings are issued for bid with an issue date of 08-09-2024.
The project specifications detail mechanical systems including HVAC equipment, exhaust fans, unit heaters, and louvers. Key equipment to be installed includes two exhaust fans (EF-501 with 12,000 CFM capacity and EF-502 with 1,810 CFM capacity), seven electric suspended unit heaters (EUH series, each 10.0 KW rated at 3-phase, 480V), and one electric cabinet unit heater (CUH-1, 10.0 KW). Two wall louvers (L-1 and L-2, each 48" x 74" Greenheck EDJ-601 models) are specified. The contractor is responsible for removal of existing AC units, roof fans, and associated controls, with careful handling and VA coordination required for equipment disposition. Installation requirements include equipment approvals prior to construction, factory pre-wired interconnections with single power connections, mounting specifications (unit heaters at 8'-6" above finished floor, thermostats at 48" AFF), and coordination with Building Automation System integration. Control sequences are detailed for fan operation based on thermostat setpoints (85°F for EF-501, 80°F for EF-502, 40°F for heating), with motorized damper interlocks, alarm monitoring, and fail-safe provisions specified. All equipment must meet AGA, CSA, or UL certifications, sound levels not to exceed 50 dB, and basis-of-design compliance protocols must be followed for all material and equipment substitutions.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, ALL STRUCTURAL, ALL MECHANICAL, ALL ELECTRICAL DRAWINGS AND ENTIRE PROJECT MANUAL. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK AT NO ADDITIONAL CHARGE TO THE VA.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND WORK, OR BETWEEN THEIR WORK AND THE WORK OF THEIR TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTING CONDITIONS EXIST. ADDITIONAL COMPENSATION WILL NOT
BE GRANTED AFTER AWARD OF CONTRACT FOR ANY WORK REQUIRED TO COMPLY WITH THESE
REQUIREMENTS.
3. DRAWINGS ARE GENERALLY DIAGRAMMATIC. ROUTING OF PIPING, CONDUITS, RACEWAYS, ETC., AS SHOWN ON DRAWINGS, DOES NOT INTEND TO SHOW EVERY RISE, DROP, OFFSET, FITTING NOR EVERY STRUCTURAL ELEMENT THAT MAY BE ENCOUNTERED DURING THE INSTALLATION OF THIS WORK. EACH CONTRACTOR SHALL MAKE ANY REQUIRED CHANGES FROM THE GENERAL ROUTING SHOWN ON THESE DRAWINGS, SUCH AS OFFSETS, BENDS OR CHANGES IN ELEVATION DUE TO COORDINATION WITH THE WORK OF OTHER TRADES AND BUILDING CONSTRUCTION. SUBMIT PROPOSED CHANGES TO THE ARCHITECT / ENGINEER FOR REVIEW. ALL CHANGES SHALL BE MADE WITHOUT ADDITIONAL COST TO THE VA OR DELAY IN COMPLETION
DATE OF THE PROJECT.
4. IT IS THE INTENT OF THESE DOCUMENTS THAT THE MECHANICAL CONTRACTOR PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS FOR THE COMPLETE INSTALLATION OF ALL WORK SHOWN ON THE PLANS AND/OR DESCRIBED HEREIN, INCLUDING ALL DEVICES, CONTROLS AND APPURTENANCES AND TESTING
THAT IS REQUIRED TO SET SYSTEMS INTO OPERATION.
5. SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF PIPING CAN BE RUN TO BETTER ADVANTAGE, PREPARE AND SUBMIT SHOP DRAWINGS SHOWING THE CHANGES BEFORE PROCEEDING WITH THE WORK. SUBMIT PROPOSED CHANGES TO THE ARCHITECT / ENGINEER FOR REVIEW. IF SUCH CHANGES
ARE APPROVED, THEY SHALL BECOME A PART OF THE CONTRACT AFTER THEIR APPROVAL.
6. THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ALL ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC MOUNTING ARRANGEMENT, WEIGHT OR LOCATION SHALL NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY TO VERIFY THE SPECIFIC REQUIREMENT FURNISHED OR THE OTHER TRADES WORKING IN THE SAME AREA. NO ADDITIONS TO THE CONTRACT SUM WILL BE PERMITTED FOR ITEMS INSTALLED IMPROPERLY, IN WRONG LOCATIONS, IN CONFLICT WITH OTHER WORK, ETC.
7. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT FEDERAL BUILDING CODES, REGULATIONS, AND REQUIREMENTS, LOCAL UTILITY COMPANY REQUIREMENTS, AND ASHRAE STANDARDS.
8. THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE FEES, INSPECTIONS, AND TAXES APPLICABLE TO THEIR DIVISION AND SHALL BE INCLUDED IN THE BASE BID AS PART OF THEIR
CONTRACT.
9. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY WORKMANSHIP. THIS CONTRACTOR GUARANTEES ALL OF HIS WORK AND MATERIALS FOR THE PERIOD AS
REQUIRED IN THE SPECIFICATIONS. FROM FINAL ACCEPTANCE BY THE VA/COR.
10. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF THE WORKMEN IN ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, IN., 20TH AND
E. STREETS, N.W. WASHINGTON, D.C.
11. CONTRACTOR SHALL CHECK DRAWINGS OF OTHER TRADES TO VERIFY THAT SPACES IN WHICH THEIR WORK WILL BE INSTALLED ARE CLEAR OF OBSTRUCTIONS. WORK SHALL BE INSTALLED TO MAINTAIN MAXIMUM HEADROOM AND SPACE CONDITIONS AT ALL POINTS IN THE BUILDING. WHERE HEADROOM OR SPACE CONDITIONS APPEAR INADEQUATE, CONTRACTOR SHALL NOTIFY VA/COR BEFORE PROCEEDING WITH THE
INSTALLATION OF THEIR WORK.
12. THE SEQUENCE FOR THE INSTALLATION OF ALL WORK SHALL BE COORDINATED BETWEEN ALL CONTRACTORS ON THE PROJECT AND IN STRICT ACCORDANCE WITH VA STIPULATIONS AS DIRECTED BY
SAME.
13. CONTRACTOR SHALL BE RESPONSIBLE AND PAY FOR ALL CORING, CUTTING, PATCHING, REPAIRING, REFINISHING AND REMOVAL/REPLACEMENT OF NEW OR EXISTING BUILDING CONSTRUCTION REQUIRED TO ACCOMMODATE THE INSTALLATION OR REMOVAL OF THEIR WORK. CONTRACTOR SHALL XRAY ALL SLABS PRIOR TO CORING. ALL PATCHING, REPAIRING AND REFINISHING WORK SHALL BE PERFORMED BY THOSE REGULARLY INVOLVED IN THAT TRADE AND SHALL MATCH THE ADJACENT CONSTRUCTION AS CLOSELY AS POSSIBLE. CARE SHALL BE TAKEN SO AS NOT TO DAMAGE ANY EXISTING BUILDING CONSTRUCTION OR ITEMS THAT ARE TO REMAIN. ANY EXISTING FINISHES THAT ARE DAMAGED DURING THE INSTALLATION OF NEW WORK OR REMOVAL OF EXISTING WORK SHALL BE REPAIRED, REPLACED AND PAID FOR BY THE INSTALLING CONTRACTOR, TO THE SATISFACTION OF THE VA/COR. REFER TO ARCHITECTURAL DRAWINGS FOR EXISTING BUILDING CONSTRUCTION THAT IS TO REMAIN AND, THEREFORE, SUBJECT TO PATCHING, REPAIRING, REFINISHING, AND REMOVAL/REPLACEMENT. WHERE THERE IS EVIDENCE THAT WORK OF ONE TRADE WILL INTERFERE WITH WORK OF OTHER TRADES, ALL TRADES SHALL MEET ON JOB SITE TO WORK OUT SPACE CONDITIONS AND MAKE SATISFACTORY ADJUSTMENTS TO INSTALLATION OF THE NEW WORK.
CONTRACTORS SHALL VERIFY EXACT LOCATIONS OF ALL DEVICES AND EQUIPMENT WITH FIELD
CONDITIONS, SHOP DRAWINGS, AND WORK OF OTHER TRADES PRIOR TO ROUGH-IN. EACH CONTRACTOR SHALL BE RESPONSIBLE, AT THEIR OWN EXPENSE, FOR THE REMOVAL AND REINSTALLATION OF ANY PART OF THEIR WORK IF SAME WAS INSTALLED WITHOUT CONSULTING WITH OTHER TRADES BEFORE INSTALLING
THEIR WORK.
14. CONTRACTOR SHALL STORE ALL MATERIALS AND EQUIPMENT SHIPPED TO THE SITE IN A PROTECTED AREA.
IF MATERIAL IS STORED OUTSIDE OF THE BUILDING, IT MUST BE STORED OFF THE GROUND A MINIMUM OF SIX INCHES (6") SET ON 6 X 6 PLANKS AND/OR WOOD PALLETS. ALL MATERIAL AND EQUIPMENT MUST BE COMPLETELY COVERED WITH WATERPROOF TARPS OR VISQUIN. ALL PIPING AND DUCTWORK WILL HAVE THE ENDS CLOSED TO KEEP OUT DIRT AND OTHER DEBRIS. NO EQUIPMENT WILL BE ALLOWED TO BE STORED OUTSIDE THE BUILDING ON THE SITE UNLESS IT IS SUPPORTED OFF THE GROUND AND
COMPLETELY PROTECTED WITH WEATHERPROOF COVERS.
15. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS AS REQUIRED IN THE SPECIFICATIONS PRIOR TO THE
START OF INSTALLATION FOR VA/COR APPROVAL AND THE SUCCESSFUL REVIEW BY THE
ARCHITECT/ENGINEER.
16. THIS CONTRACTOR SHALL FURNISH AS-BUILT DRAWINGS TO THE VA BEFORE FINAL PAYMENT WILL BE ISSUED. THE AS-BUILT DRAWINGS SHALL BE SUBMITTED IN ELECTRONIC REPRODUCIBLE FORM TO THE
ARCHITECT / ENGINEER OF RECORD FOR REVIEW AND COMPILATION.
17. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE STARTUP AND TESTING OF ALL EQUIPMENT, UTILITIES
AND SYSTEMS.
18. THIS CONTRACTOR SHALL PROVIDE A COMPETENT OPERATING TECHNICIAN TO INSTRUCT THE VA IN THE
OPERATION AND MAINTENANCE OF THE EQUIPMENT.
19. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF
WORK, CLEAN EQUIPMENT AND DEVICES. REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE
PROPERTY AND LEAVE THE WORK IN NEAT AND CLEAN ORDER AND IN COMPLETE WORKING CONDITION.
EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS AND UNPACKED OR REMOVED FROM CARTONS BY THIS CONTRACTOR. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ON-SITE DEBRIS COLLECTIONS / STORAGE AND OFFSITE DISPOSAL. DUMPSTER
LOCATIONS SHALL BE COORDINATED WITH THE VA COR.
20. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINERS, TRANSMITTERS, CONTROL DEVICES. PRIOR TO COMMENCING INSTALLATION WORK, REFER CONFLICTS BETWEEN THIS REQUIREMENT AND CONTRACT DRAWINGS TO THE ARCHITECT / ENGINEER OF RECORD FOR RESOLUTION.
FAILURE OF THE CONTRACTOR TO RESOLVE, OR POINT OUT ANY ISSUES WILL RESULT IN THE CONTRACTOR
CORRECTING AT NO ADDITIONAL COST TO THE VA.
21. UNLESS INDICATED OTHERWISE, THE ARCHITECT/ENGINEER MAKES NO REPRESENTATION AS TO WHETHER OR NOT ANY HAZARDOUS OR CONTAMINATED MATERIALS (INCLUDING BUT NOT LIMITED TO ASBESTOS, PCB'S, LEAD, CONTAMINATED SOILS, ETC.) ARE PRESENT WITHIN THE EXISTING BUILDING OR ON THE SITE.
WORK SHOWN ON THE DRAWINGS AND/OR INDICATED IN THE SPECIFICATIONS SHALL NOT BE CONSTRUED TO CALL FOR CONTACT WITH ANY OF THESE MATERIALS. IF THESE MATERIALS ARE ENCOUNTERED OR SUSPECTED, THE CONTRACTOR SHALL NOT DISTURB THEM AND SHALL CONTACT THE VA/COR IMMEDIATELY.
22. SERVICES TO EXISTING BUILDING SHALL BE KEPT IN OPERATION INCLUDING POWER, SIGNAL SYSTEMS, LIGHTING, TELEPHONE, HEATING, COOLING, VENTILATING, TEMPERATURE CONTROL, SEWERS AND HOT AND COLD WATER. ANY NECESSARY INTERRUPTION OF THESE SERVICES TO ACCOMPLISH CONTRACT WORK SHALL BE ARRANGED WITH THE VA / COR A MINIMUM OF 30 DAYS IN ADVANCE. SUCH INTERRUPTIONS SHALL BE KEPT TO AN ABSOLUTE MINIMUM AS FAR AS TIME INTERVAL IS INVOLVED AND TEMPORARY SERVICES SHALL BE FURNISHED AND INSTALLED UNDER THIS CONTRACT WHERE NECESSARY TO ACCOMPLISH THIS
PURPOSE. TEMPORARIES SHALL BE REMOVED BY THE CONTRACTOR ONLY AFTER NEW PERMANENT
SERVICES ARE INSTALLED AND FULLY OPERATIONAL. SELECT SHUTDOWNS MAY REQUIRED WORK OUTSIDE OF NORMAL OPERATING HOURS OF 8:00 am - 4:30 pm.
23. IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS, OR GREATER QUANTITY OF WORK, AS DETERMINED BY THE
GOVERNMENT/CONTRACTING OFFICER, SHALL BE PROVIDED.
1. ALL EQUIPMENT/DEVICES SHALL BE OF FIRST RATE QUALITY (UNLESS OTHERWISE SPECIFIED) AND ARE TO BEAR THE APPROPRIATE AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE
SPECIFIC DESIGN PURPOSE.
2. ALL EQUIPMENT SOUND LEVELS SHALL NOT EXCEED 50 DB AT PROPERTY LINE.
3. ALL INTERCONNECTING WIRING AT UNIT SHALL BE FACTORY PRE-WIRED AND REQUIRE ONLY ONE (1) POWER CONNECTION TO THE UNIT BY THE ELECTRICAL CONTRACTOR. DISCONNECT SWITCH SHALL BE BY THE
ELECTRICAL CONTRACTOR.
4. SUBMIT THE REQUIRED NUMBER OF COPIES OF EACH CATALOG CUT, FOR THE EQUIPMENT SPECIFIED, TO THE VA/COR FOR APPROVAL AND TO THE ARCHITECT /ENGINEER FOR HIS/HER SUCCESSFUL REVIEW PRIOR TO THE BEGINNING OF CONSTRUCTION. THIS CONTRACTOR SHALL ALSO ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION AND MAINTENANCE OF EACH ITEM INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND CONTROL WIRING DIAGRAMS. SUBMIT THE REQUIRED NUMBER OF COPIES TO THE VA/COR FOR HIS/HER
SUCCESSFUL REVIEW.
5. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE BASIS OF DESIGN INCLUDING ALL DIMENSIONAL DESIGN. IF THE CONTRACTOR PURCHASES EQUIPMENT FROM A SPECIFIED ACCEPTABLE MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT SUBMITTED FOR REVIEW DOES NOT MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO THE VA. CONTRACTOR WILL ALSO PAY ALL COSTS FOR ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS AND THE VA TO MAKE CHANGES WHICH
WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE AND TO FUNCTION AS INTENDED.
6. CONTRACTOR AND/OR MANUFACTURER SHALL VERIFY THAT THE CHARACTERISTICS OF THE EQUIPMENT HE SUBMITS FOR REVIEW MEET THE CAPACITY AND DUTY SPECIFIED. WHEN EQUIPMENT SUBMITTED FOR REVIEW REQUIRES MODIFICATIONS TO THE WORK OF OTHER CONTRACTORS, SUBMITTING CONTRACTOR SHALL PAY FOR ALL COSTS FOR ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS, VA, ARCHITECT OR ENGINEER
TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT FUNCTION SAFELY AND PROPERLY.
7. CONTRACTOR MUST FIELD VERIFY SIZES, CAPACITIES, WEIGHTS, HORSE POWERS, ETC. ON ALL EQUIPMENT.
NOTIFY THE VA/COR IF ANY DISCREPANCIES EXIST BETWEEN THE ACTUAL FIELD CONDITIONS AND THE
DRAWINGS.
HVAC SYMBOLS AND ABBREVIATIONS
VOLUME DAMPERVD
FLEXIBLE DUCT CONNECTION
MANUAL SINGLE BLADE OR OPPOSED BLADE DAMPER
MOTOR OPERATED DAMPER
VERTICAL FIRE DAMPER WITH ACCESS DOOR
AIR FLOW
DUCT SIZE FREE AREA (1ST FIGURE, SIDE OF DUCT SHOWN)
CROSS-SECTION OF SUPPLY OR OUTSIDE AIR INTAKE DUCT
CROSS-SECTION OF RETURN DUCT
INCLINED RISE (R) OR DROP (D)
90° ELBOW WITH TURNING VANES
90° BRANCH TAKE-OFF W/45 DEGREE ENTRY
EQUIPMENT TAG
ROUND FLEXIBLE DUCT
SQUARE OR RECTANGLE DUCT TRANSITION
SQUARE OR RECTANGLE TO ROUND DUCT TRANSITION
12x24
WALL THERMOSTAT OR TEMPERATURE SENSOR
ROUND
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DUCT UP TO ROOF MOUNTED EXHAUST FAN OR VENTILATOR
THERMOMETER (WITH PIPE WELL)
FLOW SWITCH (WITH THREAD OR WELD-O-LET)
PRESSURE GAUGE AND NEEDLE VALVE
PRESSURE SWITCH (WITH THREAD OR WELD-O-LET)
CONCENTRIC PIPE REDUCER OR INCREASER
PIPE UNION (OR FLANGES IF 2 1/2" OR LARGER PIPE)
DRAIN VALVE WITH HOSE THREADED OUTLET
CIRCUIT BALANCING VALVE W/BALANCING PORTS (8" AND UNDER)
2 WAY CONTROL VALVE
3 WAY CONTROL VALVE
BALL VALVE (2" & SMALLER)
CHECK VALVE
GATE VALVE
GLOBE VALVE
LOW PRESSURE STEAM (UP TO 15 PSIG)
LOW PRESSURE CONDENSATE (UP TO 15 PSIG)
DRAIN LINE
DIRECTION OF FLOW
PITCH OF PIPE (DOWN)
PIPE ELBOW (TURNED UP)
PIPE ELBOW (TURNED DOWN)
PIPE TEE DOWN (DROP)
PIPE TEE UP
PIPE TEE UP OR ANGLE
PIPE TEE DOWN OR ANGLE
NEW CONNECTION
SOLENOID VALVE
PRESSURE REDUCING VALVE
PRESSURE RELIEF VALVE (PIPE TO FLOOR DRAIN)
AUTOMATIC BALL OR BUTTERFLY VALVE
STEAM TRAP ASSEMBLY
THERMOMETER WELL
REFRIGERANT EXPANSION VALVE
AD
A.F.F.
BHP
BOP
BTU
BTUH
CC
CFM
DB
DN.
EAT
EF
ESP
EWT
FPF
FPM
FV
HP
HWR
HWS
LAT
LWT
NK
PD
PH
PHC
PSI
RPM
SF
SP
TSP
WB
W.C.
WG
ACCESS DOOR
ABOVE FINISHED FLOOR
BRAKE HORSEPOWER
BOTTOM OF PIPE
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
COOLING COIL
CUBIC FEET PER MINUTE
DRAIN LINE
DRY BULB
DOWN
ENTERING AIR TEMPERATURE
EXHAUST FAN
ENTERING WATER TEMPERATURE
FAHRENHEIT
FINS PER FOOT
FEET PER MINUTE
FACE VELOCITY
HORSEPOWER
HOT WATER RETURN
HOT WATER SUPPLY
LEAVING AIR TEMPERATURE
LEAVING WATER TEMPERATURE
NECK
PRESSURE DROP
PHASE
PREHEAT COIL
POUNDS PER SQUARE INCH
REVOLUTIONS PER MINUTE
SUPPLY FAN
STATIC PRESSURE
TOTAL STATIC PRESSURE
WET BULB
WATER COLUMN
WATER GAUGE
PLUG VALVE (GAS COCK)
GALLONS PER MINUTEGPM
SPRAY WATER RETURN
SPRAY WATER SUPPLY
LOW TEMPERATURE (HEATING) HOT WATER SUPPLY (UP TO 120°F)
LOW TEMPERATURE (HEATING) HOT WATER RETURN (UP TO 120°F)
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
EXTERNAL STATIC PRESSURE
WALL HUMIDISTAT
WALL THERMOSTAT OR TEMPERATURE SENSOR WITH GUARD
BUTTERFLY VALVE (2 1/2" & LARGER)
CIRCUIT FLOW INDICATOR W/BALANCING PORTS AND MEMORY STOP
BUTTERFLY VALVE FOR BALANCING (10" AND ABOVE)
GENERAL CONTRACTORGC
TEMPERATURE CONTROLTC
MAXIMUM OVERCURRENT PROTECTIONMOCP
MINIMUM CIRCUIT AMPSMCA
TYPICALTYP.
HOT WATER COILHWC
TEMPERATURE WELL WITH DDC SENSOR
STRAINER
PRESSURE WELL WITH DDC SENSOR
PRESSURE/TEMPERATURE PLUG WITH CAP
STRAINER WITH BLOWDOWN VALVE
PIPING, DUCTWORK, OR EQUIPMENT TO BE REMOVED
BAS BUILDING AUTOMATION SYSTEM
D
PUMPED CONDENSATE RETURN
VACUUM CONDENSATE
VARIABLE FREQUENCY DRIVEVFD
F
CROSS-SECTION OF EXHAUST DUCT
MEDIUM TEMPERATURE HOT WATER SUPPLYMTHWS
MEDIUM TEMPERATURE HOT WATER RETURNMTHWR
HIGH TEMPERATURE (HEATING) HOT WATER SUPPLY
HIGH TEMPERATURE (HEATING) HOT WATER RETURN
HIGH TEMPERATURE HOT WATER SUPPLYHTS
HIGH TEMPERATURE HOT WATER RETURNHTR
(E) EXISTING
HIGH PRESSURE STEAM SUPPLY
HIGH PRESSURE CONDENSATE RETURN
BUTTERFLY VALVE
THESE LISTS OF SYMBOLS AND ABBREVIATIONS ARE GENERAL. NOT ALL SYMBOLS AND
ABBREVIATIONS MAY BE APPLICABLE TO THIS PROJECT.
50% PROPYLENE GLYCOL HOT WATER SUPPLY
50% PROPYLENE GLYCOL HOT WATER RETURN
DIFFUSER TAG
S-SUPPLY
R-RETURN
E-EXHAUST
DIFFUSER/GRILLE
IDENTIFICATION
__CFM
DIFFUSER/GRILLE
SIZEDIFFUSER/GRILLE
AIRFLOW
RATE
NTS NOT TO SCALE
MAKE-UP WATER
CONDENSER WATER TO TOWER
CONDENSER WATER FROM TOWER
NEW CONNECTION POINT
EA EXHAUST AIR
SA SUPPLY AIR
SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED
AND PROVIDED HEREIN.
EQUIVALENCY SUBSTITUTIONS: THE "BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS" ARE TO BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED AND DETAILED
THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS
SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE
SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
DUCT SMOKE DETECTOR
HORIZONTAL FIRE DAMPER
XXX-1
XX
CWTT CONDENSER WATER TO TOWER
CWFT CONDENSER WATER FROM TOWER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
P a r k i n g
R a m p
B u f f a l o
N
Y
D e s D o c s
D r a w i n g s W
O R
K I N
G M d w g
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
cverdu Image
MECHANICAL DEMOLITION
KEY NOTES
X
1. REMOVE AC UNIT AND ALL ASSOCIATED SUPPORTS AND CONTROLS. PATCH HOLES
TO MATCH EXISTING.
2. REMOVE EXISTING ROOF FAN AND ALL ASSOCIATED SUPPORTS AND CONTROLS,
THERMOSTATS, ETC.
3. EXISTING LOUVER TO REMAIN. LOUVER SHALL REMAIN IN CLOSED POSITION AND
ALARM SET IN THE OFF POSITION DURING CONSTRUCTION.
4. EXISTING FAN TO REMAIN IN SERVICE.
5. CAREFULLY REMOVE EQUIPMENT AND RETURN TO THE VA FOR FURTHER
INSTRUCTIONS. CONTRACTOR SHALL PROPERLY DISPOSE OF ANY EQUIPMENT NOT
WANTED BY THE VA.
WANTED BY THE VA.
7 8
C
UP3
36x24
1 1.7
A.3
A
7 8
C
UP
1 1.7
A.3
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
P a r k i n g
R a m p
B u f f a l o
N
Y
D e s D o c s
D r a w i n g s W
O R
K I N
G M
D d w g
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
N
KEY PLAN
STAIR 2
STAIR 3
DN
UP
LOWER LOBBY
LEVEL 1 LOBBY
EUH-101
10.0 KW
EUH-001
10.0 KW
'EUH-101'
L-1
DN
DN
UP
M01
MEDICAL CENTER
LOBBY
LEVEL 2 LOBBY
EUH-M01
10.0 KW
'EUH-201'
'EUH-M01'
EUH-201
10.0 KW
'EUH-001'
L-2 2
OPEN
TO
BELOW
DN
DN
UP
'EUH-301'
EUH-301
10.0 KW
LEVEL 4 LOBBY
OPEN
TO
BELOW
OPEN
TO
BELOW
MECHANICAL KEY
NOTES
1. THERMOSTAT WITH LOCKABLE GUARD PROVIDED AND INSTALLED BY
TEMPERATURE CONTROL CONTRACTOR, TO INTERLOCK WITH UNIT INDICATED.
2. DAMPER TO BE INTERLOCKED WITH NEW FAN 'EF-501' ON ROOF. WHEN FAN
STARTS/STOPS, DAMPER SHALL OPEN/CLOSE. UPON LOSS OF POWER, DAMPER
SHALL FAIL OPEN. A SIGNAL SHALL SEND AN ALARM TO THE BAS IF THE DAMPER
FAILS TO OPEN. MOTORIZED DAMPER POWER SHALL BE FROM FAN CIRCUIT VIA
INTEGRAL TRANSFORMER.
3. MAKE FULL SIZE DUCT CONNECTION TO FAN. TERMINATE DUCT BELOW ROOF WITH
WIRE MESH SCREEN.
4. REFER TO ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHT AND LOCATION.
X
GENERAL NOTES
A. REFER TO ELECTRICAL DRAWINGS FOR CONDUIT LOCATIONS, WIRING
REQUIREMENTS, PANEL LOCATIONS AND DISCONNECTS FOR ELECTRICAL UNIT
HEATERS.
B. MOUNT ELECTRIC UNIT HEATER (EUH) SUCH THAT THE BOTTOM OF THE HEATER IS
8'-6" ABOVE FINISHED FLOOR.
C. THERMOSTATS SHALL BE MOUNTED APPROXIMATELY 48" AFF. REFER TO
ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHT INFORMATION.
11.511 12
DN
DN
UP
'EUH-401'
EUH-401
10.0 KW
LEVEL 4 LOBBY
OPEN
TO
BELOW
OPEN
TO
BELOW
C.3
C.1
B.6
C.2
C
C.3
C.1
B.6
C.2
11.511 12
C.3
C.1
B.6
C.2
11.511 12
C.3
C.1
B.6
C.2
11.511 12
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
P a r k i n g
R a m p
B u f f a l o
N
Y
D e s D o c s
D r a w i n g s W
O R
K I N
G M d w g
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
N
KEY PLAN
STAIR 2
STAIR 3
LEVEL 5 LOBBY
EF-501
(ON ROOF)
'EF-501' 'EUH-501'
EUH-501
10.0 KW
EF-501
12,000 CFM
MECHANICAL KEY
NOTES
1. THERMOSTAT WITH LOCKABLE GUARD, PROVIDED AND INSTALLED BY
TEMPERATURE CONTROL CONTRACTOR, TO INTERLOCK WITH 'EF-501' ON ROOF.
MOTORIZED DAMPER TO INTERLOCK WITH 'EF-501' ON ROOF. WHEN EF-501
STARTS/STOPS, MOTORIZED DAMPER SHALL OPEN/CLOSE.
2. THERMOSTAT WITH GUARD, PROVIDED AND INSTALLED BY TEMPERATURE CONTROL
CONTRACTORL, TO INTERLOCK WITH WITH UNIT INDICATED.
3. MAKE FULL SIZE DUCT CONNECTION TO FAN. TERMINATE DUCT BELOW ROOF WITH
WIRE MESH SCREEN.
X
GENERAL NOTES
A. REFER TO ELECTRICAL DRAWINGS FOR CONDUIT LOCATIONS, WIRING
REQUIREMENTS, PANEL LOCATIONS AND DISCONNECTS FOR ELECTRICAL UNIT
HEATERS.
B. MOUNT ELECTRIC UNIT HEATER (EUH) SUCH THAT THE BOTTOM OF THE HEATER IS
8'-6" ABOVE FINISHED FLOOR.
C. THERMOSTATS SHALL BE MOUNTED APPROXIMATELY 48" AFF. REFER TO
ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHT INFORMATION.
11.511 12
C.3
C.1
B.6
C.2
11.511 12
C.3
C.1
B.6
C.2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
P a r k i n g
R a m p
B u f f a l o
N
Y
D e s D o c s
D r a w i n g s W
O R
K I N
G M d w g
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
N
KEY PLAN
STAIR 2
STAIR 3
STAIR TOWER 2
M
CUH-1
10.0 KW
'CUH-1'
EF-502
1,810 CFM
MECHANICAL KEY
NOTES
1. EXISTING 36x24 LOUVER TO REMAIN. DAMPER TO BE INTERLOCKED WITH NEW FAN
'EF-502' ON ROOF. WHEN FAN STARTS/STOPS, DAMPER SHALL OPEN/CLOSE. UPON
LOSS OF POWER, DAMPER SHALL FAIL OPEN AND A SIGNAL SHALL SEND AN ALARM
TO THE BAS IF THE DAMPER FAILS TO OPEN. MOTORIZED DAMPER POWER SHALL BE
FROM FAN CIRCUIT VIA INTEGRAL TRANSFORMER.
2. THERMOSTAT WITH LOCKABLE GUARD TO INTERLOCK WITH 'EF-502' ON STAIR
TOWER 2 ROOF. MOUNT THERMOSTAT APPROXIMATELY 48" AFF. REFER TO
ARCHITECTURAL DRAWINGS FOR MORE INFORMATION ON MOUNTING HEIGHTS.
3. MAKE FULL SIZE DUCT CONNECTION TO FAN. TERMINATE DUCT BELOW ROOF WITH
WIRE MESH SCREEN.
4. INSTALL PER MANUFACTURER'S RECOMMENDATIONS.
X
GENERAL NOTES
A. REFER TO ELECTRICAL DRAWINGS FOR CONDUIT LOCATIONS, WIRING
REQUIREMENTS, PANEL LOCATIONS AND DISCONNECTS FOR CABINET UNIT
HEATER.
B. THERMOSTATS SHALL BE MOUNTED APPROXIMATELY 48" AFF. REFER TO
ARCHITECTURAL DRAWINGS FOR MOUNTING HEIGHT INFORMATION.
DN
STAIR TOWER 2
'EF-502 '
1 1.7
A.2
A
1 1.7
A.2
A
1 1.7
A.2
A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
P a r k i n g
R a m p
B u f f a l o
N
Y
D e s D o c s
D r a w i n g s W
O R
K I N
G M d w g
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
N
KEY PLAN
STAIR 2
STAIR 3
WALL LOUVER SCHEDULE
EQUIPMENT TAG LOCATION SERVICE MANUFACTURER MODEL TYPE
SIZE (IN.)
CFM
FREE AREA
VELOCITY
(FPM)
P.D. (IN.
W.G.)
WATER
PENETRATION
VELOCITY (FPM)
NOTES
W H D
L-1 LEVEL 1
LOBBY101 EF-1 GREENHECK EDJ-601 EXTRUDED ALUMINUM
DRAINABLE 48 74 6 6,000 423 0.05 998 1,2,3,4
L-2 MEDICAL CENTER
LOBBY M01 EF-1 GREENHECK EDJ-601 EXTRUDED ALUMINUM
DRAINABLE 48 74 6 6,000 423 0.05 998 1,2,3,4
NOTES:
1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL
2. BIRDSCREEN.
3. COLOR AND FINISH TO BE SELECTED BY ARCHITECT.
4. WATER PENETRATION VELOCITY IF BASED ON 0.01 OUNCES/SQ.FT. WITH A 48"x48" LOUVER AND A TEST PERIOD OF 15 MIN.
ELECTRIC SUSPENDED HEATER SCHEDULE
GENERAL HEATER FAN DATA ELECTRICAL DATA
NOTESEQUIPMENT TAG LOCATION TYPE MANUFACTURER MODEL KW PHASE VOLT TYPE CFM AMPS PHASE VOLT
EUH-001 ELEVATOR
LOBBY
SUSPENDED
HORIZONTAL MARLEY MUH0541 10.0 3 480 PROP. 650 12.0 3 480 1,2,3,4
EUH-101 ELEVATOR
LOBBY
SUSPENDED
HORIZONTAL MARLEY MUH0541 10.0 3 480 PROP. 650 12.0 3 480 1,2,3,4
EUH-M01 ELEVATOR
LOBBY
SUSPENDED
HORIZONTAL MARLEY MUH0541 10.0 3 480 PROP. 650 12.0 3 480 1,2,3,4
EUH-201 ELEVATOR
LOBBY
SUSPENDED
HORIZONTAL MARLEY MUH0541 10.0 3 480 PROP. 650 12.0 3 480 1,2,3,4
EUH-301 ELEVATOR
LOBBY
SUSPENDED
HORIZONTAL MARLEY MUH0541 10.0 3 480 PROP. 650 12.0 3 480 1,2,3,4
EUH-401 ELEVATOR
LOBBY
SUSPENDED
HORIZONTAL MARLEY MUH0541 10.0 3 480 PROP. 650 12.0 3 480 1,2,3,4
EUH-501 ELEVATOR
LOBBY
SUSPENDED
HORIZONTAL MARLEY MUH0541 10.0 3 480 PROP. 650 12.0 3 480 1,2,3,4
NOTES:
1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL.
2. DISCONNECT SWITCH.
3. MOUNTING KIT TO MATCH MOUNTING REQUIREMENTS PROVIDED BY HEATER MANUFACTURER.
4. FAN DELAY SWITCH.
ELECTRIC CABINET UNIT HEATER SCHEDULE
EQUIPMENT
TAG LOCATION MANUFACTURER MODEL TYPE
FAN HEATER CABINET CABINET DIMENSIONS (IN.) FILTER
NOTES
CFM KW PHASE AMPS VOLT MOUNTING ARRANGEMENT L W H MOUNTING
HEIGHT TYPE SIZE
CUH-1 STAIR TOWER 2 MARLEY CUH945 WALL MOUNTED 500 10.0 3.0 13.0 480 SURFACE UPFLOW 48 9.5 26.5 10" PERM. 1/2" 1,2,3,4,5
NOTES:
1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUAL 3. RETURN AIR THERMOSTAT.
2. COLOR AS SELECTED BY ARCHITECT. 4. FACTORY INSTALLED MOTOR STARTER AND DISCONNECT SWITCH.
5. WALL MOUNTING KIT TO MATCH APPLICATION.
AIR FLOW
SUPPORT FROM STRUCTURE
ABOVE WITH STEEL RODS
RIGID WIRE BIRD GUARD.
DRAINAGE GUTTER
TERMINATE DUCT
BELOW ROOF DECK
WITH WIRE MESH
SCREEN AT INLET
PRE-FAB ROOF CURB
SLOPED TO SUIT ROOF
PITCH.
REMOTE MOUNTED
MOTOR W/COVER.
BUTTERFLY DAMPER ASSEMBLY
RUBBER CUSHIONED
DAMPER STOP.
M
I N
WALL
CONTROL WIRE CONDUIT
ELECTRICAL JUNCTION BOX
SECURE TO WALL W/(4)
SCREW ANCHORS
THERMOSTAT WITH 1/4"
INSULATING BASE
1" PVC STAND-OFF
TO SUIT ROOF PITCH
PRE-FAB ROOF CURB SLOPED
HVAC UNIT COUNTERFLASHING
12" HIGH FULLY LINED AND INSULATED
ROOF CURB WITH 2 THRU BOLTS PER
SIDE. INSULATE WITH 1-1/2" THICK
3 LB. DENSITY INSULATION.
TREATED WOOD NAILER
STAINLESS STEEL SCREW FASTENER
WITH NEOPRENE WASHERS.
COVER WITH SEALANT.
WELDED 18 GA. GALVANIZED STEEL
ALL 4 SIDES OF OPENING. BY G.C.
4"x6"x3/8" STEEL ANGLE AT
ROOFING MATERIALS
RIGID INSULATION BY G.C.
DRIVE PIN WITH WASHER
EXHAUST FAN SCHEDULE
EQUIPMENT TAG
BASIS OF DESIGN
LOCATION AREA SERVED TYPE DRIVE WEIGHT
(LBS) CFM SP (IN.) MAXIMUM
SONES
FAN
RPM BHP
MOTOR CONTROL
TYPE NOTES
MANUFACTURER MODEL HP RPM PHASE VOLT
EF-501 GREENHECK RE2-36-615-VG ROOF ELEVATOR LOBBY PROPELLER HOOD DIRECT 656 12,000 0.5 37 1,066 2.6 5 1,725 3 480 T-STAT 1,2,3,4,5
EF-502 GREENHECK RE2-20-419-VG ROOF STAIR TOWER 2 PROPELLER HOOD DIRECT 225 1,810 0.5 24 1,474 0.51 1 1,725 3 480 T-STAT 1,2,3,4,5
NOTES:
1. OTHER ACCEPTABLE MANUFACTURERS: VA APPROVED EQUALS 5. ALL MOTORIZED DAMPERS INTERLOCKED WITH FANS SHALL BE FROM FAN CIRCUIT VIA INTEGRAL
2. PROVIDE THE FOLLOWING OPTIONS: GRAVITY BACKDRAFT DAMPER, NEMA 3R DISCONNECT SWITCH, AND SPEED CONTROLLER TRANSFORMER.
3. PROVIDE ALUMINUM BIRDSCREEN.
4. PROVIDE PRE-FABRICATED 18" TALL INSULATED ROOF CURB.
NOTE:
ALL THERMOSTATS SHALL HAVE LOCKABLE COVERS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
P a r k i n g
R a m p
B u f f a l o
N
Y
D e s D o c s
D r a w i n g s W
O R
K I N
G M d w g
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
MECHANICAL ROOM EXHAUST FAN
MS
CT
FAN STATUS:
A. THE CONTROLLER SHALL MONITOR THE FAN STATUS.
B. ALARMS SHALL BE PROVIDED AS FOLLOWS:
a. FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
b. FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
BI - EXHAUST FAN STATUS
BO - EXHAUST FAN START/STOP
STAIR 3 EXHAUST FAN POINTS LIST (EF-501)
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X X
X XX
X
THERMOSTAT
FAN RUNTIME EXCEEDED X X
T
BI - ZONE OVERRIDE
AI -ZONE SETPOINT ADJUST
AI -ZONE TEMP
THE FAN SHALL RUN WHENEVER ZONE THERMOSTAT RISES ABOVE 85°F (ADJ.)
FAN:
A. THE FAN SHALL RUN ANYTIME THE ZONE TEMPERATURE IS BELOW HEATING SETPOINT (40°F ADJ), UNLESS
SHUTDOWN ON SAFETIES.
SUSPENDED UNIT HEATER POINTS LIST
POINT NAME
HARDWARE POINTS SOFTWARE POINTS
SHOW ON
GRAPHIC
AI AO BI BO AV BV SCHED TREND ALARM
X X
X X
X X X
XX X X
X
NOTE TO TEMPERATURE CONTROL CONTRACTOR:
FAN STATUS
FAN START/STOP
FAN FAILURE
LOUVER DAMPER A STATUS (EF-501) X
X
LOUVER DAMPER B STATUS (EF-501) X
X
X
X
X
X
X
X
LOUVER DAMPER A FAILURE TO OPEN (EF-501)
LOUVER DAMPER B FAILURE TO OPEN (EF-501) X
X
MECHANICAL ROOM EXHAUST FAN
MS
CT
FAN STATUS:
A. THE CONTROLLER SHALL MONITOR THE FAN STATUS.
B. ALARMS SHALL BE PROVIDED AS FOLLOWS:
a. FAN FAILURE: COMMANDED ON, BUT THE STATUS IS OFF.
b. FAN IN HAND: COMMANDED OFF, BUT THE STATUS IS ON.
BI - EXHAUST FAN STATUS
BO - EXHAUST FAN START/STOP
STAIR 2 EXHAUST FAN POINTS LIST (EF-502)
HARDWARE POINTS SOFTWARE POINTS
POINT NAME AI AO BI BO AV BV SCHED TREND ALARM
SHOW ON
GRAPHIC
X X
X XX
X
THERMOSTAT
FAN RUNTIME EXCEEDED X X
T
BI - ZONE OVERRIDE
AI -ZONE SETPOINT ADJUST
AI -ZONE TEMP
THE FAN SHALL RUN WHENEVER ZONE THERMOSTAT RISES ABOVE 80°F (ADJ.)
FAN STATUS
FAN START/STOP
FAN FAILURE
WALL DAMPER CLOSED STATUS
WALL DAMPER OPEN STATUS
X
X
X
X
X
XWALL DAMPER FAILURE TO OPEN
BO - FAN LOW SPEED
BO - FAN HIGH SPEED
SUPPLY
AIR
BI - ZONE OVERRIDE
AI -ZONE TEMP
AI -ZONE SETPOINT ADJUST
T
M
C. FAN RUNTIME EXCEEDED: FAN STATUS RUNTIME EXCEEDS A USER DEFINABLE LIMIT (ADJ.).
X X
X X
FAN STATUS
FAN START/STOP
FAN FAILURE
HEATING SETPOINT ADJUST
ZONE TEMPERATURE
ZONE OVERRIDE
LOW ZONE TEMPERATUR
X
X
ELECTRIC HEAT FAILURE TO ENERGIZE X
X
ALL CONTROLS SHALL BE INTEGRATED INTO
THE EXISTING BUILDING MANAGEMENT SYSTEM.
THE CONTROL CONTRACTOR SHALL BE
RESPONSIBLE FOR PROVIDING THE CORRECT
TYPE, SIZES AND QUANTITIES OF CONTROL
CABLES, CONTROLLERS, SENSORS,
TRANSFORMERS, DEVICES AND PROGRAMMING
NECESSARY FOR A FULLY FUNCTIONAL SYSTEM.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K C
C G
P
R O
J E
C T
S
P a r k i n g
R a m p
B u f f a l o
N
Y
D e s D o c s
D r a w i n g s W
O R
K I N
G M d w g
P
M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
| 01-M001.pdf |
| Sheets and Views |
| M001 |
| 02-MD101.pdf |
| Sheets and Views |
| MD101 |
| 03-M101.pdf |
| Sheets and Views |
| M101 |
| 04-M102.pdf |
| Sheets and Views |
| M102 |
| 05-M103.pdf |
| Sheets and Views |
| M103 |
| 06-M501.pdf |
| Sheets and Views |
| M501 |
| 07-M701.pdf |
| Sheets and Views |
| M701 |
File details come from the government source that posted it. Updated .