This document is a set of plumbing design drawings and specifications for a parking ramp expansion project at the U.S. Department of Veterans Affairs facility located at 3495 Bailey Avenue, Buffalo, New York 14215 (Project 528-18-375). The drawings are issued for bid by the Office of Construction and Facilities Management with Bancroft A/E as the architect/engineer of record.
The project encompasses plumbing demolition and new storm drainage piping installation across five levels of a parking garage and medical center addition. Key specifications include: storm drainage piping using cast iron with hubless clamp and shield connections above ground and PVC solvent weld below ground; horizontal drainage slopes of 1/8" per foot minimum for piping 4" diameter and larger; all suspended horizontal piping supported by hangers spaced no further than 8 feet apart; cleanouts at all dead ends and changes of direction; and expansion joints at every other level for rainwater collectors. Plumbing fixtures required include floor drains (JR Smith 2140C-U-M-B or approved equal), area drains (Zurn Z537 or approved equal), and an elevator sump pump (Weil 1411 or approved equal, 50 GPM, 1/2 HP, 115V single phase). The basis of design for valves specifies Crane or Stockham manufacturers with specific model numbers for gate, globe, and check valves. All materials must be new, first quality, and UL-listed; equivalent substitutions require formal equivalency submission and approval prior to procurement. The contractor is responsible for all temporary connections, modifications to existing piping, field verification of equipment dimensions and weights, and compliance with all local, state, and federal plumbing codes.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING GENERAL NOTES PLUMBING MATERIALS AND PROCEDURES NOTES PLUMBING SYMBOL LIST
SYMBOLPROCEDURES: DESCRIPTION
1. ALL MATERIALS SHALL BE NEW OF FIRST QUALITY AND UL LISTED FOR THE SPECIFIC DESIGN PURPOSE.
2. FURNISH AND INSTALL UNIONS WHERE INDICATED OR AS DEEMED NECESSARY FOR REPAIR OR SERVICE. UNIONS 2" AND SMALLER SHALL BE STANDARD GROUND JOINT BRASS TO IRON SEAT, MALLEABLE IRON, SCREWED. UNIONS 2-1/2" AND
LARGER SHALL BE STANDARD CAST IRON FLANGED UNIONS 125# CLASS.
3. THE BASIS OF DESIGN FOR VALVES SHALL BE MANUFACTURED BY CRANE, STOCKHAM. VALVE NUMBERS INDICATED HERE ARE CRANE. GATE VALVES, 2" AND SMALLER, #428. GLOBE VALVE, 2" AND SMALLER #7. CHECK VALVE, 2" AND SMALLER, #36.
VALVES ARE SUITABLE FOR IRON OR STEEL PIPE ONLY. IF COPPER PIPING IS USED, MODIFY VALVE NUMBERS AS REQUIRED AND SUBMIT PROPER VALVES FOR VA/COR APPROVAL. REFER TO SPECIFICATION SECTION 22 05 23 GENERAL DUTY VALVES.
4. THE BASIS OF DESIGN FOR PIPE INSULATION AT ALL PIPE HANGERS SHALL CONSIST OF INSUL-SHIELD FIBERGLASS PIPE
SUPPORTS AS MANUFACTURED BY INSUL-COUSTIC.
5. HANGERS SHALL BE OF STANDARD WEIGHT STEEL OR IRON ROD AND RING OR CLEVIS TYPE. SEE 4/P501 FOR PIPE
HANGER DETAIL.
AD AREA DRAIN
1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER THAN 8'-0" APART. NO PIPING SHALL BE SELF-SUPPORTING NOR BE SUPPORTED FROM EQUIPMENT
CONNECTIONS.
2. ALL PARALLEL PIPES TWO (2) OR MORE SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE
HANGER.
3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND CONTRACTION IN
PIPING SYSTEMS UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL.
4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT AND
SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM. ALL
CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8" BENDS. NO LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES SHALL BE PROTECTED
FROM FREEZING.
5. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT CHANGES OF DIRECTION, AT 50'-0" INTERVALS ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC. WHERE CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH EXTENSIONS TO FLOOR ABOVE OR
TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE BASE OF EACH STACK.
6. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR THROUGH
FIRE RATED ASSEMBLIES.
7. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/4" PER FOOT FOR PIPING 3" DIA.
AND UNDER.
8. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THEN 1/8" PER FOOT FOR PIPING 4" DIA.
AND OVER.
9. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE
EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND CAUSING
MAJOR PIPING REVISIONS.
MATERIALSSEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL REQUIREMENTS LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AND AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED BELOW.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) PROTOCOLS” ARE TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS AND ASSEMBLIES SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE FULL BOD EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, FIRE PROTECTION, AND ELECTRICAL DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK. THIS CONTRACTOR SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF THE ABOVE SHALL
BE INCLUDED IN THE SCOPE OF WORK.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR WORK AND THE WORK OF OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR CONFLICTS EXIST.
3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER, REQUIREMENTS AND LOCATION OF THE WORK SHOWN AND INCLUDED. THE WORK INDICATED, BUT HAVING MINOR DETAILS OBVIOUSLY OMITTED, SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE VA/GOVERNMENT.
4. THE CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, THE WORK SHOWN ON THE DRAWINGS AND PROVIDED IN THE SPECIFICATIONS WITHOUT DEVIATION, WITH THE EXCEPTION OF ANY BASIS OF DESIGN (BOD) EQUIVALENCY SUBSTITUTIONS. THESE REQUESTED SUBSTITUTIONS WILL NEED TO BE IDENTIFIED, SUBMITTED AND APPROVED BY THE VA/CO AND SHALL BE IN FULL COMPLIANCE WITH THE BASIS OF DESIGN COMPLIANCE PROTOCOLS. SEE GI001.
5. THIS CONTRACTOR IS RESPONSIBLE TO FURNISH AND INSTALL ALL LABOR AND MATERIALS NECESSARY FOR A COMPLETE SYSTEM. WHERE THERE IS NO MENTION OF THE RESPONSIBLE PARTY FOR A SPECIFIC ITEM TO BE FURNISHED OR INSTALLED ON THE DRAWINGS, THE DRAWING'S TRADE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR ALL RELATED PURCHASES AND LABOR FOR PROVIDING A COMPLETE OPERATING SYSTEM FOR
THIS ITEM.
6. WHEN PERFORMING ANY CUTTING OR PATCHING (RESTORE TO ORIGINAL STATE) ALL BUILDING MATERIALS AND FINISHES AS REQUIRED TO PROVIDE A FINISHED PRODUCT THAT IS LIKE NEW AND DOESN'T STAND OUT AS BEING
DIFFERENT OR DISTINGUISHABLE AS A PATCH OR REPAIR.
7. THIS CONTRACTOR SHALL VERIFY AND COORDINATE ALL MOUNTING, ARRANGEMENTS, HEIGHTS AND LOCATIONS PRIOR TO ROUGH-IN AS REQUIRED BY THE VA DESIGN GUIDES/MANUALS ALONG WITH THE EXPRESSED DESIGN
INTENT PRESENTED WITHIN THESE DOCUMENTS.
8. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL SLEEVES THRU WALLS AND THROUGH FLOORS, INCLUDING CORING IF REQUIRED. CONTRACTOR SHALL X-RAY AREAS TO DETERMINED LOCATION OF RE-INFORCEMENT.
9. PLUMBING CONTRACTOR SHALL VERIFY EXACT LOCATION OF ALL EXISTING SANITARY, VENT AND WATER SUPPLY
PIPING ON THE SITE PRIOR TO THE PERFORMANCE OF ANY WORK.
10. PROVIDE SERVICE VALVES AT ALL BRANCH SUPPLY PIPING. SUCH SERVICE VALVES SHALL BE AS PER THE
SPECIFICATIONS AND IN KEEPING WITH THE VA STANDARDS AND REQUIREMENTS.
11. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT GOVERNING LOCAL, COUNTY, STATE, AND FEDERAL BUILDING CODE REQUIREMENTS AND REGULATIONS PLUS COMPLIANCE WITH LOCAL UTILITY COMPANY
AND VA REQUIREMENTS.
12. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF PERFORMING QUALITY
WORKMANSHIP.
13. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE PROTECTION OF ALL PERSONNEL THRU ALL PHASES OF WORK, COMPLYING WITH ALL APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, INC., 20TH AND E. STREETS, N.W.
WASHINGTON, D.C.
14. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY, RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING OF ALL NEW EQUIPMENT AND MATERIALS FURNISHED BY THIS CONTRACTOR ALONG WITH EQUIPMENT FURNISHED BY THE VA AND INSTALLED BY THIS CONTRACTOR.
PROVIDE PROTECTION FROM DAMAGE BY THE CONSTRUCTION, HANDLING, VANDALISM AND WEATHER DURING ALL
PHASES OF CONSTRUCTION UNTIL COMPLETION OF THE WORK.
15. THIS CONTRACTOR SHALL SUBMIT SHOP DRAWINGS IN THE NUMBERS REQUIRED BY THE SPECIFICATIONS PRIOR TO THE START OF INSTALLATION FOR VA/COR APPROVAL AND A SUCCESSFUL REVIEW BY THE ARCHITECT/ENGINEER.
16. THIS CONTRACTOR SHALL FURNISH AS-BUILT CONTRACT DOCUMENTS TO THE VA/COR BEFORE FINAL PROJECT CLOSE-OUT CAN OCCUR. THE CONTRACT RECORD AS-BUILT DOCUMENTS SHALL BE PROVIDED IN ELECTRONIC
REPRODUCIBLE FORM.
17. ALL NEW SANITARY PIPING SHALL BE GIVEN A FULL STATIC PRESSURE TEST. METHOD OF TEST AND REQUIREMENTS TO BE MET SHALL BE AS PER THE SPECIFICATIONS AND IN CONJUNCTION WITH ALL LOCAL, STATE AND FEDERAL CODE REQUIREMENTS ALONG WITH ALL REQUIREMENTS OF THE VA, BOTH FEDERAL AND
LOCAL. ADD REPORT TO THE SUBMITTAL REGISTER.
18. PLUMBING CONTRACTOR SHALL BE RESPONSIBLE FOR THE PUMPING AND DRAINING OF TRENCHES OR PITS
NECESSARY FOR THE INSTALLATION OF THEIR WORK.
19. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE ENTIRE PORTION OF THEIR WORK, CLEAN EQUIPMENT AND DEVICES, REMOVE SURPLUS MATERIALS AND RUBBISH FROM THE PROPERTY, LEAVE THE WORK IN NEAT AND CLEAN ORDER, AND PROVIDE A COMPLETED SYSTEM(S) THAT HAS BEEN FULLY TESTED AND IS IN GOOD WORKING CONDITION. EACH RESPECTIVE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC., INSTALLED BY THIS
CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS
CI CAST IRON (PIPE)
CO CLEANOUT
DN DOWN
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
SAN SANITARY PIPING
WCO WALL CLEANOUT
TYP. TYPICAL
RISER DOWN
RISER UP
POINT OF CONNECTION (TO EXISTING)
SHUT-OFF VALVE
BALL VALVE
CHECK VALVE (DIRECTION OF FLOW)
PLUMBING EQUIPMENT TAG
POINT OF DEMOLITION (OF EXISTING)
21. ALL EQUIPMENT/DEVICES SHALL BE AND OF FIRST RATE QUALITY (UNLESS OTHERWISE SPECIFIED) AND IS TO BEAR THE APPROPRIATE NSF, AGA, CSA OR UL APPROVED LABELS, LISTINGS, AND CERTIFICATIONS FOR THE SPECIFIC
DESIGN PURPOSE.
22. THE DRAWINGS, SCHEDULES AND SPECIFICATIONS HAVE BEEN PREPARED USING ONE MANUFACTURER FOR EACH PIECE OF EQUIPMENT AS THE BASIS OF DESIGN. BEFORE THE CONTRACTOR PURCHASES EQUIPMENT FROM A SPECIFIED ACCEPTABLE MANUFACTURER, BUT NOT THE SCHEDULED MANUFACTURER USED FOR THE BASE DESIGN, THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL COMPLIANCE WITH THE PROTOCOLS REQUEST FOR EQUIVALENCY SUBMISSION AND APPROVAL PROCESS THAT NEEDS TO BE COMPLETED SUCCESSFULLY BEFORE SUCH A SUBSTITUTION WILL BE ALLOWED TO OCCUR AND BE SUBMITTED VIA THE SHOP DRAWING PROCESS. AS PART OF THAT PROCESS THE REQUESTING CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING ALL THE DIMENSIONS OF THE EQUIPMENT TO VERIFY THAT IT WILL FIT IN THE SPACE SHOWN ON THE DRAWINGS. MINOR DEVIATIONS IN DIMENSIONS WILL BE PERMITTED, PROVIDED THE RATINGS MEET THOSE SHOWN ON THE DRAWINGS AND EQUIPMENT WILL PHYSICALLY FIT INTO THE SPACE ALLOCATED WITH SUITABLE ACCESS AROUND EQUIPMENT FOR OPERATION AND MAINTENANCE OF THE EQUIPMENT. WHEN EQUIPMENT SUBMITTED FOR REVIEW DOES NOT MEET THE PHYSICAL SIZE OR ARRANGEMENT OF THAT SCHEDULED AND SPECIFIED, CONTRACTOR SHALL BE RESPOSIBLE FOR ANY AND ALL ALTERATIONS REQUIRED TO ACCOMMODATE SUCH EQUIPMENT AT NO ADDITIONAL COST TO THE V.A.
CONTRACTOR WILL ALSO BE RESPONSIBLE FOR ALL ADDITIONAL WORK REQUIRED BY OTHER CONTRACTORS TO MAKE CHANGES WHICH WOULD ALLOW THE EQUIPMENT TO FIT IN THE SPACE AND FUNCTION AS INTENDED. SEE FULL
BASIS OF DESIGN COMPLIANCE PROTOCOLS ON GI001.
23. GENERAL CONTRACTOR MUST FIELD VERIFY SIZES, CAPACITIES, WEIGHTS, ETC. ON ALL EQUIPMENT. DISCREPANCIES FROM THE ORIGINAL BASIS OF DESIGN ON THE DRAWINGS WILL NOT CONSTITUTE A BASIS FOR CHANGE ORDERS.
VERIFY WITH VA/COR FOR ANY AND ALL DISCREPANCIES IF THEY EXIST.
24. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY AND QUALITY OF WORK, AS DETERMIONED BY
THE GOVERNMENT/CO/COR, SHALL BE PROVIDED.
REDUCER OR INCREASER
FCO FLOOR CLEAN OUT
WALL CLEAN OUT
(E) EXISTING
B.F.F. BELOW FINISHED FLOOR
A/E ARCHITECT / ENGINEER
WCO
ST STORM PIPING
A.F.F. ABOVE FINISH FLOOR
SP SUMP PUMP
PD PUMPED DRAIN
(D) DEMO
UG UNDERGROUND
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P0
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text
PLUMBING - GEN NOTES ABBREVIATIONS AND SYMBOLS
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P001 cverdu Image
UP
VAN
VANVANVAN VAN
VAN
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10 11.8
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
B.9
10.1 11
C.3
C.2
B.6
(E)10"ST UG
(E)6"ST RISER
(E)8"ST UG
(E)8"ST UG
(E)4"ST UG
(E)4"ST UG
(E)8"ST UG
(E)8"ST UG
(E)6"ST UG(E)10"ST UG
(E)4"ST UG
(E)4"ST UG
(E)6"ST RISER
(E)8"ST UG
(E)8"ST UG
(E)6"ST RISER
(E)4"ST RISER
(E)6"ST UG
(E)4"ST RISER
(E)6"ST UG
(E)12"ST UG
(E)6"ST RISER
PLUMBING DEMOLITION KEY NOTESX
1. EXISTING UNDERFLOOR STORM PIPING TO REMAIN AS IS.
2. EXISTING RISER TO REMAIN AS IS.
3. TRENCH FLOOR AND CUT EXISTING STORM PIPING AS SHOWN.
READY PIPING FOR RECONNECTION TO NEW.
A. ALL WORK IMPACTING LEVEL 3 SHALL BE DONE OFF-HOURS TO
MINIMIZE SHUT DOWN OF THIS AREA.
B. ALL ASSOCIATED PIPING INCLUDING BUT IS NOT LIMITED TO THE
FOLLOWING SYSTEMS: STORM PIPING.
C. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO
FINISHES OR COMPONENTS NOT SCHEDULED FOR DEMOLITION.
DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET
EXCEED FORMER CONDITIONS.
E. PATCH AND FILL CONCRETE SLAB WHERE STORM PIPING HAS BEEN
REMOVED.
F. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON
AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY
ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED
THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED,
SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE, THE
CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID
PLUMBING PIPING, NOTIFY THE COR AND ENGINEER AND WAIT FOR
FURTHER INSTRUCTIONS.
PLUMBING DEMOLITION GENERAL NOTES
(E)12"ST UG
INCOMING SERVICE
1 (E)12"ST UG
INCOMING SERVICE
(E)CO 1
(E)CO1
(E)CO1
(E)CO1
(E)CO1
(E)CO
(E)CO 1 (E)CO1
(E)CO1
(E)CO 1
(E)FD
1(E)FD
(E)CO1
(E)FD 1
(E)FD 1
(E)FD1
(E)FD
(E)FD
LEVEL 1
LEVEL 2
LEVEL 3
(NEW ADDITION)
LEVEL 4
(NEW ADDITION)
LEVEL 5
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
LEVEL 0
MED. CENTER
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
PD
1.
dw g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
ELECTRIC
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ELVR
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
STORM PIPING DEMOLITION PLAN - LEVEL 1
AutoCAD SHX Text
PLUMBING - STORM PIPING DEMO PLAN - LEVEL 1
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text
PFPD101
DN
UP
DN
DN
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
VAN
VAN
(E)6"ST RISER
(E)6"ST RISER
(E)6"ST RISER
(E)4"ST RISER (E)6"ST RISER
(E)4"ST RISER
PLUMBING DEMOLITION KEY NOTESX
1. EXISTING FLOOR DRAIN TO REMAIN AS IS.
2. EXISTING RISER TO REMAIN AS IS.
1 1
A. ALL WORK IMPACTING LEVEL 3 SHALL BE DONE OFF-HOURS TO
MINIMIZE SHUT DOWN OF THIS AREA.
B. ALL ASSOCIATED PIPING INCLUDING BUT IS NOT LIMITED TO THE
FOLLOWING SYSTEMS: STORM PIPING.
C. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO
FINISHES OR COMPONENTS NOT SCHEDULED FOR DEMOLITION.
DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET
EXCEED FORMER CONDITIONS.
E. PATCH AND FILL CONCRETE SLAB WHERE STORM PIPING HAS BEEN
REMOVED.
F. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON
AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY
ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED
THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED,
SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE, THE
CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID
PLUMBING PIPING, NOTIFY THE COR AND ENGINEER AND WAIT FOR
FURTHER INSTRUCTIONS.
PLUMBING DEMOLITION GENERAL NOTES
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
PD
2.
dw g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text F.D.
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
STORM PIPING DEMOLITION PLAN - LEVEL 2
AutoCAD SHX Text N
AutoCAD SHX Text
PLUMBING - STORM PIPING DEMO PLAN - LEVEL 2
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text
PD102
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
(E)6"ST DN
(E)6"ST DN
(E)6"ST DN
(E)4"ST DN
(E)4"ST DN (E)6"ST DN
PLUMBING DEMOLITION KEY NOTESX
1. EXISTING FLOOR DRAIN TO REMAIN AS IS.
2. DISCONNECT AND REMOVE CAP AND READY STORM PIPING FOR
RECONNECTION TO NEW.
2 2 2
1 1
A. ALL WORK IMPACTING LEVEL 3 SHALL BE DONE OFF-HOURS TO
MINIMIZE SHUT DOWN OF THIS AREA.
B. ALL ASSOCIATED PIPING INCLUDING BUT IS NOT LIMITED TO THE
FOLLOWING SYSTEMS: STORM PIPING.
C. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO
FINISHES OR COMPONENTS NOT SCHEDULED FOR DEMOLITION.
DAMAGED ITEMS SHALL BE REPLACED OR REPAIRED TO MEET
EXCEED FORMER CONDITIONS.
E. PATCH AND FILL CONCRETE SLAB WHERE STORM PIPING HAS BEEN
REMOVED.
F. PIPING AND EQUIPMENT SHOWN ON THIS DRAWING WAS BASED ON
AS-BUILT DOCUMENTATION PROVIDED BY THE VA AND A CURSORY
ON SITE REVIEW OF EXISTING CONDITIONS. IF IT IS DISCOVERED
THAT ANY PIPING OR EQUIPMENT, INDICATED TO BE DEMOLISHED,
SERVES OTHER AREAS BEYOND THIS PROJECT SCOPE, THE
CONTRACTOR MUST BE IMMEDIATELY STOP DEMOLITION OF SAID
PLUMBING PIPING, NOTIFY THE COR AND ENGINEER AND WAIT FOR
FURTHER INSTRUCTIONS.
PLUMBING DEMOLITION GENERAL NOTES
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
PD
3.
dw g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
STORM PIPING DEMOLITION PLAN - LEVEL 3
AutoCAD SHX Text N
AutoCAD SHX Text
PLUMBING - STORM PIPING DEMO PLAN - LEVEL 3
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text
PD103
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10 11.5
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
11 12
DN
VANVANVAN VAN
VAN VAN
C.3
C.2
B.6
C.1
UP
LEVEL 1
(E)10"ST UG
(E)6"ST RISER
(E)8"ST UG
(E)8"ST UG
(E)4"ST UG
(E)4"ST UG
(E)8"ST UG
(E)8"ST UG
(E)6"ST UG(E)10"ST UG
(E)4"ST UG
(E)4"ST UG
(E)6"ST RISER
(E)8"ST UG
(E)8"ST UG
(E)6"ST RISER
(E)4"ST RISER
(E)6"ST UG
(E)4"ST RISER
(E)6"ST UG
(E)12"ST UG
(E)6"ST RISER
(E)12"ST UG
INCOMING SERVICE
(E)12"ST UG
INCOMING SERVICE
(E)CO
(E)CO
(E)CO
(E)CO
(E)CO
(E)CO
(E)CO (E)CO
(E)CO
(E)CO
(E)FD
(E)FD
(E)CO
(E)FD
(E)FD
(E)FD
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
1. EXISTING UNDERFLOOR STORM PIPING TO REMAIN AS IS.
2. EXISTING RISER TO REMAIN AS IS.
3. PROVIDE ELEVATOR SUMP PIT AND ELEVATOR PUMP. REFER TO
DETAIL SHEET 5/P501 FOR MORE INFORMATION.
4. TRENCH FLOOR AND ROUTE NEW 4"ST AS SHOWN.
5. (NOT USED)
6. EXTEND 2"PD AND EXTEND AND DISCHARGED TO FD-2. PROVIDE
AIR GAP.
7. WALL MOUNTED HIGH WATER ALARM AND SENSOR PANEL
INSTALLED IN THE ELEVATOR PIT LEVEL 0.
8. EXTEND 4" DRAIN TILE PIPING AND CONNECT TO CATCH BASIN.
REFER TO CIVIL DRAWINGS FOR CONTINUATION AND 10/P501 FOR
DRAIN TILE ABOVE FOOTING DETAIL.
X PLUMBING KEY NOTES
1 1
SP-1
2"PD UP TO
CEILING ABOVE
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION
OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS,
AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO
ABOVE FLOOR FIXTURES DURING CONSTRUCTION IF NECESSARY.
D. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE
EXISTING PIPING NECESSARY TO PERMIT THE INSTALLATION OF
NEW WORK.
E. ALL DRAINAGE PIPING ABOVE GRADE SHALL BE CAST IRON W/
NO-HUB CONNECTIONS. ALL DRAINAGE PIPING BELOW GRADE
SHALL BE CAST IRON W/ HUB AND SPIGOT CONNECTIONS. SLOPE
ALL DRAINAGE PIPING AT 1/8" PER FOOT MINIMUM UNLESS NOTED
OTHERWISE. ALL R.W.C.'S SHALL HAVE EXPANSION JOINTS
LOCATED AT EVERY OTHER LEVEL. ALL PUMP DISCHARGE LINES
SHALL BE TYPE "L" COPPER PIPE U.N.O.
F. TOP OF DRAIN GRATE SHALL BE 1/2" BELOW FINISHED FLOOR AT
SUPPORTED TIERS AND 1" AT GROUND TIER. TYPICAL FOR ALL
DRAINS. SEE STRUCTURAL DRAWINGS FOR FLOOR ELEVATIONS.
G. ALL PIPING AND RISERS EXPOSED TO POSSIBLE BUMPER DAMAGE
SHALL BE PROTECTED W/ PIPE GUARDS. SEE DETAILS 1 & 2/PFP501.
H. PIPE HANGERS AND SUPPORTS SHALL BE ARRANGED SO THAT
THEY WILL SUSTAIN THE LOADS AND RETAIN THE PIPING SECRUELY
IN POSITION UNDER FULLY LOADED CONDITIONS. SEE DETAILS 3 &
4/PFP501.
I. CLEANOUTS SHALL BE LOCATED AT THE BASE OF ALL DRAINAGE
RISERS AND AT OTHER LOCATIONS SHOWN ON THE DRAWINGS.
J. THE USE OF POWDER, GAS OR OTHER TYPE OF POWER
PROPELLED FASTENERS IS PROHIBITED.
K. CONTRACTOR TO USE X-RAY TO DETERMINE PLACEMENT OR
CONCRETE REINFORCEMENTS PRIOR TO CORING AREAS TO RUN
NEW PLUMBING.
L. CONTRACTOR TO REFER TO SPECIFICATION SECTION 22 14 00 FOR
STANDARD STORM PIPING TESTING.
PLUMBING GENERAL NOTES
4"ST UG
EXISTING ELEVATOR
TO BE ABANDONED
4"DT UG
UP TO
YCO
4"DT UG
F
FD-2
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P1
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text F.D.
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
ELECTRIC
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
ELVR
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 1
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P101
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 1
AutoCAD SHX Text N
UP
DN
DN
DN
LEVEL 2
ELEVATORS
MEDICAL
CENTER
LOBBY
VAN
VAN
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10 11.5
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
C.3
C.2
B.6
C.1
DN
UP
(E)6"ST RISER
(E)6"ST RISER
(E)6"ST RISER
(E)4"ST RISER (E)6"ST RISER
(E)4"ST RISER
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
1. EXISTING FLOOR DRAIN TO REMAIN AS IS.
2. EXISTING RISER TO REMAIN AS IS.
X PLUMBING KEY NOTES
1 1
2 2
EXISTING ELEVATOR
TO BE ABANDONED
YCO
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION
OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS,
AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO
ABOVE FLOOR FIXTURES DURING CONSTRUCTION IF NECESSARY.
D. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE
EXISTING PIPING NECESSARY TO PERMIT THE INSTALLATION OF
NEW WORK.
E. ALL DRAINAGE PIPING ABOVE GRADE SHALL BE CAST IRON W/
NO-HUB CONNECTIONS. ALL DRAINAGE PIPING BELOW GRADE
SHALL BE CAST IRON W/ HUB AND SPIGOT CONNECTIONS. SLOPE
ALL DRAINAGE PIPING AT 1/8" PER FOOT MINIMUM UNLESS NOTED
OTHERWISE. ALL R.W.C.'S SHALL HAVE EXPANSION JOINTS
LOCATED AT EVERY OTHER LEVEL. ALL PUMP DISCHARGE LINES
SHALL BE TYPE "L" COPPER PIPE U.N.O.
F. TOP OF DRAIN GRATE SHALL BE 1/2" BELOW FINISHED FLOOR AT
SUPPORTED TIERS AND 1" AT GROUND TIER. TYPICAL FOR ALL
DRAINS. SEE STRUCTURAL DRAWINGS FOR FLOOR ELEVATIONS.
G. ALL PIPING AND RISERS EXPOSED TO POSSIBLE BUMPER DAMAGE
SHALL BE PROTECTED W/ PIPE GUARDS. SEE DETAILS 1 & 2/PFP501.
H. PIPE HANGERS AND SUPPORTS SHALL BE ARRANGED SO THAT
THEY WILL SUSTAIN THE LOADS AND RETAIN THE PIPING SECRUELY
IN POSITION UNDER FULLY LOADED CONDITIONS. SEE DETAILS 3 &
4/PFP501.
I. CLEANOUTS SHALL BE LOCATED AT THE BASE OF ALL DRAINAGE
RISERS AND AT OTHER LOCATIONS SHOWN ON THE DRAWINGS.
J. THE USE OF POWDER, GAS OR OTHER TYPE OF POWER
PROPELLED FASTENERS IS PROHIBITED.
K. CONTRACTOR TO USE X-RAY TO DETERMINE PLACEMENT OR
CONCRETE REINFORCEMENTS PRIOR TO CORING AREAS TO RUN
NEW PLUMBING.
L. CONTRACTOR TO REFER TO SPECIFICATION SECTION 22 14 00 FOR
STANDARD STORM PIPING TESTING.
PLUMBING GENERAL NOTES
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P1
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 2
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P102
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 2
AutoCAD SHX Text N
DN
UP
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10 11.5
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
C.3
C.2
B.6
C.1
LEVEL 3
ELEVATORS
VAN
VAN
DN
DN
UP
6"ST UP
AND DN
6"ST UP
AND DN
6"ST UP
AND DN
4"ST UP
AND DN
4"ST UP
AND DN
6"ST UP
AND DN 1. EXISTING FLOOR DRAIN TO REMAIN AS IS.
2. UNPLUG STORM RISER PIPE PLUG AND PIPE SLEEVE PLUG AND
CONNECT NEW STORM RISER PIPING. EXTEND STORM RISERS UP
THROUGH FLOORS ABOVE. REFER TO SHEETS 1/P501 AND 2/P501
FOR PIPE GUARD DETAIL.
X PLUMBING KEY NOTES
1 1
EXISTING ELEVATOR
TO BE ABANDONED
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION
OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS,
AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO
ABOVE FLOOR FIXTURES DURING CONSTRUCTION IF NECESSARY.
D. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE
EXISTING PIPING NECESSARY TO PERMIT THE INSTALLATION OF
NEW WORK.
E. ALL DRAINAGE PIPING ABOVE GRADE SHALL BE CAST IRON W/
NO-HUB CONNECTIONS. ALL DRAINAGE PIPING BELOW GRADE
SHALL BE CAST IRON W/ HUB AND SPIGOT CONNECTIONS. SLOPE
ALL DRAINAGE PIPING AT 1/8" PER FOOT MINIMUM UNLESS NOTED
OTHERWISE. ALL R.W.C.'S SHALL HAVE EXPANSION JOINTS
LOCATED AT EVERY OTHER LEVEL. ALL PUMP DISCHARGE LINES
SHALL BE TYPE "L" COPPER PIPE U.N.O.
F. TOP OF DRAIN GRATE SHALL BE 1/2" BELOW FINISHED FLOOR AT
SUPPORTED TIERS AND 1" AT GROUND TIER. TYPICAL FOR ALL
DRAINS. SEE STRUCTURAL DRAWINGS FOR FLOOR ELEVATIONS.
G. ALL PIPING AND RISERS EXPOSED TO POSSIBLE BUMPER DAMAGE
SHALL BE PROTECTED W/ PIPE GUARDS. SEE DETAILS 1 & 2/PFP501.
H. PIPE HANGERS AND SUPPORTS SHALL BE ARRANGED SO THAT
THEY WILL SUSTAIN THE LOADS AND RETAIN THE PIPING SECRUELY
IN POSITION UNDER FULLY LOADED CONDITIONS. SEE DETAILS 3 &
4/PFP501.
I. CLEANOUTS SHALL BE LOCATED AT THE BASE OF ALL DRAINAGE
RISERS AND AT OTHER LOCATIONS SHOWN ON THE DRAWINGS.
J. THE USE OF POWDER, GAS OR OTHER TYPE OF POWER
PROPELLED FASTENERS IS PROHIBITED.
K. CONTRACTOR TO USE X-RAY TO DETERMINE PLACEMENT OR
CONCRETE REINFORCEMENTS PRIOR TO CORING AREAS TO RUN
NEW PLUMBING.
L. CONTRACTOR TO REFER TO SPECIFICATION SECTION 22 14 00 FOR
STANDARD STORM PIPING TESTING.
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P1
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
(NEW AT LEV. 3)
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 3
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P103
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 3
AutoCAD SHX Text N
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10 11.5
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
C.3
C.2
B.6
C.1
LEVEL 4
ELEVATORS
VAN
VAN
DN
DN
UP
1. CONNECT NEW STORM RISER PIPING. EXTEND STORM RISER UP AND
CAP BELOW CEILING. REFER TO 6/P501 FOR TOP TIER DRAINAGE
DETAIL FOR MORE INFORMATION. REFER TO SHEETS 1/P501 AND
2/P501 FOR PIPE GAURD DETAIL.
2. EXTEND STORM PIPING FROM FLOOR BELOW AND CONNECT TO
FLOOR DRAIN.
X PLUMBING KEY NOTES
6"ST UP
AND DN
6"ST UP
AND DN
6"ST UP
AND DN
4"ST UP
AND DN
4"ST UP
AND DN
6"ST UP
AND DN
FD-1 2 FD-1 2 FD-1
2FD-1
2FD-12FD-12 FD-1
2 FD-1
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION
OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS,
AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO
ABOVE FLOOR FIXTURES DURING CONSTRUCTION IF NECESSARY.
D. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE
EXISTING PIPING NECESSARY TO PERMIT THE INSTALLATION OF
NEW WORK.
E. ALL DRAINAGE PIPING ABOVE GRADE SHALL BE CAST IRON W/
NO-HUB CONNECTIONS. ALL DRAINAGE PIPING BELOW GRADE
SHALL BE CAST IRON W/ HUB AND SPIGOT CONNECTIONS. SLOPE
ALL DRAINAGE PIPING AT 1/8" PER FOOT MINIMUM UNLESS NOTED
OTHERWISE. ALL R.W.C.'S SHALL HAVE EXPANSION JOINTS
LOCATED AT EVERY OTHER LEVEL. ALL PUMP DISCHARGE LINES
SHALL BE TYPE "L" COPPER PIPE U.N.O.
F. TOP OF DRAIN GRATE SHALL BE 1/2" BELOW FINISHED FLOOR AT
SUPPORTED TIERS AND 1" AT GROUND TIER. TYPICAL FOR ALL
DRAINS. SEE STRUCTURAL DRAWINGS FOR FLOOR ELEVATIONS.
G. ALL PIPING AND RISERS EXPOSED TO POSSIBLE BUMPER DAMAGE
SHALL BE PROTECTED W/ PIPE GUARDS. SEE DETAILS 1 & 2/PFP501.
H. PIPE HANGERS AND SUPPORTS SHALL BE ARRANGED SO THAT
THEY WILL SUSTAIN THE LOADS AND RETAIN THE PIPING SECRUELY
IN POSITION UNDER FULLY LOADED CONDITIONS. SEE DETAILS 3 &
4/PFP501.
I. CLEANOUTS SHALL BE LOCATED AT THE BASE OF ALL DRAINAGE
RISERS AND AT OTHER LOCATIONS SHOWN ON THE DRAWINGS.
J. THE USE OF POWDER, GAS OR OTHER TYPE OF POWER
PROPELLED FASTENERS IS PROHIBITED.
K. CONTRACTOR TO USE X-RAY TO DETERMINE PLACEMENT OR
CONCRETE REINFORCEMENTS PRIOR TO CORING AREAS TO RUN
NEW PLUMBING.
L. CONTRACTOR TO REFER TO SPECIFICATION SECTION 22 14 00 FOR
STANDARD STORM PIPING TESTING.
2 FD-1
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P1
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
RAMP UP
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
PLUMBING-STORM PIPING PLAN - LEVEL 4
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P104
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 4
AutoCAD SHX Text N
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10 11.5
C
D
C
B
A.3
A.2
A
1 1.7 2 9 9.4 10
1 2 3 4 5 6 7 8 9 10
C
C.3
C.2
B.6
C.1
LEVEL 5
ELEVATORS
DN
DN
6" PIPE SLEEVE
PLUG
6" PIPE SLEEVE
PLUG
AD-1 2AD-1
2AD-1
2AD-12AD-12 AD-1
2 AD-1
1. PIPE SLEEVE PLUG. REFER TO 6/P501 FOR TOP TIER DRAINAGE
DETAIL FOR MORE INFORMATION.
2. EXTEND STORM PIPING FROM FLOOR BELOW AND CONNECT TO
AREA DRAIN.
X PLUMBING KEY NOTES
6" PIPE SLEEVE
PLUG
2 AD-1
6" PIPE SLEEVE
PLUG
6" PIPE SLEEVE
PLUG 2AD-16" PIPE SLEEVE
PLUG
VAN
VAN
A. ALL SHUTDOWNS WILL REQUIRE A MINIMUM OF 30 DAYS ADVANCE
NOTICE. COORDINATE ALL PLUMBING SERVICE
OUTAGES/SHUTDOWNS WITH VA COR.
B. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION
OBTAINED FROM FIELD SURVEYS, EXISTING BUILDING DOCUMENTS,
AND STAFF. VERIFY EXISTING CONDITIONS AND REPORT ANY
CONFLICTS BEFORE PROCEEDING.
C. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN SERVICE TO
ABOVE FLOOR FIXTURES DURING CONSTRUCTION IF NECESSARY.
D. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE
EXISTING PIPING NECESSARY TO PERMIT THE INSTALLATION OF
NEW WORK.
E. ALL DRAINAGE PIPING ABOVE GRADE SHALL BE CAST IRON W/
NO-HUB CONNECTIONS. ALL DRAINAGE PIPING BELOW GRADE
SHALL BE CAST IRON W/ HUB AND SPIGOT CONNECTIONS. SLOPE
ALL DRAINAGE PIPING AT 1/8" PER FOOT MINIMUM UNLESS NOTED
OTHERWISE. ALL R.W.C.'S SHALL HAVE EXPANSION JOINTS
LOCATED AT EVERY OTHER LEVEL. ALL PUMP DISCHARGE LINES
SHALL BE TYPE "L" COPPER PIPE U.N.O.
F. TOP OF DRAIN GRATE SHALL BE 1/2" BELOW FINISHED FLOOR AT
SUPPORTED TIERS AND 1" AT GROUND TIER. TYPICAL FOR ALL
DRAINS. SEE STRUCTURAL DRAWINGS FOR FLOOR ELEVATIONS.
G. ALL PIPING AND RISERS EXPOSED TO POSSIBLE BUMPER DAMAGE
SHALL BE PROTECTED W/ PIPE GUARDS. SEE DETAILS 1 & 2/PFP501.
H. PIPE HANGERS AND SUPPORTS SHALL BE ARRANGED SO THAT
THEY WILL SUSTAIN THE LOADS AND RETAIN THE PIPING SECRUELY
IN POSITION UNDER FULLY LOADED CONDITIONS. SEE DETAILS 3 &
4/PFP501.
I. CLEANOUTS SHALL BE LOCATED AT THE BASE OF ALL DRAINAGE
RISERS AND AT OTHER LOCATIONS SHOWN ON THE DRAWINGS.
J. THE USE OF POWDER, GAS OR OTHER TYPE OF POWER
PROPELLED FASTENERS IS PROHIBITED.
K. CONTRACTOR TO USE X-RAY TO DETERMINE PLACEMENT OR
CONCRETE REINFORCEMENTS PRIOR TO CORING AREAS TO RUN
NEW PLUMBING.
L. CONTRACTOR TO REFER TO SPECIFICATION SECTION 22 14 00 FOR
STANDARD STORM PIPING TESTING.
1 1 1
(NEW ADDITION)
LEVEL 4
LEVEL 4
LEVEL 5
WEST
MEDICAL
CENTER
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
PARKING
GARAGE
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
STAIR /
ELEV.
SOUTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P1
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text
RAMP DN
AutoCAD SHX Text
PARKING GARAGE
AutoCAD SHX Text
NEW STAIR / ELEVATOR TOWER
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ISOMETRIC DIAGRAM
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 5
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P105
AutoCAD SHX Text
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING - STORM PIPING PLAN - LEVEL 5
AutoCAD SHX Text N
PIPE SIZE AS
INDICATED
LOCKING NUT
HANGER ROD,
SIZE PER SPEC.
HEAVY DUTY
EXPANSION ANCHOR
P/C CONCRETE TEE
STANDARD CLEVIS HANGER
(MSS SP-69 TYPE 1)
SUPPORT NUT
COLUMN/WALL
TYPICAL
NOTES:
1. IF ADDITIONAL DISTANCE FROM COLUMN OR WALL IS REQUIRED OR IF RISER IS MOUNTED AT
EDGE OF COLUMN, USE B-LINE SYSTEMS FIGURE B3149 CLAMP OR APPROVED EQUAL. BEND
AND DRILL HOLES IN LEGS AS REQUIRED.
2. CHANNEL OR CLAMP ARE NOT TO EXTEND PAST EDGE OF COLUMN OR WALL. IF OUTSIDE
DIMENSION OF CLAMP IS GREATER THAN THHICKNESS OF WALL OR COLUMN, USE A B-LINE
SYSTEMS FIGURE B3149 HANGER OR APPROVED EQUIAL, BEND LEGS INWARD AND DRILL
HOLES AS REQUIRED.
3. ALL MATERIALS AND HARDWARE SHALL BE STAINLESS STEEL NO SUBSTITUTE.
4. SPECIFY TYPE OF PIPE FOR SIZING PIPE CLAMPS.
(2) 1/2" DIA. X 3 1/2" EXPANSION
ANCHOR (COORD. ANCHOR
LOCATIONS W/ REINFORCING)
TYPICAL
FLANGED-LIP TYPE CHANNEL.
TYPICAL
B-LINE SYSTEMS FIGURE B3148 OFFSET
PIPE CLAMP OR APPROVED EQUAL
RISER
TYPICAL
B-LINE SYSTEMS FIGURE
B3149 PIPE CLAMP OR
APPROVED EQUAL
NOTE:
ALL PLATES HARDWARE, ETC.,
TO BE STAINLESS STEEL.
FACE OF COLUMN OR WALL
SPLIT SCHEDULE 40 STEEL PIPE, 2"
LARGER DIA. THAN RISER
STRAP ANCHOR PLATE 1/4" x 3" (4)
REQ'D. WELD TO SPLIT PIPE
PLAN
RISER
(1) 1/2" DIA x 3 1/2" EXP. ANCHOR
EACH STRAP ANCHOR
2'-9
6" 1 1
/2" 1 1
/2"
FLOOR
ELEVATION
NOTE:
ALL PLATES HARDWARE, ETC.,
TO BE STAINLESS STEEL.2'-9
6"
PLAN
RISER
(1) 1/2" DIA x 3 1/2" EXP. ANCHOR
EACH STRAP ANCHOR
FLOOR
ELEVATION
MIN. 2" CLEARANCE
AROUND ALL PIPES
MIN. 2" CLEARANCE
AROUND ALL PIPES
1/4" PLATE STEEL
MIN. 2" CLEARANCE
AROUND ALL PIPES
FACE OF COLUMN OR WALL
RISER
STRAP ANCHOR PLATE 1/4" x 6" (1)
REQ'D. WELD TO 1/4" PLATE STEEL
RAINWATER COLLECTOR (RWC)
NO-HUB CONNECTION TYPICAL
PIPE SUPPORT
P/C COLUMN
PROVIDE TEE AT TOP TIER
EXPANSION JOINT AT EVERY
OTHER LEVEL
P/C TEE
PIPE HANGER
SLOPE @ 1/2" /FT
GRID
NOTE: COORDINATE SUMP LOCATION WITH ELEVATOR BUFFERS.
P/C TEE
P/C BEAM
P/C COLUMN
GRID
PIPE HANGER
PROVIDE TEE W/PLUG
PIPE SLEEVE (PLUG
SLEEVE W/PVC PLUG)
RAINWATER COLLECTOR
(RWC)
EXPANSION JOINT AT
EVERY OTHER LEVEL
NO-HUB CONNECTIONS
TYPICAL
SLOPE @ 1/2" /FT
B
C
DIA
15 1/4
SEEPAGE OPENINGS
COLLAR CAN BE USED AS
FLASHING CLAMP (WHEN
REQUIRED)
C
12" DIA
11 1/2" DIA
2"
B
6"
NO HUB
15" SQ
13 1/8" SQ
3" 3 1/2"
6"
4 3/4"
6"
12" DIA
HANGER ROD TABLE FOR CAST IRON PIPING
NOMINAL PIPE SIZE HORIZONTAL SPACING ROD DIAMETER
1 1/2" 60" 3/8" 3" 60" 1/2"
4" TO 5" 60" 5/8"
6" TO 8" 60" 3/4"
10" TO 12" 60" 7/8"
NOTES:
1. PIPE SUPPORTS SHALL BE SHOP COATED WITH ZINC CHROMATE PRIMER PAINT.
ELECTROPLATED COPPER HANGER RODS, HANGERS AND ACCESSORIES MYA BE USED IN
COPPER TUBING.
2. HORIZONTAL PIPING AND TUBING SHALL BE SUPPORTED WITHIN 0-12" OF EACH FITTING
OR COUPLING.
3. MAXIMUM SUPPORT SPACING FOR HORIZONTAL PLASTIC SHALL BE 4'-0".
4. VERTICAL PIPING AND TUBING SHALL BE SUPPORTED AT THE BASE, AT EACH FLOOR, AND
AT INTERVALS NO GREATER THAN 15'0".
5. HANGER RODS SHALL BE LOW CARBON STEEL, FULLY THREADED OR THREADED AT EACH
END WITH TWO REMOVABLE NUTS AT EACH END FOR POSITIONING ROD AND HANGER AND
LOCKING IN PLACE.
SUBMERSIBLE SUMP PUMP
CONCRETE ANCHOR FLANGE
COVER CUP FLANGE
LOOSE SET PERFORATED STEEL COVER
FLUSH WITH SLAB.
UNION
PUMP DISCHARGE PIPING (PD)
CHECK VALVE
BALL VALVE
ELEVATOR PIT WALLS \ ELEVATOR SHAFT
2"PD (CEILING OF LEVEL 1 LOBBY)
INDIRECT WASTE PD TO OPEN SITE
DRAIN. PROVIDE AIR GAP.
OPEN SITE DRAIN
PIGGYBACK GROUNDED PLUG
SUMP BASIN \ SUMP PIT
(MIN. 18"DIA x 30"DEEP)
ELEVATOR PIT SLAB \ ELEVATOR SHAFT
\ LEVEL "0"
DUPLEX RECEPTACLE BY ELECTRICAL
CONTRACTOR.
STORM DRAIN
NTS
FOOTING
FLOOR SLAB
FOUNDATION WALL
WATERPROOFING
FOUNDATION WALL
DRAINAGE SYSTEM
12" MIN. OVERLAP
NOTES:
1. PROVIDE MINIMUM PITCH FOR ALL DRAINTILE PIPING.
2. COORDINATE INTEGRATION OF FOUNDATION WALL
DRAINAGE SYSTEM WITH GENERAL CONTRACTOR
AND MANUFACTURER'S REQUIREMENTS.
MI
N.
" G
RA
VE
L
SEE PLAN FOR SIZE OF PERFORATED
DRAIN TILE
MINIMUM 6" OF WASHED FILTERING GRAVEL
EXTENDING FROM ALL SIDES OF PIPE.
UNDISTURBED SUBSURFACE/SOIL
FILTER FABRIC WRAPPED AROUND WASHED
GRANULAR FILL WITH 12" MIN. OVERLAP AT TOP.
PARKING DECK \ LEVEL "1"
2"PD
CEILING TILE
LEVEL 1 LOBBY
PROVIDE SEAL WHERE DISCHARGE PIPING
PENETRATES THE ELEVATOR PIT WALL.
WATER PROOF SEALS
WALL MOUNTED SUMP PUMP ALARM
PANEL WITH HIGH WATER ALARM AND
SENSORS LOCATED IN THE ELEVATOR PIT
LEVEL 0.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P5
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
PIPE HANGER DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
PIPE SUPPORT DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
PIPE GUARD DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
MULTIPLE RISER PIPE GUARD DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL DRAINAGE DETAIL FOR SUPPORTED SLAB
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
TOP TIER DRAINAGE DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL FLOOR DRAIN DETAIL
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL AREA DRAIN DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
NTS
AutoCAD SHX Text
ELEVATOR PIT SUBMERSIBLE PUMP DETAIL
AutoCAD SHX Text
AutoCAD SHX Text
TYPICAL DRAINTILE ON TOP OF FOOTING DETAIL
AutoCAD SHX Text
PLUMBING DETAILS
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P501
(E)12"ST UG
LEVEL 1
LEVEL 3
LEVEL 4
LEVEL 5
(E)CO
(E)CO
(E)CO (E)FD
(E)FD
(E)FD
(E)FD
(E)FD
(E)CO
(E)CO
(E)FD
(E)FD
(E)FD
(E)CO
(E)CO
FD-1
AD-1
FD-1
AD-1
(E)FD
(E)FD (E)FD
(E)FD
(E)FD
(E)FD
FD-1
AD-1
FD-1
AD-1
FD-1
AD-1
FD-1
AD-1
(E)FD
(E)FD
(E)FD
(E)FD
(E)FD(E)CO
(E)CO
(E)FD
(E)FD
FD-1
AD-1
FD-1
AD-1
(E)FD
(E)FD
(E)CO
(E)CO
(E)6"ST UG
(E)4"ST RISER
4"ST RISER
(E)6"ST RISER
(E)6"ST
RISER
(E)10"ST UG
(E)4"ST UG
(E)8"ST UG
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 1
(E)10"ST UG
(E)12"ST UG
(E)12"ST UG
(E)6"ST UG
(E)6"ST UG
(E)4"ST RISER
(E)4"ST RISER
4"ST RISER
4"ST RISER
(E)6"ST RISER
6"ST RISER
(E)6"ST RISER
6"ST RISER
6"ST RISER
6" PIPE SLEEVE PLUG
6" PIPE SLEEVE PLUG
6"ST RISER
(E)8"ST UG
(E)8"ST UG
(E)8"ST UG
(E)8"ST UG
(E)6"ST RISER
(E)4"ST UG
(E)4"ST UG
4"ST UG 4"ST UP TO OPEN SITE DRAIN.
EXTEND 2"PD FROM ELEVETOR SUMP
PUMP AND DRAIN TO OPEN SITE DRAIN
WITH AIR GAP.
(E)6"ST RISER
(E)6"ST RISER
6"ST RISER
6"ST RISER
(E)6"ST RISER
6"ST RISER
LEVEL 2
LEVEL 1
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 2
LEVEL 3
LEVEL 4
LEVEL 5
LEVEL 1
(E)4"ST RISER
6"ST RISER
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT EXISTING EXPANSION JOINT
EXISTING EXPANSION JOINT EXPANSION JOINT
EXPANSION JOINT
EXPANSION JOINT
EXPANSION JOINT
EXPANSION JOINT
EXPANSION JOINT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
K:
\C
C G
_P R
O
JE
C
TS
\2
1\
-1
Pa rk in g R am p
(B uf fa lo
, N Y)
\4
- D es
D oc s\
2- D ra w in gs
\W O
R
KI
N G
\2 1-
3_
P6
.d w g 6/
/2
:3
9:
P M
ISSUE FOR BIDOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
PARKING RAMP EXPANSION
3495 BAILEY AVE., BUFFALO, NY 14215
528-18-375
Project Director
Revisions: Date:
www. bancroft-ae.com
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
08-09-2024
ISSUE FOR BID 08-09-2024
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
AutoCAD SHX Text
STORM PIPING RISER
AutoCAD SHX Text
PLUMBING- STORM PIPING RISERS
AutoCAD SHX Text
RH
AutoCAD SHX Text
HS
AutoCAD SHX Text P601
PLUMBING PIPING MATERIALS
SYSTEM MATERIAL JOINING METHOD FITTINGS REMARKS
STORM DRAINAGE (ABOVE
GROUND)
CAST IRON; CISPI 301 S.S. CLAMP AND SHIELD CAST IRON (HUBLESS) 1" MINERAL FIBER w/ VAPOR BARRIER: R-VALUE - 3.7
STORM DRAINAGE
(UNDERGROUND)
PVC; ASTM D2665 (NO
CELLULAR FOAM CORE)
SOLVENT WELD PVC NONE
NOTES:
1. ABOVE MATERIALS TABLE SHOWS BASIC INFORMATION REGARDING THE MATERIALS USED. SEE SPECIFICATIONS FOR DETAILS.
2. INSULATION SHALL MEET THE IECC-2012 AND ASHRAE 90.1-2010 REQUIREMENTS FOR THICKNESS AND R-VALUE
PLUMBING FIXTURE SCHEDULE
MARK DESCRIPTION MANUFACTURER MODEL STORM REMARKS
FD-1 PARKING DRAINS JR SMITH 2140C-U-M-B (+2646Y)
OR APPROVED EQUAL
4" HEAVY DUTY CAST IRON DECK DRAIN WITH VANDAL PROOF DUCTILE IRON GRATE, SEDIMENT BUCKET
& NO-HUB ADAPTOR (MIN. GRATE FREE AREA OF 26 SQ. IN.)
FD-2 FLOOR DRAIN ZURN Z45-BZ1-DP OR
APPROVED EQUAL. 4"
MEDIUM DUTY (NOT TRAFFIC) FLOOR DRAIN SHALL COMPLY WITH ASME A112.6.3. TYPE FLOOR C FLOOR DRAIN SHALL HAVE A CAST IRON BODY DOUBLE DRAINAGE PATTERN, CLAMPING DEVICE, LIGHT DUTY NICKLE BRONZE ADJUSTABLE STRAINER WITH ROUND OR SQUARE GRATE OF 6" WIDTH
OR DIAMETER MINIMUM. ZURN #Z415-BZ1-DP OR APPROVED EQUAL.
AD-1 AREA DRAIN ZURN Z537 OR APPROVED
EQUAL
4" - 6" TO
MATCH RISER
HEAVY DUTY PARKING DECK DRAIN, 15-7/8" SQUARE TOP, DURA-COATED CAST IRON BODY WITH BOTTOM OUTLET, HEAVY-DUTY GASKETED DRAIN SUPPORT FLANGE, VANDAL-PROOF SECURED TOP
WITH HEAVY-DURY SLOTTED DUCTILE IRON GRATE.
NOTES:
1. SIZES LISTED ARE MINIMUM CONNECTIONS REQUIRED TO FIXTURES.
ELEVATOR SUMP PUMP SCHEDULE
MARK LOCATION GPM PUMP HEAD
(ft)
DISCHARGE
SIZE (in)
MIN. BASIN
SIZE (IN) HP RPM
ELECTRICAL DATA
MANUFACTURER MODEL
HZ VOLT PHASE
SP-1 ELEVATOR PIT 50 18 2 18"DIA x 30"
DEEP 1/2 1750 60 115 1 WEIL 1411
REMARKS:
1. HEAVY DUTY PUMP, CAST IRON CASE, CAST IRON IMPELLER, STAINLESS HARDWARE AND STRAINER. PUMP CLEAR AND GREY WATER WITH SOLIDS.
2. POWER CORD LENGTH - 15 ft WITH 3 CONDUCTOR GROUNDED PLUG.
3. PROVIDE WITH WALL MOUNTED HIGH WATER ALARM AND SENSOR PANEL.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .