08000-METAL_WINDOWS_FSB.pdf
PDF 49 KB Posted
- Attached to
- Chicopee Armory Renovations Sub-Contractor Bids
- Solicitation number
- S125144-vCurrent
- Issued by
- Hampden County, Massachusetts
About this file
This document is a specification for a Filed Sub-Bid related to the Chicopee Armory Rehabilitation MMD Project No. 985010 in Chicopee, Massachusetts. The work described includes the provision of labor, materials, and equipment necessary to complete the metal windows portion of the project, as outlined in Section 085113, "Aluminum Windows" and the referenced contract drawings. The project has identified alternates, as described in Section 012300, "Alternates". The sub-bid is subject to the time, manner, and requirements for submitting sub-bids as described in the Massachusetts Military Division provided Division 0 documents.
The document does not provide details on pricing terms, set asides, incumbents, funding requirements and sources, or any other salient commercial information. It appears to be a technical specification focused on the scope of work for the metal windows sub-contract.
View the file
Other files
Show 40 more
Latest 50 of 183 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985010
CHICOPEE, MASSACHUSETTS ISSUED FOR BID – 05/20/11
10090 METAL WINDOWS 080001 - 1
SECTION 080001
METAL WINDOWS
(Filed Sub-Bid Required)
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. General provisions of the Contract, including General and Supplementary Conditions and
Division 1 Specification Sections, apply to this Section.
B. Time, manner and requirements for submitting sub-bids is as described in Massachusetts
Military Division provided Division 0 documents.
1.2 SUMMARY
A. Work Included: Provide labor, materials and equipment necessary to complete the work of this filed sub-bid. Work is described by but not limited to the following specification sections and contract drawings.
B. Reference Specifications: The Work of the Filed-Sub is described in the following Sections:
1. Section 085113, “Aluminum Windows”
C. Reference Drawings: The Work of this Filed Sub-Bid is shown on the following Contract
Drawings: GI001, AE101, AE102, AE201, AE311, AE611, AE621.
1.3 ALTERNATES
A. Refer to Drawings and Section 012300, “Alternates” for requirements.
PART 2 - PRODUCTS – NOT USED
PART 3 - EXECUTION – NOT USED
END OF SECTION 080001
File details come from the government source that posted it. Updated .