260001-ELECTRICAL_FSB.pdf
PDF 60 KB Posted
- Attached to
- Chicopee Armory Renovations Sub-Contractor Bids
- Solicitation number
- S125144-vCurrent
- Issued by
- Hampden County, Massachusetts
About this file
This document is a specification for the electrical work required as part of the Chicopee Armory Rehabilitation project in Chicopee, Massachusetts. The project is being managed by the Massachusetts Military Division and requires a filed sub-bid for the electrical work. The electrical work includes general requirements, conductors, grounding, acceptance testing, raceways, installation of equipment and wiring, transformers, switchboards, panelboards, safety switches, motor controllers, and lighting fixtures. The work is described across multiple specification sections and is shown on the referenced contract drawings. The document also references any alternates that may apply to the electrical work.
The electrical sub-contractor will need to provide labor, materials, and equipment to complete the full scope of electrical work detailed in this document. Pricing terms, set-asides, funding sources, and other commercial considerations are not explicitly stated. Interested sub-contractors will need to respond to the solicitation by the stated deadline in order to be considered for this project.
View the file
Other files
Show 40 more
Latest 50 of 183 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985010
CHICOPEE, MASSACHUSETTS ISSUED FOR BID – 05/20/11
10090 ELECTRICAL 260001 - 1
SECTION 260001
ELECTRICAL
(Filed Sub-Bid Required)
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. General provisions of the Contract, including General and Supplementary Conditions and
Division 1 Specification Sections, apply to this Section.
B. Time, manner and requirements for submitting sub-bids is as described in Massachusetts
Military Division provided Division 0 documents.
1.2 SUMMARY
A. Work Included: Provide labor, materials and equipment necessary to complete the work of this filed sub-bid. Work is described by but not limited to the following specification sections and contract drawings.
B. Reference Specifications: The Work of the Filed-Sub is described in the following Sections:
1. Section 26 05 00 "General Requirements for Electrical Work"
2. Section 26 05 19 "Low Voltage Electrical Conductors"
3. Section 26 05 26 "Grounding"
4. Section 26 05 30 "Electrical Acceptance Testing"
5. Section 26 05 33 "Raceway and Fittings"
6. Section 26 05 50 "Installation of Electrical Equipment"
7. Section 26 05 60 "Installation of Wire and Cable"
8. Section 26 22 00 "Low Voltage Transformers"
9. Section 26 24 13 "Switchboards"
10. Section 26 24 16 "Panelboards"
11. Section 26 28 16 "Safety Switches"
12. Section 26 29 13 "Motor Controllers"
13. Section 26 51 00 "Lighting Fixtures"
C. Reference Drawings: The Work of this Filed Sub-Bid is shown on the following Contract
Drawings: GI001, E001, E601, ED101, EL101, EL102, EP101, EP102, EP651 & ES101.
1.3 ALTERNATES
A. Refer to Drawings and Section 012300, “Alternates” for requirements.
PART 2 - PRODUCTS – NOT USED
CHICOPEE ARMORY REHABILITATION MMD PROJECT NO. 985010
CHICOPEE, MASSACHUSETTS ISSUED FOR BID – 05/20/11
10090 ELECTRICAL 260001 - 2
PART 3 - EXECUTION – NOT USED
END OF SECTION 260001